My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0215.001 2000-2002
ClerkCouncil
>
Council Records
>
Communications
>
2000-2002
>
COM 0215.001 2000-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2008 2:21:27 AM
Creation date
5/10/2008 2:28:16 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2000-2002
Communication
0215
Point
001
Author
Doreen Shirota, Department of Water Supply
Communications - Referred To
COUNCIL
Comments
FC-78: Recommends Bill 59 pass 1st reading - 05/15/01
Communications - File Code
FND/BND
Document Relationships
BIL 059 Draft 01 2000-2002
(Related)
Path:
\Council Records\Bills\2000-2002
REP FC 078 05/15/2001 2000-2002
(Related)
Path:
\Council Records\Reports\2000-2002\Finance Committee (FC)
REP FC 078 05/15/2001 2000-2002
(Related To)
Path:
\Council Records\Reports\2000-2002\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> o8i7o~2o01 o8:ai FAQ 961 8857 DEPT ~`ATER SUPPLY Dd%o ~tjooa <br /> ~ 1®~ ~1: 1~s project is situated in the Iaai l~is€~.ct mod. ~nor~ <br /> ~Y ~ ~c ~ ale area, This is the fi phase of our water sots devclo <br /> scheraae for this area. The pa~rpose is to explore fox ~®dv~ter soaa€se gavel®p~.~t at o~ <br /> e~ re~eroir site. `Tho will be aboatt 1000 fact deep. We are ~ticapati for a well <br /> will Terodaace at least 300 Upon co~pl~on of the sccon~d phase whic4t will be for the <br /> development snto a production source, this well will btconae the pri~aty so~arcc for this system, <br /> The exists sprite soaarce will becoane the saapplernental soairce. <br /> Thee construction cost is S 1,000.000. <br /> cae Metd~ Elorato~ W~Fi: Tl9is project is sateaated ~ our Sough. Hilo T3i~sct and <br /> more specif ca11y in ~e Papaikou area, Tfnis drallang phase is the first phi of rhea ell <br /> d+evelo~ proj~. T drli will about 1 X00 fit deep. We are antici for a well <br /> that ~ produce at least 100 Upon completion of the sect phase whack gill be for the <br /> develop~ne~t auto a produceion soa~rce, this well wait the ary souse for flee I.cie <br /> area., The exit spry source gill become the secon~ry source. <br /> The es ' c 'on asst is $1,000,000. <br /> Ipala ~xpl®rat®sy Well: °I~is project is sit~.tcd oar 1~Torth K.ohaba. Distract asad smmore <br /> specifi.~lly ~e ItdakapalaAl~iuli area. `This drilli~sg phase is the first phase of than well <br /> dcvelopnac3at project. T',be d~3liug will be about 500 fact deep and. at our existing res~voir <br /> site._ We ~tici for a well that will produce at least X00 gpin. Upon coffipletion of <br /> ~e secotad phase wlaach wall be for the develop~.erst into a production sow~rce, s wt;ll will <br /> the praraaary source f®r rhea system. The existat~ sole g soaarce bcsonae flee <br /> secon,dy source. <br /> Tlat d cor~on cost is $ 500,000. <br /> ~aha~la. p~r°a.~~ Nell No. Z: This project is satta~ed in our dC~i District ~xd toore <br /> specifically oaxr T'ahala sys°teffi. The drilling phase is ~e fiat phase of this welt d~elopnaent <br /> proj~t. This ptoj~t is ss Diet l'ahala l~seraroir Site. T w be alsoagt 1200 <br /> feet deep. We are ticipat~ng for a wit that will eat ~ ?00 Upon coa~,pletioa~ <br /> of the second phase which will be for flee developr.t into a production source, clai.s well will <br /> becoffie ~e backa~p well source to the fi~ well. <br /> 'T'he a cd pion cost is S 1,000,000_ <br /> . <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.