My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 280 Draft 05 1996-1998
ClerkCouncil
>
Council Records
>
Bills
>
1996-1998
>
BIL 280 Draft 05 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2021 1:22:45 PM
Creation date
5/10/2008 7:47:11 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
1996-1998
Bill/Resolution
280
Draft
05
Introducer
Gary Safarik & J. Curtis Tyler, III, Council Members
Referred To
PWIRC
Action 1
Presented: PWIRC - 6/1/04
Action 2
PWIRC-52: Recommends passage of Bill 280, Draft 5, on first reading - 06/01/04
Action 3
Council: Amends Bill 280, Draft 5, to Draft 6 - 6/16/04
Document Relationships
AGE COUNCIL 06/16/2004 2002-2004
(Related)
Path:
\Council Records\Agendas\2002-2004\Council
AGE PWIRC 06/01/2004 2002-2004
(Related)
Path:
\Council Records\Agendas\2002-2004\Public Works & Intergovernmental Relations Committee (PWIRC)
COM 0042.012 2002-2004
(Related To)
Path:
\Council Records\Communications\2002-2004
COM 0042.013 2002-2004
(Related To)
Path:
\Council Records\Communications\2002-2004
COM 0042.013 2002-2004
(Related)
Path:
\Council Records\Communications\2002-2004
COM 0042.014 2002-2004
(Related To)
Path:
\Council Records\Communications\2002-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b) Within sixty (60) days of receiving a complete application for a sign permit, and unless <br /> the applicant has provided written consent for a time extension, the director shall either: <br /> (I) Issue the sign permit in writing, if: <br /> (A) After an examination of the plans, specifications, and other data, the director <br /> finds that the sign(s) that is the subject of the application conforms in every respect with the <br /> requirements of this chapter and all applicable statutes and ordinances; <br /> (B) The application has been reviewed and approved by the electrical inspector, if <br /> required pursuant to section 3-15; <br /> (C) The application has been reviewed by the Kailua Village Design Commission, <br /> if required under Article 2; and <br /> (D) Applicable sign permit fees have been received; or <br /> (2) Reject the sign permit in writing, if the sign that is the subject of the application <br /> fails in any way to conform with the requirements of this chapter. <br /> <br /> (c) In case of a rejection, the director shall: <br /> (I) Specify in writing the section or sections of this chapter with which the <br /> application is inconsistent; and <br /> (2) Provide the applicant with information about any applicable variance or appeal <br /> processes contained in this chapter or otherwise permitted by law. <br /> Section 3-19. Permit contents and record. <br /> (a) Permits shall be numbered and shall contain the following information: <br /> (I) The permit number and the date of issuance; <br /> (2) The name of the property owner and sign owner; <br /> (3) The location of the sign(s), including tax map key number; and <br /> (4) In the case of a temporary sign or banner, the date of expiration of the permit. <br /> (5) The amount of any fees paid. <br /> (b) fhe director shall maintain for public inspection a record of all permits issued. <br /> Section 3-20. Inspection upon completion. <br /> A permittee shall, upon completion of the installation, construction, erection, relocation or <br /> alteration of the sign, notify the director who shall inspect the sign for compliance with the <br /> permit and this chapter. The director may revoke any sign permit issued upon failure of the <br /> holder of the permit to comply with any provision of this chapter. <br /> Section 3-21. Time limit on permit. <br /> If the work authorized under a sign permit is not started within twelve months after the date of <br /> issuance, or if work is suspended for more than ninety calendar days, the permit shall be void <br /> 14 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.