HomeMy WebLinkAboutCOM 0455.000 2002-2004Harry Kim
Mayor
COUNTY OF HAWAII
25 Aupuni Street, Room 215 • Hilo, Hawaii 96720-4252 • (808) 961-8211 • Fax (808) 961-6553
KONA: 75-5706 Kuakmi Highway, Suite 103 • Kailua-Kona, Hawai'i 96740
(808) 329-5226 • Fax (808) 326-5663
December 30, 2003
Honorable James Y. Arakaki, Chairman
and Members of the County Council
Dixie Kaetsu
Managing Director
Peter L. Hendricks
Deputy Managing Director
County of Hawaii
25 Aupuni Street
ti
Hilo, HI 96720
OC)
CQ
s Z,
Z
�,
Dear Chairman Arakaki and Members:
cD
Change of Zone Application (REZ 03-025) 3
Applicant: Lehua Lam, LLC ry
Request: A -5a to RS -7.15
Tax Map Key: 7-5-20:71 and 72
State Land Use Boundary Amendment Application (SLU 03-010)
Request: Agricultural to Urban
Change of Zone Application (REZ 03-024)
Request: A -la to CV -10
Applicant: Verizon Hawaii, Inc.
Tax Map Key: 7-4-8:20
State Land Use Boundary Amendment Application (SLU 03-011)
Request: Agricultural to Urban
Change of Zone Application (REZ 03-026)
Request: A -5a to RS -15
Applicant: Uluwehi Properties, LLC
Tax Map Key: 7-5-17:21
Change of Zone Application (REZ 02-016)
Applicant: Thomas A. Tuso
Request: Agricultural (A -5a) to Family Agricultural (FA -3a)
Tax Map Key: 7-5-12:38
As required by Chapter 4, Sec. 6-4.3(C), Hawaii County Charter, transmitted herewith for the County
Council's consideration and action are the Planning Commission's letters and enclosures regarding the
above -referenced requests.
ncerely,
Harry Kim
Mayor
btll ZC
Enclosures
cc: Planning Department
Comm. NO. �—
Ref. To: 1� L
Ref. Date
Harry Kim
Mayor
DeCHnber 30, 2003
County of Hawaii
PLANNING COMMISSION
101 Pauahi Street, Suite 3 • Hilo, Hawaii 96720-3043
(808)961-8288 • Fax (808)961-8742
Honorable James Y. Arakaki, Chairman
and Members of the County Council
County of Hawaii
25 Aupuni Street
Hilo, HI 96720
Dear Chairman Arakaki and Members:
Change of Zone Application (REZ 03-025)
Applicant: Lehua Lani, LLC
Request: A -5a to RS -7.5
Tax Man Key: 7-5-20:71 and 72
The Planning Commission, after a duly held public hearing on December 4, 2003, voted to
recommend for your approval the proposed legislative bill to change the district classification for
approximately 10.1 acres of land from the Agricultural 5 -acre (A -5a) to a Single Family
Residential — 7,500 square foot (RS -7.5) zoned district. The property is located along the east
(mauka) side of Alii Drive, between the Alii Lani Condominium and the Alii Garden
Marketplace and across from the Kona By The Sea and Kona Riviera Villas condominium
complexes, Puapuaa 2Id, North Kona, Hawaii.
The Commission concurs with the following Planning Director's reasons for recommending
favorable consideration of the change of zone:
The applicant is requesting a Change of Zone from an Agricultural (A -5a) zoned
district to a Single Family Residential (RS -7.5) zoned district to develop a 58 -unit single
family Planned Unit Development (PUD) for approximately 10.1 acres of land. The
applicant intends to construct 58 single-family residential dwellings on lots ranging from
4,000 to 6,000+ square feet, and about a %z acre open space/archaeological preserve park
adjacent to the planned Alii Parkway.
Honorable James Y. Arakaki, Chairman
and Members of the County Council
Page 2
In order to consider an area for any type of zoning designation, the applicable
goals, policies and standards of the General Plan must be adequately addressed. It is only
through such a comprehensive policy analysis approach that evaluations and decisions
can be made to better time and stage developments to achieve growth determined by the
General Plan and related planning documents. The implications of these evaluations and
decisions must be also considered as they may have an impact on similar areas in the
County.
The Change of Zone request from Agricultural (A -5a) to a Single Family
Residential (RS -7.5) zoned district will conform to, among others, the Land Use (Single
Family Residential) and Housing elements of the General Plan. The Land Use Pattern
Allocation Guide (LUPAG) Map component of the General Plan is a representation of the
document's goals and policies to guide the coordinated growth and development of the
County. It reflects a graphic depiction of the physical relationship among the various land
uses. The LUPAG Map establishes the basic urban and non -urban form for areas within
the County. The subject area is designated Medium Density Urban and Urban Expansion
Area. The Medium Density Urban designation may allow "Village and neighborhood
commercial and residential (up to 35 units per acre) and related functions." Urban
Expansion Area allows for a mix of high density, low density, industrial and/or open
designations in areas where new settlements may be desirable, but where specific
settlement pattern and mix of uses have not yet been determined. Within areas designated
for development as resorts, portions of the resort area may be included in the urban
expansion area. The proposed residential development would be consistent with these
General Plan land use designations.
The parcel to the north is zoned RM -2 and is developed with the Alii Lam
condominium. The parcel to the south is zoned A -5a and contains the Alii Garden
Marketplace. Alii Drive is located immediately to the west (makai) of the subject parcel.
Parcels on the makai side of Alii Drive are zoned RM -1.5 and are developed with the
Kona Riviera Villa and Kona by the Sea condominium projects. The proposed Alii
Parkway forms the upper boundary of the subject site. Mauka of the proposed Alii
Parkway, the area is zoned RS -10 and is developed with the Kahakai Estates
single-family residential project. Therefore, a favorable recommendation of this change
of zone request will be consistent with the emerging land use pattern being established
within this portion of North Kona.
Honorable James Y. Arakaki, Chairman
and Members of the County Council
Page 3
To allow the 4,000 to 6,000 -square foot sized lots and lesser setbacks within the
RS -7.5 zoned district, the applicant intends to apply for a PUD permit after the change of
zone is approved. The Planned Unit Development (PUD) is intended to encourage
comprehensive site planning that adapts the design of the development to the land, by
allowing diversification in the relationships of various uses, buildings, structures, open
spaces and yards, building heights, and lot sizes in planned building groups, while still
insuring that the intent of the Zoning Code is observed. The minimum land area required
for a PUD is two acres.
The property is currently not used for any agricultural activities. The Federal
Emergency Management Agency Flood Insurance Rate Map (FIRM) designates the
property as Zone "X", an area determined to be outside of the 500 -year flood plain. The
property slopes from its eastern to its southern boundary at a grade between two and four
percent. The elevation of the site varies from approximately 40 feet at the southeastern
corner to less than 20 feet along the Alii Drive frontage. The property is unclassified by
the Agricultural Lands of Importance to the State of Hawaii (ALISH) System. Soils
within the property and surrounding area are classified as "E" or "Very Poor" for
agricultural productivity by the Land Study Bureau. While the potential for intensive
and/or extensive agricultural uses may exist, the soil conditions within the property and
surrounding area would preclude such intensive agricultural activities from being
conducted.
The access to the project site will be from Alii Drive. According to the
Department of Public Works (DPW), Alii Drive fronting the property is a two-lane
County road with 20 -foot -wide pavement in good condition, with 6 -foot -wide paved
shoulders, all within an approximately 50 -foot -wide right-of-way. According to the
General Plan, Alii Drive shall be improved to a 60 -foot wide right-of-way. As such, the
DPW requires the applicant to provide for the future road widening by dedicating one-
half of the difference between the existing width of Alii Drive and 60 feet to the County
as a condition of final subdivision approval, or issuance of a certificate of occupancy.
The DPW, in the interests of pedestrian and bicyclist safety, requires the applicant to
provide a paved shoulder extending to the right-of-way property line. The DPW may
require pavement transitions, signs and markings, drainage improvements, and relocation
of utilities. The DPW also requires the applicant to locate utility meter and pressure
reducing valve vaults out of the right-of-way.
Honorable James Y. Arakaki, Chairman
and Members of the County Council
Page 4
The DPW requires that the applicant's access to Alii Drive provide adequate
sight distances, be limited to one approach, and be located to avoid turning conflicts with
existing developments, all of which must meet with the approval of DPW. The DPW
requires that the applicant provide a minimum of 45 feet of storage and turnaround on the
Alii Drive side of any gated vehicle access. All driveway connections shall conform to
Chapter 22, Streets and Sidewalks, of the Hawaii County Code.
The eastern boundary of the subject parcel is or will be the Kahului to Keauhou
Parkway (Ali`i Highway) Phase 1 right-of-way. When this report was prepared,
acquisition of the right-of-way had not been completed. The DPW requires that the
subject property owner shall be required to provide any additional right-of-way, at no cost
to the County, as established by and upon completion of the final right-of-way maps by
DPW's consultant. The DPW requires that vehicular access to the individual lots shall
not be from any major collector or arterial roadways. An emergency vehicular egress,
with a breakaway gate, may be provided to Alii Highway, meeting with the approval of
DPW.
To serve the subject property and intermediate properties, the DPW requires that
the applicant extend the existing two-way left turn lane improvements along the Alii
Drive frontage of the subject property. The two-way left tum land improvements shall
consist of, but not limited to, pavement widening, drainage improvements, street lights,
signs and markings and any relocation of utilities, which must all meet with the approval
of the DPW. The DPW also requires the applicant to construct and dedicate all
improvements at no cost to the County.
The DPW requires that all roadways within the proposed development follow the
guidelines incorporated in the Hawaii Statewide Uniform Design Manual for Streets and
Highways. The DPW requires that these roadways also meet the requirements of DPW.
The DPW requires concrete curbs, gutters, and sidewalks, in areas of pedestrian traffic.
The site is serviced by County water and wastewater systems. Electrical,
telephone and cable services are available to the site. Police are located within 3 miles,
and fire facilities are located within 5 miles. Kona Hospital is about 7 miles from the
property.
The Civil Defense Agency has stated that the proposed site is beyond the
acceptable range of the nearest Emergency Warning Siren, and recommends that the
developer purchase and install an approved Emergency Outdoor Warning Siren.
Honorable James Y. Arakaki, Chairman
and Members of the County Council
Page 5
The subject request is not contrary to Chapter 205A, Hawaii Revised Statutes,
relating to Coastal Zone Management Area. The property is situated within the Special
Management Area. It is located approximately 300 feet from the coastline and therefore,
will not be impacted by coastal hazard and beach erosion. There are no identified
recreational resources, public access to the shoreline or mountain areas, scenic and open
space preserves, coastal ecosystems, marine resources or other natural and environmental
resources in the project area. Thus, the proposed request and use of the property will not
adversely impact those resources. Vegetation on the site consists primarily of introduced
exotics. The site and much of the surrounding areas have or are being developed with
structures, and it is not anticipated that endangered or threatened candidate species of
flora or fauna are located within the subject property. The project area has not been
identified as containing any significant botanical or biological habitat.
An archaeological inventory survey of the subject site was performed by Paul H.
Rosendahl, Inc., (PHRI), and a report was prepared in July 2003 which indicated the
following: "During the survey 14 sites and 36 component features were identified. These
included wall, enclosure, C -shape, terrace, concrete structure, mound, platform, modified
outcrop, and well features. These features are prevalent in both the North Kona District
and the island of Hawaii. The functions of these features were largely for habitation,
agriculture, possible boundary, and burial. Of the 9 recorded terraces, 3 were thought to
be paepae or sleeping houses, while the remaining were thought to be agricultural in
nature. Of the 7 enclosures, 4 were thought to be related to animal/agricultural use, while
the remaining appeared to be associated with habitation. There were 5 platforms
identified, and all appeared to be of the late prehistoric or contact -era age. When tested, 2
of the features (features D & E at Site 16116) confirmed the presence of human remains.
The others did not. Five mounds were identified, and these appeared to be agricultural in
function, consistent with the Kona Field System. The 2 concrete features appeared to be
of recent vintage and for animal husbandry. The 4 walls, the 2 modified outcrops, and the
single C -shape appear to also have agricultural function. The C -shape appeared to
provide shelter associated with the agricultural activity. There was one well found of the
site. This well had a concrete and basal `apron' around it, a windmill tower, and an
engine shed. It thus appeared to be of recent vintage. Relative to the sites on the subject
property, the survey concluded that 13 of the 14 sites as being significant solely for their
informational content and that no further work was recommended for these sites. The
remaining site (16116), which consisted of 2 burial platforms, was recommended for
preservation `as is,' with possible landscaping. If they have to be relocated, the survey
recommended that further data collection be done. The applicant intends to preserve this
site and incorporate it as part of its landscaping/open space feature. In that event, a Burial
Treatment Plan for this site will be prepared and submitted to the Hawaii Burial Council
for its review and approval. The plan will essentially call for the establishment of a
Honorable James Y. Arakaki, Chairman
and Members of the County Council
Page 6
landscaped buffer surrounding the site." The applicant believes that with the approved
mitigation, the archaeological impacts of the project will not be significant. The
applicant noted that should there be any inadvertent finds during construction of the
project, work will be stopped until clearance from the Planning Department has been
secured. The archaeological inventory survey prepared by PURI was originally
conducted in 1991 and was updated in July 2003. To date, there is no record that the
archaeological inventory survey had been submitted to the State of Hawaii Department
of Land and Natural Resources -Historic Preservation Division (DLNR-HPD) for
acceptance and/or that the DLNR-HPD has approved a preservation and mitigation plan.
In view of the recent Hawaii State Supreme Court's "PASH" and "Ka Pa'akai O
Ka'Aina " decisions, the issue relative to native Hawaiian gathering and fishing rights
must be addressed. These rights must be addressed in terms of the cultural, historical,
and natural resources and the associated traditional and customary practices of the site.
Investigation of valued resources: The applicant presented the following
information from which the Planning Commission can determine the valued cultural,
historical, and natural area within the sought for the rezoning: archeological
reconnaissance survey, including a historical survey of documentary records; botanical
study; and faunal study. According to the applicant, since the subject site is not adjacent
and/or nearby to the shoreline, and since there are no known identified trails going
through the site, fishing and/or coastal access should not be an issue. According to the
applicant, vegetation in this area consists primarily of introduced exotics. These include
kiawe (Prosopis pallida), `opiuma (Pithecellobium dulce), African tulip (spathodea
campanulata), koa-haole (Leucaena glauca), monkeypod (Samanea saman), lantana
(Lantana camara), guinea grass (Panicum maximum), bitter yam (Discorea bulbifera),
and other exotic grasses and weeds. During a field survey by the applicant's
archaeological consultant, one indigenous plant, ilima (Sida fallax) was noted. The
applicant stated that it would not be likely that rare or endangered plant life would be
found on the site, and that since the site and much of the surrounding areas have
structures or are being developed with structures, it did not appear likely that rare or
endangered animal life would be found on the site.
The valuable cultural, historical, and natural resources found in the area sou hght for
the Rezoning: Relative to the archeological and cultural sites on the subject property, the
archeological inventory survey concluded that 13 of the 14 sites as being significant
solely for their informational content and that no further work was recommended for
these sites. The remaining site (16116), which consisted of 2 burial platforms, was
recommended for preservation `as is,' with possible landscaping.
Honorable James Y. Arakaki, Chairman
and Members of the County Council
Page 7
Possible adverse effects or impairment of valued resources: The setting of the
burials would be changed from the present condition of a relative natural setting to one
where modern single family residential dwellings will be nearby. Further, the setting for
the burials would be further altered by the close proximity of the future Kahului to
Keauhou Parkway (Ali`i Highway) Phase 1 right-of-way, which would be located mauka
of the burial sites. If the burial platforms have to be relocated, the survey recommended
that further data collection be done. Another concern would be whether access to the
burial sites by descendants would be possible through the private roads of this
development.
Feasible actions to protect native Hawaiian rights: The applicant intends to
preserve the burial sites and incorporate it as part of its landscaping/open space feature.
A Burial Treatment Plan for this site must be prepared and submitted to the Hawaii
Burial Council for its review and approval. The applicant has stated that the plan would
essentially call for the establishment of a landscaped buffer surrounding the site. The
applicant has stated that with the approved mitigation, the archaeological impacts of the
project will not be significant. Regarding the access to the burials on the project site by
descendants, the applicant has said that descendants will be allowed unfettered access to
the burial site, as will be reflected in the approved Burial Treatment Plan. There is no
record that DLNR-HPD has approved a preservation and mitigation plan, which would
include the Burial Treatment Plan. Conditions of approval will be included relating to
valued cultural resources to insure that impacts to these resources are minimized, and that
traditional and customary Hawaiian rights to these resources are continued.
Based on the above findings, the approval of the Change of Zone request from an
Agricultural (A -5a) to a Residential (RS -7.5) zoned district would result in an appropriate
land use pattern that will further benefit the public.
For your favorable consideration, an amendment to Section 25-8-3 (North Kona Zone Map), of
the County Zoning Code is transmitted.
Honorable James Y. Arakaki, Chairman
and Members of the County Council
Page 8
We are enclosing copies of the staff Background and Planning Director's Recommendation for
your information.
Sincerely,
Fred Galdones, Chairman
Planning Commission
Llehualani02PC
Enclosures
cc: Mr. Sidney Fuke
Mr. Randall Farleigh
Department of Public Works
Department of Water Supply
Planning Department - Kona
Department of Land & Natural Resources-HPD/Kona
Rodney Haraga, Director/DOT-Highways, Honolulu
1zhual. iCOZSMAAm-11/17/03
COUNTY OF HAWAII PLANNING DEPARTMENT
BACKGROUND REPORT
LEHUA LANI, LLC
CHANGE OF ZONE APPLICATION (REZ 03-025)
SPECIAL MANAGEMENT AREA USE PERMIT (SMA 03-015)
LEHUA LANI, LLC has submitted an application for a Change of Zone for 10.1 acres
from an Agricultural 5 -acre (A -5a) to a Single Family Residential - 7,500 square foot (RS -7.5)
District and a Special Management Area (SMA) Use Permit to allow the development of a 58 -
unit single family residential house and lot subdivision and related improvements. The property
is located along the east (mauka) side of Alii Drive, between the Alii Lani Condominium and the
Alii Garden Marketplace and across from the Kona By the Sea and Kona Riviera Villas
condominium complexes, Puapuaa 2nd, North Kona, Hawaii, TMK: 7-5-20:71 and 72.
PROPOSED DEVELOPMENT
Request: The applicant is requesting the change of zone and the Special Management
Area Use Permit to allow a 58 -unit single family residential house and lot development
through the Planned Unit Development (PUD) process. The proposed development
includes:
• Single-family housing: 58 single-family residential homes on lots ranging in size from
4,000 to 6,000+ square feet. The applicant is proposing four basic home designs,
varying between one and two stories in height. None of the structures are planned to
exceed the maximum height limit of 35 feet. Some of the structures will be set back
less than the required 15 feet from the front and rear property lines and 8 feet along
the sides. Since the lots are proposed to be less than 7,500 square feet and the
setbacks less than the minimum requirements for the RS -7.5 district, the applicant
intends to submit a PUD application after the Change of Zone application has been
approved.
• A'/nacre open space/archaeological preserve park site is proposed adjacent to the
planned Ali'i Parkway. This site would serve as an archaeological preserve, and a
45 9� hC
passive recreation area. The site would be a landscaped visual and noise buffer from
the planned Ali'i Parkway.
• Landscaped features, with an emphasis on native plants, will be incorporated at the
entrance to the project, the open space/archaeological/buffer area, as well as within
the road rights-of-way.
• A private loop road with grass swales within the road rights-of-way will be
constructed. The primary road would have a right-of-way of approximately 36 feet,
with a 20 -foot -wide pavement. The rear access lanes would have a right-of-way of 24
feet with an 18 foot -wide pavement. In addition to the grassed swales, the applicant
proposes trees and flowering landscaping in the balance of the road rights-of-way.
All of the roads and improvements are to be owned and maintained by the
homeowners association. None of the proposed improvements are intended for
dedication to the County.
Project construction is expected to commence in June 2004, with a two-year build -out
period. The applicant hopes to begin construction next year, upon issuance of all required
permits. Estimated cost for the development is $15 million. (See Exhibit A - Special
Management Area Use Permit and Change of Zone applications)
STATE AND COUNTY PLANS
2. State Land Use Designation: Urban.
GP Land Use Pattern Allocation Guide (LUPAG) Map: Medium Density Urban and
Urban Expansion Area.
4. Kona Regional Plan: Residential (Res -10).
5. County Zoning: Agricultural 5 -acres (A -5a).
6. Planned Unit Development (PUD): The applicant intends to apply for a PUD permit
separately. The PUD is intended to encourage comprehensive site planning that adapts
the design of the development to the land, by allowing diversification in the relationships
of various uses, buildings, structures, open spaces and yards, building heights, and lot
sizes in planned building groups, while still insuring that the intent of the Zoning Code is
observed. The minimum land area required for a PUD is two acres. (See Exhibit B -
591
Section 25-6-1, Planned Unit Development (PUD) Section of Zoning Code)
Coastal Zone Management, HRS, Chapter 205A: The entire State of Hawaii lies
within the Coastal Zone Management area. The intent of the Coastal Zone Management
Program is to guide and regulate public and private uses in the coastal zone management
area with respect to recreational resources, historic resources, public access to the
shoreline, scenic and open space resources, coastal ecosystems, marine resources,
economic uses, coastal hazards, managing development, public participation, and beach
protection.
8. Special Management Area: The project site is located in the County's Special
Management Area (SMA), approximately 300 - 1,000 feet from the shoreline. The SMA
is a part of the Coastal Zone Management Program regulated by the County.
DESCRIPTION OF PROJECT SITE AND SURROUNDING AREA
9. Subject Property: The project site is located approximately one mile south of Lunapule
Road, and '/z mile north of Royal Poinciana Drive, on the southwestern slope of Hualalai.
The subject property is located on the mauka side of Ali'i Drive, approximately 300 to
1,000 feet from the ocean, and consists of two parcels (TMK 7-5-20: 71 & 72) with a
combined area of 10.142 acres. The site is generally rectangular in shape with a frontage
of 6,456 feet and a depth of 7,406 feet. The subject property is vacant of any structures
and improvements and has been used in the past for cattle grazing.
10. Surrounding Zoning and Land Uses: The parcel to the north is zoned RM -2 and is
developed with the Ali'i Lani condominium. The parcel to the south is zoned A -5a and
contains the Alii Garden Marketplace. AIN Drive is located immediately to the west
(makai) of the subject parcel. Parcels on the makai side of Alii Drive are zoned RM -1.5
and are developed with the Kona Riviera Villa and Kona by the Sea condominium
projects. The proposed Ali'i Parkway forms the upper boundary of the subject site.
Mauka of the proposed Ali'i Parkway, the area is zoned RS -10 and is developed with the
Kahakai Estates single-family residential project. The Kahakai Elementary School is
situated approximately 500 feet southeast of the subject site.
11. Elevation and Slope: The general slope of the site ranges from 2% to 4% and slopes
-3-
down towards the west or makai direction. The elevation of the site varies from
approximately 40 feet at the southeastern comer to less than 20 feet along the Ali'i Drive
frontage.
12. U.S.D.A. Soil Type: Punalu'u and Waiaha Soil Series. The soils are characterized by
well -drained, thin organic soils overlying pahoehoe lava bedrock. The surface layer is
very brown muck, about 8 inches thick, and is underlain by pahoehoe lava bedrock.
Although the organic soil is rapidly permeable, runoff is medium, and the erosion hazard
is slight.
13. Land Study Bureau's Productivity Rating: "E" or "Very Poor".
14. ALISH: Unclassified.
15. Flora/Fauna: Vegetation in this area consists primarily of introduced exotics. These
include kiawe (Prosopis pallida), `opiuma (Pithecellobium dulce), African tulip
(spathodea campanulata), koa-haole (Leucaena glauca), monkeypod (Samanea saman),
lantana (Lantana camara), guinea grass (Panicum maximum), bitter yam (Discorea
bulbifera), and other exotic grasses and weeds. During a field survey by the applicant's
archaeological consultant, one indigenous plant, ilima (Sida fallax) was noted. The
applicant states that it would not be likely that rare or endangered plant life would be
found on the site. The applicant also states that since the site and much of the
surrounding areas have structures or are being developed with structures, it did not appear
likely that rare or endangered animal life would be found on the site.
16. Marine Environment: The site is not a coastal property, and is upland of the coast.
According to the applicant, there is a concern for potential runoff and sedimentation
associated with the construction and operation of the project. The construction of
buildings, roads, and other impermeable surfaces could have a potential long-term impact
upon increasing runoff and sedimentation flowing into the marine environment.
According to the applicant, in order to address the runoff problems, storm water will not
be directed into ocean, but will be directed into drywells that will be designed to
accommodate the storm water flow. The applicant plans to direct excess water to the
landscaped areas where the ground is more permeable and is able to absorb the additional
-4-
water. The applicant will also comply with the erosion and dust control requirements of
the County Grading Ordinance during construction, and has concluded that with these
measures, there should be little, if any, potential adverse impact to the marine
environment.
17. Noise Impacts: According to the applicant, the existing noise environment consists of
ambient noise resulting primarily from traffic and incidental human activities, wind and
foliage, surf, birds, and intermittent flybys of helicopters and aircraft. In the short-term,
the project will generate construction traffic and construction equipment noise. The
applicant intends to comply with State of Hawaii noise regulations. Other mitigation
measures include limiting construction activities to certain periods of the day, requiring
all construction equipment to have approved exhaust and muffler systems, and adhering
to the State Department of Health blasting requirements. In the long-term, the noise
impacts will be associated with additional traffic, and noise from the project itself.
According to the applicant, because of the residential nature of the project, it is not
anticipated that the noise level will increase appreciably.
18. Air Quality: According to the applicant, the project will not generate any direct long-
term air quality impacts. The applicant states that the only discernible long-term impact
would be associated with vehicular traffic to and from the site, and that the impact should
not be significant with the anticipated low volume of traffic. The applicant states that
during the short-term, construction dust could affect the area's air quality, and indicated
that dust control measures would include watering, covering of open -bed trucks, taking
wind patterns into consideration during earthwork, and initiating landscaping early.
19. FIRM: Zone "X", an area outside of the 500 -year flood plain.
20. Coastal Hazards: The lower portion of the subject property is located approximately
300 feet from the shoreline, and falls within the Civil Defense Tsunami Evacuation zone.
The subject parcel is not an oceanfront parcel, and thus will not affect or be affected by
shoreline processes. The US Geological Survey (USGS) classifies this area — which
includes Kailua-Kona — as Lava Flow Hazard Zone 4, on a scale of ascending risk 9 to 1.
By way of reference, the City of Hilo is located within Zone 3, while the lower Puna area
-5-
ranges between 1 and 2. The Building Code designates the entire island of Hawaii in
Earthquake Zone 4, and contains certain structural requirements to address the relative
seismic hazards.
21. Recreational Resources: The proposed development will not reduce the size of the
coastline or other areas used for public recreational uses.
22. Visual Resources: Looking makai towards the ocean from Kuakini Highway, the subject
site is visible and will have some visual impact. However, there are already structures
that are located makai of the subject site that obscure views of the coastline. According
to the applicant, the proposed development with all of its structures no higher than 35 feet
tall, will not result in further diminution of the coastal view from the highway. This is
because the distance of the site from the highway (over 1,000 feet), the less dominating
single-family structures, and the landscaping work favorably together to reduce the visual
impact of the project from Kuakini Highway. The applicant notes that given the project's
extensive landscaping, the visual impact to the surrounding areas will not be significant,
since the subject site is bounded by multi -family residential developments to the north
and west, and single-family residences to the east.
23. Archaeological/Historical/Cultural Resources: An archaeological inventory survey of
the subject site was performed by Paul H. Rosendahl, Inc., (PHRI), and a report was
prepared in July, 2003 which indicated the following: "During the survey 14 sites and 36
component features were identified. These included wall, enclosure, C -shape, terrace,
concrete structure, mound, platform, modified outcrop, and well features. These features
are prevalent in both the North Kona District and the island of Hawaii. The functions of
these features were largely for habitation, agriculture, possible boundary, and burial. Of
the 9 recorded terraces, 3 were thought to be paepae or sleeping houses, while the
remaining were thought to be agricultural in nature. Of the 7 enclosures, 4 were thought
to be related to animal/agricultural use, while the remaining appeared to be associated
with habitation. There were 5 platforms identified, and all appeared to be of the late
prehistoric or contact -era age. When tested, 2 of the features (features D & E at Site
16116) confirmed the presence of human remains. The others did not. Five mounds
0
were identified, and these appeared to be agricultural in function, consistent with the
Kona Field System. The 2 concrete features appeared to be of recent vintage and for
animal husbandry. The 4 walls, the 2 modified outcrops, and the single C-shape appear
to also have agricultural function. The C-shape appeared to provide shelter associated
with the agricultural activity. There was one well found of the site. This well had a
concrete and basal `apron' around it, a windmill tower, and an engine shed. It thus
appeared to be of recent vintage. Relative to the sites on the subject property, the survey
concluded that 13 of the 14 sites as being significant solely for their informational content
and that no further work was recommended for these sites. The remaining site (16116),
which consisted of 2 burial platforms, was recommended for preservation `as is,' with
possible landscaping. If they have to be relocated, the survey recommended that further
data collection be done. The applicant intends to preserve this site and incorporate it as
part of its landscaping/open space feature. In that event, a Burial Treatment Plan for this
site will be prepared and submitted to the Hawaii Burial Council for its review and
approval. The plan will essentially call for the establishment of a landscaped buffer
surrounding the site." The applicant believes that with the approved mitigation, the
archaeological impacts of the project will not be significant. The applicant noted that
should there he any inadvertent finds during construction of the project, work will be
stopped until clearance from the Planning Department has been secured. The
archaeological inventory survey prepared by PHRI was originally conducted in 1991 and
was updated in July, 2003. To date, there is no record that the archaeological inventory
survey had been submitted to the State of Hawaii Department of Land and Natural
Resources -Historic Preservation Division (DLNR-HPD) for acceptance and/or that the
DLNR-HPD has approved a preservation and mitigation plan.
24. Valued Cultural Resources: In view of the recent Hawaii State Supreme Court's
"PASH" and "Ka Pa'akai O Ka Aina" decisions, the issue relative to native Hawaiian
gathering and fishing rights must be addressed. These rights must be addressed in terms
of the cultural, historical, and natural resources and the associated traditional and
customary practices of the site. According to the applicant, since the subject site is not
-7-
adjacent to and/or near the shoreline, and there are no known identified trails going
through the site, fishing and/or coastal access should not be an issue. Regarding the
burials on the project site, the applicant has stated that descendants will be allowed
unfettered access to the burial site, as will be reflected in the approved Burial Treatment
Plan. There is no record that DLNR-HPD has approved a preservation and mitigation
plan, which would include the Burial Treatment Plan.
