My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2026-020 2024-2026
ClerkCouncil
>
Council Records
>
Ordinances
>
2026
>
ORD 2026-020 2024-2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2026 1:23:34 PM
Creation date
3/12/2026 9:55:48 AM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2024-2026
Year
2026
Ordinance
020
Effective Date
3/11/2026
Document Relationships
BIL 121 Draft 02 2024-2026
(Related)
Path:
\Council Records\Bills\2024-2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
evacuation purposes, it need not be paved but will be reasonably compact enough to <br />accommodate vehicles leaving the project site. The right of access across the emergency <br />evacuation access route, including the terms of its use, maintenance, relocation, and related <br />matters, will be recorded as an easement burdening TMK: 7-8-010:051 in favor of TMK: <br />7-8-010: 10 1. The improvements of this emergency evacuation access route, if necessary, <br />will be completed and the necessary easement will be recorded prior to issuance of a <br />Certificate of Occupancy for the first residential unit within the project area. <br />[F-]G. Access to the development shall meet with the approval of the Department of Public <br />Works. The roadway easement from the Mamalahoa Highway Bypass to the project shall <br />be constructed to County dedicable standards, including curbs, gutters and sidewalks, <br />meeting with the approval of the Department of Public Works, and [dedieate ] dedicated <br />to the County upon request. <br />[G-.]H. Any vehicular security gate shall be set back approximately 60 feet from any County <br />dedicated road. Whenever in use, the security gate shall be staffed to facilitate access by <br />emergency vehicles and personnel. <br />[W-]L All wastewater generated shall be disposed into the Keauhou Resort's sewer system owned <br />and maintained by the Keauhou Community Services, Inc., [41s]its successors or assigns. <br />[1-.]J. All development -generated runoff shall be disposed of on -site and shall not be directed <br />toward any adjacent properties. <br />[-J-.]K. A drainage study shall be prepared by a licensed civil engineer and submitted to the <br />Department of Public Works. The recommended drainage improvements shall be <br />constructed, meeting with the approval of the Department of Public Works, prior to <br />issuance of a Certificate of Occupancy for the first residential unit within the project area. <br />[K—.]L During construction, measures shall be taken to minimize the potential of both fugitive dust <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.