My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0375.001 2024-2026
ClerkCouncil
>
Council Records
>
Communications
>
2024-2026
>
COM 0375.001 2024-2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2025 2:12:16 PM
Creation date
7/8/2025 3:03:23 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2024-2026
Communication
0375
Point
001
Author
Jeffrey W. Darrow, Planning Director
Communications - Referred To
LAAC
Document Relationships
AGE LAAC 2025-07-22 2024-2026
(Related)
Path:
\Council Records\Agendas\2024-2026\Legislative Approvals and Acquisitions Committee (LAAC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPLICANT'S REQUEST (CONT.) <br />■ THE DESIGN INCORPORATES 40 PARKING STALLS, INCLUDING TWO <br />HANDICAPPED -ACCESSIBLE STALLS, AND A 24-FOOT-WIDE DRIVEWAY WITH A <br />TURNAROUND AREA. THE FRONT YARD WILL BE LANDSCAPED, AND A <br />SCREENING HEDGE WILL BE PLANTED ALONG THE PROPERTY BOUNDARIES. <br />■ IF THE CHANGE OF ZONE REQUEST IS APPROVED, THE APPLICANT PLANS TO <br />FINALIZE CONSTRUCTION PLANS AND APPLY FOR PERMITS WITHIN 12 <br />MONTHS. CONSTRUCTION IS EXPECTED TO BEGIN WITHIN TWO YEARS OF <br />APPROVAL AND TAKE APPROXIMATELY 1 .5 TO 2 YEARS TO COMPLETE. <br />HOWEVER, DUE TO POTENTIAL DELAYS FROM PERMITTING, LABOR <br />AVAILABILITY, AND FINANCING, THE APPLICANT REQUESTS A 1 O-YEAR <br />TIMEFRAME TO COMPLETE THE PROJECT, WHICH IS ESTIMATED TO COST <br />AROUND $900,000. <br />c) <br />w <br />w <br />ry <br />c) <br />i <br />Z <br />Q <br />U <br />I <br />n <br />rl <br />
The URL can be used to link to this page
Your browser does not support the video tag.