Laserfiche WebLink
ACennntin~; <br /> 1. Transfer sewer billing to Department of Water Supply. <br /> No progress as of the date of this report, however, we are negotiating with s consultant <br /> to develop independent billing system, in-house. <br /> 2 Develop and integrate accounts payable software with MP2 <br /> A consultant contract was executed and is to progress to develop accounts payable <br /> software. We've decided to abandon MP2 and develop entire package, in-house. <br /> 3. Reduce delinquent accounts to 26% <br /> As of 1/31/01, delinquent accounts are 37% (Total outstandlug over 90/180 days/Total <br /> A/R). <br /> <br /> 4. Provide account balance notices to customers with delinquent balances. <br /> We Gave currently discontinued this service due to unanticipated problems we've <br /> experienced when this service was initiated. <br /> 5 Fill new Plant Electnc~an and Laboratory Techmcian I position. Extend lumted term <br /> positions for three Assistant WWTP Operators. <br /> Currently, our new Plant Electrican and Laboratory Technician I position have not <br /> been tilled. Extended limited-term appointments for two (2) of our Assistant WWTP <br /> Operators. <br /> <br /> 6. Install two network connections between Hilo and Kealakehe WWTP/SPS <br /> This project has been deferred. <br /> <br />