Laserfiche WebLink
collection systems for each community; (ii) package plants connected to the existing collection <br /> systems in each community; (iii) a maintenance contract model individual wastewater system <br /> program for both communities;and (iv)an operating permit model individual wastewater <br /> system program for both communities. Respondent may evaluate additional project options. <br /> b. Preliminary Engineering Report. Within 180 days of EPA's written <br /> approval of the Feasibility Report, have a licensed professional engineer who has experience <br /> with wastewater treatment, including individual wastewater systems and municipal treatment <br /> facilities, prepare and submit for EPA's approval a Preliminary Engineering Report for Pahala. <br /> Within 300 days of EPA's approval of the Feasibility Report, have a licensed professional <br /> engineer who has experience with wastewater treatment, including individual wastewater <br /> systems and municipal treatment facilities, prepare and submit a Preliminary Engineering <br /> Report for Na'alehu for EPA's approval.The Preliminary Engineering Reports shall describe the <br /> project details for each feasible option, including the planning area description, planning <br /> period,description of construction phases, owner and operator of the facilities, and location of <br /> facilities(including a map);the design parameters for each feasible option (for example, major <br /> unit processes,flow diagrams, pipe lengths,sizes and locations, design criteria);and project <br /> costs for each feasible option. <br /> c. Environmental Review. By July 30, 2024,submit for EPA's approval an <br /> Environmental Information Document("EID")for Pahala. Within 365 days of EPA's approval of <br /> the Na'alehu Preliminary Engineering Report submit for EPA's approval an EID for Na'alehu. <br /> Respondent shall have a qualified professional conduct environmental review of the feasible <br /> options identified in the Feasibility Evaluation Report as well as a no action alternative.The <br /> 7 <br />