25. Traffic: A Traffic Impact Analysis Report (TIAR) for this project was prepared by
Witcher Engineering LLP in August, 2003. The study evaluated the traffic impact of this
project relative to Ali'i Drive, Royal Poinciana Drive, and Lunapule Road. The study
calculated the levels of service (LOS) at various intersections to determine levels of
impact resulting from the project. LOS is based on the average stopped delay per vehicle
for individual approaches and the intersection as a whole, with a range from "A" to "F."
A LOS "A" would be ideal, with average delays of less than 5 seconds, while LOS "F"
would be the worst, with average delays of 60 or more seconds, and requiring mitigating
measures. Based on this LOS approach, the study made the following findings and
conclusions: Relative to the project's intersection, the AM and PM level of service
(LOS) would be "C," with or without a left -turn lane at Ali'i Drive. In the case of
Lunapule Road, the existing and projected (with the project) AM or morning (6:30 am.
to 9:00 a.m.) LOS for westbound traffic is "C, " and is `B" for the PM or afternoon (3:00
p.m. to 6:00 p.m.). During the same period, the AM LOS at Royal Poinciana Drive is
"C," and is "D" for the PM traffic. The LOS for southbound movements at both the
Lunapule Road and Royal Poinciana Drive intersections was "A." According to the
TZAR, the levels of service at the Alii Drive and Royal Poinciana Drive intersection and
the Ali'i Drive and Lunapule Road intersection will not be significantly impacted by this
development. The TIAR states that the Lunapule Road intersection has been impacted
seriously by several developments, but that these developments had little impact on the
intersection of Royal Poinciana and AIN Drive. The report concluded that a left tum lane
from AIN Drive to the project site was not needed "since the level of service and
approach delay remain the same."
tf11
According to the Department of Public Works:
Ali'i Drive traffic in the southbound lane will experience some delay when
left turns are made to the project during peak hours. Additional delays can
be expected when pedestrian traffic and vehicle traffic share the road.
No increase in traffic volumes on Ali'i Drive over the build -out period was
accounted for in the report, and that if the existing tum lane is extended, it
will serve intermediate properties as well. The Department of Public
Works recommends that the existing two-way left tum lane fronting the
adjacent property to the north be extended to serve the entry to the subject
property.
The Police Department, consistent with its recommendations for all new requests
along Alii Drive for multi -unit subdivisions, is requesting left -turn storage lanes.
26. Public Access: The subject site is not adjacent to or near the shoreline, and thus no
public accesses to the shoreline will be affected. Further, according to the applicant,
since there are no known identified trails going through the site, fishing and/or coastal
access would not be an issue.
PUBLIC UTILITIES AND SERVICES
27. Access: The proposed access to the project site is from Ali'i Drive. According to the
Department of Public Works (DPW), Ali'i Drive fronting the property is a two-lane
County road with 20 -foot -wide pavement in good condition, and 6 -foot -wide paved
shoulders, all within an approximately 50 -foot wide right-of-way. According to the
General Plan, Alii Drive shall be improved to a 60 -foot wide right-of-way. As such, the
DPW requires the applicant to:
provide for the future road widening by dedicating one-half of the difference
between the existing width of Alii Drive and 60 feet to the County as a condition
of final subdivision approval, or issuance of a certificate of occupancy;
provide a paved shoulder extending to the right-of-way property line. Pavement
transitions, signs and markings, drainage improvements, and relocation of utilities
may be required as necessary;
1n
• locate utility meter and pressure reducing valve vaults out of the right-of-way;
• provide adequate sight distances for access onto Alii Drive, be limited to one
approach, and be located to avoid turning conflicts with existing developments, all
of which must meet with the approval of DPW;
• provide a minimum of 45 feet of storage and turnaround on the Alii Drive side of
any gated vehicle access;
provide any additional right-of-way, at no cost to the County, as established by
and upon completion of the final right-of-way maps by DPW's consultant. The
eastern boundary of the subject parcel is or will be the Kahului to Keauhou
Parkway (Ali'i Highway) Phase 1 right-of-way. When this report was prepared,
acquisition of the right-of-way had not been completed.
• restrict vehicular access to the individual lots from any major collector or arterial
roadways. An emergency vehicular egress, with a breakaway gate, may be
provided to AIN Highway, meeting with the approval of the DPW.
extend the existing two-way left tum lane improvements along the Alli Drive
frontage of the subject property; the two-way left tum land improvements shall
consist of, but not limited to, pavement widening, drainage improvements, street
lights, signs and markings and any relocation of utilities, meeting with the
approval of the DPW
construct concrete curbs, gutters, and sidewalks in the areas of pedestrian traffic,
and dedicate all improvements at no cost to the County.
The Kona Traffic Safety Committee (KTSC) expressed concerns regarding the
project's density, pedestrian safety, traffic impact on Ali'i Drive and Mauka-Makai
Traffic, emergency and service vehicle access, and school transportation. The KTSC:
• suggested that the developer designate jogging/walking paths separate from
parking and vehicular traffic lanes and recommended, for safety reasons, that a
left -tum lane from AIN Drive into the project be required;
• expressed concerns that the 18 -foot pavement for the rear access lanes will not be
adequate to handle large emergency and service vehicles, such as fire trucks,
-10-
ambulances, and garbage trucks, and urged that the rear access lanes have 20 -foot
pavements;
• requested that the applicant fund installation of a direct pedestrian link between
the project and Kahakai Elementary School, and a button -activated cross -walk
light on Alii Drive for intermediate and high school students using the bus.
Civil Defense noted that any additional development along Ali'i Drive without a
corresponding "Mauka-Makai" access route will have an adverse effect on traffic in the
event of an emergency evacuation for the tsunami evacuation zone.
28. Water: The site is presently served by the County water system. There is a water line
along AIN Drive, which will be extended into the subject site. According to the
applicant, the anticipated water commitment for this project should not exceed 58 units.
29. Wastewater: The County has an 8 -inch sewer line along AIN Drive. The applicant
intends to discharge the project's wastewater into this system. The State Department of
Health, in noting that the project was within or in near proximity to the County sewer
system, supported the sewer requirements made by the County.
30. Solid Waste: Solid waste generated by the proposed project will be collected by private
refuse collection companies and transported to the County's Puuanahulu Landfill.
31. Drainage: The DPW requires that all development -generated runoff be disposed of on-
site and shall not be directed toward any adjacent property. The applicant, in the use of
drywells in the subject development, may be required to obtain an Underground Injection
Control (UIC) permit from the State of Hawaii Department of Health. The State
Department of Health stated that the applicant should contact the Army Corps of
Engineers to determine whether a Federal license or permit (including a Department of
Army Permit) is required for this project. The DPW requires that a drainage study shall
be submitted prior to issuance of a grading permit, and that the recommended drainage
system shall be constructed meeting with the approval of the DPW. Although the
property is not located in a designated special Flood Hazard Area on the Flood Insurance
Rate Maps, the applicant is advised of existing drainage reports on file with DPW for the
area. The DPW requires that the applicant identify and address offsite flows through the
-11-
subject property as required by the Subdivision code and the Storm Drainage Standard in
a manner meeting with the approval of the DPW. The study shall address the proposed
culverts on the Kahului to Keauhou Parkway (Alii Highway) Phase 1 plans, the existing
drainage easement on the subject property and a concrete box culvert in AIN Drive
fronting the subject property.
32. Essential Utilities and Services: Electricity and telephone services are available to the
site. Police protective services are available from the Kealakehe Police Station located
about three miles of the project site, and from Captain Cook in South Kona. Within 5
miles from the site, there are three fire stations, at Kailua-Kona, Kealakehe, and Pu'uloa.
There is another fire station at Captain Cook. Emergency medical and paramedical
services are also provided from these fire stations. The Kona Hospital is located in
Kealakekua approximately seven miles from the site. The County Civil Defense Agency
stated that the proposed site is beyond the acceptable range of the nearest Emergency
Warning Siren, and recommended that the developer purchase and install an approved
Emergency Outdoor Warning Siren.
33. Affordable Housing: The County Office of Housing and Community Development,
stated that the housing conditions, pursuant to the requirements of Chapter 11, Article 1,
Hawaii County Code, relating to Affordable Housing Policy, are applicable to the
residential portions of the project.
34. Schools: Kealakehe Elementary, Intermediate, and High School are located in
Kealakehe. The property is located in close proximity to Kahakai Elementary School.
The State Department of Education (DOE) requests that the fair share school contribution
be included as a condition of approval. The DOE also requests that "...special efforts be
made to coordinate construction activity with the principal of Kahakai Elementary School
so that construction -related dust and noise could be minimized during school hours."
35. Parks: The Old Kona Airport State Park is located approximately four miles north of the
project site. Other State Parks in the area include the Kealakekua Bay Historic Park and
Kekaha Kai State Park. County parks in the region include Disappearing (White) Sands
Beach Park, Hookena Beach Park and Kahaluu Beach Park. The Department of Parks
-12-
and Recreation (P&R):
states that the South Kona District is currently under -served by existing active
public recreational facilities and amenities, and that any increase in available
dwelling units without a corresponding increase in active recreational amenities
should be considered an adverse impact;
states that the proposal to set aside common areas for a passive park site and for
conservation of a burial site will be valuable assets to the residents of the
subdivision. However, P&R feels that the passive park sites will not be sufficient
to service the active recreational needs of the residents of the proposed
subdivision who will be forced to seek active recreation opportunities primarily at
nearby public facilities;
• requested that the Fair Share Contribution be assessed in conjunction with the
proposed actions, and that appropriate measures be taken to ensure that the
proposed passive park sites be preserved and cared for in perpetuity by the
applicant. The department had no interest in assuming any responsibility, at any
capacity, for the subject "park" sites.
AGENCIES' AND ORGANIZATIONS' COMMENTS
36. Department of Public Works: (See Exhibit C - October 28, 2003 Memo)
37. Department of Environmental Management: (See Exhibit D - October 2, 2003
Memo)
38. Police Department: (See Exhibit E - October 20, 2003 Memo)
39. Fire Department: (See Exhibit F - October 15, 2003 Memo)
40. Department of Parks and Recreation: (See Exhibit G - October 22, 2003 Memo)
41. Civil Defense Agency: (See Exhibit H - October 7, 2003 Memo)
42. Office of Housing and Community Development: (See Exhibit I - October 2, 2003
Memo)
43. Department of Health: (See Exhibit J - October 20, 2003 and October 22, 2003
Memos)
44. State Department of Transportation: (See Exhibit K - October 8, 2003 Memo)
-13-
45. Department of Education: (See Exhibit L - October 29, 2003 Letter)
46. Kona Traffic Safety Committee: (See Exhibit M - October 19, 2003 Letter)
47. Hawaii Electric Light Company, Inc.: (See Exhibit N - October 17, 2003 Letter)
48. Kona Soil and Water Conservation District: (See Exhibit O - October 20, 2003
Letter)
49. Department of Land and Natural Resources, Land Division: (See Exhibit T —
November 14, 2003)
AGENCIES - NO RESPONSE
50. Department of Water Supply and Department of Land and Natural Resources -Historic
Preservation Division.
APPLICANT'S RESPONSE TO AGENCIES
51. (See Exhibit P - Applicant's Response Letters dated October 12, 2003, October 22,
2003, two letters dated October 31, 2003, and November 17, 2003)
PETITION FOR STANDING IN CONTESTED CASE HEARING
52. Two Petitions for Standing in a Contested Case Hearing were received: 1) Robert Russell
and Lillian Fox (See Exhibit Q - Petition for Standing in Contested Case Hearing
received on October 13, 2003), and 2) Debra Wijet (See Exhibit R - Petition for
Standing in Contested Case Hearing received on October 13, 2003). The petitions
were received without notarizations and the $100 filing fees. The Planning Department
informed both petitioners that their petitions were incomplete and returned the petitions
without action. The Planning Department informed the petitioners that the petitions could
be resubmitted if notarized and accompanied with the required filing fees. (See Exhibit S -
October 16, 2003 Letters).
14-
APPLICATIONS
FOR
SPECIAL MANAGEMENT AREA USE
PERMIT
and
COUNTY REZONING
(A -5a TO RS -7.5)
LEHUA LANI, LLC
Puapua' a 2nd, North Kona, Hawai i
TMK: (3) 7-5-20: 71 & 72
Prepared For:
Lehua Lani, LLC
Prepared By:
Sidney M. Fuke, Planning Consultant
September 2003 E X W B I T
A
0 0
' SPECIAL MANAGEMENT AREA USE PERMIT APPLICATION
COUNTY OF HAWAII
PLANNING DEPARTMENT ,
(Type or legibly print the requested informa4u)
CC
' APPLICANT: L ehua L ani , LLC
APPLICANT'S SIGNATURE: w4uC DATE: 9 / 8 /03
ADDRESS: c/o Randall Farleigh
2140 Atwood Drive
Anchorage, AK 99517
' LIST APPLICANT'S INTEREST IF NOT OWNER:
LIST PRINCIPAL(S) INCLUDING NAMES OF MAIN OFFICERS: Randall Farleigh (Manaeing
' (907) 274-9819 member) Denise Farleigh (me
PHONE:(Bus.) (Res.) (Fax)
(907) 277-2288
LANDOWNER(S):,
LANDOWNER
LANDOWNER(S) ADDRESS
Cama ac a
REQUEST: DEvelopment of a 58 -unit single-family residential
house and lot subdivision (Planned Unit Development) and
ated improvemetns 72
(3) 7-5-20:71
TAX MAP KEY: ZONING: A -5a proposed fog
SIZE OF PROPERTY OR AFFECTED AREA(S): 10.1+ Acres (441,77 SF) RS -7.5
AGENT
Sidney Fuke
ADDRESS: 100 Pauahi Street
Hilo, HI 96720
Suite 212
TELEPHONE:(Bus.) 969-1522 (Res.)_ (Fax) 969-7996
Please indicate to whom original correspondence and copies should be sent.
ORIGINAL: Sidney Fuke COPIES: Randall Farleieh
(See Instructions on Reverse Side)
0 0
CHANGE OF ZONE APPLICATION
COUNTY OF HAWAII
PLANNING DEPARTMENT
(Type or legibly print the requested information)
APPLICANT:
APPLICANT'S SIGNATURE:
ADDRESS: c/o Randy Farleigh
2140 Atwood Drive
Anchorage, AK 99517
9/8/03
LIST APPLICANT'S INTEREST IF NOT OWNER:
LIST PRINCIPAL(S) INCLUDING NAMES OF MAIN OFFICERS:
Randy Farleigh (Managing
Member) Denise Farleigh (member)
PHONE:(Bus.) (907) 274-9819 (Res.)
(Fax) (907) 277-2288
LANDOWNER(S): Randall and Denis F/arleigh
LANDOWNER SIGNATURE(S): s y�l tistj.'�
DATE: 9/8/03
( ay be Ay letter)
LANDOWNER(S) ADDRESS: Same as applicant
REQUEST: A -5a TO RS -7.5
- TAX MAP KEY: (Existing zoning) (3) 7-5-20: 71 & 72
(Proposed Zoning)
STREET ADDRESS OF PROPERTY: 7 5 Alii Drive
SIZE OF PROPERTY OR AFFECTED AREA(S) TO BE REZONED:
10.1+ acs (441,778 sf )
AGENT: Sidney Fuke
ADDRESS: 100 Pauahi Street, Suite 212
-
Hilo, HI 96720
TELEPHONE: (Bus.) 969-1522 (Res.) (Fax) 969-7996
Please indicate to whom original correspondence and copies should be sent.
ORIGINAL: Sidney Puke COPIES: Randall Farleigh
(See Instructions on Reverse Side)
I
I
' ATTACHMENT
Residential Rezoning
'
PLANNING DEPARTMENT
COUNTY OF HAWAII
APPLICATION FOR CHANGE OF ZONE
'I.
If
your request is approved, do you intend to subdivide
the
subject land in accordance with the approved change
of
zone?
Yes
If
yes, please answer the rest of question 1 and then to
question
3.
'
a.
How many acres of the requested area do you intend to
subdivide?
All
4,000
6,000+
b.
Into what lot sizes?
to sf
C.
If your request is approved, approximately how long
'
after the date of approval do you expect to submit
your subdivision plans to the Planning Department
'
for preliminary approval? Immediately
d.
Do you intend to build houses on the newly created
lots?
Yes
'
If yes, please answer the following questions:
tOn
how many of 'those lots?
All
At what approximate price range? House
' Lots
Total
Approximately how long, after approval of
the subdivision, would the first house be
available for occupancy?
If you intend to subdivide, please submit a
preliminary schematic subdivision plan together
with your change of zone application form.
$350,000 to $400,OOC
1 year
3
4
r
2. If you have no firm plans of subdividing the subject area, r
do you intend to:
a. Sell or lease the land to someone who nas firm
plans? r
b. Sell or lease the land to someone who has tentative
plans? ,
C. Sell or lease the land to someone who has no plans?
d. Keep it? '
e. Other (please state)
f. If you intend to do either a, b, or c, please elaborate
on the kind of plans the other party has. Please, also,
include in your answer approximately how soon after
approval of your rezoning do you expect to transfer the
subject land to another party.
Do you think that your request and your further plans
for the land will alleviate the local housing situation? Yes
How? The project would put single-family residential
units on the market at an affordable range in
an area customarily oriented to the multiple -family
range.
Are there any buildings on the subject area? No
If so, what kind?
What do you intend to do with those'bufrd-fngs if -your
request is approved?
-2-
0 0
5. Is the subject land currently being used for any
agricultural activitity?
If so, please list the kinds of products grown and on
how many square feet or acres of land per product.
6. To your knowledge, has there been any flooding and/or
drainage problem on the subject area?
If so, please describe the problem.
7. Do you think that the roads leading to the subject area
needs improvement?
If so, what kind?
Is the road adequate for the proposed traffic volume
or load?
a, What sort of governmental assistance and/or improvements
do you feel will be needed in the subject area when
developed?
-3-
M
We
Me
yes
No
a.
Schools
%
b.
Roads
%
%
C .
Sewer
%
d.
Drainage
e.
Police Protection
%
-3-
M
We
Me
• • ,
Yes No
f. Fire Protection g
g. Recreational Facilities g '
h. Public Utilities %
i. Other % ,
For those checked ",yes," please elaborate what type or kinds of
improvements and/or assistance are needed.
Signature: C
l,74�
Address: 2140 Atwood Drive Anchorage, AK
Telephone: ( 907 ) 274-9819
Date: 9/08/03
i
-4-
rM7A/50A
H
I
11
•
0
PLANNING AND ENVIRONMENTAL REPORT
LEHUA LANI, LLC
PUAPUAA 2n°, NORTH KONA, HAWAII
TMK: (3) 7-5-20: 71 & 72
' I. GENERAL BACKGROUND
i
J
I
I
I
I
I
I
t_l
The applicant, Lehua Lani, LLC, is proposing to develop a 58 -unit single-
family Planned Unit Development (PUD) project on 10.1+ acres (441,778
square feet) of land. The subject site, identified by TMK: 7-5-20: 71 & 72, is
located on the mauka side or west of Ali'i Drive, approximately 1 mile south
of Lunapule Road.
The subject site, which is vacant of any structures, is situated within the
State Land Use Urban district. It is zoned Agriculture (A -5a) by the County
and located within the County Special Management Area (SMA). Given the
above, before the subject project can be developed, it must be rezoned into
the Single-family Residential (RS -7.5) district by the County Council and also
be granted a SMA permit by the County Planning Commission. This report
is intended to support these requests.
II. PROJECT LOCATION
As noted earlier, the subject site, consisting of 10.1+ acres, is located
approximately 1 mile south of Lunapule Road and 1/2 mile north of Royal
Poinciana Drive. More specifically, the Alii Garden Marketplace is situated
to its immediate south, while the Alii Lani condominium is located to its
north. The Kona Riviera Villa and Kona By The Sea condominium projects
are located immediately makai of the subject site. (See Figures 1 & 2).
There are other multiple -family residential projects and single-family
residences in the general vicinity. The proposed Alii Parkway forms the
upper boundary of the subject site, and the Kahakai Estates is located
mauka of the proposed Parkway in this area. The Kahakai Elementary
School is situated approximately 500 feet southeast of the subject site.
III. PROJECT DESCRIPTION
A. Project Concept
The basic objective of this project is the creation of a master planned,
affordable, pedestrian -friendly, socially conducive, residential
• • 1
400
LU
0
J Y
CL
i N o
C.
oco
\\ o
to O
O O
d O O O
O W
� o Y
7
Y J
6 O O t
m E m
Y
G
Figure 1 -
S
1
1
1
1
Auala! �� x� -< A Horne zV �
' Elderly `-.� ,� �'ti'" �5. a --t PF •e %uilua Piety Esi
r Housing lb
nHale°
rr�� — z Rye—aalalai
' Bil fuh K°^ o Z ala alai
a" � colony
�a
1.
eUn
Lj
thof
�'� • Royal Kailuan r
a K • t�'� 3 gillcreSt
1d y6 AC. Loi
P • � w
L�a4ilaRaotel c • Tonery
Una P�+le °r0r Ori° �i1n efface -
0
1 �
Sea IT40age •
' Kona Shares •
Alii Ytlla •
' - Sub Kana Makai •
"ect Site
Ol• Kuakini
. • Alii Lam
Kahakai
'
�' os°ao� ls`c• cry ttr �Elem 46y dy
_G0� � 'rk�t Schl AliiKai
• Ftp o,Fe;QO�,Q .f. o� .�p •
1t� �� YsQos • • / � �LJf � �d `?JaA � F00
L:�`
-Ppr°cto Gose. t •
�oF , betty - 40,r
t0
1o(51
le4o�t0°moo%Wa
• • $isDQ en. C d�a�O� Ry
tt :\ otcV I�oLitT, J-bl. • oc. 4 �'fo
t �cr p`: • Ka nana
tor °`l'� 0.5 • Trees /aq
�a
c AI
aa°�. CO Ive �°ry0& rJ • �� o Polms
\�o •K
�°`O \�, 4 Luther h �i •�`� �f
�o� Chu*c 4 �
V�l_.- C¢sa de o
78-0348
f%e 'Alohi Rai K --'al hi Kai P1
' Fissure 2 3'� on Alii
]golorn
Q
• 0
community called "Lehua Lani ". This community would be designed
in a manner that reflects the island's unique Hawaiian culture, as well
as its natural environment. It is also intended to function and
encourage a sense of community or neighborliness among its
occupants.
To that end, the planned community would include design statements
— such as landscaped entrances and building design — that help
define and distinguish this community from other developments. At
the same time, homes would be spaced and aligned in a manner
where social interaction would be encouraged, while preserving and
taking advantage of the natural airflow and light.
Furthermore, the subdivision and the homes would be designed in a
manner so that greater personal interaction among neighbors would
be encouraged, while maintaining a greater sense of open space.
This would be accomplished through the creation of common open
space and buffer areas, pedestrian -friendly streetscape, and homes
that would encourage neighborly interaction.
The archaeological features located on the mauka end of the site
would be preserved and made a part of the project's buffer from the
Parkway. The open space and pedestrian ambiance would be
enhanced through buffers and rear access streets.
Then, too, a related objective is to create a pedestrian -friendly project.
This will be achieved in part through the streetscape and roadway
system. There will be a landscaped entry, traffic calming roadway
features such as loop road and rear access lanes, and a modified
sidewalk system, which will also serve as a walkingfjogging area.
To accomplish these goals and the goal of affordable housing, there
will have to be some deviations from certain development standards.
In that regard, a Planned Unit Development (PUD) permit will be
applied for to achieve the necessary deviations or variances. These
deviations, however, would not compromise public health and safety.
Project Components
As outlined in Figure 3, the Lehua Lani community would consist of
the following components:
58 single-family residential homes on lots ranging between 4,000
to 6,000+ square feet. Tentatively, there would be 4 basic home
2
7
Il
I
L1'
E
/Lm�ied 9inin-1
8
eniJd !lIV c
Fissure 3
s
W �
E 2
0
Idesigns,
varying between 1 and 2 stories. None of the structures
would exceed the maximum height limit of 35 feet. To achieve the
desired level of design objectives, some of the structures will be
I
set back less than the required 15 feet from the front and rear
property lines and 8 feet along the sides.
'
In terms of the spatial design of the project, a majority of the
homes will have a main lanai oriented toward the street or open
space. This is to encourage a greater sense of community while
'
enabling homeowners to monitor activities within the project area.
Two -car garages will be placed at various locations on a site to
avoid creation of a typical subdivision with wall to wall 2 -car
'
garages at the front of the houses.
Relative to the design of the homes, each home will attempt to
'
reflect or capture the local character and sensitivity to the
indigenous Hawaiian context. This would be achieved through the
use of roof overhangs, gable and hip roofs, lanais, traditional
'
window placement, and a historical precedent for form and building
materials. (See Figure 4).
About a 1/2 -acre open space/archaeological preserve park site
wou ,e created adjacent o e planned
'
not only serve as an archaeological preserve, but a passive area
for recreation, social exchange and interaction. It would also serve
as a landscaped visual and noise buffer from the Parkway.
t•
the
Landscaped features, with an emphasis on native plants, at
entrance to the project, the open space/buffer area, as well as
'
within the road rights-of-way.
• Private loop road with grassed swales within the road rights-of-
way. The primary road would have a right-of-way of 36+ feet, with
a 20+ -foot wide pavement. The rear access lanes would have a
right-of-way of 24± feet with 18+ -feet pavement.
'
In addition to the grassed swales, there will be trees and flowering
landscaping within the balance of the road rights-of-way. This will
help create a friendly, pedestrian -oriented streetscape, where the
roads and their rights-of-way would not be limited to vehicles.
They would have multiple functions, serving also as
and a visual amenity.
jogging/walking paths, overflow parking,
IV
V.
W
r
It should be noted that all of the roads and improvements therein
would be owned and maintained by the homeowners association.
None of the proposed improvements is intended to be dedicated to
the County.
C. Project Costs and Timetable
The total improvement cost of this project is projected at $15 million,
less land and carrying costs. The applicant hopes to begin
construction upon issuance of all required permits within the next
year. The anticipated construction commencement date is June
2004, with a 2 -year build out period.
PERMITTING REQUIREMENTS
The subject site is zoned Agriculture (A -5a) or one unit for every 5 acres of
land. Inasmuch as the proposed Lehua Lani project will have 58 units, the
applicant is requesting the subject site be rezoned into the Single-family
Residential (RS -7.5) or one unit for every 7,500 square feet district. At the
same time, since the site falls within the County Special Management Area
(SMA), a SMA Use Permit is required from the Planning Commission.
As noted earlier, a Planned Unit Development (PUD) permit will also be
applied for separately. The PUD permit, which is subject to the approval of
the County Planning Director, is required to enable the required deviations
from the minimum lot size, set back, road width and improvements, and
associated requirements of the Zoning and Subdivision Codes. Should there
be favorable actions on the rezoning, SMA, and PUD applications, other
ministerial permits - such as grading/grubbing, Plan Approval, Building
Permit, Department of Health air quality permit, and the like - will still be
required.
INSTITUTIONAL CONSIDERATIONS
A. State Land Use
The State Land Use designation of the project site is Urban. As such,
the requested zoning is consistent with this designation and no further
State Land Use action would be required.
B. General Plan
The County General Plan Land Use Pattern Allocation Guide
(LUPAG) map is not intended to be specifically measurable. The site
I
I
1
1
0
L
r_`
y
0
L
1
1
1
P
I
[1
P
11
C.
19
E.
0 0
is generally designated Resort and Urban Expansion. A Resort Area
includes "uses such as hotels, condominium -hotels (condominiums
developed and/or operated as hotels), and supporting services."
Urban Expansion areas "Allows for a mix of high density, low density,
industrial and/or open designations in areas where new settlements
may be desirable, but where the speck settlement pattern and mix of
uses have not yet been determined. Within areas designated for
development as resorts, portions of the resort area may be included in
the urban expansion area."
The proposed residential development would be consistent with those
designations. As such, no General Plan amendment would be
required to effectuate this project.
Draft Kona Regional Plan
This plan attempts to further define the General Plan and serves as a
guide for decision -makers. In 1984, it was adopted by the Planning
Commission. To date, the County Council has not adopted it.
Notwithstanding the above, it does provide some measure of land use
guidance.
In that regard, the Land Use Concept map of this plan suggests that
this area is suitable for a Res -10 (maximum 10 residential units per
acre) use. The proposed project and zoning (RS -7.5) would result in
less than 6 units per acre, making it consistent with this Draft Plan.
Other Land Use Plans
The subject site falls outside of the planning boundaries of the Master
Plan for Kailua-Kona and the Keahole to Kailua Master Plan.
County Zoning
The County zoning of the subject property is Agriculture (A -5a). Most
of the properties in the immediate vicinity of the subject site are zoned
for multiple family residential uses. The Alii Lani condominium
located to its north is zoned RM -2, while the Kona By The Sea and
Kona Riviera projects located makai or west of the project site are
zoned RM -1.5. The Alii Garden Marketplace to its south is zoned
Agriculture -5a, while the Kahakai Estates subdivision located mauka
or east of the project site and across of the proposed Ali' i Parkway
are zoned R-10. The zoning map for the Kahakai Estates project,
VI.
0
0
which also shows the zoning designations of other surrounding
properties, is identified by Figure 5.
If approved, the overall density of the site would be consistent with the
requested RS -7.5 zone. Although the project will conform to the
proposed density, some of the other technical requirements of the
Zoning and Subdivision Codes will not be met.
As noted earlier, the lots will vary between 4,000 to 6,000+ square
feet, which would be less than the minimum area of 7,500 square
feet. Then, too, in terms of setbacks, the minimum requirement for
the requested RS -7.5 zone is 15 feet from the front and rear property
lines, and 8 feet from the sides. Some of the structures, particularly
the garages, will not meet the setback requirements. Nonetheless, all
of the structures will conform to the required setbacks relative to Ali i
Drive and all adjoining properties.
The maximum allowable height is 35 feet. The proposed buildings will
vary between 1 and 2 stories and will not exceed the maximum
allowable height of 35 feet, inclusive of the roof, within the requested
RS -7.5 zone. (See Figure 4).
To achieve these design deviations from the Zoning and Subdivision
Code, the applicant will be applying for a Planned Unit Development
(PUD) Permit.
F. Relationship to SMA Obiectives and Policies
The site is located within the County Special Management Area
(SMA). As such, a SMA Use Permit would be required. A discussion
of this project's relationship to the SMA policies and objectives are
found in Chapter IX of this report.
G. Other Permits
The other required permits will be of the ministerial variety. Some of
these include grad inglgrubbing, Plan Approval from the Planning
Director, Building Permit, water and sewer hook up, and the like.
ENVIRONMENTAL CONSIDERATIONS
A. General Description
The subject site is located on the southwestern slope of Hualalai.
