My WebLink
|
Help
|
About
|
Sign Out
Home
RES 593 Draft 01 2024-2026
ClerkCouncil
>
Council Records
>
Resolutions
>
2024-2026
>
RES 593 Draft 01 2024-2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2026 3:12:22 PM
Creation date
6/5/2026 3:53:51 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2024-2026
Bill/Resolution
593
Draft
01
Introducer
Jennifer Kagiwada, Council Member
Referred To
GOEAC
Action 1
GOEAC-142: Recommended adoption - 06/16/26
Action 2
Council: Adopts Res. 593-26 & GOEAC-142 - 07/08/26
Reading Number
1
Reading Date
7/8/2026
Ayes
9-Galimba, Hustace, Inaba, Kagiwada, Kaneali'i-Kleinfelder, Kierkiewicz, Kimball, Onishi, and Villegas
Noes
0
Absent
0
Excused
0
Document Relationships
AGE COUNCIL 2026-07-08 2024-2026
(Related To)
Path:
\Council Records\Agendas\2024-2026\Council
AGE GOEAC 2026-06-16 2024-2026
(Original Version)
Path:
\Council Records\Agendas\2024-2026\Governmental Operations and External Affairs Committee (GOEAC)
COM 0936.000 2024-2026
(Related)
Path:
\Council Records\Communications\2024-2026
COM 0936.001 2024-2026
(Related)
Path:
\Council Records\Communications\2024-2026
REP GOEAC 142 2026-06-16 2024-2026
(Related)
Path:
\Council Records\Reports\2024-2026\Governmental Operations and External Affairs Committee (GOEAC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Na`alehu Community Cesspool Closure Project <br /> 31. Respondent shall take appropriate measures to fully and properly comply with the SDWA <br /> with respect to the Na`alehu Community Cesspools including constructing a secondary wastewater <br /> treatment facility to serve the Na`alehu community("NWalehu Wastewater Treatment Facility"),closing <br /> the Na`alehu Community Cesspools identified in Paragraph 22,and replacing and expanding the existing <br /> wastewater collection system serving Na`alehu Community.As soon as practicable,but no later than the <br /> deadlines specified herein;Respondent shall complete the following milestones to achieve compliance <br /> with the SDWA: <br /> a. By January 4,2018,complete Phase 1 ESA.The need to perform a Phase 2 ESA <br /> based on information discovered during Phase I shall be considered aforce majeure event,as defined in <br /> Paragraph 50 of this Consent Order. If a Phase 2 ESA is required,the County shall notify EPA of any <br /> anticipated delay in compliance with the requirements of this Consent Order following the procedures <br /> specified in Paragraph 51 of this Consent Order,and shall diligently and expeditiously pursue its <br /> completion.Upon notification of anticipated delay,EPA may approve in writing an extension of <br /> deadlines included in this Consent Order that are affected by the delay in accordance with Paragraph 52 <br /> of this Consent Order. <br /> b. By May 28,2018,hold initial public meeting with affected community; <br /> c. By June 27,2018,acquire land for Na`alehu Wastewater Treatment Facility; <br /> d. By October 25,2018,complete Preliminary Engineering Report; <br /> e. By October 5,2019,complete Environmental Assessment for Na`alehu <br /> Wastewater Treatment Facility in accordance with H.R.S.Chapter 343; <br /> f. By June 28,2020,complete design of Na`alehu Wastewater Treatment Facility. <br /> The Na`alehu Wastewater Treatment Facility shall be designed in accordance with good engineering <br /> practices and capable of servicing all residential properties currently connected to the three NA`alehu <br /> Community Cesspools,plus a minimum of thirty(30)additional properties,to be identified by <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.