Laserfiche WebLink
d Traffic Sienals and Street L~~hts The budget for this section increases by <br /> $337,673 (26%). S~gmficant changes within each object code include <br /> l Electricity -increases by $231,600 (32%)because of higher energy <br /> charges Estimated shortfall for the current budget ~s $100,000 <br /> because of significant increases caused by higher cost of fuel Future <br /> budget is based on additional increases in energy costs, as well as the <br /> energy costs for new signals and street lights added to the system <br /> 2 :Miscellaneous contract services -decreases by $47,200 (21%) <br /> Anticipate using fuel tax funds for street I~ght duct work in Waikoloa <br /> 3 Fuels and lubricants -increases by $2,463 (29%) because of higher <br /> fuel costs <br /> 4 Highway materials -increases by $ ] 50,000 (50%) to purchase green <br /> LED signals (energy conservation conversion program) <br /> e Traffic Siens and Markines The budget for this section decreases by $18,740 <br /> (4%) Significant changes w~thm each object code include <br /> 1 Refuse disposal -decreases by $2,000 (40%) because of reduced <br /> regwrements for disposal of hazardous materials <br /> 2 Fuels and lubricants -increases by $1,850 (25%) because of higher <br /> fuel costs <br /> f. Pazkine Meters Unfunded <br /> <br /> 4 CONCLUSION <br /> The division's budget for FY 2001-2002 ~s $3,501,655, an increase of $423,143 (14%) <br /> from FY 2000-2001 The 14% increase in the overall Traffic Drv~sion budget for FY <br /> 2001-2002 ~s pnmazily from increases m the electricity charges ($231,600), the initial <br /> material cost of the LED energy conservation conversion program ($150,000), the cost of <br /> new striping egwpment to improve the quality and durab~hty of pavement markings <br /> ($110,000) and replacement equipment ($166,500) <br /> <br />