My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 195 Draft 06 1998-2000
ClerkCouncil
>
Council Records
>
Bills
>
1998-2000
>
BIL 195 Draft 06 1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2019 8:58:11 AM
Creation date
5/10/2008 5:57:44 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
1998-2000
Bill/Resolution
195
Draft
06
Introducer
Leithead-Todd, Bobby Jean, Councilmember Planning Committee Chair
Referred To
COUNCIL
Action 1
Council: Bill 195, Draft 6 deferred to 2/21/02 mtg. - 2/06/02
Action 2
Council: Bill 195, Draft 6 passes 2nd & final rdg. - 2/21/02
Status
Adopted
Date To Mayor or Adoption Date
2/22/2002
Reading Number
2
Reading Date
2/21/2002
Ayes
6-Arakaki;Elarionoff;Leithead-Todd;Smith;Tyler III;Yagong
Noes
3-Chung;Jacobson;Pisicchio
Absent
0-
Excused
0-
Absent .
0-
Excused .
0-
File Code
ZNG/PN
Document Relationships
COM 0027.001 2000-2002
(Related)
Path:
\Council Records\Communications\2000-2002
COM 0027.065 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0027.065 2000-2002
(Related)
Path:
\Council Records\Communications\2000-2002
COM 0027.066 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0027.067 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0370.011 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0370.012 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
ORD 2002-023 2000-2002
(Related To)
Path:
\Council Records\Ordinances\2002
ORD 2002-023 2000-2002
(Related)
Path:
\Council Records\Ordinances\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works). Construction of the first stage shall be completed prior to the <br /> issuance of the County's approval of occupancy for any portion of the Phase II <br /> Area. The second stage shall consist of upgrading the preliminary vehicular <br /> access to dedicable standards, meeting with the approval of the Department of <br /> Public Works, and which shall be constructed concurrently with the development <br /> of the lands immediately fronting the roadway. Connector Road 2 shall be <br /> consistent with the approved future roadway circulation plan and shall be <br /> dedicated to the County of Hawaii upon completion. In conjunction with final <br /> subdivision approval for any portion of the Project Area (Phase I), the applicant <br /> shall record a covenant, meeting with the approval of the Planning Director, with <br /> the Bureau of Conveyances requiring the construction of Connector Road 2 in the <br /> manner and schedule prescribed above. <br /> <br /> N. Should the County, through its Department of Public Works, determine that the <br /> Road A/Volcano Highway/Keaau Bypass intersection is being adversely <br /> impacted, it [may] shall require that Connector Road 2 be constructed prior to the <br /> development schedule, as provided in Condition M ,above. "Adversely <br /> impacted" shall mean that the subject intersection has reached LOS "D" (a [45] 35 <br /> second control delay), as determined by a Traffic Impact Analysis Report (TIAR). <br /> The DPW may require the applicant to prepare the TIAR or prepare its own <br /> TIAR, at its sole discretion. Upon determination that there is an adverse impact, <br /> the first [state] stake of Connector Road 2, as defined in Condition M, above, shall <br /> be completed by the applicant within eighteen (18) months of notification by the <br /> County. The construction of Connector Road 2 shall be financially assured by <br /> bond or other means meeting with the approval of the director, prior to the County <br /> approval of occupancy of any portion of the project area. <br /> O. A drainage study, if required, shall be prepared and submitted for approval to the <br /> Department of Public Works prior to Final Subdivision Approval. Drainage <br /> -7- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.