My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 060 Draft 04 2000-2002
ClerkCouncil
>
Council Records
>
Bills
>
2000-2002
>
BIL 060 Draft 04 2000-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2008 2:50:02 PM
Creation date
5/10/2008 2:29:54 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2000-2002
Bill/Resolution
060
Draft
04
Introducer
Bobby Jean Leithead-Todd, PC Chair
Referred To
COUNCIL
Action 1
Council: Bill 60, Draft 3, amended to Bill 60, Draft 4, and passed 2nd and final reading - 7/31/01
Status
Adopted
Date To Mayor or Adoption Date
8/2/2001
Reading Number
2
Reading Date
7/31/2001
Ayes
9-Arakaki;Chung;Elarionoff;Jacobson;Leithead-Todd;Pisicchio;Safarik;Tyler III;Yagong
Noes
0-
Absent
0-
Excused
0-
File Code
ZNG/KN
Document Relationships
AGE COUNCIL 07/31/2001 2000-2002
(Related)
Path:
\Council Records\Agendas\2000-2002\Council
COM 0219.005 2000-2002
(Related)
Path:
\Council Records\Communications\2000-2002
COM 0219.005 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
ORD 2001-065 2000-2002
(Related To)
Path:
\Council Records\Ordinances\2001
ORD 2001-065 2000-2002
(Related)
Path:
\Council Records\Ordinances\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approval for Phase 3, if required by the Department of Water Supply. <br /> [F]E. The property shall be zoned in three phases. Phase 1 shall consist of <br /> approximately 35 acres. Final subdivision approval of all increments within <br /> Phase 1, or final plan approval for all developments within Phase 1, whichever is <br /> applicable, shall be secured within ten (10) years from the effective date of this <br /> change of zone ordinance. Phase 2 shall consist of approximately 25 acres and <br /> shall be developed within ten (10) years from the completion of Phase 1 <br /> development, as determined by the Planning Director. Phase 3 shall consist of <br /> approximately 30 acres and shall be developed within ten (10) years from the <br /> completion of Phase 2 development, as determined by the Planning Director. <br /> <br /> [G]F. The applicant shall adhere to the overall landscaping master plan and <br /> development design manual approved by the Planning Director in accordance <br /> with Ordinance No. 92-85. <br /> <br /> [H]G. The applicant shall install a conduit and loop detectors for a traffic signal and <br /> channelization at the intersection of Makala Boulevard and Luhia Street <br /> concurrent with the development of Phase 1 if required by the County Department <br /> of Public Works (DPW) or the State Department of Transportation (DOT). The <br /> applicant will monitor traffic conditions at the Makala Boulevard and Luhia Street <br /> intersection throughout the development of Phase 1 and will install a traffic signal <br /> light when conditions are warranted. Additionally, following the State's widening <br /> of Queen Kaahumanu Highway to a four-lane highway, the applicant will <br /> complete further channelization of Makala Boulevard, at its intersection with <br /> Queen Kaahumanu Highway, including a second left-turn lane on the mauka <br /> bound approach. <br /> [I]H. Prior to the development of Phases 2 and/or 3, upon request by the DPW or the <br /> DOT, the applicant shall submit a current Traffic Impact Analysis Report (TIAR) <br /> -4- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.