Laserfiche WebLink
Ocerstions• <br /> 1. Document conditron of all sewer lines and repatr deficiencies. Increase inspection and <br /> cleaning by 20 <br /> FY 00-01 esdmste of 30 miles was based on 20% over FY 99-00 estimates. As of <br /> 1/31/01, miles of sewer Iinea cleaned/inspected are 11.75, which is equivalent to 39% of <br /> our current year's estimate. The Wastewater Division does not ezpect to realize our <br /> target goal of 30 miles of cleaning and inspection in this fiscal year due to the <br /> unexpected number of repairs which have been required. Refer to "Program <br /> Messnres, Point Repairs Completed". ' <br /> 2. Reduce preventable spills by 50%. <br /> FY 00-01 estimate of l was based on 50% over Fl' 99-00 estlmate. Currently, no <br /> preventable sewer spills have occurred. <br /> 3. Maintain acceptable rattng from Department of Health for all facittes. <br /> Total number of facilities included in this objective is five (5). Currently, we have <br /> received one (1) acceptable rating for our Papaikou WWTP. We are currently awaiting <br /> the results for the inspections of our Kapehu WWTP and Hilo WWTP. The ratings for <br /> Kulaimano WWTP and Kealskehe WWTP were unacceptable. <br /> 4. Establtsh realtsttc equtpment replacement plan and execute plan. <br /> FY 00-01 Estimate o[ Equl went Replacement ProJecfa Planned/Completed: <br /> Name of Project Location Status <br /> 1. Hilo WWTP Deferred <br /> 2. Primary Clarlller Pumps Hilo WWTP Complete <br /> <br /> 3. Hilo WTP Biotower Pumps Hilo WWTP Bid April 2001 <br /> <br /> 4. Hilo WTP Sec. Clarifier Pumps Htlo WWTP Complete <br /> 5. No. 3 Water Pumps Htlo WWTP Bid June 2001 <br /> 6. Replace HWWTP VF'D's (4) Hilo WWTP Deferred <br /> 7. Hilo WWTP Deferred <br /> 8. Renovation Project 19 Btd June 2001 <br /> <br /> 9. Equipment replacement Generator Sunnse Ridge SPS Deferred <br /> 10. Upgrade pomp controls Wazloa SPS 95% complete <br /> 11. Replace generator/ATS Hale Halawat SPS Completed <br /> 12. Installatlon of Antodialers for all All Facilttres Bid June 2001 <br /> facilities <br /> 5. Maintain laboratory quality control. <br /> We have passed our EPA Laboratory Quality Control Testing, which means we have <br /> met our objective for this year. <br /> <br />