My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0216.000 1996-1998
ClerkCouncil
>
Council Records
>
Communications
>
1996-1998
>
COM 0216.000 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2015 9:11:34 AM
Creation date
5/10/2008 7:47:44 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
1996-1998
Communication
0216
Point
000
Author
Stephen K. Yamashiro, Mayor
Communications - Referred To
PC
Comments
PC-38: Recommends passage of Bill 64 on 1st reading - 04/01/97 (PC 022) Council: Passes Bill 64 on 1st reading and adopts PC-38 - 04/23/97 (MB 742) Council: Passes Bill 64 on 2nd and final reading - 5/7/97 (MB 937)
Communications - File Code
PLG
Document Relationships
AGE COUNCIL 04/23/1997 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Council
AGE COUNCIL 05/07/1997 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Council
AGE PC 04/01/1997 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Planning Committee (PC)
BIL 064 Draft 01 1996-1998
(Related To)
Path:
\Council Records\Bills\1996-1998
BIL 064 Draft 01 1996-1998
(Related)
Path:
\Council Records\Bills\1996-1998
ORD 1997-064 1996-1998
(Related To)
Path:
\Council Records\Ordinances\1997
REP PC 038 04/01/1997 1996-1998
(Related To)
Path:
\Council Records\Reports\1996-1998\Planning Committee (PC)
REP PC 038 04/01/1997 1996-1998
(Related)
Path:
\Council Records\Reports\1996-1998\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
* Employee facilities. Provide amenities for employees such as a fitness room. <br /> * Garden setting. Incorporate the existing garden, greenhouses and landscaping <br /> into a lush and inviting setting for visitors and island residents. <br /> * Accessibility. Locate in a convenient and easily accessible area. <br /> <br /> 6. Concurrent request for Change of Zone: Big Island Candies, Inc. has submitted an <br /> application for a Change of Zone by changing the district classification from Single <br /> Family Residential (RS-10) to General Commercial (CG-20) for the subject property in <br /> order to accommodate the proposed new facility and relocate its operations. The <br /> Change of Zone request is being processed concurrently with this amendment to the <br /> General Plan LUPAG Map. <br /> 7. Conceptual Plan: Big Island Candies, Inc. proposes to construct a main two-story <br /> building which will have the ground level for retail and production activities and the <br /> second level for office, storage and employee facilities, including a fitness room. <br /> Similar to the existing facility, visitors and residents will be able to view the production <br /> operations from the retail area through glass walls. The proposed main building will <br /> focus on candy and baked products. A courtyard and covered walkway will connect <br /> the main building to an auxiliary retail wing for retailing other types of products <br /> (e.g., t-shirts). The total gross floor area of the proposed main building will be <br /> approximately 29,700 square feet. The auxiliary building will be approximately 4,000 <br /> square feet to accommodate for up to four retail businesses at 1,000 square foot per <br /> bay. The height of the proposed new facility will be 35 feet. <br /> 8. Hours of Operation: Normal hours for production operations will be from 7:30 a.m. <br /> to 4:00 p.m., Monday through Friday, with possible exceptions during peak holiday <br /> periods. Retail operations will be from 8:30 a.m. to 5:00 p.m., seven days a week. <br /> 9. Employees: Big Island Candies, Inc. currently employs 75 persons full-time. An <br /> additional 15 persons are employed seasonally or part-time especially during peak <br /> periods. With the new facility, there may be an additional 20 full-time positions. The <br /> number of employees working on a shift at any given time will be a projected <br /> maximum of 62 persons. <br /> -3- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.