G1
v
� Ext EN SIaN
-KINI I
MJ" Lt
l
N rzUE
or�TM
SC
_ALE
PJ
' I u
RM -7
j RMj7
\
E—
//^\KI'A\H ErLo'� p
I I I
RM
kakuWl
boy
u
AG121GULTURAL 0
\SIIVGI_.0 FA
RESIr>ENTIAL
AREA = ,OB•3J
I nM_z
u i
R9 IS
\ PJ P' rzs-lo
� fG
Proiect Site
J
mumuhalo
point
`-
F9
AMENDMENT TO THE ZONING CODE
AMENDING SCCTION 25-8-3 (NORTH KONA ZONE
MAP) AR-FlCLE 8, CHAPTER 2E (ZONING COC�7=� OF
' THE HAINAII COUNTY CODE, Io7 CHANGING THE.-
D19TR1CT CL.A551F1CA7l0N FROM 4,0ARICULTURAL
(A-so)T'O SINGLE (RS -:)0)
AT P�►APUAA 1ST AND 2ND, NORTH KONA,
t-iAYVf�II.
PR�PAR�� C3Y _ pt-ANMNG I7t=PA�TMCNT.
COUNT7 of 1-1AWAtl
J11NC ?S,1sJ'.�°.J:Revised}
'TMM = 7- `-�-�0 ' PonTtorq o1= 1 JAN. 6, Q00o(RevtSCn)J(jNET`G, 1980
'Figure 5 �yCA HAr<AI A99oCIATE3�
• 0
Located on the mauka side of Ali' i Drive, approximately 300+ to
1,000+ feet from the ocean, the site consists of two parcels with a
combined area of 10.142 acres. The site is generally rectangular in
shape with a frontage of 645+ feet and a depth of 740± feet.
The subject site is vacant of any structures and improvements and
has been used in the past for cattle grazing. The general slope of the
site ranges from 2% to 4% and runs towards the west or makai. The
elevation of the site varies from approximately 40 feet at the its
southeastern corner to less than 20 feet along the Alii Drive frontage.
Being on the leeward side of the island, the project site is generally
sunny in the mornings with occasional afternoon clouds. The rainy
season is usually during the summer, with wetter periods from
November to January. The average annual rainfall is approximately
30 to 40 inches, with pan evaporation estimated at 55 inches per year.
The wetter months tend to occur between March through September.
The mean annual temperature is about seventy-five (75) degrees
Fahrenheit, with the warmer months during the summer. Winds tend
to be light and variable. Slight easterly winds occur during the day,
while westerly or mountain winds are prevalent during the evenings.
B. Soils and Topography
The US Department of Agriculture Soil Conservation Survey Report
identifies the predominate soils overlying the project site as Punalu'u
and Waiaha Soil Series. These soils are characterized by well -
drained, thin organic soils overlying pahoehoe lava bedrock. The
surface layer is very dark brown muck about 8 inches thick. It is
underlain by pahoehoe lava bedrock. Although the organic soil is
rapidly permeable, runoff is medium, and the erosion hazard is slight
The Land Study Bureau Overall Master Productivity Rating for the
subject area is essentially Class "E° or poor (E233). This suggests
the site has poor productivity potential for agricultural crops. It is of
the Waiha soil series where there is shallow soil material. It is
described as being rocky, well drained and unsuited for machine
tillability.
The State of Hawai'i's Agricultural Lands of Importance to the State of
Hawaii (ALISH) maps do not have a classification of this area.
1
'
C. Natural and Coastal Hazards
The Federal Emergency Management Agency's Flood Insurance Rate
'
Map (FIRM) Map designates this area Zone X,
areas determined to be outside the 500 -year flood plain.
'
It should be noted, however, that the site falls within the Civil Defense
Tsunami Evacuation zone. The shoreline is about 300 feet from the
'
lower portion of the subject site.
The US Geological Survey (USGS) classifies the area — which
includes Kailua-Kona - as Lava Flow Hazard Zone 4, on a scale of
'
ascending risk 9 to 1. By way of reference, the City of Hilo is located
within Zone 3, while the lower Puna area ranges between Zones 1
'
and 2.
The Building Code designates the entire island of Hawaii in
'
Earthquake Zone 4 and contains certain structural requirements to
address the relative seismic hazards.
'
D. Flora and Fauna Implications
Vegetation in this area consists primarily of introduced exotics. These
'
include the kiawe (Prosopis pailida), 'opiuma (Pithecellobium dulce),
African tulip (Spathodea campanulata, koa-haole (Leucaena glauca),
monkeypod (Samanea saman), lantana (Lantana camara), guinea
'
grass (Panicum maximum), bitter yam (Dioscorea bulbifera) and other
exotic grasses and weeds. During a field surrey, the archaeologist
noted the presence of one indigenous plant, 'ilima (Sida fallax).
Given the above, it does not appear likely that one would find rare or
endangered plant life on the site. Notwithstanding this evaluation, as
'
noted earlier, to the extent feasible, native landscaping and/or exotics
that are typical of this area would be incorporated into the project's
landscape.
Likewise, as the site and much of the surrounding areas have or are
developed with structures, it does not appear likely that one would find
rare or endangered animal life on the site.
As such, there should not be any significant or adverse impacts to the
area's flora and fauna.
8
E. Archaeological Implications
An archaeological inventory survey of the subject site was performed
by Paul H. Rosendahal, Ph.D., Inc. (PHRI), and a report was prepared
in July 2003. (Appendix A)
During the survey 14 sites with 36 component features were
identified. (See Figure 6) These features included wall, enclosure, C -
shape, terrace, concrete structure, mound, platform, modified outcrop,
and well. These features are prevalent in both the North Kona District
and island of Hawaii. The functions of these features were largely for
habitation, agriculture, possible boundary, and burial.
Of the 9 recorded terraces, 3 were thought to be paepae or sleeping
houses, while the remaining were thought to be agricultural in nature.
Of the 7 enclosures, 4 were thought to be related to animal/agriculture
use, while the remaining appeared to be associated with habitation.
There were 5 platforms identified, and all appeared to be of the late
prehistoric or contact -era age. When tested, 2 of the features
(features D & E at Site 16116) confirmed the presence of human
remains. The others did not.
Five (5) mounds were identified, and these appeared to be agricultural
in function, consistent with the Kona Field System. The 2 concrete
features appeared to be of recent vintage and for animal husbandry.
The 4 walls, the 2 modified outcrops, and the single C -shape appear
to also have agricultural function. The C -shape appeared to provide
shelter associated with the agricultural activity.
There was one well found on the site. This well had a concrete and
basalt "apron" around it, a windmill tower, and an engine shed. It thus
appeared to be of recent vintage.
Relative to the sites on the subject property, the survey concluded
that 13 of the 14 sites as being significant solely for their informational
content and that no further work was recommended for these sites.
The remaining site (16116), which consisted of 2 burial platforms, was
recommended for preservation "as is", with possible landscaping. If
they have to be relocated, the survey recommended that further data
collection be done. The applicant intends to preserve this site and
incorporate it as part of its landscaping/open space feature.
vm
a
p
W m
Z¢
Z¢
O
¢
vt�
Ui
~
�=
U
�<
O
FE
Q
__�m�maxwn��em�mrevr
3 A I d O
vm
W
W m
m
6
O
¢
vt�
Ui
~
�=
U
�<
O
FE
Q
0
W
7
J
o
� 7
'0 0
�
o
¢
O
Q
__�m�maxwn��em�mrevr
3 A I d O
1 1 l V
Figure 6
8 S
S
_ o
o
u
E
0
0
s
F.
G.
9 0
In that event, a Burial Treatment Plan for this site will be prepared and
submitted to the Hawaii Burial Council for its review and approval.
The plan will essentially call for the establishment of a landscaped
buffer surrounding the site.
It should be noted that should there be any inadvertent finds during
the construction phase of the project, work will stop until clearance
from the Planning Department has been secured.
Based on the above, it is believed that with the approved mitigation,
the archaeological impacts generated by this project will not be
significant.
Valued Cultural Resources
In view of the recent Hawaii State Supreme Court's "PAW and "Ka
Pa'akai O Ka'Aina" decisions, the issue relative to native Hawaiian
gathering and fishing rights must be addressed. Specifically, there
must be a discussion of the cultural, historical, and natural resources
and associated traditional and customary practices of this site.
In this situation, the subject site is not adjacent and/or proximate to
the shoreline. There are no known or identified trails going through
the site. As such, fishing and/or coastal access should not be an
issue.
It is not known whether the subject or immediate surrounding area
was ever used for the gathering of plants by native Hawaiians.
However, as the site is overgrown with introduced vegetation, it would
appear very unlikely that the site would serve such purpose today
and/or in the recent past.
There is, however, a burial on the site. As such, unfettered access to
descendants will be allowed to this site. This will be reflected in the
approved Burial Treatment Plan.
Based on the above, with the planned mitigation, it does not appear
that the project would have any adverse impact relating to the cultural
and historical resources of this area.
Marine Environment
Although the site is not a coastal property, it is proximate to it. As
such, the concern for potential runoff and sedimentation associated
10
0
E
with the construction and operation of the project will be there. The
construction of buildings, roads, and other impermeable surfaces
could also have a potential long-term impact.
To address these short and long term potential concerns, the
applicant proposes a number of measures. These include:
Not directing any of the stormwater to the ocean. Drywells, subject
to the State approval process, will be designed to accommodate
this stormwater.
' . Through proper design, excess water will be directed to
landscaped areas where the ground is a little more permeable and
-- —
can absorb -the additional -water. -The -County Grading- r mance;-
' which governs erosion and dust control during construction, will
also be complied with.
I
n
1]
U
I
I
1
Thus, there should be little, if any potential adverse impact on the
marine environment if reasonable precaution is taken during and after
the construction period.
H. Noise, Air Quality, and Dust
The existing noise environment consists of ambient noise levels
resulting primarily from traffic and incidentally human activity, wind
and foliage, surf, birds, and intermittent flyby events (helicopters and
aircraft).
In the short-term, the project will generate construction traffic and
construction equipment noise. To mitigate these impacts, the
applicant intends to comply with State Department of Health noise
regulations. Other mitigation include limiting construction activities to
certain periods of the day; requiring all construction equipment to
have approved exhaust and muffler systems; and adhering to State
DOH blasting measures.
In the long-term, the noise impacts would be additional traffic and, of
course, from the project itself. Due to the residential nature of the
project, however, it is not anticipated that the noise level will increase
appreciably.
The proposed project should not generate any direct long-term air
quality impacts. The only discernible impact would be associated
with vehicular traffic to and from the site. While there will be an
11
VII.
impact to the ambient air quality, the impact should not be significant
particular with the anticipated low volume of traffic. Further, with
higher EPA standards for automobile emissions, air quality impacts
should be further mitigated.
During the short-term, however, construction dust could affect the
area's air quality. Dust control measures would be implemented by
the applicant and would include watering, covering of open -bed
trucks, taking winds patterns into consideration during earthwork, and
initiating the landscaping early.
INFRASTRUCTURE CONSIDERATIONS
A. Road and Access
The project site is located on the mauka side of Alii Drive,
approximately 1 mile south of Lunapule Road and 1/2 mile north of
Royal Poinciana Drive. AIF i Drive is a 2 -lane, County road, with a 30+
feet of pavement within a right-of-way of 50 feet in this area. The
pavement is wide enough for pedestrian movements on both sides of
the road. The posted speed limit is 30 mph.
A Traffic Impact Analysis of this project was prepared by Witcher
Engineering LLP (Appendix B). The study evaluated the traffic
impact of this project relative to Alii Drive, Royal Poinciana Drive, and
Lunapule Road. The evaluation compared the effects prior to the
development of Alii Lani, Kona Hawaiian Village and Sea Ridge in
2000 and the current condition, after these projects have been built.
Please note that the report indicated a projected density of 59 units,
although only 58 are being proposed.
The study calculated the levels of service (LOS) at various
intersections to determine levels of impacts resulting from this project.
LOS is based on the average stopped delay per vehicle for individual
approaches and the intersection as a whole, with a range from "A" to
'T". A LOS "A" would be the ideal, with average delays of less than 5
seconds, while LOS "F" would be the worst, with average delays of 60
or more seconds and requiring mitigating measures.
Based on this LOS approach, the study made the following findings
and conclusions:
Relative to the project intersection, the AM and PM level of service
(LOS) would be "C", with or without a left -turn lane at Alii Drive.
12
IJ
H
L
E
F
[I
C--3
In the case of Lunapule Road, the existing and projected (with the
project) AM or morning (6:30 a.m. to 9:00 a.m.) LOS for
westbound traffic is "C" and "E" for the PM or afternoon (3:00 p.m.
to 6:00 p.m.) During the same period, the AM LOS at Royal
Poinciana Drive is "C" and "D" for the PM traffic. The LOS for
southbound movements at both intersections was "A".
The report thus concluded that "The levels of service at the
intersections of Alii Drive and Royal Poinciana Street (sic) and Alii
Drive and Lunapule Road are not significantly impacted by this
development. In the case of Lunapule Road the intersection has
been impacted seriously by several developments, whereas, these
developments seem to have little impact on the intersection of
Royal Poinciana and Alii Drive."
The report further determined that a left turn lane from Alii Drive
to the project site was not needed. It reasoned that this was not
needed "since the level of service and approach delay remain the
same."
Water
The site is presently serviced by the County water system. There is a
water line along Alii Drive, which will be extended into the subject
site. The anticipated water commitment for this project should not
exceed 58 units.
C. Wastewater
The County has an 8 -inch sewer line along AH'i Drive. The applicant
intends to discharge the project's wastewater into this system.
D. Utilities
Telephone and electrical services are already available to the site.
E. Protective Services
Being within an urban area, all of the required police, fire, and related
services are available. Police protective services are provided from
the stations at Kealakehe located less than 3 miles from the site and
Captain Cook in South Kona. Within 5 miles from the site, there are 3
fire stations. These would be at Kailua-Kona, Kealakehe, and
13
• 0
Pu'uloa. There is also another station at Captain Cook. Emergency
medical and paramedical services are also provided from these
stations.
The Kona Hospital at Kealakekua is located approximately 7 miles
from the site and is managed by the State.
VIII. OTHER CONSIDERATIONS
A. View Plane
The subject site is visible from Kuakini Highway, looking makai
towards the ocean. As such, any development of the site will
generate some measure of visual impact. However, there are some
mitigating factors.
For one, there are structures located makai of the subject site and the
ocean that already obstruct the views of the coastline. As such, the
proposed development should not result in the further diminution of
coastal visual impact.
Notwithstanding that situation, the proposed buildings will be less than
what is already allowed in the existing Agriculture (A -5a) zone of 45
feet. All structures will be no higher than 35 feet tall, which is
consistent with the requested Zoning Code's 35 -foot height
requirement for a single-family residential zone. Then, too, instead of
massive, monolithic structure(s) that normally accompany multiple -
family projects, this project will have more but less dominating
structures. With the proposed landscaping, the sense of visual scale
should not be pronounced.
Additionally, the distance of this site to the Highway (over 1,000 feet).
As such, the distance, landscaping, and type of structures should all
contribute to reduce the visual impact of this project from the
Highway.
Relative to the surrounding area, the subject site is somewhat
bounded by a commercial use to the south, multiple -family residential
developments to the north and west, and single-family residential to
the east. As such, given the residential scale of this project with its
extensive landscaping, the visual impact to surrounding areas should
not be significant.
14
0 0
IB. Coastal Access
' The subject property does not abut the shoreline. It is more than 300
feet from the shoreline. There are other privately owned parcels
between the subject property and the ocean. As such, the proposed
' improvements would have no impacts to any existing or planned
coastal accesses in the area.
' IX. RELATIONSHIP TO SMA OBJECTIVES
' A. Recreational Resources
The proposed improvements should not have any adverse impact to
the recreational resources of the area. The property is not a coastal
property, and there are intervening privately owned properties
between the project site and the ocean.
' Furthermore, the project will provide open space and a passive
recreational area. This should enable residents to recreate on site,
' and, as needed, go off site.
B. Historical and Cultural Resources
' With the exception of the two burials, sufficient mitigation of the
0 15
remaining sites have been taken which should not affect the
development of this project. A burial treatment plan will be prepared
'
and submitted for the review and approval by the Hawaii Island Burial
Council in the near feature. The approved mitigation will be
implemented in conjunction with the development of this project.
'
Tentatively, the plan would call the preservation and incorporation of
the sites as part of the overall landscaping of the project. Access to
'
lineal descendants would also be afforded.
Further, should there be any inadvertent finds, work will immediately
'
cease until clearance from the County Planning Department is
secured.
'
Relative to the site's potential cultural resources, the site is not a
coastal property and does not have a history of providing indirect
access to the shoreline. As noted earlier, the burials will be preserved
'
and lineal descendants of the burials will be afforded access. Finally,
there is no visible evidence that the site has been used for gathering
of native plants for medicinal or food, particularly as the site is
0 15
C.
D.
E.
E
somewhat devoid of substantial vegetation. However, if legitimate
claims are made, access will be provided.
As such, the development of this site should not have any adverse
impacts to native Hawaiian cultural or religious practices.
Scenic and Open Space Resources
As noted earlier, the site is located makai of the Kuakini Highway.
However, the development of this site should not significantly impair
the views of the shoreline. There are already structures between the
ocean and the subject site which obstruct some of the near shore
views. Then, too, the scale and design of the project would be
visually less pronounced than a typical multiple -family residential
project. As such, this project should not adversely impact any scenic
coastal resources.
The development of any site will diminish open space, and this project
is no different. Thus, the goal is to mitigate this impact. In this
situation, the structures will be residential in scale and the project
(including the road rights-of-way) will be extensively landscaped. The
landscaping and scale of the structures should help mitigate the visual
loss of open space.
Coastal Ecosystem
The proposed improvements should not generate any adverse
impacts to the area's coastal ecosystem. Although the structures and
roadways may increase the volume of rainwater, they will be directed
into existing or new drywells on-site and away from the ocean. The
road rights-of-way will be grassed instead of paved, creating a greater
permeable surface rather than the conventional street system.
Further, the site is situated over 300 feet from the shoreline, and any
direct interaction between the proposed improvements and the
coastal water should not be excessive, if at all.
Then, too, there already is a sewer line that fronts Alii Drive. This line
will be extended within the project to accommodate all of the project's
wastewater demand.
Economic Uses
With the long-standing melting global economies and global
insecurities due in part to the threat of terrorism and health concerns
16
' 0 0
1
t(such as SARS), it should be heartening to still find businesses willing
to invest and develop properties. The community, in its Draft Kona
' Regional Plan, expressed a desire to keep the subject area for
residential uses at a scale of 10 units per acre. In this situation, this
will be less, and oriented to residents. Should approvals to develop
' this project be given, it will transform a vacant lot into a healthy
residential community, convenient to places of employment.
Furthermore, in this situation, the applicant is willing to develop the
project consistent with the General Plan, Draft Kona Regional Plan,
and other regulatory requirements. In so doing, it should directly and
'
indirectly generate over 15 short-term, full and part-time employment
in the construction and construction -related industries. New moneys
will be circulated within the community.
'
Upon its completion, this planned commercial and condominium
complex should generate over a few full and part time jobs. Much of
'
this would be for the maintenance of the common areas.
F. Coastal Hazards
Although the site is designated "X" on the Flood Insurance Rate map,
it still falls within the Civil Defense Tsunami Evacuation Zone.
However, with the advance early warning systems, there should be
adequate provisions to address impacts from tsunami (with the
exception of locally generated tsunamis).
As the site is not located adjacent to the shoreline and over 300 feet
away, normal winter storm waters should not be an issue for this
1
project.
G. Managing Development
'
While this function is more applicable to the "authority" or approving
agencies, the request is intended to operate within the confines of the
'
requested Single-family Residential (RS -7.5) Zoning Code, except as
may be modified through the issuance of a PUD permit. Through the
PUD process, some design variations would be sought, variations that
'
would still not compromise public health and safety issues. All uses
and density, however, would be consistent with the RS -7.5 zone.
tIn
this sense, this project would be consistent with said zoning. In that
regard, this project would be consistent with the policy of "us(ing),
'
implement(ing), and enforc(ing) existing law effectively to the
17
H.
J.
K.
0
0
maximum extent possible in managing present and future coastal
zone management."
Public Participation
There is a statewide public advisory body called Marine and Coastal
Zone Management Advisory Group (MACZMAG) that has the task,
among other matters, of advising the lead agency (Office of State
Plan) on coastal management issues. This includes a direct or
indirect review of certain requests that may have statewide coastal
zone management implications.
Public participation in the review of the permitting process is also
achieved through the use of sending notices to surrounding property
owners of the submittal of this rezoning and SMA applications and
another separate notice informing said owners of the date of the
Planning Commission's required public hearing as well as the rights to
request for participation via a contested case hearing for the SMA
application.
Beach Protection
The subject property is not a coastal property and over 300 feet from
the shoreline. As such, the policies and objectives relating to this
matter do not apply.
Marine Resources
Mitigating measures will be taken during the construction and post -
construction period of this project. Erosion control measures meeting
with the requirements of the State Department of Health and County
Department of Public Works will be developed and implemented,
particularly during the construction period. Drywells, if needed,
meeting with the Underground Injection Control (UIC) requirements of
the State Department of Health will be used to help address potential
impacts from surface runoff after the project is completed. Then, too,
the project's drainage will be directed to the landscaped areas within
the project site, including the road rights-of-way, to further minimize
the velocity and volume of surface runoff going into drywells.
SMA CONCLUSIONS
Based on the foregoing, it is concluded that the proposed
improvements are consistent with the objectives, policies and
1V
0 0
guidelines of the Special Management Area Rules and Regulations.
Specifically:
' A. The proposed project will not have any substantial, adverse
environmental or ecological effect. Any effect that may result
' will be minimized to the extent practicable and is clearly
outweighed by public health, safety and welfare, and other
compelling public interest.
' Further, it will not generate any adverse effects by themselves
or in conjunction with other individual developments, the
' potential cumulative impacts of which would result in a
substantial adverse environmental or ecological effect and the
elimination of planning options. Appropriate mitigating
' measures will be taken to address any potential adverse
impacts of this project;
' B. The proposed uses - as discussed earlier - are consistent with
the objectives, policies, and guidelines of the SMA Rules and
Regulations; and
C. The proposed uses are consistent with the County General
Plan, Draft Kona Regional Plan, and the County Zoning Code.
tAll of those documents earmark the subject site for resort uses, and
the requested hotel use would be consistent with the resort
' designation. No zoning amendment is required to effectuate this
request.
' X. IMPACT SIGNIFICANCE ANALYSIS
A. Relationship Between Local Short -Term Uses of Environment
' and Maintenance and Enhancement of Long -Term Productivity
' If the request were denied, the short-term use of the site would
probably continue in low level agriculture or lay fallow. The applicant
may eventually construct one or two dwellings on each of the site.
' Given the urban (RM -1.5) character of the areas makai and north of
the subject site as well as the 10,000 square foot lot Kahakai Estates
' Subdivision to the east, there may be pressures for the subject
property to be similarly zoned. And from the perspective of trying to
create a community, the continued pattern of only multiple -family
19
residential uses may not necessarily be appropriate. Then, too, the ,
continued vacant, quasi -agricultural use may not also be appropriate.
From a long-term productivity standpoint, then, the proposed 58 -lot ,
single-family residential development would provide a much- needed
diversity of residential living options to the community.
B. Irreversible and Irretrievable Commitment of Resources '
The subject site is already partially disturbed. As such, the project ,
should not result in an irreversible commitment of natural or
archaeological resources. While there are some archaeological ,
resources on the site, appropriate mitigation (such as the preservation
of the burial) will be taken.
The soil on the parcel has been classified "D" or poor by the Land
Study Bureau, representing poor agricultural potential. This is
evidenced by the vegetation on the site. While the area is capable of
supporting agricultural crops, it would not be suitable, given its
surrounding urban uses. It is thus maintained that the creation of the
58 -lot project would not result in the loss of properties which may
have significant agricultural resource potential.
C. Mitigative Measures
The applicant intends to make improvements, if necessary, to be
consistent with the subdivision process, except as may be modified
through the PUD process. And during the construction phase of this
project, contractors will be obligated to comply with appropriate State
noise and air quality standards.
Should further unanticipated archaeological finds be discovered in
conjunction with the development of the site, work will stop (as is
required by the State and County) and clearance secured before work
is resumed.
There is no existing drainageway on the property. Any and all
required grading or grubbing work would be done in conjunction with
the required permits. This is to assure that the development of this
site does not adversely affect the drainage of the surrounding areas.
Finally, as the site is vacant, there will be no person or businesses to
be dislocated by this project.
all
'
D. Alternatives to the Proposed Proiect
1. No Proiect
'
Under the status quo alternative, the site will continue to
remain in its fallow state or limited agricultural use. It could
'
also remain a fire hazard, during periods of drought.
The site could also be developed with 1 or 2 dwellings on each
'
of the lot.
Given the present mixture of land uses and lot sizes in this
'
area and proximity to urban areas, the site may not be utilized
to its fullest family -agricultural potential.
2. Altemative Density
Under this alternative, the applicant could seek a more
'
intensive zoning, such as RM -1 to RM -4 zoning. All of these
zoning categories would arguably be consistent with the RM -1
zoning on the makai and north sides of the subject site. They
'
would also be consistent with the General Plan and land use
concept map of the Draft Kona Regional Plan.
Such an approach, however, may not be compatible with the
policy of trying to foster a mixture of residential type within an
'
urban environment. Then, too, a denser project would add
more stress to the area's infrastructure.
'
3. Evaluation of Altematives
'
The project's impacts to the area's social and physical
infrastructure would not appear to be significantly pronounced.
Certain mitigative measures will be taken to address any
possible impacts associated by the development of this project.
'
Further, the project would be consistent with the land use
objectives sought to be accomplished by the County General
Plan LUPAG map.
'
the
In view of the aforementioned, it would appear that none of
alternatives would be more prudent and beneficial than the
'
requested RS -7.5 alternative.
21
XI.
•
REGULATORY ANALYSIS
A. General Plan LUPAG Map
•
The General Plan provides for the long-range comprehensive
development of the island of Hawaii. It provides direction for
balanced growth in the County.
The County General Plan Land Use Pattern Allocation Guide
(LUPAG) map is not intended to be specifically measurable. As noted
earlier, the site is generally designated Resort and Urban Expansion.
A Resort Area includes "uses such as hotels, condominium -hotels
(condominiums developed and/or operated as hotels), and supporting
services." Urban Expansion areas "Allows for a mix of high density,
low density, industrial and/or open designations in areas where new
settlements may be desirable, but where the specific settlement
pattern and mix of uses have not yet been determined. Within areas
designated for development as resorts, portions of the resort area
may be included in the urban expansion area."
The proposed residential development would be consistent with those
designations. As such, no General Plan amendment would be
required to effectuate this project.
The proposed revision to General Plan recommends that this area be
changed to Medium Density Urban. This designation suggests land
uses that are "Village and neighborhood commercial and residential
and related functions (3 -story commercial, residential — up to 35 units
per acre."
Based on the requested Single-family Residential (RS -7.5) zone, the
project would be consistent with the existing and proposed General
Plan LUPAG designation, and no amendments would be required.
B. General Plan Polices
The requested zoning would be consistent with the goals, policies,
and standards of the General Plan document.
For one, it may provide limited short-term economic opportunities
largely through the construction of any improvements required for the
residential development. Relatedly, longer-term opportunities could
be created largely in the form of maintenance of the private
roads/landscaping within the project and the creation of a stable
22
1
11
I
H
F
community. In so doing, the resultant project should add sustained
revenues to the County and State coffers.
The project intends to be energy conscious through the use and/or
encouragement of solar energy and design features to take
advantage of wind patterns.
Maintaining and improving the quality of the environment is important
to the success of this project. The General Plan identifies five (5)
areas of environmental concerns - air pollution, water quality, soil
pollution, solid waste disposal, and noise pollution. As proposed, the
project would not be violative of any of those objectives.
Aside from vehicular transmission, air pollution associated with the
project should be negligible. All wastewater systems would be
disposed off in the County's system along Alii Drive. This should be
sufficient to address any potential groundwater or coastal water
impacts.
If required, a solid waste management plan could be prepared and
implemented. Being a residential project, it should not be a noisy
one. Any noise -generating facility - such as air conditioners - would
be carefully placed to minimize their noise impacts to adjoining
properties.
The project area is outside of any floodway. Nonetheless, a drainage
system will be designed in a manner to protect the property as well as
to minimize the volume of surface runoff generated by this
development.
The site does have some archaeological sites. The burials will be
preserved, and other mitigative measures will be taken. Furthermore,
work will cease if unanticipated archaeological remains are discovered
while continuing its farming operations. Work will resume only after
proper clearances from the State and/or County have been received.
Being partially disturbed and within an urban environment, the
prospects of the site serving as a habitat for rare or endangered plant
or animal life appear remote.
As this is a residential project, it will directly fulfill the objectives of the
housing element. Specifically, these include goals, among others,
which
23
• Attain a diversity of socio-economic housing mix throughout the
different parts of the County
• Maintain a housing supply which allows a variety of choice
• Improve and maintain the quality and affordability of the existing
housing stock
• Seek sufficient production of affordable rental and fee -simple
housing in the County in a variety of sizes to satisfactorily
accommodate the needs and desires of families and individuals
The Plan also emphasizes that developments be mindful of an area's
natural beauty. In this situation, the project will be developed in a
manner where it blends with the existing terrain and enhances the
natural environment through the introduction of landscaping.
Although the project site is about 300 feet from the ocean, it is also
separated by other developments from the ocean. As such, some of
the usual coastal resources concern would not be pronounced.
There will be no interference with shoreline access. Then, too, by
hooking up into the County's wastewater system, impacts to the
coastal water should be minimized.
There will be little impact to public facilities. The roadway and
related system within the project site will be private. The water
system will be developed in a manner meeting with the requirements
of the Department of Water Supply. All on-site improvements will be
constructed by the applicant. Schools and other public facilities are
also located proximate to the site, most of them being less than 5
miles away.
Finally, in terms of the Land Use element, the pertinent goals,
policies, and standards of the General Plan note the following:
Designate and allocate land uses in appropriate proportions and
mix and in keeping with the social, cultural and physical
environments of the County
The County shall encourage the development and maintenance of
communities meeting the needs of its residents in balance with the
physical and social environment
24
' 0 0
' Zoning requests shall be reviewed with respect to General Plan
designation, district goals, regional plans, State Land Use District,
' compatibility with adjacent zoned uses, availability of public
services and utilities, access, and public need
' The county shall encourage the development and maintenance of
communities meeting the needs of its residents in balance with the
physical and social environment
' In view of the foregoing goals and policies, it is noted that the
requested zoning would be consistent with the Resort and Alternate
' Urban Area of the LUPAG map. It would also be compatible with the
surrounding area. There are multiple -family residential zonings
(RM -1.5, RM -2, V-1.5) adjacent and proximate to the subject site.
' There is also a residential subdivision mauka of the site and across of
the proposed Alii Parkway.
' The soil of the site is classified "M or poor. While it does have some
measure of agricultural potential, as evidenced by the existing
vegetation on the site, the site does not have resource that is deemed
' to be critical from an agricultural perspective. Furthermore, this area
is bounded by urban uses.
' The property has no severe topographic or geologic problems that
would render the land unusable for the proposed subdivision and
activity.
1
1
I
25
r •
APPENDIX A
Archaeological Inventory Survey — Ali'i Drive Parcels
Land Of Puapua'a 2°d, North Kona District
Island of Hawaii (TMK: 3-7-5-20: 71, 72)
Paul H. Rosendahl, Ph.D., Inc.
