Laserfiche WebLink
reports, studies, or relevant permit applications are under review for approvals by <br /> government agencies shall not count towards the deadline established in the <br /> ordinance. To justify this tolling,the Applicant shall provide evidence of the <br /> excluded time period to the planning department for its review and approval, <br /> which shall consist of dates obtained from a government agency website, <br /> permitting program, or office indicating when the required plans,reports, studies, <br /> or permit applications were submitted, approved, denied, or returned by the <br /> government agency. <br /> [Dd [n fve f et future road wideni.,,, stfip along M,,no.,o Street shall be deli.,e ted <br /> en thy,, =tte eview The five f t wide future road <br /> ] A <br /> five(5) foot wide future road widening strip along the property's Manono Street <br /> frontage shall be subdivided and dedicated, at no cost to the County, when <br /> required by the Department of Public Works (DPW). The Applicant shall provide <br /> their pro-rata share for the construction of full improvements to the entire <br /> property frontage along Manono Street consisting of, but not limited to,pavement <br /> widening with concrete curb, gutter and sidewalk, drainage improvements and <br /> any required utility relocation meeting with the approval of the DPW. This pro- <br /> rata share for roadway improvements specified in this condition shall be <br /> determined by the DPW and shall become due and payable to the County of <br /> Hawai`i within six (6)months from the date that formal notice is served upon the <br /> Applicant by the DPW regarding a program for the installation of curb, gutter and <br /> sidewalk improvements along Manono Street. <br /> [&]G. <br /> - 3 - <br />