Laserfiche WebLink
Dr. Holeka Goro Inaba, Council Chair <br />and Members of the County Council <br />County of Hawaii <br />June 20, 2025 <br />Page 4 <br />The Hilo Community Development Plan (CDP) identifies the area as "RM-4 <br />(multi -family residential)," which is consistent with the applicant's proposed multi- <br />family development. <br />Based on the preceding, the proposed CG-10 zoning would be consistent with the <br />General Plan. <br />All essential utilities and services are available to the site. Access to the subject <br />property is from Kino`ole Street, a County -owned and maintained minor arterial road <br />with an approximately 42-foot-wide pavement within a 60-foot-wide right-of-way. The <br />roadway in front of the property consists of two travel lanes and a central two-way left - <br />turn lane with no on -street parking available. The parcel's frontage is also improved with <br />curb, gutters, and sidewalks with grass strips (landscaping planter) between the concrete <br />sidewalk and curb. The applicant proposes to construct a 24-foot-wide driveway to <br />accommodate two-way ingress/egress and 40 parking stalls, two of which will be <br />handicapped accessible spaces. <br />Based on the proposed zoning, the Department of Public Works (DPW) <br />recommends that the applicant provide improvements to the property's Kino`ole Street <br />frontage consisting of, but not limited to, updating the landscape planter within the <br />concrete sidewalk by filling it with concrete in conformance with the current County <br />standard, and any required utility relocation, meeting the requirements of the Americans <br />with Disabilities Act. The current utility pole should not be impacted by the location of <br />the proposed driveway as stated in HCC Section 22-4.9. These improvements should be <br />at no cost to the County. Conditions of approval will be included to address the <br />preceding. <br />The proposed development is expected to generate fewer than 50 peak -hour <br />vehicle trips, so a Traffic Impact Analysis Report (TIAR) is not required. However, since <br />a zoning change does not compel the applicant to proceed with the proposed <br />development, a condition will be added requiring a TIAR if the property is developed <br />with a different permitted land use that exceeds 50 peak -hour trips. <br />County water is available to the property from an existing 8-inch waterline within <br />the Kino`ole Street and the subject parcel is currently serviced by an existing 5/8-inch <br />meter, which is limited to an average daily usage of 400 gallons per day. Conditions of <br />approval will require the applicant to secure and maintain water commitments for the <br />additional 23 units of water and construct and dedicate necessary water system <br />improvements to provide for potable and fire suppression water to the property for the <br />project. <br />