July 2003
I
1
1
i
1
1
1
0
Report 1340-070103
Archaeological Inventory Survey
AIN Drive Parcels
Land of Puapua`a 2nd, North Kona District
Island of Hawaii
Paul H. Rosendahl, Ph.D., Inc.
Archaeological • Hislorical • Cultural Resource Management Studies & Services
* V I
Report 2340-070203 ,
Archaeological Inventory Survey
Alii Drive Parcels
--Land-of-P-uapua-a-2-nd-North Kona -District
Island of Hawaii (TMK:3-7-5-20:71,72)
BY
James A. Head, B.A.
Supervisory Archaeologist
Susan T. Goodfellow, Ph.D.
Laboratory Director
Paul H. Rosendahl, Ph.D.
Principal Archaeologist
PREPARED FOR
Randy and Denise Farleigh
do Carrie Nicholson
Clark Realty Corporation
75-5722 Kuakini Tower, Suite 103
Kailua-Kona, HI 96740
JULY 2003
PNIIPaul H. Rosendahl, Ph.D., Inc.
Archaeological • Historical • Cultural Resource Management Studies & Services
HAWAII: 224 Wal nuanua A.. • Hilo, Hawaii 96720 • (BOB) 969-1763 GUAM: P.O. Box 23305 • G.M.F.. Gunn %921 • (671) 472-3117
' PREFACE
' The fieldwork for the initial archaeological inventory survey for the Alii Drive Parcels project area
was completed in October 1991, and a draft report on the fieldwork findings was completed in April of
1992 (Head, Goodfellow, and Rosendahl 1992). Due to client financial and development concerns,
however, the report was never finalized and never submitted for regulatory review by the Hawaii State
Historic Preservation Division (SHPD).
Recently, the project, under new ownership, was reactivated. At the request of our client, Clark Realty
Corporation, acting on behalf of their client, Mr. and Mrs. Randy Farleigh, PHRI was asked to complete the
' inventory survey project and to submit the inventory report for SHPD review. Because the fieldwork for the
report was conducted in 1991, and the report originally written in 1992, a number of concerns arose. The
primary concern was that since 1991, SHPD review standards for archaeological inventory survey reports
have gradually been revised and upgraded. The existing report, therefore, would have to be evaluated and
' revised to meet current standards. PHRI Principal Archaeologist Dr. Paul H. Rosendahl discussed this issue
with Dr. Ross Cordy, Chief Archaeologist, and Dr. Patrick McCoy, Hawai' i Island Staff Archaeologist for
the SHPD. Based on the consultations, PHRI then formulated specific tasks needed to upgrade the previous
' study to current standards, as outlined in Chapter 276: Rules Governing Standards for Archaeological
Inventory Surveys and Reports: Hawaii Administrative Rules, Title 13, DLNR; Subtitle 13, SHPD (May
2001;draft rules).
' One of the specific tasks was to conduct additional inventory fieldwork in the project area. This
fieldwork included relocation and updated assessments of condition and significance for all previously
identified sites, and detailed recording as necessary to upgrade existing field records and to document any
' newly identified sites or features. After this additional fieldwork was conducted, the earlier draft report
(Head, Goodfellow, and Rosendahl 1992) was to be revised to incorporate the fieldwork findings. The
specific manner in which the previous draft report was to be revised, therefore, was considered. In revising
' the report, it was decided that the integrity of the initial draft report, for the most part, should be
maintained, and that the bulk of the information to upgrade the report should be placed in an appendix. This
was deemed necessary in order to clearly demarcate work that took place in the past, and work that took
' place recently. Without this demarcation, confusion could arise; for example, there has been substantial
archaeological work done in the vicinity of the project area subsequent to the original inventory survey. To
place information on these subsequent archaeological projects in the Previous Archaeological Work section
of the original report would be misleading and might create confusion regarding matters such as the
' chronology for site identification in the vicinity.
Appendix C of the current revised report, contains the following information to upgrade the report:
' 1. Summary of archaeological work conducted subsequent to the fieldwork for the
initial inventory survey (Head, Goodfellow, and Rosendahl 1992);
' 2. Discussion of settlement patterns and predicted site patterns for the project area;
3. Plan maps for sites in the original report (Head, Goodfellow, and Rosendahl 1992)
' lacking such maps;
EM
4. Selected photographs of site and features; and
5. A review of general significance assessments and recommended treatments for all
sites identified in the project area.
Leonard Kubo
Senior Editor
July 2003
Reference Cited
Head, J.A., S.T. Goodfellow, and P.H. Rosendahl
1992 Archaeological Inventory Survey, Alii Drive Family Housing Project. Land of
Puapuaa 2nd, North Kona District, Island of Hawaii (TMK:3-7-5-20:71,72). PHRI
Report 1067-092691. Prepared for CRL Development, Inc.
I iv
SUMMARY
Paul H. Rosendahl, Ph.D., Inc. (PHRI) in 1991 conducted an archaeological inventory survey of the
' approximately 10 -acre Alii Drive Parcels project area, located in the Land of Puapua'a 2nd, North Kona
District, Island of Hawai'i (TMK:3-7-5-20:71,72). During the fieldwork, 14 sites consisting of more than
36 component features were identified. Three of these were previously known sites (6335, 6336, 6337)
consisting of seven component features. The project area features comprised the following formal types:
t wall, enclosure, C -shape, terrace, concrete structure, mound, platform, modified outcrop, and well. The
features comprised the following functional types: habitation, agriculture, agriculture/possible habitation,
indeterminate, possible boundary, habitation/agriculture, and burial.
' Thirteen of the sites identified during the current project are assessed as significant solely for
information content. No further archaeological work is recommended for any of these sites. Testing at
' Features D and E, Site 16116, during this inventory, however, revealed human burials. This site is
assessed as significant for information content, for cultural value, and as an excellent example of a site
type. Preservation "as is" is recommended for Features D and E.
1
1
1
• 0
V
Contents
Introduction • I
Background I
Scope of Work 1
Project Area Description 2
Previous Archaeological Work • 2
Summary of Historical Documentary Research • 8
Field Methods and Procedures • 8
Findings II
Surface Findings 1 I
Subsurface Findings • I I
Data Analyses by Susan T. Goodfellow, Ph.D. 26
Age Determinations • 26
Portable Artifacts 28
Midden • 30
Conclusion 33
Evaluation of Survey Methodology • 33
Discussion • 33
Suggested Future Research 38
General Significance Assessments and Recommended General Treatment 39
References Cited 41
Appendix A: Site Descriptions
Appendix B: Historical Documentary Research By Lehua Kalima
Appendix C: Information to Update Original Inventory Survey
I
I
Figures
Figure 1. Project Area Location Map 3
Figure 2. Site Location Map • 4
Figure 3. Site 16116, Agricuhural/Burial Complex • 10
Figure 4. Functional Disribution of Sites • 15
Figure S. Sample Map of Kona Field System at Site 16116 • 16
Figure 6. Site 16114, Habitation Terrace • 17
Figure 7. Site 16117, Habitation/Agricuhurol Platform • 18
Figure 8. Site 16116, Feature D, TU4, East Face (PHRI Neg. 1870-26a) 20
Figure 9. She 16116, Feature G, TU -6, East Face (PHRI Neg. 1894-(9a) 22
Figure A -I. Site 16113 • A -I
Figure A-2. Site 16115 • A-5
Figure A-3. Site 16116, Feature D, TU -1 • A-7
Figure A-4. She 16118 • A-9
Figure A-5. Site 16133 • A-10
Figure 8-1. Portion of the Kailua Section of North Kona in the Late 1920s B•3
Figure C-1. She 6335, Wall C-13
Figure C-2. Site 6336, Wall C-14
Figure C-3. Site 6337, Feature C, View to West -Southwest C-15
FigureG4. Site 6337, Feature D, Platform, View to West -Southwest C-16
Figure C-5. Site 16111, Feature C, Windmill Platform, View to North C-17
Figure C-6. She 16111, Feature A (Wall), Feature B (Mound), View to South -Southwest C-18
Figure G7. Site 16113, Feature A, Enclosure, View to East -Northeast • G19
Figure C-8. Site 16113, Feature B, C -shape, View to West -Northwest • C-20
Figure C-9. She 16114, Terrace, View to West -Northwest C-21
Figure C 10. She 16115, Feature E Enclosure, View to East C-22
Figure C-1 I. Site 16115, Feature E, Enclosure, TU -1, Post Excavation • C-23
Figure C-12. Site 16116, Feature A Mound, View to North -Northwest • C-24
Figure G13. She 16116, Feature B, Upright and Mound, View to East -Northeast C-25
FigureC-14. She 16116, Feature C, Mound, View to North -Northwest C-26
Figure C-15. Site 16116, Feature D, Platform, View to North -Northwest C-27
Figure GI6. She 16117, Platform, View to North -Northeast C-28
Figure C-17. She 16118, Enclosure • C-29
Figure C• 18. She 16119, Terrace, Northwest Comer, West Face, View to East -Southeast • C-30
Figure C-19. Site 16133, Feature B, Terrace, View to East -Southeast • C-31
Figure C-20. Plan View of She 6325
• C-32
Figure C-11. She 6325, Feature K TU -1320.33, East Face Profie • C-33
Figure C-22. She 6337, Feature B
C-34
Figure C-23. She 6337, Feature C
C-35
Figure G24. Site 6337, Feature D
C-36
Figure C-25. She 15108 • C-37
Figure C-26. She 16119, Feature A
C-38
vi
W, w
Tables
vii
Table I. Correlation of Site Numbers • 8
Table 2. Summary of Identified Sites and Features • 12
Table 3. Frequencies of Formal Feature Types 14
Table 4. Frequencies of Functional Feature Types 14
Table 5. Sununary of Radiocarbon Age Determinations • 27
Table 6. Detailed Distribution of Portable Artifacts 29
Table 7. Detailed Distribution of Midden • 32
Table B. Summary of General Significance Assessments and Recommended General Treatments • 40
IJ
I
• 0
BACKGROUND
Paul H. Rosendahl, Ph.D., Inc. (PHRI), conducted an
archaeological inventory survey of the approximately
10 -acre AIN Drive Family Housing Project project area, in
the Land of Puapuaa 2nd, North Kona District, Island of
Hawaii (TMK:3-7-5-20:71,72). The overall objective of the
survey was to provide information sufficient for satisfying
all historic preservation regulatory review requirements of
the Hawaii County Planning Department (HCPD) and the
Department of Land and Natural Resources - State Historic
Preservation Division (DLNR-SHPD).
The survey field work was conducted September 9-20,
and October 21-31, 1991 under the guidance of Supervisory
ArchaeologistJamesHead,B.A.,andHawaii Projects Director
Alan T. Walker, B.A. Principal Archaeologist Dr. Paul H.
Rosendahl provided overall direction for the project. Crew
members included Field Archaeologists Jason Betryhill, Jack
Harris, and Jeffrey Putzi, B.A. The field work took
approximately 480 labor -hours to complete.
SCOPE OF WORK
The basic purpose of an inventory survey is to identify—
todiscoverandlocate onavailablemaps—features ofpotential
amhaeologicalsignificancepresent withmthe speciftedproject
area. An inventory survey is an initial level of archaeological
investigation It is extensive rather than intensive in scope,
and is conducted with the printary aim of determining the
presence or absence of archaeological resources within a
specified project area. Asurveyof this type indicates boththe
general nature and the variety of archaeological remains
present, and the distribution and density of such remains. It
permits a general si gnificanceassesstnent of the archaeological
resources, and facilitates formulation of recommendations
and estimatesfor any mitigation workthatmight be necessary
or appropriate. Such work could include intensive survey—
further data collection involving detailed recording of sites
and features, and selected test excavations. It might also
include subsequent data recovery research excavations,
construction monitoring, interpretive planning and
development, and/or preservation of sites and features with
significant scientific research, interpretive, and/or cultural
values.
The basic objectives of the present survey were fourfold:
(a) to identify (find and locate) all sites and site complexes
present within the project area; (b) to evaluate the potential
general significance of all identified archaeological remains;
(c) to determine the possible impacts ofpropcsed development
upon the identified remains; and (d) to define the general
scope of any subsequent further data collection and/or other
mitigation work that might be necessary or appropriate.
Based on a review of readily available background
literature, familiarity with the project area, extensive
familiarity with the current requirements of pertinent review
authorities, and on discussions with Mr. Livingston of CRL
Development, Inc. the following specific tasks were
determined to constitute an adequate and appropriate scope
of work for the inventory survey:
1. Review archaeological and historical literature
relevant to the project area, and conduct limited
historical documentary research (with an emphasis
on readily available documentary sources) and
interviews with any appropriate and available local
informant sources;
2. Conduct 100% coverage, high-intensity ground
survey of the project area;
3. Conduct limitedsubsurface testing of selectedsites
and features identified within the project area (a) to
determine the presence or absence of potentially
significant buried cultural features or deposits, and
(b) to obtain suitable samples forage determination
analyses; and
4. Analyze field and historical research data, and
prepare appropriate reports.
The inventory survey was carried out in accordance with
the standards for inventory -level surveyrecommendedby the
Department of Land and Natural Resources - State Historic
Preservation Division (DLNR-SHPD). The significance of
the archaeological remains identified in the project area was
assessed intermsof (a) the National Registercriteriacontained
in the Code of Federal Regulations (36 CFR Part 60), (b) the
criteria for evaluation of traditional cultural values prepared
by the National Advisory Council on Historic Preservation,
and (c) PHRI Cultural Resource Management (CRM) value
modes. DLNR-SHPD and the Hawaii County Planting
Department both use these first two criteria to evaluate
eligibility for both the Hawaii State and National Register of
Historic Places.
INTRODUCTTON
PROJECT AREA DESCRIPTION
The project area is a c. 10 -acre parcel situated C. 40-80 ft
(12-24 m) above mean sea level (AMSL), and located c. 250-
500 ft (76-153 m) from the Pacific Ocean. The project area is
bounded on the west by Alii Drive, on the east by the
proposed Alii Drive Realignment Corridor and additional land
within Puapuaa 2nd, and on the north and south by additional
land within Puapuaa 2nd (Figures I and 2).
The project area is part of the Kona Lava Plain, a low-
cliffed volcanic coast (defined by Armstrong (1983:37) as
coastline with wave -cut cliff—avenge height about 20 ft [6
m]). The surface of the project area and vicinity was formed
by HuaWai Volcanic Series flows which may be Late
Pleistocene in age. In general, the lava flows are highly
permeable, but carry brackish water along the coast (Stems
and MacDonald 1946:140).
Terrain in the project area is gently undulating and
consists of soils included in the Puu Pa-Pakini-Waiaha
association: shallow to deep, nearly level to steep, well -
drained to somewhat excessively drained soils that have a
medium -textured subsoil or medium -textured underlying
material; on uplands. This association is found in leeward
areas (e.g. small areas of North and South Kohala, North and
South Kona, and at Ka Lae (South Point) in Kau (Sato, et al.
1973:7). More specifically, soil in the project area consists of
Punaluu extremely rocky peat (6-20% slopes), representing
the Punaluu series of well -drained, thin organic soils over
pahoehoe lava bedrock They are found on uplands from sea
level to 1000 ft (305 m), and are rapidly permeable, with slow
run-off, and a slight erosion hazard. This soil is used for
pasture (ibid.:48). Rainfall in the project area is c. 30 to 40
inches (118-157 mm) per year, and the mean annual
temperature is approximately 75 degrees F. (24 degrees C.)
(Armstrong 1983:63-64).
Vegetation within the project area varies in densityfrom
moderate to heavy, and consists primarily of introduced
exotics such as kiawe (Prosopis pallida [Numb, and Bonpl.
ex Willd.] HBI), 'opiunta (Pithecellobium dulce [Roxb.]
Bentlf.), African tulip tree (Spathodea campanulara Beauv.)
and koa-haole (Leucaena glauca (L.] Benth), scattered
monkeypod (Santaneasaman [Jacq.] Merr.), lantana (Lantana
cantara [L.]), guinea grass (Panicurrt maximum Jacq.), bitter
yam (Dioscorea bulbifera L.) and other exotic grasses and
weeds. One indigenous plant, 'ilinta (Sida fallax [L.]) was
observed in the area.
FV
PREVIOUS ARCHAEOLOGICAL WORK
Both the Lands of Puapuaa 2nd and the sutramding
ahupua'a have been subjected to numerous archaeological
inventories and mitigation projects, stermning from the
proposed Alii Drive Realignment Studies (Ching et al.1973,
Soehren 1978, Hommon and Rcsetdahl 1983, Walker and
Rosendahl 1985a), the Kahakai Development Project (Welch
1982, Walker and Rosendahl 1984, Walker and Rosendahl
1985b, Landrum, et al. 1990), the Pualani Residential
Community (Walker and Rosendahl 1988, Carlson and
Rosendahl 1990, Graves 1991x, 1991b, 1991c, and in prep.)
and the Kuakini Highway Realignment Corridor (Schilt et al.
1984). Other projects conducted within the general area
include Dye (1978) Hammatt (1980), Robins, et al. (1990),
and Head et al. (1991).
In 1973, ArchaeologicalResearchCenterHawaii (ARCH)
initially surveyed the Alii Drive Realignment Corridorportion
of the current project area for Belt, Collins, & Associates
(Ching et al. 1973). The objective of that surface survey was
to "...locate, identify, describe, and indicate a priority of
importance for every feature of archaeological value with the
assigned study area" (Ching et al. 1973:25). Three sites
containing six component features were identified in the portion
of the corridor within the present project area. the features
consisted of wall shelters and a platform (Site 6325a b*), walls
(Sites 6336, and 6337), and U-shaped shelters (Site 6337a).
The features comprised the following functional types:
habitation, possible burial, and boundary. Ching et al. (1973)
recommended that further archaeological mitigation work at
the sites be completed prior to site destruction.
In early 1978, Dye conducted reconnaissance surveys of
four parcels being considered as sites for the proposed
Kahakai Elementary School. The area designated as Parcel
A (which was not bulldozed) contained four archaeological
sites along with"...amorphous mounds of loosely piled rocks,
usually found in association with an exposed pahoehoe
outcrop" (Dye 1978:14). Site 50 -Ha -D7-6 was a 1.4 m high
L-shaped wall, 3.0 by 4.0 m long, with a wooden post and an
attached wire at the end ofthelongerwall. SiteD-7wasalow,
rectangular platform of basalt Site D-8 was asmalllava-tube
cave containing the remains of marine gastropods, other
invertebrates, and kukui. Site D-9 was arectangular enclosure
measuring 13.5 by 12.0 by 0.45 m high. Dye recommended
that "Accurate location and plane -table mapping of Site D7-
6, -7, -8, and -9, with limited test excavations at Sites D7-7,
-8, and -9 would mitigate the effects of school construction at
this site" (1978:19).
" State Inventory ofHistoricPlaces(SIHP) site designationsystencallfoui-digitsitenumbersprefxedb50-10-37(50-State
of Hawaii, 10=Island of Hawaii, 37-USGS 75' series quad map ["Kealakekua, Hawaii]).
INTRODUC77ON
3
A
Iz
d _Ydd V r
n
1�m
t+1 ,d m LL
IOLL �
7 r
/ V1
3 A I H 0 1 1 1 V
1
I
I
Il
I
• 0
INTRODUCT70N
In 1978, Soehrenconducted anarchaeological inventory
survey of c. 50 acres (202 ha) along the inland (east) side of
Ilii Drive. The survey area included the present project area
(Soehren 1978). Within the present project area Soehren
reidentified one site (Site 6325) initially recorded by Ching
et al. (1973) and located two additional sites (Sites N and O).
Site Nwas interpreted to be apossible burial site; the function
of Site O was not stated. Soehren stated that with the
exception ofpossible graves,"[nlofeatures were found in this
survey which have major archaeological or historical
significance" (1978:1).
Beginning in 1980,archaeological workincluding survey
and salvage excavations inthe Kuakini Realignment Corridor
(Schilt 1984) was undertaken by for the State of Hawaii by
B.P. BishopMuseum,DepartmentofTransportation. Formal
feature types in the corridor included platforms, enclosures,
modified outcrops, and open soil areas. Functional types in
the corridor area included agriculture, habitation,
transportation, and ranching. Thirty-three volcanic glass
and six radiocarbon dates derived during the corridor study
indicated that the dryland agricultural and temporary
habitation features within Puapuaa were initially utilized
between c. AD 1400 and some time c. 1600 to 1650.
Intensive agriculture and semi-permanent or permanent
habitation followed from about AD 1600 to 1650 period,
until 1779 and continued intotheearly I800s(Schilt 1984:277-
278). Then, about AD 1799-1850, aperiod which coincides
with the decline of the indigenous Hawaiian population,
agriculture in the area was on the decline or was abandoned
(Schilt 1984:281-282). Schilt states that garden -related areas
and a seasonal habitation site were "situated atop small to
large, prominent outcrops"(1984:281).
In 1980, Hammatt conducted an archaeological survey
of a shoreline property in the Land of Puapuaa 1st., located
just to the northand west of theproject area, across AM Drive.
The size of the survey area appears to have been c. 38.0 acres
(15.4ha) and two archaeological sites were located. Site 6439
was a platform and "may be the foundation of a large
Hawaiian hale" (Hammatt 1980:ii). The other site, called
Kauakaiakaola Heiau (Site 3836), "is a major Hawaiian
temple mentioned in Ellis and thought to be associated with
Kamehameha I. It was restored in 1947 and is now covered
with vegetationand has some crumbling walls particularly on
the nakai side" (ibid:ii). Testing was recommended for the
platform if its location were planned for development. The
heiau was recommended for preservation and possible
integration into development plans.
In 1982, Welch returned to the Parcel A area (Dye 1978)
to conduct archaeological salvage operations. In addition to
the two sites (D7-8 and 137-9) found by Dye (1978) in the
Lands of Puapusa 2nd, six other sites (D7-71, -73, -74, -75,
-76, and -78 were located in Puapuaa 2nd. Welch (1982)
argues that the lava tube cave (D7-8) was used for habitation
with indications that the cave was used as an activity area and
not as a refuse area He also indicates that the high stone
platform (Site D7-74) may have been a religious shrine, but
no evidence of a burial was found in the bubble below. The
remainder of the sites in the project area appear to have been
used primarily for agricultural purposes, with some serving
multiple functions.
In early 1983, Hommon and Rosendahl (1983) re-
inspected the Alii Drive Realignment Corridor portion of the
present project area for Belt, Collins & Associates. The
purpose of the survey was to provide archaeological data to
update the environmental impact statement being prepared
for Hawaii County by Belt, Collins & Associates. Because
the Alii Drive Realignment Corridor portion of the present
project areahadbeenpreviously surveyed (Ching eta1.1973),
the Hommon and Rosendahl (1983) investigation focused on
determining which sites and features were still present and
evaluated the reliability of the earlier recording.
In addition to the four sites and six component features
identified by Ching et al. (1973), Hommon and Rosendahl
identified three new features in the vicinity of Site 6337
(Hommon and Rosendahl 1983:field records). These three
features were subsequently designated Sites 63376 (habitation
terrace), 6337c (possibleburial platform), and 6316 (possible
burial platform) (Walker and Rosendab11985a). Site 6316 is
a wall in another portion of the corridor (Ching et al. 1973,
Hommon and Rosendahl 1983), and Walker and Rosendahl
(1985a) identify Site 6316 as a platform. Based on the
findings of their survey, Hommon and Rosendahl (1983)
recommended that the area surveyed by Ching et al. (1973)
(the portion of the Alii Drive Realignment Corridor withinthe
present project area) be subjected toreconnaissance (mventory)
survey.
In 1984, PHU conducted a reconnaissance survey of
TMK Parcel 76 and a portion of the Alii Drive Realignment
Corridor (Walker and Rosendahl 1985a). The survey was an
addendum tothefull archaeological reconnaissancesorveyof
theKahakai Developmentproject area (WalkerandRosendahl
1985b). Four sites (Sites 6316, 6325, 6336, and 6337)
consisting of nine component features were identified in the
portion of the corridor contained within the present project
area. Site 6316 was misnumbered by Walker and Rosendahl
(1985a); Site 6316 is actually another site in a adjacent
ahupta'a. During the present survey, Site 6316 (Walker and
Rosendahl 1985a) was renumbered as Site 1001-5. Based on
0 0
IN7RODUC77ON
the findings of their survey, Walker and Rcsendahl (1985a)
reconunendednof niherwerkforSite6336. Fortheremaining
sites (Sites 6316 [1001-5], 6325, and 6337) mitigation was
recommended.
In 1985, PHRI conducted an archaeological inventory
survey and test excavations at Kahakai Development project
area, a c. 115 ave (46.5 ha) parcel situated in the Lands of
puapuaa 1st and 2nd (Landrum et al. 1990). During the
project, 46 sites (consisting of 206 features) were identified,
of which, three were newly identified. The features included
boundary walls, cave shelters, habitation structures, terraces,
mounds, platforms, burials, a historic roadbed, recent cattle
enclosures, shrines, and a possible heiau.
Subsurface testing occurred as part of the project. A total
of 118.3 sq m was excavated withmarine mollusc shell being
themostcommonitem. Fifteenhumanburials were identified
as well. Of the 46 sites identified in the area, 26 were found
to be significant solely for information content. No further
wok was recommended for 20 of these sites; the remainder
(6) were recommended for further data collection. Six of the
remaining 20 sites were assessed as significantfor information
content and cultural value. Further data collection and
preservation "as is" was recommendedfor twoof thesix sites,
and further data collection and disinterment and reinterment
was recommended for the four remaining sites. Five sites
were assessed as significant for information content and were
provisionally assessed as significant forculturalvalue. Further
data collection and provisional disinterment and reinterment
was recommended for these sites. Four sites were assessed as
significant for information content, as excellent examples of
site types, and provisionally significant for cultural value.
Further data collection followed by provisional disinterment
and reinterment was recommended for these sites. Two sites
were assessed as significant for information content and were
provisionally assessed as having cultural value. Further data
collection and provisional preservation "as is" was
recommended for these sites. Two sites were assessed as
significant for information content, as excellent examples of
site types, and as having cultural value. Following further
data collection, preservation with interpretive development
was recommended for these sites. Finally, one site was
assessed as significant for information content and as an
excellent example of a site type. Further data collection was
recommended for this site (Landrum et al.:ii).
In early 1988, PHU conducted an archaeological
reconnaissance of the Pualani Subdivision project area,
consisting of c. 100 acres (41 ha) in the lands of Puapuaa 1st
and 2nd (Walker and Rosendahl 1988). The proposed project
parcel was locatedmauka of theKuakini Realignment Corridor
(Hawaii Belt Road) and while partially in the same ahupua `a
as the present project area (Puapuaa 2nd), it is at a higher
elevation. Seventy-six sites (including 129 component
features) were recorded during the survey. Of the 76 sites, six
had beenpreviously identified and 70 werenewlyfound. The
sitesincludedbothsingle-andmulti-canponentsites. Formal
feature types included terrace, trail, C- and L-shaped walled
shelter, walled encle sure, freestanding wall, modified outcrop,
platform, lava blister, boulder alignment, mound, historic
railroad bed, and modified area Tentative functional types
included habitation, transportation, agricultural, religious,
possible burial, boundary wall, historic dump, and recent
cattle ranching structure (wall, pen, and foundation).
During the field work (Walker and Rosendahl 1988),
portions of the Kona Field System (Newman 1970) were
found throughout the project area. Previously declared
eligible for inclusion to the National Register of Historic
Places (NRNP), the Kona Field System (Site 6601) is a
complex of aboriginal Hawaiian dryland cultivation and
habitation remains extending from the Kailua area south to
Hookena. In 1974, for the nomination of this agricultural
complex to the Hawaii Register of Historic Places (Site 10-
37-6601), T. Stell Newman wrote:
Themost extensive and monumental workof ancient
Hawaii is the Kona Field System, lying along the
western side of Hawaii Island. This field system is
so extensive that it can only be appreciated from an
airplane or by air photos, for it is an integrated
complex of remains three by eighteen miles in size.
The fields form a patterned network of elongated
rectangles lying as a band parallel to the sea
(Newman IN Schilt 1984:3).
In 1990, PHRI conducted a 100% coverage, variable -
intensity archaeological survey of c. 65 acres (26.3 ha) for the
Pualani Development - Phase II project area in the Lands of
Puapuaa 1st and 2nd (Carlson and Rosendahl 1990). Sixty-
foursites (138 componentfeatures) were identified during the
course of the inventory. Limited subsurface testing also
occurred at seven sites, and radiometric dates ranging from
the eleventh to the twentieth century were returned. Fifty-
sevenof the total of 64 sites wereassessedas significantsolely
for information content. Of these 57 sites, seventeen will
require no further archaeological work, while 40 were
recommended for further data collection Of the remaining
seven sites, four are assessed as potentially significant for
cultural value and information content. These sites may
contain burials; further data collection was recommended for
them, and preservation"as is"wasprovisionallyrecommended,
pending data collection results. Two sites were assessed as
I
1
I
I
I
11
J
0 •
INMODUMON
significant for information content, as excellent examples of
site types, and for potential cultural significance. Both sites
maycontainburials. Forthesetwosites,furtherdatacollee ion
was recommended, andpreservation "as is"was provisionally
recommended, pending further data collection results. The
final site was assessed as significant for information content
and cultural value. This site is a burial cave containing the
remains of at least four individuals. Further data collection
and preservation "as is" was recommended.
In 1990, Cultural Surveys Hawaii conducted an
archaeological inventory survey and testing on 18.5 acres
(7.5 ha) in the makai portion of Puapuaa 1st and 2nd
ahupua`a (Robins et al. 1990). Fifty-seven sites were
located including habitation structures, agricultural
complexes, walls, and a probable burial structure. Limited
testing offeatures forhumanburials was undertaken, as were
tests for cultural deposits. With one possible exception,
human remains were not present within the tested features.
None of the total of 57 sites was recommended for
preservation, and 38 sites were considered not significant or
no longer significant. The remaining sites are considered
significant for information content and were recommended
for further data recovery (ibid.:i).
In 1991, PHRI conducted an archaeological field
inspection of the Alii Drive Family Housing project area
(Walker 1991). Eight sites were identified in the field (Sites
6335,6336,6337,1001-1,1001-2,1001-3,1001-4, and 1001-
5). Previous archaeological work and informant information
indicated there were three other sites in the project area that
had not beenre-identified (Sites N, O, and 6325). Walker and
previous archaeological researchers identified 11 sites in the
project area. They consisted of more than 19 component
features, and comprised the following formal feature types:
wallshelter,platform, wall, U -shape shelter, terrace, enclosure,
mound, and cairn. The features comprised the following
functional types: habitation, possible burial, possible
agriculmire, boundary, and indeterminate,
Three features in the project area have undergone
inventory -level survey work: Sites 6335, 6336, and 6337 (the
wallfeature only) (Walkerand Rosendahl 1985x, Landrum et
al. 1990). The remaining sites in the project area were only
tentatively and generally assessed in the report, because they
had notundergone inventory -level work All of the remaining
sites, however, were assessed as probably significant for
information content. It was also recommended that an
inventory -level survey be conducted in the project area prior
to any development activity.
