My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2001-001 2000-2002
ClerkCouncil
>
Council Records
>
Ordinances
>
2001
>
ORD 2001-001 2000-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2013 1:52:23 PM
Creation date
5/10/2008 2:15:50 PM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2000-2002
Year
2001
Ordinance
001
Effective Date
1/2/2001
Document Relationships
BIL 345 Draft 01 1998-2000
(Related To)
Path:
\Council Records\Bills\1998-2000
BIL 345 Draft 02 1998-2000
(Related)
Path:
\Council Records\Bills\1998-2000
BIL 345 Draft 02 1998-2000
(Related To)
Path:
\Council Records\Bills\1998-2000
COM 0132.000 2000-2002
(Related)
Path:
\Council Records\Communications\2000-2002
COM 0373.000 2000-2002
(Related)
Path:
\Council Records\Communications\2000-2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. Should the Council adopt a Unified Impact Fees Ordinance settuig forth criteria <br /> for Imposition of exactions or the assessment of impact fees, conditions included <br /> herein shall be credited towazds the requirements of the Unified Impact Fees <br /> Ordinance <br /> K An initial extension of trine for the performance of conditions within the <br /> ordinance may be granted by the Planning Director upon the following <br /> circumstances <br /> 1 The non-performance is the result of conditions that could not have been <br /> foreseen or aze beyond the control of the applicant, its successors or <br /> assigns, and that aze not the result of their fault or negligence <br /> 2 Granting of the time extension would not be contrary to the General Plan <br /> or Zoning Code <br /> 3 Granting of the time extension would not be contrary to the onginal <br /> reasons for the granting of the change of zone <br /> 4 The time extension granted shall be for a penod not to exceed the period <br /> onginally granted for performance (i.e , a condition to be performed <br /> within one yeaz may be extended for up to one additional yeaz) <br /> 5 If the applicant should require an additional extension of time, the <br /> Planning Director shall submit the applicant's request to the County <br /> Council for appropriate action <br /> <br /> L. Should any of the conditions not be met or substantially complied with in a timely <br /> fashion, the Director may initiate rezoning of the subject area to its onginal or <br /> more appropriate designation <br /> -4- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.