Laserfiche WebLink
HC12 Public Works NIA Perform needs <br />In progress <br />DPW has utilized Y NIA WA <br />assessmentand <br />various sources to r <br />i riverine flood studies <br />progress with flood , <br />Ito Identify flood risk <br />hazard studies, i <br />and flood mitigation <br />including Puna r <br />Flood Study <br />projects In areas of <br />completed by l <br />need, Including but not <br />USACEandaSouth ! <br />limited to; Puna, North <br />Kohata lWaikoloa # <br />Xona, South Kohala <br />Village/Puakoi <br />sand Hamakua. <br />flood Study In <br />progress with a <br />contracted design <br />consultant. Further <br />studies to be <br />performed as <br />neededand <br />_ <br />feasible. 1 <br />HC13 Hawal'iState Hawal'i Coordinate with the <br />Unknown at <br />DOT County state to <br />the time of this <br />i <br />upgrade/retrofit <br />plan. <br />Singing Bridge to <br />address chronic <br />coastal flooding and <br />Impacts from tsunami. <br />1 <br />Tsunami project — <br />criticality of the DPW <br />bridge to get retrofitted <br />to prevent isolated <br />populations. <br />® TETRA TECH <br />21-32 2025 Hawai'l County Hazard Mitigation Plan <br />