In 1991 PHRI provided amitigationplanforthe proposed
Pualani Residential Community (Jensen 1990) and mitigation
fieldwork was begun on the fust zoning increment (Graves
1991a). This work proceeded in fourphases (a) relocation of
the sites to be recorded, (b) vegetation clearing and update of
previous field records, (c) detailed mapping and description
of each feature, and (d) test excavations. During this phase
of the fieldwork, each of the 36 identified sites (within the
Increment I planning zone) was relocated and subjected to
further data collection.
Also in 1991, PHRI performed mitigation within the
second zoning increment of the Pualani Residential
Community(Graves 1991b). Fieldworkwas carried outusing
a phased approach similar to that applied during Graves
1991a. Data collection was completed at Site T-35 and at
peripheral features of Site T-37. All 14 sites in the Increment
II Planning Zone were relocated and subjected to further data
collection Some sites were combined and two previously
unidentified sites (Sites T-76 and T-77) were located and
underwent detailed recording and auger testing.
Also in 1991, Jensen (1991) assembled a Data Recovery
Plan for the Pualani Development Company Wastewater
Treatment Facility project area at the Pualani Development -
Phase II project area in the Lands of Puapuaa 1st and 2nd.
Subsequently PHRI conducted archaeological data recovery
at the proposed Wastewater Treatment Facility project area
(Graves 1991b). Seventeen of the 64 identified sites found
during the inventory survey of the Phase lI project area
(Carlson and Rosendahl 1990) were located within the
proposed WastewaterTreatment Plantproject area and all 17
sites were considered significant for information content
only. Of these 17 sites, three were sufficiently recorded
during the inventory survey, and no further work was
recommended for them. Mitigation of the remaining 14 sites
proceeded with a methodology similar to that outlined in
Graves (1991a), and all wererelocated. Purtherdatacollectian
was performed at all locations.
In 1991, PHRI returned to the Alii Highway project area
for the Phase 1(a) work (Dunn and Rosendahl 1991). The
specific objective of the Phase 1(a) work was to identify (to
determine the presence or absence of) any sites of such
significance as to seriously constrainorprevent the proposed
highway development. Such sites would most likely consist
of burials, religious sites, and outstanding examples of site
types. During the project, 136 sites consisting of more than
535 componentfeatures were identified withinorimmediately
adjacent to the project area. Three of the sites, consisting of
71 features, were newly identified.
Tfie sites identified consisted -of both complexes and
single -feature sites, and they wereboth alteredand unaltered,
with conditions ranging from poor to good. Formal feature
a
INTRODUCTION
types identified include caim, C -shape, cave, cave with
exterior platform, cupboard, enclosure, enclosure with
platform and wall, filled crevice, filled paved blister, L -
shape alignment, L -shape wall, midden scatter, modified
outcrop,mound,paved area, paved depression, paved walled
depression, petroglyph, platform, platform with adjoining
wall, sealed cave, terrace, trail, U -shape, wall, and wall
fragments. Based on their appearance at the time of field
work, feature -type designations for sites were changed, in
some cases, from their designations as assigned in Ching et
al. (1973) and Hommon and Rosendahl (1983) surveys.
Functional interpretations for the features included
agriculture, boundary, burial, habitation, indeterminate,
marker,possible burial,possible habitation, possible shrine,
possible water catchment, recreation, shrine, and
transportation. The functional interpretations are tentative,
as further work is needed to substantiate the preliminary
assessments.
It was also noted that there were simple agricultural
features throughout the entire project area, and that only a
representative sample of them were recorded. Such features
were recorded when they were concentrated in an area or
when they constituted a variety of formal types.
In 1991, PHU conducted an archaeological inventory
survey at the proposed Alii Drive Sewer Project site (Head et
al. 1991). The proposed site consisted of two parcels within
c. 1000 feet (300 m) of each other: (a) a proposed sewer line
easement in Pua'a 2nd and 3rd, and (b) the W aiaha Bay Sewer
Pump Station (SPS) in Waiaha 1st and 2nd.
During the field work, 20 sites consisting of more than 38
component features were identified. The features comprised
the following formal types: enclosure, modified outcrop,
paved terrace, filled blister, L-shaped wall, midden scatter,
modified outcrop with alignment, trail, and walled overhang.
The formal feature types comprised the following functional
types: habitation, agriculture, boundary marker, clearing,
storage, transportation, and habitation/agriculture.
All 20 of the identified sites were assessed as significant
solely for information content. No further work was
recommended for three of the 20 sites. Further data collection
was recommended for the remaining seventeensites (ibid.:ii).
SUMMARY OF HISTORICAL
DOCUMENTARY RESEARCH
The previous -discussion, when taken in conjunction with
legendary accounts and historical documentation, indicates
that use of the project area and vicinity has occurred from at
least the 12thcentury AD. Thesedata can thenbe used to view
previous archaeological work inPuapua'aas well as on-going
archaeological research. Itnowseems that the maineconomy
in the project area has been agricultural: gardening and food
crops in the distant past, and in more recent times, animal
husbandry. In general terms, there are indications that in
1824, a substantial number of people (approaching 20,000
inhabitants [including 3,000 at Kailua]) were living along the
coast (Thurston IN Kelley 1983:14). Scattered temporary
housing has also been located in upslope portions of the Kona
Field System, with indications of lower status permanent
housing still further upslope (Graves in prep.). Findings of
archaeological investigations in the past have substantiated this,
and the present project also confirms this to varying degrees.
FIELD METHODS
AND PROCEDURES
The archaeological resource inventory performed at
this location has resulted in the archaeological examination
of c. 100% of the proposed impact area. This was
accomplished using pedestrian transects (oriented east -west)
ranging from 5.0 to 7.0 in apart, depending on terrain and
vegetation density. The project area consists of two
rectangular parcels (Lot 4A and Lot 5A) with the long axis
turning east/west.
Table 1.
CORRELATION OF SITE NUMBERS
SIHP
PEW
6335
—
6336
—
6337
—
15108
1067-38
16111
1067-24
16112
1067-25
16113
1067-14
16114
1067-16
16115
1067-23
16116
1067-26
16117
1067-36
16118
1067-34
16119
1067-28
16133
1067-29
1
LJ
1
I
0
INTRODUCTION
All identified sites were described on standard PHRI
site survey record forms and were photographed using 35
mm black -and -white film. Detailed recording of sites
included written descriptions, measurements, and plan
maps. Each site, or the primary feature within the site
complex, was marked with pink and blue flagging tape, and
an aluminum tag bearing the temporary site number, the
date, the letters "PHRI," and the PHRI project number (91-
1067). All newly identified sites were assigned one- or two -
digit PHRI temporary field numbers prefixed with "1067-,"
beginning with "1067-l." All sites were subsequently
assigned permanent State Inventory of Historic Places
(SIHP) site numbers (Table 1). Several sites originally
located during previous projects were also relocated. These
sites were assigned PHRI temporary field numbers, but
have retained their original SIHP designation.
As noted earlier, minor agricultural features are
ubiquitous in the project area. Because of the density and
continuity of these features, it was deemed not feasible and
not necessary to record all of them. Rather, a representative
sample of them was recorded. To accomplish this a 25 m2
area within Site 16116 was cleared and mapped to illustrate
the type of features present and their distribution. This is
shown in Figure 3. The area of Site 16116 was chosen as it
is typical of the project area: it contains a few major
structural features (two major mounds and an enclosure)
surrounded by numerous minor agricultural features such as
small terraces and mounds.
N
During the testing phase of the inventory project,
potential radiocarbon samples and soil samples were taken.
Test excavations consisted of controlled test units and
seventeen test units, which were placed at six sites.
The number and placement of these test units were
selected to thoroughly sample the sites and features in the
project area. Test units were excavated with hand trowels,
by natural stratigraphic layers. These units were excavated
until bedrock or sterile soil was reached. Excavated
material was screened through both 114 -in and 118 -in mesh
screen, and all cultural materials were retained. When
charcoal was found, samples were taken for radiocarbon
age determination analysis. Excavation data was recorded
on standard PHRI record forms. As during the
reconnaissance phase of the survey, detailed 35 mm black -
and -white photographs were taken to show both pre- and
post -excavation views. It was also determined that further
testing, mapping, and sampling of the Kona Field System
(Newman 1970) should occur before completion of the
fieldwork. All work was completed during the latter pan of
October 1991.
All burial units encountered during test excavations
were left in place and the excavations were backfilled.
4
LU
w
tCLt�
a6.
r
G
gn
N
E
t
F
c�
w
t ON
Ypp
W
O
a
LL
e LL
r C W
Cl
� rtr t'A�.�, tL'et
IQ
LL
68i
{tom
LU
�
L
b\
E
t
F
I
n 7 �
O
a
LL
E
t
1
I
1
I
I
I
1
u
I
1
I
• 0
11
SURFACE FINDINGS
Fourteenarchaeological sites, consisting of more than 36
component features, were identified in the project area. The
sites were both prehistoric and historic. Three of them (6335,
6336, and 6337) were previously known and were included in
the current project, because six of their seven known features
are in the area of potential effectforthe proposed development.
The site locations are shown in Figure 2. Table 2 summarizes
thesites internis of componentfeatures,formal and functional
types, pMU Cultural Resource Management (CRM) value
mode assessments, and recommended field work tasks.
Appendix A provides detailed descriptions for each site.
The sites comprised six complexes (multi -feature sites)
and eight single -feature sites, and include the following
fonnalfeaturetypes: wall,enclosure, C -shape, terrace, concrete
structure, mound, platform, modified outcrop, and well
(Table 3). The sites comprised the following functional
types: habitation, agriculture,aocurlture/possible habitation,
indeterminate, possible boundary, retaining wall, habitation(
agriculture, and burial (Table 4, Figure 4),
The most common recorded formal feature type in the
project area was terrace (N-9 or 25.2%) Othercommontypes
included wall, enclosure, mound, platform, and modified
outcrop. Themest commonfunctional types were agricultural
(18 examples), with habitation and habitation/agricultural
also represented.
Site 16116, an agricultural/burial complex, is illustrated
in Figure 4. Eight features have been recorded at this site.
These include an enclosure, four mounds, two platforms, and
a modified outcrop. The portion of Site 16116 illustrated in
Figure 3 is shown on the left side of Figure 4. This site is
located on gentle ntakai-sloping pahoehoe lava flows with
nu merousoutcropsofbedrock. This slope is gentle throughout
the site area, becoming flat near the Site 16112 location,
immediately to the west. Vegetation on and surrounding the
site is composed of exotics including kiawe, koa-hook,
lantana, and guinea grass.
An example of a habitation terrace was noted at Site
16114 (Figure 6). This single -component habitation site
consists of a stacked, faced terrace built onto the south and
west faces of a bedrock outcrop. The site is at c 300 m (994 ft)
elevation, and the terrain is roughly level, with a slight
westward slope to the ocean Vegetation includes kiawe,
lantana, koa-haole, and guinea grass.
Ahabitation/agriculturalplatfotmisfoundatSite 16117
(Figure 7). This is a medium-sized feature with a small
cupboard or "well" built into the top. It is constructed of
small -to -medium basalt boulders piled atop a bedrock
outcrop. The site is found in an area of almost flat pahoehoe
lava flows with numerous bedrock outcrops. Vegetation in
the immediate area includes kiawe, lantana, 'ilima, guava,
and guinea grass.
SUBSURFACE FINDINGS
Seventeen test units were excavated at six sites (16114,
16115, 16116, 16117, 16133, and 6337) in order to recover
datable radiometric samples, to test for the presence of buried
cultural deposits, and to determine the presence or absence of
human remains. The units yielded ten radiocarbon samples,
of which seven were dated. The units also revealed several
midden samples (see Age Determinations and Midden
sections), and disclosed the presence of human burials in two
locations at Site 16116. All test units were backfilled and
features were restored at the conclusionof the testing. Detailed
descriptions of the unit stratigraphies follow.
Site 16114, Feature A, TU -1
Site 16114 is a late prehistoric or historic terrace located
in the south-central portion of the project area. Feature A is
a stacked and faced terrace built onto the south and west faces
of a bedrock outcrop, and may have served as a prehistoric
habitation TU -1(1.0 by 1.0 m) was placed in the center. This
feature appears to be built upon the ground surface, and
excavation of TU -1 (placed in the center) ceased when
bedrockwas encountered in all quadrants. The unit displayed
the following stratigraphy:
Layer Description
63-75 cmbd; The upper level was of basalt
which contained coral and sparse marine shell;
cultural layer
II Total layer thickness rumfmrn 75-90 cmbd. It
was divided into two layers as discussed
immediately below
No •
FINDINGS
Table 2.
SUMMARY OF IDENTIFIED STTES AND FEATURES
*SE"
Site
No.
Formal
Site/Feature
Type
Tentative
Functional
Interpretation
CRM Value Field Work
Mode Assess. Tasks
R I C DR SC EX
6335
Wall
Agriculture
L
L
L - -
6336
Wall
Agriculture
L
L
L
6337
Complex (5)**
Poss. boundary/
M
M
M +
habitation
A
Enclosure
Habitation
B
Platform
Habitation
C
Platform
Indeterminate
D
Ten -ace
Habitation
E
Wall
Possible boundary
15108
Terrace
Agriculture
L
L
L -
16111
Complex (5)
Agriculture
L
L
L - -
A
Enclosure
Agriculture
B
Enclosure
Agriculture
C
Well
Agriculture
D
Concrete
Agriculture
structure
E
Concrete
Agriculture
structure
16112
Wall
Agriculture
M
L
L -
16113
Complex (2)
Habitation/
M
L
L
agriculture
A
Enclosure
Agriculture/
possible habitation
B
C -shape
Habitation
" SwtelnventoryofHWorieP/aces(SIHP)numbers.SlHPnumbersarefivedigitnumbersprefuedby5470.37(50-State
of Hawaii, 10 -Island of Hawaii; 37-USGS 7.5'series quad map ('Kealahekua, Hawaii J)-
Number of componentfeatures within complex
Cultural Resource Management Value Mode Assessment:
Nature: R - scientific research, I - interpretive, C - cultural
Degree: H - high, M - moderate, L - low
Field Work Tasks: DR - detailed recording (scaled drawings, photographs, and written descriptions),
SC - surface collections, -
BX - test excavations.
12
1
I
I
1
i
FINDINGS
Table 2. (cont.)
SIHP
Site
No.
Formal
Site/Feature
Type
Tentative
Functional
Interpretation
CRM Value Field Work
Mode Assess. Tasks
R I C DR SC EX
16114
Terrace
Habitation
M
L
L
16115
Complex (5)
Habitatianjindeteanmate/
M
L
L
Agriculture
A
Terrace
Habitation
B
Terrace
Agriculture
C
Mound
Indeterminate
D
Terrace
Indeterminate
E
Enclosure
Habitation
16116
Complex (7)
Agriculture/
H
L
H +
burial
A
Enclosure
Agriculture
B
Mound
Agriculture
C
Mound
Agriculture
D
Platform
Burial
E
Platform
Burial
F
Modified outcrop
Agriculture
G
Mound
Agriculture
H
Mound
Agriculture
16117
Platform
Habitation/
M
L
L
agriculture
16118
Enclosure
Habitation
M
L
L
16119
Terrace
Habitation
M
L
L
16133
Complex (3)
Agriculture/
L
L
L
possible habitation
A
Modified outcrop
Agriculture/
W/Wall
possible habitation
B
Terrace
Agriculture
C
Terrace
Agriculture
13
FINDINGS
Table 3.
FREQUENCIES OF FORMAL FEATURE TYPES
Formal Type
No.
%
SIHP No.
Terrace
9
25.2
6337(D), 16114, 15108, 16115
(A,Bp), 16119, 16133(B,C)
Enclosure
7
19.6
16111 (ABF), 16113 (A), 16115 (E),
Habitation
9
25.2
16116 (A), 16118
Platform
5
14.0
6337 (CB), 16116 (D,E), 16117
Mound
5
14.0
16115 (C), 16116 (C D,GA
Concrete structure
2
5.6
16111 (D,E)
Wall
4
11.2
6337 (E), 16112, 6335, 6336
C -shape
1
2.8
16113 (B)
Modified outcrop
2
5.6
16133 (A), 16116 (F)
Well
1
2.8
16111 (C)
OIA% `( `,35 1008
IN
Table 4.
FREQUENCIES OF FUNCTIONAL FEATURE TYPES
Function Type
No.
%
SIHP No.
Agriculture
18
50.4
15108, 16111 (A-E), 16112, 16115
(B), 16116 (A -C, F -H), 16133 (B, C),
6335,6336
Habitation
9
25.2
6337 (A B D), 16113 (B), 16114, 16115
(A,E), 16118, 16119
Burial
2
5.6
16116 (D, E)
Indeterminate
3
8.4
16115 (C, D), 6337 (C)
Agriculture/possible
2
5.6
16113 (A), 16133 (A)
habitation
Habitation/agriculture
1
2.8
16117
Possible boundary
1
2.8
6337 (E)
14
1
1
I
1
I
1
t
1
1
1
1
1
1
1
1
1
,W
__
OF
�<U
mF-U
mm Q.
0 •
_m
Om
g�
vi QJ �
M mU m
QS
SU
Q
O
J
0 7
o m
Q
'-3hrr[n�x vvnwr.�nezTis
3 A I H Cl I I I V
8VR n
i
r
m
r6
FINDINGS
GO
a
16
I
1
1
1
0
FINDINGS
11
17
Figure 6. Site 16114, Habitation Terrace
qr
go
Fe
A
Q
TU -1
SITE TAO
UPRIONT - d �q�.\ �.goa�Cs ', i'`" - U•�
yi �,,. ', y X {` Y
ZT
�\ • 0,o o Yo 4PQ°� po Q//
c` !g ;. �;., 'r
M4 a yp
81\f 0.
-_ �- I_I
' / \� 1 °..., IRI/
; i% i C •/
/\v'
N
TEST UNIT BEDROCK
\\
SOIL FLAT AREA
i
}t0 �
KIAWE =Z' FACED WALL
Figure 6. Site 16114, Habitation Terrace
0 •
FINDINGS
I
ONSISTS OF ORALS,
S. AND SAPLINGS
QSITE TAO
np t w
2 —_
M6
aTEST UNIT
PILED BASALT COBBLES
STACKED MALL
BEDROCK
Figure 7. Site 16117, Habitation/Agricultural Platform
18
0
FINDINGS
II -1 75-85 cmbd; black (10YR 2/1 moist); silt; very
' dark brown (10YR 2/2 dry); weak, very fine
granular structure; loose, very friable, slightly
sticky, slightly plastic; cultural layer
' II -2 85-90 cmbd; black (10YR 2/1 moist); silt; dark
brown (7.5YR 3/2 dry); stmctureless; loose,
very friable, slightly sticky, slightly plastic;
cultural layer
III 90-110cmbd sodsampletaken&am65-70cmbd;
dark brown (7.5YR 3/4 moist); silt; dark brown
(7.5YR 3/4 dry); structureless; loose, very
friable, sticky, slightly plastic; cultural layer
Site 16115, Feature E, TU -1
This site is a pre -contact agriculture/habitation site
consisting of at least five features. Features A,.B, and D are
terraces, Feature c is a rock mound, and Feature E is an
enclosure. The Feature E enclosure consists of small stacks
and piles of unshaped basalt in most of the oval alignment
and portions of single -row alignment. The feature appears
to have served as a prehistoric habitation, and the test unit
(1.0 by 1.0 m) was placed in the center. The unit displayed
the following stratigraphy:
Layer Description
30-35 cmbd; very darkbrown (10YR 2/2 moist);
dark reddish brown (5YR 3/3 dry); weak, very
fine granularstructure; loose, very friable, non -
sticky, slightly plastic
Site 16115, Feature A, TU -2A
Feature A at Site 16115 is an amorphous depression or
cavity that was filled with basalt cobbles to fort a roughly
level, paved surface. In the south-southeast portion, there is
a small mound (34 courses high). TU -2 (1.0 by 1.0 m) was
placed over the depression; TU -2A (0.50 by 0.50 m) was
placed within the blister cave found below. TU -2A displayed
the follow stratigraphy:
Layer Description
20.36 cmbd; dark brown (7.5YR 3/2 moist);
silt; dark yellowish brown (10YR 3/4 dry);
weak, very fine granular structure; loose, very
friable, slightly sticky, slightly plastic
Site 16116, Feature D, TU -1 (Figure 8)
19
The site is a large agriculture/burial complex consisting of
more than eight features. Feature A is a tough enclosure, Features
B, C, G and H are mounds, Features D and E are platforms, and
Feature Fis a modified outcrop • Feature D is asmall,nioely built
platfotmcortst rwW offourtofivecanses oftmshaped pahoehoe
cobbles to medium boulders that are stacked and roughly
faced. Feature D lies mostly atop the surface, although some
footer stones are placed into it. The top is mostly flat and
paved with a few smaller stones. No midden or artifacts were
recovered from the test unit placed at the feature (TU -1). A
human burial was located at the bottom of the test unfit.
Excavation ceased in the unit when the burial was encamtered.
TU -1 (1.0 by 1.0 m) displayed the following stratigraphy:
Layer Description
I 15-62 cmbd; consists almost exclusively of
subangularbasalt ranging from medium cobbles
to small and medium boulders; cultural level
II 62-103 cmbd; soil samples were taken in an
area between 62 and 65 cmbd; dark reddish
brown (5YR 2.5/2 moist); silt; dark brown
(7.5YR 3/4 dry); weak, very fine granular
structure; soft, very friable, non -sticky, non-
plastic; cultural level
Site 16116, Feature E, TU -2
Feature E is a prehistoric platform that is well built and
roughly square. All four sides are stacked and faced with
easily discernible comers. It is constructed of basalt cobbles
and small boulders stacked 3-4 courses high with the top
exhibiting a slight slope to the east. This feature appears to
have beenbuilt upon the ground surface. TU -2 (1.0 by 1.0m)
was placed in the center of the feature and was excavated to
c. 1.44 m below datum, where a human skull was located
within what appears to be a prepared cist. The test unit
displayed the following stratigraphy:
Layer Description
0-77 cmbd; this level consists of basalt small
boulders and large to medium cobbles which are
placed as platform construction; cultural level
II Total layer thickness is 77-99 cmbd; an area
between 77-78 cmbd was sampled; layers II and
-Mg -737
1,' c �.: r` j J r y.' 1�►� E s }. O
_
�
"Ay Arno 14M
14-
...�#.
a"ns'
:er _• .h _ # �. - .4.�t max... '.:c X' 4s i,'
gel
a. a Fi '1r %�S`i1L .yy.,.��7 r k y,^ M���`R ���¢.,-•.t"i' .t' �¢� �..^ _.` t ��"�`a' �''`-Ji•'� } r. ' � � � 4kJ ,� ��
t P +s xxY fes: n'.. t; ,.» --d c+� ,az^:..a,G,F Y �c K -z_ Gc,;,'E qF'+q Rr dEU`,. •.`�, r' - ,g
+ r'.AVE Y@t
t
yt yv z,; a, ss 4r r-'
_07. ®R. r. r -:.nom+ §t'' '•. *w': `t $'. - cY c !," 1` t a v `5, $ai$�,,Y.,. 'i c.. s, �' k r e r
-r �- '�F_ '�) ti � s Ta-^� .� 4- •s.. r� ;.j aq�.t�,1 -g,:�"r''r �r � r _Y�,h.�' 4:
z a t ' - vS, y E" a y • ,tt ..t w ,. � K. s a �x..g zG.. L a '"'t � #° n ".. � _
AiQ
a ,arm
5 T 3
Wit - ,a`r t s i .. Vis-,+."zY3'.`...,c �, n 4 .a t q" z- k P +3 •�„_„ .. x t'z` Y s"
You £ � " ':# ...q r �' fia.+" t -t� �.� of
� r � i�-'.a arm 2 oz- -rx 5`xsz' r E a<��E'�"° � rt s s t,� ; •a .: .ti'!'D�°' � �'1�"di s_ .
x r a rF ^'`°` u`t. 3. sz a,+.: li !+4�r`y-4` s -� f-� r t>° s a•...
..F +%r �� 3 f' t..yt-'�,�'-�: _: `r'. „ y •sy ,,;:. �+�\ sfz'f £ •,^5r�
4a Y+ :r ,sxtY 5. :s' z,+, ,,'f,d' s.�� :•f'�"3. z»Y,�t _Y+f y, .K :�1+ i '5.r,d.. r cr• �' -.
--
!F. 41V '
;:^-
a . t
"i r��ra-�: _',,,3,'-�,•�2�`z+ +? a-�'� _ ,�-s• �l ;a(Q �' r " r
v
.,. � � {_' '��``. '�': �.t{ , t r`�� h��rx•�.�y.��•Y>�'x a�.v-... V� � + ,,.a r"�..: .rn Y .a '�•x''� �.r.�'^"� ? tip} 7' x r r
't,'a' -, E ;r:�s- r, e' xr^�.^5- :.t .�`:. ,r�s'!c:. � e ar : r ziitx"� �: ,� x,�_ drt' - •« .�. .Ig,.3'ksa" �. rr' tt kx '�' �-' i
J.t.:ajt.C` v,
3
"MOM
'-, o
tyOE -w . ]
t i'T Il
lC�,..�'^v'+�y
st•s , ,.'A" .t F"�• h*`.� i �� 5 '_ ',, Z.,y c --r §~as sa- x a rr'i Vit: 1 .ti
qt 'tyL '-'.S �- .: 5 +.a 1 :'.Y:�� �. :^., i.�, ''�' '"iL'yr`z"�^:.s. "'� r.��'f. -•+'. t .��-%.,-k�ai$r�y°y, �':S,:.Ft _�.,itr X �.�„ .,µ :tet 5 � wr � �« �, �'� � .
"f,y ;;-.x .,•' -. {:-. `�`-t':;�.. `�•c 4 v �,. .a'� ,g's3.,`lt-x'-`"t.-, `3''+' '�' a�P�`re�.� --�'�"�s b � ,� x" �,,. r ,�"jr.L ,• � v ! -k h a S
`:w' -,�. i d- •'t+� ' •ip '.'� % r' "�S t -. ? L' s +-+'Cz. X -,y k +�.` � f..m '� xE':. c,. S,a �.,.,.M'" - - .�,
.. ... $ ... „ �:.�. - ro_. _ .:E .,.._ ��}'+,��,�3_., � .- �. ;�..e ..._ `� t: , t � .,....-�_...... ,.,'L;'?"+: �...�. . rz. r. j,�i;, $.- "� •� * r_.'"-�•r,`'_� ... zF. -a . ^r.'�'s' .." > .. �'4.sY � x *Z ' 3 .: _.. _ . t . e
:�. 3 '':..s -'s Etii.:. ..§, r - -..r- ry .i4 -..: ?-"_,y�-E,,,�-.','e '3� •k - " -urc T '�w"v' ,; s';:- 4Y s,`-r......��,5a ,'7'cd� -aa c+a. 3; t
`•v: Sr. ✓- "�r�. ;'S � �- � �„reu W;�t�,sc.,-..;'�-h'H- - t,as:+� '-�� n
5 -:! .. _ .� • . -, N60.. +r+,... p, �'
�, :. s° '�: a a• ��, ,� r � .. �-4�r����'' � �, , „��rF ,-" ��k,a �s.x t. ?h � � a...�.-rr
e bn '' ' k � . / ' ✓ '�+y •4 § �"'�"za�. ray ..� } ..+: '„` �F: " t •�"`:�. � `�, r � 4
wo
�:<y z�r; s..c,tri.•�t•, a,t •u^` t,Tt"v.r 1 _�',+s'},t`'�.,..'•"-' .Yrn..;•:n t s'
Se
# t�"s4 ry x.:u"5c -Ipx�
,. -�,'F' 1,•. -;s:
s •s .,t: A'TG� yr., .w. h 9' +ts' ti - x�e.'f+-.r d t° i t
,,,r n'"' �:±lAic £•• s s F-t.C`;�.�•'s ,R•s k�"-.a-tea `+'"3;.. ra`. ,ts.'yF•s `moi-.- -••W",y{k.�.tr3s:"' 1 s
„y 't,'` d_n"` �'i ? y' y s+..ena�:a cE.r.. A. 'w•s't'�'"'+„;. �„C .F>.. u:d' r. +s. �' .;4 _71 .44 a
In.
r°•.t..' .".. •°rM-*, .r »•Sti�.T? -.F't •a�.-_r t
.;; k w �'• - , ,t; 'f. ' � '. t .::'sal m-rC' ''w sw �. , y 6 ?':, +;2%• `• „�, w `:
5 ..-"x• .c,, h - 4s.} t "c r ^'. S, _.--a5 _'stS �-^' °' Y {i "`!' '",." _ ?rrust.'t �'-+.`„ :as.
•y -
"�'' ,'s. - " r''S. ,�' '+�ys -: ,,, r} �-•Y w.. '�'� ''�" •&""__ :Y 'Uy�",�,G. �,s �a- ts`�"`n_`-u�+ �n_,,.c.X-t [ v.. --'L '� t - �r .+..: `;=2*'Yj''"r+'rr r.'a` r � o c:'�. 3 T, � ... ,,,. c
:,.s="'-a.',t` h— e ;.K'.., 'mak ;tr..�, ...?•:t`'•._.
,;�"ti+-" ''�:. r^.76• f+o� �i ; .rte aw;y �'x. ¢'�7 Y�. .a 'e
/.,.[,�._.jr ;. 44,5 SF+:rsf' :.. �Y :,y:�,,�.y°+ s''+•,'zt, %^ 5 Ts r24 '•, 'ak '�'f` "^ e.�..;: g^ t. ks` r R. C. F `et. .l *,t
4. �, -. r t*,-,C...'t.:=.x-..r2 .''mow .,. �; s+ty, ^„�-4p,,,'C„s •+`s •�s' vF. t
`'E ss, s-`+ ."'r`"r;'"'+ L e'i y r
r. "b - ,� ” �.�1`eY,t",�e'ta.'•� i? ;.n .:.+?'>k� :.N ar..t?*s' �+'t' �'S- < �`.,�e�t*%� Y' . k..:•a .,3„i i'.a'
his Jw' a.+n�,"'. aW - .$. n ,b,�; ,�, c;+raR d'.,+ as .t. s''r:le 'h` ',.`t.. - t.N �€.>:..^`rer d,� ei° ,, 4 :: +. $cr•
.5 MR.r. pi'.ri".,,..�.� r s:'�; _ - r aV x;. •F+'.`., : ".u:- ss a•” y:. r c •i- t.:
a .ti2.::t; ; }. .'.::d a< xc•Y. ax.. t w . .7. x 5*5 4'�., rt s«-«7 syu.,'4 ry# q{ 1 R^` _ .i.
