Laserfiche WebLink
A. The applicant(s), its successors or assigns ("Applicant") shall be responsible for <br />complying with all of the stated conditions of approval. <br />DWS. A water- eewnmitment deposit shall be paid te the DWS within 190 dayS ftOm d <br />effective date of this or-d' �eFdaaee with R-Ble 5 of the Pepat4ment of Water <br />gtipp�y's.] The [a]Applicant is responsible for maintaining valid <br />water commitments to support the proposed use until such time that required water <br />facilities charges are paid in full. <br />C. The [e]Applicant shall install a reduced pressure type backflow prevention assembly <br />within five (5) feet of the water meter on private property, which must be inspected and <br />approved by the Department of Water Supply prior to the issuance of a Certificate of <br />Occupancy. <br />D. Construction of the proposed development; or other developmenthise permitted b, + the <br />zoning district classification, shall be completed within five (5) years from the effective <br />date of this amended ordinance. The time during which re uired plans, reports, studies or <br />relevant ermit applications are under review for approvals by government agencies shall <br />not count towards the deadline established in the ordinance. To justify this tolling,the <br />Applicant shall provide evidence of the excluded time period to the planning department <br />for its review and approval, which shall consist of dates obtained from a government <br />agency website, permitting program, or office indicating when the required plans., reports, <br />studies, or permit applications were submitted, approved, denied, or returned by the <br />government agency. Prior to construction, the [ ] <br />A p licant shall secure Final Plan Approval for the proposed development from the <br />Planning Director in accordance with Section 25-2-70, Chapter 25 (Zoning Code), <br />Hawaii County Code. Plans shall identify all existing and/or proposed structures, paved <br />-2- <br />