My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 093 Draft 02 2002-2004
ClerkCouncil
>
Council Records
>
Bills
>
2002-2004
>
BIL 093 Draft 02 2002-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2008 9:00:40 PM
Creation date
5/10/2008 12:13:17 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2002-2004
Bill/Resolution
093
Draft
02
Introducer
Bobby Jean Leithead-Todd, Councilmember Chair, Planning Committee
Referred To
PC
Action 1
Council: Amends Bill 93, Draft 2, to Draft 3 - 05/21/03
Document Relationships
AGE COUNCIL 05/21/2003 2002-2004
(Related)
Path:
\Council Records\Agendas\2002-2004\Council
BIL 093 Draft 03 2002-2004
(Related To)
Path:
\Council Records\Bills\2002-2004
BIL 093 Draft 03 2002-2004
(Related)
Path:
\Council Records\Bills\2002-2004
COM 0210.003 2002-2004
(Related)
Path:
\Council Records\Communications\2002-2004
COM 0210.003 2002-2004
(Related To)
Path:
\Council Records\Communications\2002-2004
COM 0210.004 2002-2004
(Related To)
Path:
\Council Records\Communications\2002-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. A flood study of the project site shall be prepared and submitted for review and <br /> approval to the Department of Public Works prior to submittal of plans for Ylan <br /> Approval review. If required by the Department of Public Works, the applicant <br /> shall submit to the Federal Emergency Management Agency (FEMA) a Letter of <br /> Map Change prior to the issuance of a Certificate of Occupancy for any portion of <br /> the proposed commercial development. The applicant shall comply with <br /> applicable flood zone regulations for structures in flood zones. <br /> 1 L A drainage study of the subject property shall be prepared and submitted for <br /> review and approval to the Department of Public Works prior to submittal of <br /> plans for subdivision review. Drainage improvements, if required, shall be <br /> constructed or bonded meeting with the approval of the Department of Public <br /> Works prior to the issuance of Pinal Plan Approval. <br /> I. Driveway connections from the project site to the Mamalahoa Highway and <br /> Konawaena School Road shall meet with the approval of the Department of <br /> Public Works. Access to or from the Mamalahoa Highway shall be limited to <br /> right-turn movements only unless modified with the approval of the Department <br /> of Public Works. The applicant shall also provide any traffic improvements that <br /> may be deemed necessary by the Department of Public Works after review of a <br /> revised'Traflic Impact Analysis Report (LIAR) that is required under Condition E, <br /> prior to the issuance of a Certificate of Occupancy for airy commercial use on the <br /> project site. <br /> <br /> .I. The project site's frontage with Mamalahoa I Iighway and Konawaena School <br /> Road shall be improved with pavement widening and transitions with curb, gutter, <br /> sidewalk, drainage improvements and any relocation of utilities in a manner <br /> meeting with the approval of the Department of Public Works. "Chew roadway <br /> improvements shall be completed pursuant to a schedule meeting with the <br /> -5- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.