-'-
� . � .. � ^�. , :a, { ` 4 •r4"� � � �mr; "µ
:. x ,. 7 •..z.,'" .; � �., :rte � .. �. x„�+ 'f - ;�.�r,++n ,Y. '� , Y..Y �-•.^t�: ^x +. � �2 �.s'�-;..:: �• ..F�. �,�•F.. `� c,
-E` yrk _:�,.-�"` o _�,•.+� 3.x '2i',��h...� i,r,�,.�.-,....r . ^sr yy,�"€ ;�� r;,�•�.�'''�'t�.z.h '.�u'+t Win.,. r� .,+;� 'k �rc,..r �.., i �, s Y- i..
.- :. .:- a .. •�._ h,. r # ».: �ihn � :_ � M t;.. r 'vve -i: }rte '„r,�r3-..-3'• K'�..ra-K.�` ...; ,�. �S ti r.... a* ''?,sz.;, YR 5 .E s
.: > �. c' ? - f � h +! »�4. "ti f3 `t 'rte � :`�• x x
t*7.. `y .� z- p'2 k,. +'�x3� �' ti^i F .a � � ! x: 3 - J'.vt t, ,r @ 'flY S'•sg.� k a.� t^'�A d -�.' t”
,' •. d^-,;, _ S, at d � 3a #r�'F. � ;�r�,'7�ys `+x 3T'� �: �,,,ce,,,,fi s7 rr a . " i �5 =:r x"{. 1+yrs '* x �
r:
>o:...ra4 �y+3! r a Y ae^st s - -z ,..r' r g 3, •x,''.* .�- arc -.'ro.
0
FINDINGS
III were on a similar horizontal level, but were
marked by slight color gradation; cultural level
III 77-99 cmbd; asample was taken between 77-78
cmbd; cultural level
IV -A 99-107 cmbd; sample taken at 102-104 cmbd;
dark reddish brown (5YR 2.5/2 moist); silt;
dark reddish brown (SYR 3/3 dry) weak, very
fine granular structure; soft, veryfriable, slightly
sticky, slightly plastic; cultural level
IV -B 99-107 cmbd; cultural level
V 107-134 cmbd; sample taken at 110.112 cmbd;
verydusky red (2.5YR2.5/2 moist); silt; reddish
brown (5YR 4/4 dry); weak, very fine granular
structure; soft, very friable, slightly sticky,
slightly plastic; cultural level
VI 134138 cmbd; pale white -brown and sterile
Burial
Fill: 125-130 cmbd dark reddish brown (SYR 3/2
moist); silt; darkbrown (7.5YR 3/4 dry); weak,
very fine granular structure; soft, very friable,
slightly sticky, slightly plastic
Site 16116, Feature F, TU -3
This feature is an Ir shaped modified outcrop with the
long axis running roughly east -west. It is modified along its
entire length by a variety of methods, including large aligned
boulders paralleling the outcrop; large cobbles stacked 34
courses high against the outcrop to form a unifacial wall; and
a large mound ofboulders and cobbles piled along and in front
of the outcrop. TU -3 is a 1.0 by 1.0 in unit placed at the west
end of Feature F between the end of the feature and a piled
alignment of boulders running north -south. The test unit
displayed the following stratigraphy:
Layer
Description
I 51-80 cmbd; this was the body of the modified
outcrop, consisting of piled basalt cobbles and
boulders which adjoin the outcrop
II 80-100 cmbd; an arra at the top of the layer (80
cmbd) was sampled: reddish black (10YR 2/2.5/
1 moist); silt; dark reddish brown (SYR 3/3 dry);
weak, very fine granular structure; soft, very
friable, non sticky, non plastic; cultural level
w
Site 16116, Feature F, TU4
21
This Test Unit (1.0 sq m) was also placed within the
confines of the modified outcrop above (Feature F). The
excavation was placed approximately 1.0 in northeast of
TU -3 (above), in a modified section of bedrock outcrop, to
determine the presence or absence of human remains. The
excavation was terminated when bedrock was encountered
in all quadrants. The test unit displayed the following
stratigraphy:
Layer Description
I 39-83 cmbd; consists of basalt small boulders
and small to large cobbles. Some of these
appear to be placed to fill cracks and some may
have been in situ decomposing bedrock
II 74-96 cmbd; bulk soil sample taken between
86-88 cmbd; dark reddish brown (5YR 2.5/2
moist); silt; dark brown (7.5YR 3/4 dry); weak
very fine granular structure; soft, very friable,
slightly sticky, slightly plastic; probable non-
cultural layer
Site 16116, Feature B, TU -5
Feature B is a mound built of basalt pieces ranging from
small -cobble to medium-bouldersize, built against the sideof
a bedrock outcrop. Abasalt upright (c.0.60mhigh) found on
the northern portion of the mound indicated the possible
presence of a human burial. TU -5, a 1.0 by 1.0 in unit
established c. 0.20 in south of this upright, failed to disclose
either an opening in the bedrock face or a burial within the
mound.
Site 16116, Feature G, TU -6 (Figure 9)
Feature G is another mound, and consists of a northeast -
southwest pile built atop a low bedrockoutcrop. The eastside
of the mound is piled 1-2 courses high, whereas the west end
is 3-5 courses high. TU -6 is a 1.0 by 1.0 excavation placed
inthe middle of the mound. Excavationof thisunit also failed
to reveal a cave/tube or burial retrains, and was discontinued
upon encountering bedrock at c. 0.23 in below surface.
Stratigraphy of the unit disclosed:
Layer Description
I 61-93 cmbd; consists of small to large cobbles
piled atop and between two small boulders;
cultural layer
Ll
FINDINGS
II 93-116 cmbd; sampledbetween 110-115 cmbd;
dark reddish brown (5YR 2S/2 moist); silt;
dark brown (7-5YR 3/4 dry); weak, very fine
granular structure; soft, very friable, slightly
sticky, non -plastic; cultural layer
Site 16116, Feature A, TU -7
FeatureA is a veryrough encicsm consisting of corrected
mounds on the south and southwest and a rough piling or
paving on the north that terminates in a wall alignment that
extends north. Construction consists of mound and alignments
of unshaped pahoehoe (large -cobble to medium -boulder
size) roughly piled in the project area. Portions of Feature A,
Feature B, and a small portion of Feature C were carefully
recorded to provide an example of the ubiquitous agriculture
features in the project area. Feature A appears to have been
constructed both around the bedrockareas and onthe surface.
TU -7 (1.0 by 1.0 m) was placed at the northern base at the
southwest comer of Feature A, and a Veneridae shell was
located on the surface near the southwest corner. The unit
displayed the following stratigraphy:
Layer
Description
' Feature H at Site 16116 is a mound found at the east end
of the site very near the proposed Alii Drive realignment
right -of --way. This mound is approximately 3.0 by 2.5 by
' 0.50 in and was suspected as a burial feature. The feature is
composed of stacked and piled unshaped pahoehoeboulders,
a 1.0 by 1.0 m excavation was placed in the center. All
cobbles were removed from the unit, and the underlying soil
(c. 0.05 crit thick) was removed, but no cavities or burials
were revealed. Bedrock was encountered immediately below
the soil and excavation ceased.
' Layer Description
I 23-100 cmbd; sample taken at 100 cmbd;
very dark brown (10YR 2/2 moist); silt; dark
reddish brown (5YR 3/3 dry); weak, very
fine granular structure; soft, very friable,
slightly sticky, non -plastic; possible cultural
layer
Site 16117, Feature A, 1U-1
23
Site 16117 is a medium-sized habitation or agricultural
platform with a small cupboard and planting box within. It
is constructed of small -to -medium basalt boulders piled
randomly across a bedtockoutcrop. In order to determine the
presence or absence of human remains, TU -1(1.0 by 1.0 m)
was placed at the north end of the feature in an oval, roughly
flat, faced mound of small boulders set against a low outcrop.
The unit was dug to bedrock, and it appeared that the placed
stone served agriculturulpurposes. Thefollowingstratigraphy
was noted.
Layer Description
30-75 cmbd; consisted of small to medium
basalt sub -angular boulders and small to large
cobbles. No midden or artifacts were noted
within these placed stones
11 75-100 cmbd; sample taken from 75-80 cmbd;
verydusky red UOR25/2 moist); silt; darkbrown
(7-5YR 3/4 dry); structureless; loose, veryfriable,
iron -sticky, iron -plastic; cultural level
Site 16133, Feature C, TU -1
Site 16133 is a probable pre -contact agricultural site
composed of three features. Feature A is a modified outcrop,
Features B and C are terraces. TU-1(1.0by 1.0m) was placed
in the east half of Feature C, a modified outcrop/terrace with
some minimal facing. Feature C extends off of a bedrock
outcrop that lies to the east and is of stacked basalt cobbles 3-4
causes high and roughly paved on top. The following
stratigraphy was revealed:
Layer Description
21-30cmbd; consistsofunshapedbasaltcobbles
and small boulders; one waterwom basalt was
observed
H 30-69 cmbd; bulk soil sample taken from 55
cmbd; dark reddish brown (5YR 2.5/2 moist);
_ silt loam; dark brown (7.5YR 3/4 dry); weak,
very fine granularstmcture; loose, very friable,
slightly sticky, not -plastic; does not appear to
be a cultural layer
I 48-50 cmbd; dark reddish brown (5YR 2.5/2
'
moist); silt; darkreddish brown (SYR 3/3 dry);
weak, very fine granular structure; soft, very
friable, slightly sticky, slightly plastic; cultural
'
layer
'
II 55-57cnbd;darkreddishbrown(5YR3/2moist);
silt; dark brown (75YR 3/4 dry); weak, very fine
granular structure; soft, very friable, slightly
sticky, slightly plastic; non -cultural layer
Site 16116, Feature H, TU -8
' Feature H at Site 16116 is a mound found at the east end
of the site very near the proposed Alii Drive realignment
right -of --way. This mound is approximately 3.0 by 2.5 by
' 0.50 in and was suspected as a burial feature. The feature is
composed of stacked and piled unshaped pahoehoeboulders,
a 1.0 by 1.0 m excavation was placed in the center. All
cobbles were removed from the unit, and the underlying soil
(c. 0.05 crit thick) was removed, but no cavities or burials
were revealed. Bedrock was encountered immediately below
the soil and excavation ceased.
' Layer Description
I 23-100 cmbd; sample taken at 100 cmbd;
very dark brown (10YR 2/2 moist); silt; dark
reddish brown (5YR 3/3 dry); weak, very
fine granular structure; soft, very friable,
slightly sticky, non -plastic; possible cultural
layer
Site 16117, Feature A, 1U-1
23
Site 16117 is a medium-sized habitation or agricultural
platform with a small cupboard and planting box within. It
is constructed of small -to -medium basalt boulders piled
randomly across a bedtockoutcrop. In order to determine the
presence or absence of human remains, TU -1(1.0 by 1.0 m)
was placed at the north end of the feature in an oval, roughly
flat, faced mound of small boulders set against a low outcrop.
The unit was dug to bedrock, and it appeared that the placed
stone served agriculturulpurposes. Thefollowingstratigraphy
was noted.
Layer Description
30-75 cmbd; consisted of small to medium
basalt sub -angular boulders and small to large
cobbles. No midden or artifacts were noted
within these placed stones
11 75-100 cmbd; sample taken from 75-80 cmbd;
verydusky red UOR25/2 moist); silt; darkbrown
(7-5YR 3/4 dry); structureless; loose, veryfriable,
iron -sticky, iron -plastic; cultural level
Site 16133, Feature C, TU -1
Site 16133 is a probable pre -contact agricultural site
composed of three features. Feature A is a modified outcrop,
Features B and C are terraces. TU-1(1.0by 1.0m) was placed
in the east half of Feature C, a modified outcrop/terrace with
some minimal facing. Feature C extends off of a bedrock
outcrop that lies to the east and is of stacked basalt cobbles 3-4
causes high and roughly paved on top. The following
stratigraphy was revealed:
Layer Description
21-30cmbd; consistsofunshapedbasaltcobbles
and small boulders; one waterwom basalt was
observed
H 30-69 cmbd; bulk soil sample taken from 55
cmbd; dark reddish brown (5YR 2.5/2 moist);
_ silt loam; dark brown (7.5YR 3/4 dry); weak,
very fine granularstmcture; loose, very friable,
slightly sticky, not -plastic; does not appear to
be a cultural layer
1W
FINDINGS
Site 16133, Feature B, TU -2
Feature Bat Site 16133 is a terrace extending from alow
and wide bedrock knob to the south. The body of the terrace
is piled and the edges are roughly stacked. TU -2 (1.0 by 1.0 m)
was placed on the central north side and dug to c. 0.90 in
below datum. Excavation was terminated when bedrock
was encamtaed. Cultural material was not observed. TU -2
displayed the following stratigraphy:
Layer Description
29-67crnbd,layercorsisredofoobNes andbmkias
of basalt No cultural material was observed
II 67-92 cmbd; soil sample obtained at 84cmbd;
dark reddish brown (5YR 2.5/2 moist); silt;
dark brown (7.SYR 3/4 dry); weak, very fine
granular structure; loose, very friable, slightly
sticky, slightly plastic; noncultural
Site 6337, Feature D, TU -3
Feature B is a prehistoric terrace in fair condition. TU -
3 (1.0 by 1.0 m) was placed in the northwest comer in what
appeared tobea slab-linedhearth. It was hoped that a sample
for radiometric dating could be obtained. The placed stones
consist of an upright slab at the south, two slabs on the north
and small boulders at the east and west. The south half (1.0
by 0.50 m) was removed. Sparse marine shell midden and
charcoal were encountered and collected. Also noted was a
single volcanic glass shatter, coral fragments, and both fish
and mammal bone. The unit was very rocky inside and did
not appear to contain ash. A small amount of charcoal was
recovered from the excavation. It appears that the
archaeological feature was constructed on the surface, and
testing on the unit ceased when bedrock was encountered.
TU -3 displayed the following stratigraphy:
Layer Description
19-36 cmbd; consists of placed small to large
basalt cobbles on the interior of the placed
upright slabs and boulders; coral fragments
were noted in this cultural layer
II 22-50 cmbd; soil sample taken from 22-25
cmbd; reddish black (SYR 2-5/1 moist); silt;
dark brown (7SYR 3/2 dry); structtaeless; loose,
veryfriable,non-sdcky,non-plastic; cultural layer
•
III 29-64 cmbd; soil sample taken from 50-55
cmbd; reddish black (10R 2.5/1 moist); silt
loam; very dark brown (10YR 2/2 dry);
structureless; loose, very friable, non -sticky,
non -plastic; cultural layer
IV 6473 cmbd; soil sample taken from 65-70
cmbd; dark reddish brown (5YR 2.5/2 moist);
silt; dark brown (7.5YR 3/4 dry); stmctureless;
loose, very friable, slightly sticky, slightly
plastic; non -cultural layer
Site 6337, Feature C, TU -2
24
Site 6337 was initially recorded by Ching et al. (1973),
but new features were identified in the area (and assigned to
the site) by Hommon and Rosendahl (1983). These features
were designated Sites 6337b (habitation terrace), 6337c
(possible burial platform) and 6316 (possible burial platform)
(Walker and Rosendahl 1985a). Site 6316 wasmistumbered
by Walker and Rosendahl (1985a), and was subsequently
given the designation of Site 1001-5 (Walker 1991), and Site
6337d (Dunn and Rosendahl 1991).
Feature C is a small platform found very near the
proposed Alii Drive Realignment right-of-way, in the
northeastem portion of the project area. Itis stacked and faced
on the south and east sides, and collapsed on the west. TU -2
(1.0 by 1.0 m) was placed in the center of the platform to
determine if human remains were present. After excavation,
it was revealed that three pieces of historic glass, but no
human remains, midden, charcoal, total fragments, or
waterworn stones were located. Excavation stopped in the
test unit when bedrock was reached. The unit displayed the
following stratigraphy:
Layer Description
27-151 cmbd; consists of placed basalt small
boulders and small to large cobbles as platform
fill; three pieces of historic glass were rioted
during excavation; cultural level
II 151-155 cmbd; dark reddish brown (5YR 2.5/
2 moist); silt loam; dark brown (7.5YR 3/4
dry); weak, very fine granular structure; loose,
very friable, slightly sticky, nonplastic; non-
cultural layer
•
' FINDINGS
'
Site 6337, Feature B, TU -1
Layer
Description
Feature D at Site 6337 is a large, well built platform
I
0.02-135 cmbd; unshaped small -to -large
constructed of large basalt cobbles and small -to -medium
basalt cobbles and small to medium
boulders of unshaped pahoehoe. The wall on the south is well-
boulders; sparse water -worn coral present;
'
faced and stacked six to seven courses high. The east wall is
cultural layer
of similar construction, while the north and west walls are
lower and partially collapsed. There is a small hole in the
11
135-137 cmbd; organic duff layer, very sparse
northeast wall; the top slopes gently mauka and there appears
coral; cultural layer
'
to be a rough attempt at paving. TU -1 is a 2.0 by 1.0 m
excavation placed in the southern portion of the feature.
III
137-194 cmbd; soil sample taken at 150 cmbd;
Excavation progressed to almost 2.0 m below the top of the
very dusky red (2.5YR 2.512 moist); silt; dark
structure until the unit reached decomposing bedrock. Very
brown (7.5YR 3/4 dry); structureless; loose,
sparse waterworn coral and basalt were encountered, but no
very friable, slightly sticky, slightly plastic;
human remains were found. Stratigraphy in the test unit was
cultural layer
as follows:
I
11
IJ
I
25
0
26
AGE DETERMINATIONS
Objectives and Methods
The purpose of age determination analysis is to provide
initial chronological data to aid in assessing the relative
significance of sites in a project area. Seven samples of
charcoal were chosen from discrete cultural deposits within
Sites 6337, 16114, 16115 and 16116 for age determination
using radiocarbon analysis. Samples were selected based on
the amount and nature of the datable material present,
stratigraphic context, and overall distribution within the
project area. The samples were submitted for radiocarbon
analysis to Beta Analytic Inc. of Coral Gables, Florida.
Using standard procedures, the samples were pretreated
with an acid, alkali, acid series of soakings to remove
carbonates and humic acids. After pretreatment, samples
were combusted to form carbon dioxide gas, combined with
lithium to separate the carbon, and hydrolized for conversion
to liquid form. The liquid was then catalyzed to form benzene
and placed in a liquid scintillation counter to determine the
amounts of carbon -13 and carbon -12. The isotope values
obtained during the counting process were then used to
calculate the carbon-13/carbon-12 ratio for each sample, with
the final result being determined relative to international
standards in order to reduce errors produced by carbon isotope
fractionation. Processing of the seven samples proceeded
normally.
Results
The results of the radiocarbon age determination are
summarized in Table 5. The age for each sample is reported
as a range corresponding to the calendric age */- two standard
deviations. Ages were calibrated using the tables provided in
Stuiver and Pearson (1986), which correct for variations in
atmospheric carbon over time.
According to Table 5, samples RC -12446,-1245,-1248,
and -1247 yielded definitive age ranges after cahbtation,
while samples RC -1249, -1244 and RC -1243 produced
multiple age ranges. Multiple ranges are caused by "flat"
regions in the calibration curve, which correspond to periods
when atmospheric carbon decreased at a rate greater than 1.2
ppm/10 years, resulting in more than one possible fit of a
sample to the calibration curve. While multiple age ranges are
more difficult to interpret archaeologically, detailed
examination of the statistical curves, combined with evidence
from feature stratigraphy, generally provides a means of
selecting one age range as more probable than the others.
Based on these criteria, the most likely age ranges forsamples
RC -1249, -1244 and -1243 are AD 1620-1955, AD 1470-
1690 and AD 1790-1950, respectively.
The results of the age determination analysis span a
1,275 -year period extending from AD 680 to the present
(present - AD 1955). Within this period, the results from
speck features can be grouped into three clusters. The fust
cluster consists of those samples with clearly prehistoric age
ranges (680-1790 AD) and includes samples RC -1246 from
Feature D, and RC -1245 from Feature B- of Site 6337, RC -
1244 from Feature A of Site 16115, and RC -1248 from
Feature E, and RC -1247 from Feature G of Site 16116. The
age ranges yielded by the samples are consistent with known
stratigraphic relationships and artifact data, and do not appear
to be affected by contamination or disturbance.
One sample (RC -1249 from Feature A of Site 16114)
represents the second cluster, whose dates span the late
prehistoric andhistoric periods (AD 1620-1950). Examination
of the probability statistics, stratigraphic relationships and
artifact associations for the sample indicates that there is a
slightly higher probability (greater than 53 %) that the sample
is historic in age; and has an age range of AD 1800-1950. The
third cluster (with a clearly historic age range [AD 1790-
1950]) is represented by sample RC -1243 from Feature D of
Site 16116.
Based on the results of the age determination analysis,
initial occupation of the project area occurred during the
prehistoric period, and may have begun as early as AD 680 at
Feature B of Site 6337 and AD 1000 at Feature Dof the same
site. These two features, identified as a platform and a terrace,
respectively, are interpreted as having temporary/semi-
permanent habitation functions. The second phase of
prehistoric occupation occurred between AD 1410 and 1690
at Feature A (terrace) of Site 16115, and Features E (platform)
and G (mound) of Site 16116. Feature A of Site 16115 and
Feature G are interpreted as agricultural in function, while
Feature E of Site 16116 is interpreted as a burial. The
correlation of age determination results and site/feature data
thus suggests that initial use of the project area was primarily
focused on temporary/semi-permanent habitation, but
expanded in the 15th century to include agricultural andburial
activities. Evidence for late prehistoric/early historic period
occupation is derived from Feature A (terrace) of Site 16114
andFeatureD (platform)of Site 16116.FeatureAisinterpreted'
•
DATA ANALYSES
Table 5.
SUMMARY OF RADIOCARBON AGE DETERMINATIONS
PEW Lab.
C-14 Age C-13/ C-13 Adjusted *Calendric
LabNo. No. Provenience
Yrs. BP C-12 C-14 Age Range
RC- BETA-
(one sigma) Ratio Yrs. BP Yrs. AD
SITE 6337
TU -1, Layer I,
1246 49077 Fea. D 580± 120 -11.4 800± 120 1000-1400
TU -3, Layer II
22-50 cmbd
1245 49076 Fea. B 1000 ± 110 -19.4 1090 ± 110 680-1170
TU -1, Layer III
127 cmbd
SITE 16114
1249 49080 Fea. A 50 ± 150 -24.0 70 ± 150 1516-1595
TU -1, Layer Il, 1620-1955
6490 cmbd
SITE 16115
1244 49075 Fea. A 270 ± 60 -25.8 260 ± 60 1470-1690
TU -2A, Layer I 1736-1808
15-36 cmbd 1930-1954
SITE 16116
1243 49074
Fes. D 50 ± 70
-25.4 40 ± 70 1670-1780
TU -1, Layer I,
1790-1950
62-103 cmbd
1953-1955
1248 49079
Fea. E 230 ± 50
-19.6 340 ± 50 1440-1650
TU -2, Layers II -V,
74134 cmbd
1247 49078
Fea. G 420 ± 70
-26.0 400:t 70 1410-1650
TU -6, Layer II
93-116 cmbd
Calibrated according to Stuiver and Pearson (1986); range at two sigmas
27
W
DATA ANALYSES
to have functioned as a habitation, while Feature D is
interpreted as a burial. The range of activities represented in
the late prehistoric/early historic period features thus appears
to be consistent with those noted in the prehistoric period.
PORTABLE ARTIFACTS
A total of 23 artifacts were recovered from the project
area, 20 of which were classified as indigenous artifacts. The
remaining three artifacts are non -indigenous and will be
discussed in a later section. Indigenous artifacts are those
fabricated using traditional Hawaiian manufacturing
techniques and local raw materials, and they range in type
from fishing gear and tools to various decorative items.The
inventory of indigenous artifacts from the current project area
is fairly narrow in content, consisting of fishing gear, tools,
and flaked stone artifacts. A detailed tabulation of indigenous
artifacts by deposit -area is presented in Table 6. The results
of the artifactual analysis are discussed below.
Fishing Gear
One specimen of indigenous fishing gear was recovered
from the project area during the current investigation. The
artifact, a shaped tab, derives from Feature A of Site 16114.
Fishhook tabs are preforms forfishhooks, and are categorized
according to theirmanufacturing stage, following terminology
outlined by Sinoto (1975). Roughed out tabs represent the first
stage, in which bone or shell material is cut to the appropriate
size of the intended fishhook. Shaped tabs are the second
stage; and are distinguished from roughed -out tabs by the
refinement of their edges and initial shaping of the shank and
bend portions of the fishhook Hook blanks are the last stage
before actual finishing, whichinvolves the removal ofmaterial
to form the inner edges of the hook that separate the point
from the shank. The shaped tab encountered in the current
project area is manufactured from Isognomonidae, and
measures c. 18.0 mm by 5.0 mm by 4.0 mm. It has been cut
and abraded on foursides to form a rectangle, but is otherwise
unmodified.
Tools
Three tools, all abraders, were encountered in the project
area during the current investigation The assemblage derives
from Feature A of Site 16114 and Feature D of Site 16115. The
tools are described below.
Of the three abraders, one was manufactured from coral,
one from basalt, and one from an echinoid spine. Coral and
basalt abraders are evaluated according to their overall shape
in plan view, following the classification system and
W
28
nomenclature set forth by Suggs (1961) to describe coral
abraders found atNukuHiva inthe Marquesas Islands, French
Polynesia. in this system, abraders areeither infomtal,meaning
that the shape of the raw material is dominant; or formal,
indicating that the characteristics of the raw material have
been extensively modified by use. Cross-sections are generally
taken perpendicular to the tip and butt of the abrader, while
the number of abrasion faces is indicative of preferential
abrasion on a given surface. Echinoid spine abradets, which
tend to be unifomrly informal in shape, are evaluated based
on the number, location, and type of abrasion faces present,
using a system developed by PHiRI.
The coral abrader is a fragment of a formal abrader and
measures c. 23.0 mm by 13.0 mm by 6.0 mm. It is abraded on
two faces, creating a lenticular -oval cross-section and a
wedged plan view. The basalt abrader is a fragment of an
informal abrader and measures c. 88.0 mm by 73.0 mm by
23.0 mm. It is abraded on one face and has a convex lateral
cross-section.
The plan view shape of the specimen in is indeterminate.
The remaining abrader is manufactured from an echinoid
spine. It is a complete informal abrader with a single face of
abrasion The abrasion face extends from the midsection to
the distal end and is beveled. The specimen measures c. 31.0
mm by 5.0 mm by 4.0 mm.
Coral artifacts apparently served multiple purposes
prehistorically, ranging from "rubbers" used to finish canoes
and wooden bowls (Buck 1964:257-8) to saws orfiles used in
the manufacture of bone and shell fishhooks (Emory, Bonk,
and Sinoto 1968; Sugg 1961). Use of a particular surface
over a period of time might generate a sawing or filing edge,
which in turn would wear down during use to a new shape
which could serve a new purpose. Echinoid abraders, in
contrast, were most likely used for more specialized tasks
such as fishhook manufacture, as they are both smaller and
softer tools.
Flaked Stone
Sixteen of the indigenous artifacts recovered from the
project area are flaked stone artifacts. Of this assemblage,
seven specimens are composed of aphanitic basalt, and nine
are composed of volcanic glass. By provenience, the flaked
stone artifacts derive from Sites 6337, 16114, and 16115.
All flaked stone material is evaluated with respect to
flake/core type. Following established procedures for
evaluating flaked stonermterial, diagnostic flakes are defined
as those flakes having a complete or parttaLstriking platfortn
• 0
DATA ANALYSES 29
Table 6.
DETAILED DISTRIBUTION OF PORTABLE ARTIFACTS
6337
16114 16115
CATEGORY
Fea.D
FeaC
Fea-A FeaA Fea.D Fea.E
TU -3
TU -2 Site
TU -1 Site TU -2A TU -1 Site Grand
II
I Total
II III Total I Surf: I Total
Total
INDIGENOUS
FISHING GEAR
Shell
Shaped tab
0
1 1 0
1
aha
.'o
FLAKED STONE
Basalt
Flake
0
5 - 5 2 2
7
Volcanic glass
Core
0
2 - 2 0
2
Flake
1
1
4 - 4 2 2
7
�01-
3
t Rxii"^�w"
''ffP dr `ATR••F 112 r�^„i `j J�`m`�yy§` y
"aef�cs. ;xi
uPY�hM'dtw'...
a:;:ax6a
afrtpi��enar•''
TOOLS
Abrader
Basalt
0
- - 0 1 1
1
Coral
- 0
2 - 2 0
2
Echinoid
- 0
- 1 1 0
1
Ch1 ,�--'rY
:YeFiumf'r�'i�jl*:..
1
NON -INDIGENOUS
DOMESTIC ITEMS
Glass
3 3
0 0
3
Fragment
m s=
0
DATA ANALYSES
and a bulbofpercussion. Non-diagnostic flakes are fragments
that lack the platform and/or bulb. Cores tend toward
multifaceted polyhedral shapes dominated by one or more
platforms, and typically show little evidence of subsequent
use as tools. Primary cores exhibit only flake scars, while
secondary cores are actually flakes with a bulb from which
other flakes have beenremoved. Polished flakes are restricted
to the basalt assemblage, and represent flakes that have one
or morehighlypolished surfaces. Polished flakes are generally
interpreted as deriving from flaking or retouch performed on
polished stone tools such as adzes. Based on the above
criteria, the 16 specimens can be separated as follows: one
primary and one secondary flake core, eight diagnostic flakes,
four non-diagnostic flakes, and two pieces of volcanic glass
debitage. Two of the basalt flakes are polished.
Cores - Cores are further described by the number and
condition of platforms, the number and direction of flake
scars, and the presence or absence of cortex. Both of the cores
from the present project are manufactured from volcanic
glass. The primary core has at least three platforms, all of
which have been crushed, and four associated flake scars. It
is polyhedral in shape and measures c. 19.0 mm by 11.0 mm
by 7.0 num. The secondary core has a single intact platform
with one associated flake scar. It is distally contracted in plan
view and measures c. 17.0 mm by 11.0 mm by 3.0 mm. No
cortex was noted on either core.
Flakes- By composition, five of the diagnostic flakes are
aphanitic basalt, while three of the diagnostic and four of the
non-diagnostic flakes are volcanic glass. The diagnostic
flakes range from c. 12.0 to 32.0 mm in length and c. 10.0 to
32.0 nun in width, and the nort-diagnostic flakes range from
c. 13.0 to 26.0 mm in length and c. 10.0 to 34.0 mm in width.
Flakes manufactured from aphanitic basalt are generally
larger than those composed of volcanic glass, due to the
relative flaking properties of the materials.
Uses for flaked stone artifacts have been suggested both
by Barrera (1971) and by Kirch (1973), who observed:
The possible functions... are many and varied.
Basaltic glass holds a fine, sharp edge and the tools
make excellent cutting and scraping implements.
They may have been used in food preparation, for
cutting and scraping plant materials, or for delicate
woodworking... [t]hese artifacts are extremely
common, being found in virtually every type of
[Hawaiian] site. The suggestion, then, is that the
ubiquitous basaltic glass flakes functioned as a
prehistoric "pocketknife-, to use a modern
analogy... (1973: 185-6).
0
Non -indigenous Artifacts
30
Three glass fragments were encountered in the deposits
of Feature C of Site 6337. The fragments are manufactured of
clear glass, and include two non-diagnostic body fragments
and one base fragment. The base fiagmenthasraised lettering
on the exterior and a raised ring for a foot. Itmay be a portion
of a bottle. None of the fragments exhibited attributes that
could be used to date the fragments.
Summary
In general, the artifact assemblage encountered during
the current investigation suggests that a fairly narrow range
of prehistoric activities were carried out within the project
area. With the exception of a few flaked stone artifacts and an
abrader, the majority of the artifact assemblage derives ftom
Site 16114; suggesting that a broader range of activities was
undertaken at this locale compared to the other sites in the
project area. Stone tool manufacture and use is suggested by
the flaked stone assemblage, and may have been accompanied
by food processing and craft -production activities that relied
on the use of flaked stone tools. Manufacture of bone and shell
artifacts is suggested by the presence of the shaped tab and
abraders in the assemblage. The glass fragments noted in the
deposits of Site 6337 are most likely the result of recent
dumping in the area.
1/ 1
Objectives and Methods
Midden deposits are archaeologically significant on a
number of levels, as the variety and content of food remains
contained within a given midden deposit provide useful
informationcmceming prehistoric dietandresoutceutilization
patterns. The analysis ofmiddenforinventorysurveypmjects
has two primary objectives:
1. To determine midden content, in particular the ,
variety and distribution of the remains for each
cultural deposit encountered within the project
area; and ,
2. To provide an indication of dietary and resource
exploitation patterns for each site, and for the
project area as a whole. ,
All midden remains recoveredfrom the various test units
underwent detailed analysis inthelaboratory.Detailedanalysis '
involved splitting the sample into two size classes by passing
each sample through 1/4 -in and 1/8 -in mesh screens. One
iJ
I
I
1
I
I
1
! 0
DATA ANALYSES
hundred percent of the material retained in the 1/4 -in screen
is completely sorted to the lowest taxonomic level possible,
while the material retained in the 1/8 -in screen is inspected
both for artifactual material and for taxa not encountered in
the larger portion of the sample. Marine shell identifications
are verified and augmented using Kay (1979).
The sampling design outlined above is adapted from
Kirch (1979), based on a series of experiments measuring the
relative distribution of molluscan and bone material retained
on each screen. Kirch concluded that use of the screening
process increased the speed of the sorting process without
decreasing either the accuracy or statistical validity of the
overall analysis. The taxonomic distribution and weight of
materialretained on the 1/4 inscreen should thus be considered
as representative of the variety and relative percentages of
each taxon present in the entire sample.
Results
Midden remains were encountered in the deposits at
twenty of the sites in the project area. The range of taxa
present in the midden assemblage from these deposits is
summarized in Table 7. Total weights for each taxon (in
grams) are tabulated by site and feature, with subtotals
indicating the combined weight per feature for each larger
material class (eg. gastropods). The total weight of each taxon
in the project area is provided in the final column of the table,
while thegtand totalrepresents the combined weight of all the
midden materials derived from the project area.
In general, the taxa represented by the midden samples
taken from the project area were common inhabitants of the
shorelines, shallow -water areas, solutionbenches and fringing
reefs of the windward islands of the Hawaiian chain By
weight, 90.02% of the 213.95 gams of midden material
31
recovered from the project area was contributed by marine
gastropods, 3.89% by bivalves, 6.09% by other invertebrates
such as echinoids, crustaceans and non -marine gastropods,
0.1% by vertebrate faunal material, and 0.1% by vegetal
material. Cypraeidae, Neritidae, Conidae and Thaididae are
the most abundant marine gastropods by weight, while
Isognomonidaeand Veneridaeare themostcommonbivalves.
Echinoidea was the dominant taxon within the other
invertebrates category. The vertebrate faunal material was
composed of a fish and bird bone, while the vegetal material
was represented by carbonized plant remains only.
The midden assemblages, when examined by site and
feature, are generally comparable in content and relative
distribution to the project -area total discussed above. The
deposits associated with Feature A of Site 16114 contained
91.9% marine gastropods,1.42% marine bivalves, 051 % other
invertebrates, 0.1% vertebrate faunal material and 0.1 % vegetal
material, and showed the same taxonornic concentrations within
each category noted for the project area above. The deposits
associated with Feature A of Site 16115 were composed
entirely of marine gastropods, while the Feature E deposits
contained 69.3% marine gastropods, and 32.1% marine
bivalves. Cyproeidae contributed the largest amount by
weight to the Feature A deposits, and Thaididae contributed
the largest amount to the Feature E deposits at Site 16115.
The resul is of the midden analysis indicate that subsistence
patterns in the project area included the collection and
consumption of a variety of shell fish, ranging from several
taxa of marine gastropods and bivalves to echinoids and
crustaceans. The relative lack of vertebrate faunal material,
vegetal remains and non -marine gastropods inthe site deposits
may indicate that terrestrial resources were infrequently
utilized within the project area,butmay alsoreflectdiffetential
preservation of these remains.
0 0
DATA ANALYSES
Table 7.
DETAILED DISTRIBUTION OF MIDDEN
16114 16115
fe-a.A Fes.A Fea.E
Material TU -1 Site TU -2A TU -1 Site Grand
H III Total I I Total Total
MOLLUSCA
ISOGNOMONIDAE
GASTROPODA
- 2.59
0.00 2.59
VENERII)AE
0.18
TROCFEDAE
0.00 0.18
Trochus intextus
0.20
- 0.20
- 0.00
0.20
NERITIDAE
OTHER INVERTEBRATES
Nerita Picea
17.66
1.15 18.81
0.12 0.12
18.93
LITTORINIDAE
- 0.00 12.19
CRUSTACEA
0.81
- 0.91
Littorina pintado
0.69
- 0.69
- 0.00
0.69
CyPRAErDAE
121.00
2.65 123.65
0.69 2.59 3.28
126.93
THAIDIDAE
10.54
- 10.54
- 6.03 6.03
16.57
CONIDAE
14.16
- 14.16
- 3.10 3.10
17.26
UNIDENTIFIED GASTROPODA
11.63
- 11.63
- - 0.00
11.63
BIVALVIA
ISOGNOMONIDAE
2.59
- 2.59
0.00 2.59
VENERII)AE
0.18
- 0.18
0.00 0.18
0042 554 ` 554 83
(JBTOTAL'BIVALVLk
2. 7 7
0. 0W 2.77,,,,
OTHER INVERTEBRATES
ECIIINOIDEA
11.73
0.46 12.19
- 0.00 12.19
CRUSTACEA
0.81
- 0.91
- 0.00 0.81
OTHER
12 54
0.46 13 oo
,
vv[IBTOTAT
0 06 A
VERTEBRATES
Bone
0.20
0.20
- 0.00 0.20
VEGETAL
Charcoal
0.23
0.23
- 0.00 0.23
17 u- -18.
32
E
33
EVALUATION OF
SURVEYMETHODOLOGY
In general terms, the survey methodology was effective.
Access to all portions of the project area was quite good. The
density of vegetation in the project area often hampered
observations, but spacing between transects averaged five to
seven meters, so that all major archaeological features were
located. Somesmallerarchaeological features (e.g. agricultural
features such as small mounds and terraces) were identified,
but not formally designated.
DISCUSSION
Fourteen sites (more than 36 component features)
were identified in the project area. Three of these had been
previously identified, but may be affected by the proposed
development (6335, 6336, and 6337). Three of the five
features from Site 6337 were tested for human remains.
Feature A of Site 6337 lies outside the project area, and
Feature E is a wall. Sites 6335 and 6336 are historic cattle
walls.
Formal Feature Types
Formal feature types at sites in the project area included:
wall, enclosure, C -shape, terrace, concrete structure, mound,
platform, modified outcrop, and well. These features are
common types in both the North Kona District and on the
Island of Hawaii.
Three of the sites (16113, 16114, and 16115) were
[narked in the field with yellow flagging tape marked "CSH."
These sites were recorded during the current survey, since it
was not known if they had been recorded by CSH. Sites N and
O (Soehren 197 8) are thought to have been located during the
current project. Site N could be Site 16114; Soehren's (1978)
data is sketchy, but the presence of cowry and Nerita sp. shells
at the feature may conform with Soehren's findings. It is also
possible that Site 16115 (also tagged in the field as CSH 29
[Cultural Surveys Hawaii]), may be Site O, since it is in the
location indicated by Soehren (1978).
Sites 1001-1 to 1001-5 (Walker 1991) were also
relocated. Site 1001-1 was designated as Site 16112, and
Site 1001-2 possibly as Site No. 16115. Walker's (1991)
Site 1001-3 was assigned Site No. 16118. His Site 1001-4
consisted of three cairns. While these, themselves, were
not formally designated, it is believed that they form part
of the agricultural system "carpet" present within the
project area. Site 1001-5 is thought to be Feature D of Site
6337 and was recorded as such.
Terraces - Only a sample of the terraces (N=9) were
examined within the project area because they are so
widespread within the Kona Field System. These features are
raised above the ground on one to three sides to provide a
partially level surface on sloping or irregular ground. Of the
nine that were recorded, three (33%) may be habitation
terraces or paepae (sleeping houses), with the remaining six
(66%) appearing to be agricultural, or retaining, terraces.
Possible habitation terraces include those at 6337(D),,
16114, and 16119. The latter agricultural -terrace grouping
is a common component throughout the project area, and
the Kona Field System as well. These agricultural features
are thought to occur at Sites 15108, 16115 (A, B, D), and
16113 (B, C).
Enclosures - These are the second most -common feature
type (ns7) among the recorded features at the Alii Drive
Parcels Project Area. Two different types of enclosures were
located within the project area. The fust type, a high -walled
animal enclosure, was associated with the historic agricultural
Site 16111, where three features were located. The remaining
three enclosures, at Sites 16113, 16115, and 16118, appear to
be associated with habitation. The remaining enclosure feature
is at the Site 16116 agricultural complex and this large
amorphous feature is thought to be associated with agricultural
activities.
Platforms - Platforms constitute five of the recorded
features at the project area, and all appear to be of Late
Prehistoric or Contact -era age. These five features were or _
located at Site 6337 (Features C and B), at Site 16116
(Features D and E) and at Site 16117. The features at Site 6337
were tested to determine the presence or absence of human
remains. None was found. Features D and E at Site 16116
were tested, and the presence of human remains was conf rived.
The final platform at Site 16117 also resembles a modified
outcrop. It was probably used for habitation or agriculture.
Mounds - Mounds (N=5) in this project area are well-
builtfeatures constructed of pahoehoe. One of these is located
at Site 16114, and the remainder are found in conjunction with
Site 16115. As with the terrace feature -type, these are common
in the Kona Field System, and in the project area, so most were
not recorded. Itis probable thatmost of the mounds (including
the named features) served an agricultural purpose.
rA
CONCLUSION
Concrete structures - These features (n=2) are historic or
recent concrete troughs used for animal husbandry at Site 16111.
These two features, which seem to have been built on site,
appear to have provided water for domestic stock from the well
at Feature C.
Walls - Four walls were recorded in the project area. Three
of them (Sites 6336, and Feature E at Site 6337) were recorded
during Ching et al. (1973) project. These two appear historic and
may be associated with agriculture at Site 16111. All walls are
well made and appear to have been maintained recently. The
wall found at Site 16112, judging from its construction, appears
to be Late Prehistoric or Contact -era. Prehistoric and historic
walls are common feature types in the general vicinity, and the
above examples are typical.
C -shape - A single, rough C -shape was noted at Site
16113. This feature may have provided shelter for those
involved with agriculture in the surrounding field system.
Modified outcrop - Two modified outcrops were recorded
during the inventory survey, one at Site 16113 and one at 16116.
Both appear to be associated with agriculture. The features were
not tested, but appear to be consistent with other agricultural
features in the area.
Well - One water well was identified. It was located at Site
16111 and consisted of an excavation dug or blasted into
pahoehoe, a concrete and basalt "apron," a windmill tower, and
an engine shed. Also associated with the agricultural complex at
Site 16111 is a previously recorded historic wall (Feature E at
Site 6337) extending to the east.
Functional Interpretations
All project area sites have been tentatively classified as one
of the following functional types: habitation, agriculture,
agriculture/possible habitation, indeterminate, possible
boundary, habitation/agriculture, and burial. Based on the
parameters advanced in Cordy (1981:59 [Table 8]) all habitation
sites in the project area appear to be temporary in nature, except
the historic sites. These sites fit Cordy's criteria for temporary
habitation, although none of the features contained evidence of
multiple firepits. According to Cordy's model, temporary
habitations are (a) less than 16 square meters in external area, (b)
insubstantial constructions, (c) contain multiple firepits (these
would most likely exist in caves or rock shelters), and (d) have
few to no associated structures. None of the sites appeared to be
permanent habitations based on Cordy's criteria for permanent
habitation (1981:66-82). Cordy presents the following criteria
for permanent habitations: (a) external area greater than 16-19 sq
in; (b) substantial construction (stone -filled and bif iced walls);
(c) presence of special purpose structures (small, special purpose
structures for work and storage); and (d) location (permanent
housing tends to cluster mostly on the coast, either along the
shore or at the mouth of and on the sides of valley floors). Most
of the features in the current project area are precontact and were
for agriculture. This was not unexpected since the project area is
within the Kona Field System, of which the predominant
features are parallel stone walls eight to fifteen meters apart,
34
and which demarcate cultivated fields. Within the former
fieldsarevariousminoragriculunvifeabm!s includingt=ces
and mounds, as well as scattered residential features, including
terraces and temples (Kirch 1985:167).
Site 15108 is one ofmanyprehistoricagriculturalterraces
in the project area. It is unclear how these terraces functioned
within the agricultural complex, but probably crops were
raised in the soil they retained. The site was not tested
Site 16111 is late historic/recent agricultural (animal
husbandry) complex with at least five associated features.
One feature, Feature C, is a basalt, concrete, and wooden
structure utilized for pumping water to animals (using the
wind). A dated concrete pad possibly reads "1940." Testing
did not occur at this site.
Site 16111 is a wall and mound. The site has also been
given an agricultural function, and it assumed to be part of the
larger Kona Field System. This small site was not tested.
Site16113 is a small complex that is a possible habitation
site that may have been utilized in association with agriculture
at the surrounding mounds. Feature A is a large enclosure
consisting of stacked walls atop a level pahoehoe bedrock
area. Feature B is an amorphous C -shape or modified outcrop
that may have served as a temporary shelter. Testing did not
occur at this site because of a paucity of deposits.
Site 16114 is a small terrace in the same general area as
Site 16113. It is located in the center of a large number of
unrecorded agricultural mounds and was tested during the
inventory survey. A radiocarbon age detemtination from
Layer 11 of TU -1(6490 cmbd) returned a probable date ofAD
1516-1595 (RC -1249, BETA -49080) (Table 5).
Site 16115 is a cluster of at least five features
indicative of both habitation and agricultural activities.
Four of the five features appear associated with agriculture;
one feature (Feature E) may be an associated temporary
habitation. Test units were placed at Features A and Ii, but
only one radiocarbon age determination was returned. A
sample was taken from TU -2A, in Layer I at 15-36 cmbd.
This came from a paved area in a small lava blister cave that
was exposed under Feature A. The sample returned a
probable date range of AD 1470-1954 (RC -1244, BETA -
49075) (Table 5).
Site 16116 is a large agriculturaliburial complex situated
on the eastern edge of the project area near the proposed Alii.
Highway. A total of eight features were recorded at the site;
they include a large, amorphous enclosure, several mounds,
platforms, and a modified outcrop. A number of test units
I
11
11
CONCLUSION
were placed within features in thesite. Two features that were
tested (Feature D and Feature E) contained human remains;
theremainderof the testunits failed todiscloseburials. Three
of the test units did return radiocarbon age determinations.
TU -1 (Layer I, 62-103 cmbd) at Feature D, a platform with
burial, returned a probable age of AD 1790-1850 (RC -1243,
BETA -49074) (Table 5).
TU -2 at Feature E, a platform, disclosed human
remains, and Layer II -V (74-134 cmbd) was dated to a
probable age of AD 1453-1644 (RC -1248, BETA -49079)
(Table 5), well within the range of the Late Prehistoric. This
test unit disclosed an atypicalburial treatment; a capstone had
been placed over the skull and the burial was placed inside
what appears to be a stone -lined chamber or cist. Further
excavation (if necessary) could disclose further information.
TU -6 at Site 16116 was placed in Feature G, a mound.
Layer II (93-116 embd) retumed a probable date of AD 1413-
1641 (RC -1247, SETA -49078), within the range of other
dated features at the site.
TU -8 at Site 16116 was placed in Feature H, a small
mound located on the extreme eastern edge of the site. This
well -made unit of piled basalt cobbles was thought to
contain a burial or other cultural remains. Neither of the
above were located and insufficient charcoal was located for
a radiometric date.
Site 16117 has been designated as a single -component
site although other agricultural features are nearby (as they
are in other portions of the project area). This platform (or
modified outcrop) was assigned a habitation function
(probably temporary), but it may also have been used for
agricultural purposes. Testing also occurred at this site to
determine presence or absence of human remains, but none
were found. The feature was not dated due to an insufficient
amount of radiocarbon.
Site 16118 is also a single-componentsite,mostprobably
associated with the ubiquitous agricultural features in the
general area. It is asingle, low enclosure situated on the north
side of the project area and located atop a broad, elevated
pahoehoe flow, As with the nearby 16117, the site could have
served a temporary habitation function. Only a very small
amount of soil was present, so the site was not tested.
Site 16119 is aprobable habitation terrace located in the
east -central portion of the project area. It is near Site 16116
and could beanassociatedhabitationten-ace (orlowplatform)
for workers at the agricultural features in the area. The site
was not tested.
35
Site 16133 is a probable agricultural complex found in
the north -central part of the project area. It consists of two
terraces and a modified outcrop. Two Test Units were
placed at this site. TU -1, at Feature C, a terrace, was
excavated to a depth of 0.39 in below surface. This test did
notdisclosethe presence ofhumanrenaimcraiddau TU-2in
Feature B (also a terrace) failed to disclose any cultural
material, indicating that this feature may also havebeenused
for agricultural purposes.
Because itmaybe affectedbythe proposed development,
a previously identified site (6337) was tested during the
current project. The functional interpretation of habitation/
boundary had been assigned to Site 6337 before testing. The
dates obtained from testing at the site are both prehistoric.
Feature E (wall) appears to be historicfrom construction and
placement. This latter feature (E), therefore is probably not
associated with 6337, but is a lata ranching development The
remaining features of 6337 within the project area (Features B,
C, and D) appear to be associated with prehistoric babitation.
Feature B at Site 6337 is a well -made, faced and stacked
platform that is six to seven courses high The top slopes
slightly rnakai, and some attempt at rough paving is indicated
on the top. Based on general appearance, : Feature B may be
a habitation terrace. TU -1 was placed in the feature and it was
c.1.75mbefore adecomposing bedrock was reached. Inlayer
lII (1.18-1.64 cmbs), sufficient charcoal was returned for a
radiometric age determination. This sample was dated to a
probable age of AD 690-1160 (RC1245, BETA-49076)(Table 5).
TU -2 was placed in Feature C, at the extreme northeast
portion of the project area. Feature C is a small, well -made
structure of indeterminate function It may have served as a
shrine or habitation TU -2 was placed here to determine the
presence or absence of human remains. The excavation was
dug approximately 1.30 in until bedrock was reached, but no
indication of human remains was noted. Thr pieces of
historic glass were found, but no midden or charcoal.
TU -3 was placed in the northwest corner of Feature D, a
terrace with scattered shell midden on the surface. It was dug
in what was thought to be a stone -lined hearth to obtaindating
material. The placed stones in the area consisted of a vertical
basalt slab at the south, two horizontal slabs on the north, and
smallboulders on the east and west. The unit was dug down
approximately 0.50 in, where a cavity too small to be
excavated was encountered. The cavity contained a sterile
silty loam and the unit was terminated. Layer II (0.02.030 in
belowsurface)containedshellmidden many coral fragments,
and charcoal. The charcoal was daW to a probable age range
of AD 1010-1396 (RC -1246, BETA -49077) (Table 5).
•
CONCLUSION
Many of the sites in the project area relate to agriculture;
this is not unexpected because of the proximity to the Kona
Field System, which is
...estimated to spansome 4.8 by 29 kilometers. The
dominant archaeological features are parallel stone
field boundaries, anywhere from 8 to 15 meters
apart, which demarcated cultivated fields. Within
these are various minor agricultural features,
including terraces and mounds, as well as scattered
residential features, including terraces and temples
(Kirch 1985:167).
The area was utilized in the past for horticulture, and in
proto-historic and historic times also for animal husbandry.
As stated in Handy and Handy (1972):
Kona ... with its decomposing lavamixed withhumus
and intermittent rainfall which soaks away quickly
in the porous soil and rock, is ideal for sweet -potato
cultivation. Sweet potatoes were the staple in
lowland localities where there was sandy soil, as at
Kailua... (1972:526).
Writing of his work at the proposed Kahakai (Kailua-
Kona) Elementary School just to the east-southeast of the
current project area, Welch (1982) described two
environmental zones, nmuka and niakai, with the Kuakini
Wall marking the boundary between them. According to
Welch, the lower (or kola) zone (containing the current
project area):
...seems to have been the major habitation area,
containing a variety of different types of features
associated with habitation. Residences were
dispersed throughout this zone; there is no evidence
of a nucleated village. Interspersed among the
house platforms are burial platforms, communal
structures, habitation and burial caves, temporary
shelters, enclosures, walls, terrace walls, and rock
mounds..a range of domestic, political, religious,
and subsistence activities was conducted
(1982:87).
The current project area falls within Newman's (1970)
"Sweet Potato/ Wauke Zane," of the Kona Field System This
zone, whichruns in elevation from sea level to 500 ft (0-150 m)
AMSL and whichreceives seasonal rainfall ranging from 30-
50 inches (0.8-12 m). Sweet potatoes and wauke were grown
in very rocky areas of this zone (1970:134).
kn
Basing her work on Newman (1970:128-134) and Kelly
(1983:55-68), Schilt (1984), has defined four subzones of the
Kona Feld System Ranging in elevation from sea level to
12W in (4000 ft), they include the kola (coastal area), kaluutu
(seaward slope), 'apa'a (upland slope) and 'anur'u (upland
jungle). Newmans (1970) Sweet Potato/Wauke Zone is in
Schilt's kola zone. Schilt notes that crops cultivated in this
zone during late prehistory include sweet potatoes, gourd, and
wauke. According to early historic -period accounts (c. AD
1778-1825) cabbage, melons, onions, oranges and tobacco
were grown in the zone. These crops gave way to beans,
coffee, com, cotton, pineapple, Irish potatoes, and pumpkin
during the years c. 1825-1850 (1984:6).
Both Newman and Kelly included verbatim accounts of
early visitors to the fields, and Schilt used the accounts along
withdata concerning environmental parameters (topography,
flooding, soils, seasonality, and vegetation) to assess site
patterning. Schilt (1984:284) then summarized cultural
phases in her subzones in terms of five phases which overall
extend from c. A.D. 1050 to the modem era. In the Phase I,
Pioneer Settlement: c. AD 1050 to 1400, there was sporadic
use oflowland slopes and caves and later, possible de velopment
of mauka subzcnes. During Phase 11, Garden Developments
(c. AD 1400-1600 to 1650), the kola zone was used for small
gardens, with caves serving as temporary shelters. Soil depth
in the zone increased during thisperiodbyeresional deposition
resulting from development of the upland subzones. During
Phase III, Refuge, Habitation, and Intensive Gardening (c.
1600 to 1650-1779), the rnauka portion of the zone was
intensively planted with sweet potatoes, wauke, and probably
ipu (gourds). Some permanent habitation took place, but
habitation was more commonly temporary. It is probable that
enclosures, probably for pigs, were built during this phase and
that suitable caves were modified for use as refuge caves. The
ntauka areas were completely developed by the end of this
phase. Phase IV, Historic habitation and Gardening (a AD
1779 to 1850), is marked by a decrease in kola cultivation,
possibly reflecting population decline. Some permanent
habitation took place during this time, primarily makai of the
Great Wall ofKuakmi. Althoughsomepertionsofku/alands
were being claimed by Hawaiians during the Great Mahele,
no awards of parcels were made within the project area. Some
of the lands were being converted to grazing by the 18409.
During Phase V, Historic Ranching (c. A.D. 1850 to modem
times), there was a total shift to grazing,following the awards
of kola lands to individuals. There were isolated permanent
habitations (mostly of upland slopes) related to ranching.
Ranching in the area has since been almost entirely displaced
by urban activities and tourism.
I
I
J
I
I
1
I
0 0
CONCLUSION
The Kona Feld System can also be compared to the
Hawaiian cultural and historical sequence as proposed by
Kirch (1985). Kirch'sproposed sequence is composed offour
majorperiods: Colonization (AD 300-600), Developmental
(AD 600-1100), Expansion (AD 1100-1650), and Proto-
historic (AD 1650-1795). Schilt's data seems to indicate that
occupation and initial development of the Kona Field System
began sometime during Kirch's late Developmental Period,
with activity increasing during the Expansion and Proto-
historic Periods. It is also important to note that during the
Expansion Period, the social and political organization of the
societyunderwentradical change,suchas rankrifferentiation,
expansion of settlements throughout the lowlands, and the
establishment of the ahupaa'aunits for territorial organization
(possibly due to the diminishing of available lands). One
other important factor that appears to be a direct result of the
expanding population is the intensification of the economic
production. Along with the invention (or at least expansion)
of aquaculture, the establishment of the major dryland field
systems (e.g. the Kona Field System) became vital tofeeding
the rapidly expanding population.
Summary of Site Distribution
The sample of sites located during the archaeological
inventory survey of the proposed Alii Drive Family Housing
Project can be divided into two major groups: habitations
or complexes, and agricultural sites (which may include
temporary habitation utilized by those tending the crops).
The majority of the sites also appear to be prehistoric, but
the historic and recent are represented by the historic burial
at Site 16116 (Feature D) the ranching activities at Site
16111 and the stone walls that are present in the project
area.
A great number of the observed archaeological features
are terraces and mounds that are part of the Kona Field
System. These features appear to be clustered throughout the
eastern half of the project area along slopes and ridges. Many
of these seem to have resulted from the clearing of area for
planting, or from conscious construction. The terraces and
mounds probably served both to capture soils eroding
downslope and to retain moisture for planting. Both feature
types them became useful for planting.
Those sites withassociated features indicating temporary
shelterorworkareas related to agriculture are found throughout
the eastern portion of the project area and are typically located
both on ridges and in the lower portions between ridges.
Because of the density of agricultural features within the
project area, the site boundaries are somewhat arbitrary. One
way of viewing the sites in the project area is consider only
37
those features which are indicative of habitation as separate
sites and to consider the ubiquitous background features as
components of the KonaField System (Site 6601). Previously
declared eligible for inclusion on the NRNP, the Kona Feld
System is a very large complex of aboriginal Hawaiian
dryland cultivation and habitation remains which covets an
area approximately 3 by 18 mi (4.8 by 28.9 km), extending
from north of Kailua south to Hookena. Dryland agricultural
features comprising components of the Kona Feld System
aredistributed throughout the project area. However,because
the project area is on the fringes of the field system, the
features it contains are not the formal fields and well -made
kuaiwi walls that are found in the heart of the system.
When the projectfmdings are viewed with this distinction
between the habitation sites and the background agricultural
sites, the number of potential habitation features (all of
which appear to be short term, temporary, or of recurring
usage), is limited to seven features at six site locations.
These features are Feature B and D at Site 6337, Feature B
at Site 16113, the habitation terrace at Site 16114, Feature
E at Site 16115, the small enclosure at Site 16117 and the
terrace at Site 16119.
Although not all of the features indicated above were
subjected to testing during this project, four of the sites tested
did return probable radiocarbon age determinations. Feature
D (Site 6337) was given a probable date range of AD 1010-
1396 (RC -1246, BETA -49077). This is somewhat early
according to Schilt's range for development of the KonaField
System, but the latter portion is within Schilt's Phase I (or
Pioneer Settlement Phase) whichshe posits fromc. AD 1050-
1400. Schilt (1984) feels there was sporadic use of the
lowland slopes and caves at this time.
Feature B at Site 6337 was also dated, and yielded a very
early range of AD 690-1160 (RC -1245, BETA -49076). This
date places the feature (at the later probable age range) also
within the Schilt Pioneer Settlement Phase, but the date may
be the result of an early natural burn in the area and not
associated with Feature B at all.
The small terrace at Site 16114 returned a probable
radiocarbon age range of AD 1516-1595 (RC -1249, BETA -
49080), well within Schilt's Phase II, Garden Developments,
when the kola was used for small gardens, and caves were
used for temporary shelter.
Feature E at Site 16115 was not dated, but the nearby
Feature A yielded a probable age range of AD 1470-1954
(RC -1244, BETA -49075) from a-rnple obtained from a
small paved area in a blister cave. It is not known what type
of association (if any) there is between the above features at
0
CONCLUSION
Site 16115, but the age ranges obtained indicate that this site
might also fall within the Schilt Phase II, Garden
Developments.
Three additional features at Site 16116 completed the
radiocarbon age determinations derived from the inventory
survey. A probable age of AD 1672-1946 (RC -1243, BETA -
49074) was derived from fill above and around the human
burial in Feature D. The early portion of this probable age
range is within Schilt's Phase II, but the large span extends to
recent times. Feature E (also a burial feature) contained a
sufficient amount of charcoal fora probable age determination,
and a probable range between AD 1453-1644 was returned.
This is well within the Phase E Garden Developments as
indicated by Schilt (1984). A word of caution concerning the
validity or association of these dates with the burials should
be considered. It is probable that some of the charcoal is
associated with the burial, since the traditional Hawaiian
burial practice utilizes interment at night (Malo 1951:97,
Bowen 1961). However, it is also possible that the burials
(and the associated platforms) may have been placed in areas
where burning had been used previously to clear land for
gardening, or downslope from such areas.
One other radiocarbon sample was submitted from
Site 16116. This came from Feature G, a low mound
located east of Features D and E. The sample yielded a
probable age range of AD 1413-1641 (RC -1247, BETA -
49078). This probable date also falls within Schilt's Phase
II, Garden Development period.
From the number of radiocarbon dates that fall within the
given ranges of Schilt's Phase R, or Garden Development
period (n-5), it appears there was an increased usage of the
project area during this time. As stated above, Schilt argues
that the zone was being utilized for small gardens and caves
were being utilized for temporary shelter. No caves were
found within the immediate project area, but they are known
to exist nearby (e.g. Kahakai to the southeast). It is possible
that since there were no caves in the project area, small
temporary shelters were utilized in the planting areas.
It does not appear that any permanent habitations were
present within the project area. Cordy (1981) examined
several different types of permanent structures (sleeping
houses,canoehouses, men'shouse,house temple, and women's
eating house) at locations in west Hawaii Island. Cordy
postulated that sizes ranged from small to quite large, and that
these were more commonly associated with the paramount
chiefs'hotsing. Single -house (the sleepinghotse)households,
according to the early historic sources, appear to be the norm
for commoners, along with a possible work plaza and canoe
El
38 t
house (ibid:74-75). Historical documents clearly indicate
that permanent settlements were predominantly coastal. in
Cordy's study areas.It would seem to alsohold ttvehene, where:
...There were chiefs and families of chiefs of Oahu,
Molokai, Kauai, Macri. The sands of Kaiakeakua
(Kailua Bay) were won down like a dromedary's
back by the many feet of chiefs and chiefenes
tramping over them, and Kamakahonu could be seen at
night the sparkle of lights reflected in the sea like
diamonds, frmn the homes of the chiefs from Kahelo to
Lanihau. The number of chiefs and lesser chiefs
reached into the thousands (Kamakau 1961:221-222).
From the above quote and from historical information, it
can be seen that the Kailua area, at least in the late eighteenth
century, was densely populated by chiefs and lesser chiefs,
because in Kamehameha's time (and afterward) it was a
governmental center. It is probable that the more high -status
residences were located along the coast, with lower status
permanent housing located further inland. If this was the case,
it is not surprising that no permanent houses were located in
this particular project area. Perhaps the workers were allowed
only temporary housing in the kula subzone when they were
engaged in gardening, but were required to locate their
permanent residences upland.
Graves (in prep.) has found several permanent residences
in her work in the Pualani Subdivision project area, located
mauka of the current project area, at elevations ranging from
475-540 ft (145-165 m) AMSL. The permanent residences
appear to be located onhighbenches andhilltops, and usually
close to trails. Pualani and other upland areas may be the
location of the permanent housing of the gardeners who
worked the kula areas.
Construction of the miscellaneous historic features,
predominately those associated with ranching and other
animal husbandry, may have begun sometime after AD 1850
and continues to the present.
SUGGESTED FUTURE RESEARCH
While no further work is recommended for the current
project area, future archaeological research in the project -
area vicinity might profitably be directed toward further
refinement of the settlement pattern model. The following
research questions may useful in pursuing this objective:
1. Further study to determine when episodes of '
deposition of upland, water-bom agricultural soils
to the kula subzone occurred, and what caused them;
U
1
1
n
I
• 0
CONCLUSION
2. Refinement of settlement patterns through
further study of both the upland portions of the
area (esp. kalu'ulu, 'apa'a, and 'ama'u
subzones) and the coastal portions. These
studies might examine duration, nature, and
intensity of occupation;
3. Study of leeward agricultural field systems (esp.
the Kona Field System) and such variables as
population pressure, environmental constraints,
and food production/ distribution; and
4. Comparison and analyses of archaeological data
in terms of information in traditional and historic
references.
GENERAL, SIGNIFICANCE
' ASSESSMENTS AND RECOMMENDED
GENERAL TREATMENTS
'
Significance assessments and recommended general
treatments for all identified sites are summarized in Table
8. Significance categories used in the site evaluation
process are based on Rules Governing Procedures for
'
Historic Preservation Review to Comment on Chapter
6E-41, Hawaii Revised Statutes, Hawaii Administrative
Rules; Title 13, Department of Land and Natural
'
Resources; Subtitle 13, State Historic Preservation
Division Rules (May, draft rules). The DLNR-SHPD uses
these criteria for evaluating cultural resources. Sites were
'
assessed for integrity of location, design, setting,
materials, workmanship, feeling, and association and in
terms of the following criteria:
'
(1) Criterion A. Be associated with events that
have made an important contribution to the
broad patterns of our history;
'
(2) Criterion B. Be associated with the lives of
persons important in our past;
'
(3) Criterion C. Embody the distinctive
characteristics of a type, period, or method of
construction; represent the work of a master;
'
or possess high artistic value;
(4) Criterion D. Have yielded, or is likely to
yield, information important for research on
prehistory or history;
'
(5) Criterion E. Have an important traditional
to the native Hawaiian people or
cultural value
to another ethnic group of the state due to
associations with traditional cultural practices,
beliefs, events or oral accounts.
39
Based on the above federal criteria, 13 of the 14 sites
identified during the current work are assessed as
significant solely for information content. A single site
(16116) was assessed as significant for information value,
cultural value, and as an excellent example of a site type.
Since extensive mapping and testing was conducted
during the current project, and because many of the
features are ubiquitous types in the Kona Field System, no
further work is recommended for the first 13 sites. Data
collected from these sites is considered to be sufficient;
their preservation is not considered essential, although
some sites might be considered for inclusion into
development landscaping. It is recommended that all
ground disturbance be monitored by a qualified
archaeologist.
The one remaining site (16116) is significant for
information content, and for cultural value because of the
two burial platforms it includes (Features D and E). Site
16116 is also assessed as an excellent example of a site
type at the local and regional level because of the burial
platforms at Features D and E. No further work is
recommended for Site 16116, with the possible exception
of the two burial platforms, for which preservation "as
is;' (and possible inclusion into landscaping) is the first
choice. If it is deemed necessary that Features D and E be
disinterred, then further data collection is recommended
for these features also. In this case, consultation with the
Hawaii Island Burial Council and DLNR-SHPD should
occur.
The data collected in the field is consistent with the
data outlined in the Historical Documentary Research
(Appendix B, this report), and supported the testimony
concerning dairy activities cited in the Historical
Documentary Research section of this report. Site 16111
is indicative of just such an operation.
The assessments and recommendations presented in
this report have been based on the findings of an
inventory survey of the project area. There is always the
possibility, however remote, that potentially significant,
unidentified surface and subsurface cultural remains will
be encountered in the course of further archaeological
investigations or subsequent development activities. In
such situations, archaeological -consultation should be
sought immediately.
Irl w
CONCLUSION 40
Table S. Summary of
General Significance Assessments and Recommended General Treatments
Feature
Integrity
significance Evaluations
General Recommendations
A B C D E
FDC NFW PID PAI
Designation
6335
+
+ -
+ _
6336
+
+ -
- + _
6337
+
+ -
+ -
15108
+
+ -
+ -
16111
+
+ -
+
16112
+
+ -
- +
16113
+
+
+
16114
+
+
+
16115
+
+
+
16117
+
+ -
+
16118
+
+ -
+
16119
+
- + -
- +
16133
+
- - - + -
- +
Subtotal:
0 0 0 13 0
0 13 0 0
16116 + - - + + + + _ - +
Subtotal: 0 0 1 1 1 1 0 0 1
Total: 1 14 1 1 - - 1
*If avoidance of the site is not possible, then further data collection is recommended.
General Significance Categories:
A = Important for historical contribution to signipcont events andior broad patterns of history
8 e Important for association with the lives of important individuals in history
C = Excellent example of site type at local, region, island, State, or National level
D = Important for information content
E = Culturally significant
Recommended General Treatments:
FDC = Further data collection necessary (detailed recording, surface collections, and limited excavations, and possibly
subsequent data recoveryimitigation excavations)
NFW = Nor further work of any kind necessary, sufficient data collected, no preservation potential
PID = Preservation with some level of interpretive development recommended
PAI = Preservation "as is", with no further work (and possible inclusion into landscaping)
CII
I
LI
0
0
41
ACHP (Advisory Council on Historic Preservation)
1985 Guidelines for Consideration of Traditional Cultural Values in Historic Preservation Review. Advisory
Council on Historic Preservation, Washington, D.C. (Draft Report, August)
Armstrong, R.W. (ed.)
1983 Atlas of Hawaii. Honolulu: University of Hawaii Press. (Second edition)
Barrera, W., Jr.
1971 Archaeological Excavations and Survey of Keauhou, North Kona, Hawaii. Dept. Anthro, B.P. Bishop
Museum. Report Series 71-10.
Bowen, R.
1961 Hawaiian Disposal of the Dead. Unpublished Masters Thesis, University of Hawaii.
Buck, P.H (Te Rangi Hiroa)
1964 Arts and Crafts of Hawaii. Vol. VI, Canoes. B.P. Bishop Museum Special Publication 45. B.P. Bishop
Museum Press, Honolulu.
Carlson, A.K., and P.H. Rosendahl
1990 Archaeological Inventory Survey, Pualani Development -Phase II, Lands ofPuapuaalstand 2nd,North Kona
District, Island of Hawaii. PHRI Report 764-061190, Prepared for Pualani Development Company.
Ching, F.K.W., E Neller, S. Palama, and P.B. Griffin
1973 The Archaeology of North Kona: From theAhupua'aof Kahului to theAhupua'aof Kahaluu. SurfaceSurvey-
Realignment of Alii Drive. Hawaiian Archaeological Journal 73-2. Archaeological Research Center Hawaii.
Prepared for Belt, Collins, & Associates.
Cordy, R.H.
1981 A Study ofPrehistoric Social Change: TheDevelopmentofComplexSocieties inthe Hawaiian Islands. New
York Academic Press.
Dunn, A.E., and P.H. Rosendahl
1991 Preliminary Report: Phase 1(A) -Site Identification Phased Intensive Archaeological Survey- Alii Highway
Phased Mitigation Program, North Kona District, Island of Hawaii. PHRI Report No. 900-052191. Prepared
for R. M. Towill Corporation.
Dye, T.
1978 An Archaeological Reconnaissance Survey of Four Aliemative Sites for the Kaih w Keauhou Elementary
School. Report Ms. 031078. Dept. Anthro., B.P. Bishop Museum.
W W
REFERENCES CITED
Emory, K.P., W.J. Bonk, and Y.H. Sinoto.
42 t
1959 Hawaiian Archaeology: Fishhooks. B.P. Bishop Museum Special Publication 47. B.P. Bishop Press, Honolulu. ,
Graves, D.K.
1991a Interim Report: Pualani Residential Community (Phase 1), Mitigation Program - Phase II, Archaeological ,
Data Recovery, First Zoning Increment, Lands of Puapuaa 1st and 2nd, North Kona District, Island of Hawaii
(TMK:3-7-5-17:por. 28, 29). PHRI Report 962-032291. Prepared for Pualani Development Company.
1991b Interim Report: Pualani Residential Community Mitigation Program - Phase H, Archaeological Data ,
Recovery Second Zoning Increment, Lands of Puapuaa 1st and 2nd, North Kona District, Island of Hawaii
(TMK:3-7-5-17:Por. 28, 29). PHU Report 962-070891. Prepared for Pualani Development Company. '
1991c Interim Report: Pualani Residential Community (Phase II), Archaeological Data Recovery, Wastewater
Treatment Facility, Lands of Puapuaa 1st and 2nd, North Kona District, Island of Hawaii. PHRI Report 1055- '
060491. Prepared for Pualani Development Company.
in Archaeological Data Recovery Program at Pualani Residential Community, Lands of Puapuaa 1st and 2nd,
prep. North Kona District, Island of Hawaii. PHRI Report 962-030192. Prepared for Pualani Development ,
Company.
Hammatt, H.H. '
1980 Archaeological Study of a Shoreline Property, TMK:7-5-20:22,34, Puapua'a, Kona, Hawaii Island. Report
14-158. Archaeological Research Center of Hawaii. ,
Handy, E.S.C., and E.G. Handy
1972 Native Planters in Old Hawaii, Their Life, Lore, and Environment. B. P. Bishop Museum Bulletin 223. B.P. ,
Bishop Museum Press, Honolulu.. (with M.K. Pukui)
Head, J.A., S.T. Goodfellow, and P.H. Rosendahl '
1991 Archaeological Inventory Survey - Alii Drive Sewer Project, Lands of Puaa 2nd and 3rd, Waiaha 2nd and 3rd,
North Kona District, Island of Hawaii (TMK:7-5-18:7,8). PHRI Report 937-081091. Prepared for M 8r. E
Pacific, Inc. '
Hommon, RJ., and P.H. Rosendahl
1983 Archaeological Investigation of the Alii Drive Realignment Corridors, North Kona, Island of Hawaii. Science ,
Management, Inc. Prepared for Belt, Collins, & Associates.
Jensen, P.M. '
1990 Archaeological Mitigation Program, Pualani Residential Community. Phase I - Mitigation Plan for Data
Recovery, Interim Site Preservation, Burial Treatment, and Monitoring, Lands of Puapuaa 1st and 2nd, North '
Kona District, Island of Hawaii. PHRI Report 724-101589. Prepared for Pualani Development Corporation.
1991 Archaeological Data Recovery Plan, Pualani Development Company Wastewater Treatment Facility, Lands ,
of Puapuaa 1st and 2nd, North Kona District, Island of Hawaii. PERI Report 1025-020191. Prepared for
Pualani Development Company.
• 0
REFERENCES CITED 43
'
Ksmakau,
S.M.
'
1961
Ruling Chiefs of Hawaii. Honolulu: The Kamehameha Schools Press.
Kay, EA
I1979
Hawaiian Marine Shells. Reef and Shore Fauna of Hawaii, Section 4: Mollusca. A P. Bishop Museum Special
Publication 64(4). B.P. Bishop Museum Press, Honolulu.
'
Kelly, M.
1983
Na Mala O Kona: Gardens of Kona. A History of Land Use in Kona, Hawaii. Departmental Report Series
'
83-2. Dept. Anthro., B.P. Bishop Museum. Prepared for the Department of Transportation, State of Hawaii.
Kirch, P.V.
'
1973
Archaeological excavations at Kahalu'u, North Kona, Island of Hawaii. Report Series 73-1., Dept. Anthro.,
B.P. Bishop Museum.
'
1979
Marine Exploitation in Prehistoric Hawaii: Archaeological Investigations at Kalahuipua'a, Hawaii Island.
Pacific Anthropological Records No. 29. Dept. Anthro., B.P. Bishop Museum.
1985
Feathered Gods and Fishhooks: An Introduction to Hawaiian Archaeology and Prehistory. Honolulu:
'
University of Hawaii Press.
'
Landrum,
J. (IH), A.E. Haun, and P.H. Rosendahl
1990
Archaeological Inventory Survey and Test Excavations, Kahakai Development Project Area, Lands of
Puapuaa 1st and 2nd, North Kona, Island of Hawaii. PHRI Report 157-070185. Prepared for KG (Hawaii)
Construction. (With K. Delimont) (Draft).
Malo, D.
1951
Hawaiian Antiquities. B.P. Bishop Museum Special Publication No. 2. B.P. Bishop Museum Press, Honolulu.
' Newman, T.S.
1970 Hawaiian Fishing and Farming on the Island of Hawaii in A.D. 1778. Division of State Parks, Departrnent
of Land and Natural Resources.
' Robins, J.J., J.H. Toenjes, and H.H. Hammatt
' 1990 An Archaeological Survey and Testing at Puapua'a, Kona, Hawaii (TMK: 7-5-20:73,74,75). Cultural
Surveys Hawaii. Prepared for Alii Drive General Partnership.
' Sato, H.H., W. Ikeda, R. Pseth, R. Smythe, and M. Takehiro, Jr.
1973 Soil Survey of the Island of Hawaii, State of Hawaii. U.S. Department of Agriculture -Soil Conservation
' Service and the Univ. of Hawaii Agri. Experiment Station. Government Printing Office, Washington, D.C.
Schilt, R.
1984 Subsistence and conflict in Kona, Hawaii: An Archaeological Study of the Kuakini Highway Realignment
Corridor. Report Series 84-1, Dept. Anthro., B.P. Bishop Museum.
Irl
Sinoto, Y.H. and M. Kelly
REFERENCES CITED
•
44 '
1975 Archaeological and Historical Survey of Pakini-Nui and Pakini-/ki Coastal Sites: Waiahukini, Kailikii, and
Hawea, Ka'u, Hawaii. Report Series 75-1, Dept. Anthro., B.P. Bishop Museum.
Soehren, L.J.
1978 Letter Report of an Archaeological Reconnaissance Survey of a Portion of Puapuaa, North Kona, Hawaii.
Prepared for Kobayashi Development & Construction, Inc.
Stearns, H.T., and G.A. MacDonald
1946 Geology and Ground -Water Resources of the Island of Hawaii. Hawaii Division Hydrography Bulletin 9.
Stuiver, M. and G.W. Pearson
1986 High -Precision Calibration of Radiocarbon Time Scale, AD 1950 to 500 BC. Radiocarbon, 28:805-838.
Suggs, R.C.
1961 The Archaeology of Nuku Hiva, Marquesas Islands, French Polynesia. Papers of the American Museum of
Natural History 49(1)
Walker, A.T.
1991 Archaeological Field Inspection, Alii Drive Family Housing Project, Land of Puapuaa 2nd, North Kona
District, Island of Hawaii (T YM:3-7-5-20:71,72). PHRI Report 1001-020491. Prepared for Central Realty,
Ltd.
Walker, A.T., and P.H. Rosendahl ,
1984 Preliminary Report Upon Completion of Field Work: Full Archaeological Reconnaissance Survey-Kahakai
Development Project Area, Lands of Puapuaa 1st and 2nd, North Kona, Island of Hawaii (TMK:3-7-5-
20:1,76). PHRI Report 141-111284. Prepared for KG (Hawaii) Construction.
1985a Supplementary Report: Archaeological Reconnaissance of TMK Parcel 76 and the Alii Drive Realignment
Corridor, Full Archaeological Reconnaissance Survey, Kahakai Development Project Area, Lands of ,
Puapuaa 1st and 2nd, North Kona, Island of Hawaii. PHRI Report 141-013185. Prepared for KG (Hawaii)
Construction.
1985b Full Archaeological Reconnaissance Survey, Kahakai Development Project Area, Lands of Puapuaa 1st and '
2nd, North Kona, Hawaii. PHRI Report 141-111984. Prepared for KG (Hawaii) Construction.
1988 Archaeological Reconnaissance Survey - Pualani Subdivision, Lands of Puapuaa 1st and 2nd, North Kona '
District, Island of Hawaii (TMK:3-7-5-17:Por. 28, 29). PHRI Report 367-041988. Prepared for Pualani
Development Company.
Welch, D.J. '
1982 Archaeological Survey and Excavations of the Kahakai (Kailua-Kona) Elementary School Site, North Kona, '
Hawaii. Report Ms. 051082. Dept. Anthro., B.P. Bishop Museum.
• 0
A-1
SITE DESCRIPTIONS
SITE NO.: State: 6335/6336 (Figures C-1 and C-1)
SITE TYPE: Wall - — - - -
TOPOGRAPHY: Gently seaward sloping paboehoe flow
with many bedrock outcrops. This site is on the southwest
portion of a flow ridge.
VEGETATION: koa-haole, lantana, kiawe, and guinea
grass -
CONDITION: Fair -good
INTEGRITY: Unaltered
PROBABLE AGE: Historic
FUNCTIONAL INTERPRETATION: Boundary
DIMENSIONS: 1.10 in high by 0.60 in wide
DESCRIPTION: The sites consist of walls constructed of
well-stacked and faced basalt boulders.
SITE NO.: State: 6337
SITE TYPE: Complex (4 Features)
TOPOGRAPHY: Rolling pahoehoe lava flows with many
bedrock outcrops.
VEGETATION: koa-haole. kiawe, 'lima, and cucumber.
CONDITION: Fair -good
INTEGRITY: Unaltered
PROBABLE AGE: Possible historic
FUNCTIONAL INTERPRETATION: Boundary -
habitation
DESCRIPTION: The site complex consists one terrace
(Feature B), two platforms, (Feature C and D), and one wall
(Feature E).
FEATURE B: Platform (Figure C-21)
FUNCTION: Habitation'
DIMENSIONS: 5.40 in by 520 in by 1.25 in
DESCRIPTION: Feature D consists of a platform. This
platform is constructed of large basalt cobbles and small to
medium boulders of natural pahoehoe. The wall on the south
is well -faced and stacked six to seven courses high. The east
wall is of similar construction, while the north and west
walls axe somewhat lower and not as nicely faced. There is a
small puka in the northern half. The top slopes slightly makai
and indicates some rough attempt at paving. The west and
north wall have probably collapsed sometime in the past and
were also possibly faced. Feature D is located on a rolling
pahoehoe lava flow with many bedrock outcrops. Vegetation
in the area includes kiawe, 'Wma, koa-haole, and cucumber.
It is unaltered and is in good condition. Waterworn coral and
sparse basalt were observed at this feature and a c. 0.30 in
thick deposit of fine-grained silt was also observed.
FEATURE C. Platform (Figures C-3 and C-23)
FUNCTION: Indeterminate
DIMENSIONS: 3.00 m by 2.00 m by 0.80 m
DESCRIPTION: Feature C consists of a platform. This
platform is roughly rectangular, constructed of stacked basalt
boulders, and is raised and faced on the south and east sides.
Ile surface is roughly level, but collapsed on the west side.
The structure is located c. 15.00 in west of CL Stake 60+ 50,
and is possibly a burial feature.
FEATURE D: Terrace (Figures C-4 and C-24)
FUNCTION: Habitation
DIMENSIONS: 8.00 in by 8.00 in by 0.00 m
DESCRIPTION: Feature B consists of a terrace. This
terrace is roughly rectangular and is constructed of crudely
piled basalt boulders that have cracked apart. It is slightly
raised on the west side. The large boulders are 0.30 in in
diameter and the smaller stones on the west are 0.20-0.40 in
in diameter. There appears to be small planting areas on the
terrace and soil with a thin scatter of marine shell midden,
This structure is located c. 40,00 in west of CL Stake 63+50.
FEATURE E: Wall
FUNCTION: Possible boundary
DIMENSIONS: 188.00m by 0.70 m by l.10m
DESCRIPTION: Feature E consists of a wall. This wall
extends from east -west, enters the project area near corridor
centerline CL Stake 64+00 and extends west to Site 16111. It
is built of well-stacked and faced basalt boulders. The wall is
probably a historic boundary wall.
SITE NO,: State: 15108 PHRI:1067-38 SITE
TYPE: Terrace (Figure C-25)
TOPOGRAPHY: Gently seaward sloping pahoehoe flow
with many bedrock outcrops. This site is on the southwest
Pont on of a flow ridge.
VEGETATION: koa-haole, lantana, kiawe, and guinea
grass.
CONDITION: Far
INTEGRITY: Unaltered
PROBABLE AGE: Prehistoric
FUNCTIONAL INTERPRETATION: Agriculture
DIMENSIONS: 10.00 in by 8.00 m by 0.73 in
DESCRIPTION: The site consists of a terrace with six to
eight planting boxes. There are good walls on the south and
west The north wall ties into the bedrock. The terrace is
constructed around a bedrock outcrop using medium cobbles
to medium sized boulders. The planting boxes are formed by
vaults into the terrace. The site is located c. 40.00 in at 510
degrees from the northeast comer stake (of the project area)
on the- Site 6337 will. Cultural dgposits consist of e. 0.10-
0.15 in of organic silt in the bedrock pocket at the site.
0
APPENDIX A
SITE NO.: State: 16111 PHRI: 1067-24
SITE TYPE: Complex (5 Features)
TOPOGRAPHY: Flat pahoehoe flow forting a small basin
area. The makai area of this basin is crossed by the current
Alii Drive.
VEGETATION: Kiawe, guinea grass.
CONDITION: Fair
INTEGRITY: Unaltered
PROBABLE AGE: Late historic/recent
FUNCTIONAL INTERPRETATION: Agriculture
DESCRIPTION: Thesite complex consists of two enclosures
(Feature A and B), one tower/wall (Feature C), and two
concrete troughs (Feature D and E).
FEATURE A: Enclosure
FUNCTION: Agriculture
DIMENSIONS: 124.00 in by 59.00 in by 1.15 in
DESCRIPTION: This is a mostly square structure, with the
alignment along Alii Drive longer than the mauka alignment
This feature is the outside corral containing another enclosure
in the northeast comer (Feature B), a windmill/wall (Feature
C), and two concrete water troughs (Feature D and E). Feature
F, another holding pen with a loading chute, lies to the south
along Alii Drive. There are at least four openings or gates in
the wall, one each on the north and south and two along the
eastern wall. Feature A is located immediately east of Alii
Drive (across Alii Drive from utility poles No. 40, No. 41, No.
42) with the poles oriented on the makai side of Alii Drive.
Feature A is constructed by stacking and facing small basalt
boulders six -seven courses high both inside and outside, with
rubble core in the center. Feature A is unaltered and is in good
condition. Thick rolled wire, pipe, beer bottles, and cans are
found at this feature.
FEATURE B: Enclosure
FUNCTION: Agriculture
DIMENSIONS: 55.80 in by 0.70 in (wall thickness) by 1.60 in
DESCRIPTION: Feature B enclosure is a smaller holding
pen located in the northeast comer of the Feature A enclosure.
It is constructed in a similar manner to Feature A. The gate is
on the north, in the comer. There are poles set around the
inside with wire braces holding them straight Along the
northwest porion, hog wire has been placed on these interior
poles to raise the height of the fence. The remains of the gate
were also located at the entrance on the north. It is unaltered
and in fair condition. There were various cans and bottles at
the feature.
FEATURE C: Well (Figure C-5)
FUNCTION: Water catchment
DIMENSIONS: 2.10 in by 2.00 in by 9.00 in
DESCRIPTION: This feature includes the basalt concrete -
A -2 ,
lined water well, the windmill tower, a small basalt and
concrete pad located south-southeast of the well, and a small
pump shed located immediately to the west The tower is
constructed of 2 x 4 and 4 x 4 planed lumber and large wire
nails. The small pad was built using small and medium basalt
boulders and medium and large cobbles. The shed was built
on a cement and basalt pad with 2 x 4 lumber and corrugated
metal. The purpose of the shed was probably to house the
pump used to draw water up from the well and transport it
via pipes to the two concrete troughs and possibly to an old
bathtub lying near Alii Drive. Feature C is located in the
south central portion of Feature A. It is unaltered and in fair
condition. Iron pipe, planed lumber and wire nails, bottles,
cans, and rubber tubing were found at and around the
feature.
FEATURE D: Concrete structure
FUNCTION: Water catchment
DIMENSIONS: 3.09 in by 1.15 in by 0.55 in
DESCRIPTION: This is a formed concrete water trough
used to water cattle. It appears to have been poured on site atop
a concrete base. It is constructed of formed concrete poured
with vertical wire supports imbedded within. Feature D is
unaltered and is in fair condition.
FEATURE E: Concrete structure
FUNCTION: Water catchment
DIMENSIONS: 2.70 in by 0.92 in by 0.45 in
DESCRIPTION: Feature E consists of a formed and pouted
concrete trough for domestic animal watering. Feature E is
located at 2920 from the Feature C tower (within Feature A).
It is unaltered and in fair condition. Various broken concrete
pieces are located makai.
FEATURE F: Enclosure
FUNCTION: Agriculture
DIMENSIONS: 44.00 in by 9.10 in by 1.15 in
DESCRIPTION: This enclosure is shaped as an expending
rectangle which joins the southeast corner of Feature A. It is
joined with Feature A by a small break in the SW comer of the
Feature A stone wall. There is another break in the SW which
leads to a wooden stock loading dock fronting the mauka side
of Alii Drive.
SITE NO.: State: 16112 PHRI: 1067-25
SITE TYPE: Wall (Figure C-6)
TOPOGRAPHY: Roughlylevel, very gradual west-southwest
slope, broken up by bedrock outcrops of various sires.
VEGETATION: Dense grasses and lantana ground cover
with kiawe throughout the area.
CONDITION: Fair
• 0
APPENDIX A
INTEGRITY: Unaltered
PROBABLE AGE: Prehistoric
FUNCTIONAL INTERPRETATION: Agriculture
DpdENSIONS: 13.00 in by 1.50 m by 0.60 m
DESCRIPTION: This site consists of a low wall with a small
mound. They are constructed of basalt cobbles atop and along
a bedrock outcrop.
SITE NO.: State: 16113 (Figure A-1)
PHRI: 1067-14
SITE TYPE: Complex (2 Features)
TOPOGRAPHY: Fla4 roughly level terrain broken up by
bedrock outcrops, slight decline to the west.
VEGETATION: Kiawe, koa-haole, lantana, and grass.
CONDITION: Good
INTEGRITY: Unaltered
PROBABLE AGE: Prehistoric
FUNCTIONAL INTERPRETATION: Habitation)
agriculture
DESCRIPTION: The site complex consists of one low -
walled enclosure (Feature A) and one C -shape (Feature B).
FEATURE A: Enclosure (Figure C-7)
FUNCTION: Agriculture/possible habitation
DIMENSIONS: 11.00 m by 10.00 m by 1.40 m
DESCRIPTION: Feature A consists of a walled enclosure.
The wall alternates between piled and stacked/faced basalt
pahoehoe cobbles three -six couseshigh. The walled enclosure
is situated on a pahoehoe now that slopes to the west The
walls of the enclosure are stacked and faced. Various areas
exhibit disturbance. Feature A is located c. 10.00 m west of
the west edge of Feature B. The site is at c. 10.00 m north of
the southern boundary of the project. There are large sections
of the wall still intact, although the section on the west appears
recently stacked. The majority is one -three courses high.
Feature A is altered and is in poor to fair condition. No
portable remains were visible except for a piece of waterwom
coral. The deposit is c. 0.10-0.15 m of silty organics, found
only in the cracks of the pahoehoe.
FEATURE B: C -shape (Figure C-8)
FUNCTION: Habitation
DDKENSIONS: 6.00 m by 2.80 m by 0.44 m
DESCRIPTION: Feature B consists of pahoehoe cobbles
and small boulders piled and stacked to form a large, rough C -
shape with a smaller C -shape built into the west end. Feature
B is located c. 10.00 m due east of the east edge of Feature A.
It is unaltered but in poor condition. No portable remains were
visible at this feature. There is organic matter from grass (c.
0.03-0.05 m thick) over the entire floor surface.
A-3
SITE NO.: State: 16114 Other. CSH 47
PHRI: 1067-16
SITE TYPE: Terrace (Figure C-9)
TOPOGRAPHY: Roughly level, slight westward slope to
oceanatc.300mtowest Areabrokenup by bedrock outcrops
of various sizes.
VEGETATION: Kiawe, lantana, koa-haole, and guinea
gam•
CONDITION: Good
INTEGRITY: Unaltered
PROBABLE AGE: Prehistoric
FUNCTIONAL INTERPRETATION: Habitation
DIMENSIONS: 16.30 m by 3.50 m by 1.00 in
DESCRIPTION: The site consists of a stacked and faced
terrace built onto the south and west faces of a bedrock
outcrop. It is constructed of small basalt boulders and large
cobbles stacked three-four toruses high and five -six courses
wide for the fust c. 7.00 m (west -east), culminating in a piled
mound of small boulders and large cobbles. From this mound,
the terrace continues after c. 1.00 m of intervening bedrock.
This second part of the terrace is three courses high and three-
four courses wide. This feature etuds in a second boulder/cobble
mood All parrs of the feature are more or less contiguous.
SITE NO.: State: 16115 Other. CSH 29
PHRI: 1067-23
SITE TYPE: Complex (5 Features)
TOPOGRAPHY: A series of roughly north -south miming
and westward facing bedrock outcrops which step down from
east to west as part of the overall westward slope.
VEGETATION: Large kiawe in various stages of life and
death are mixed with smaller kiawe saplings, k1u, lantana, koa-
haole, guinea grass, and vines.
CONDITION: Good
INTEGRITY: Unaltered
PROBABLE AGE: Prehistoric
FUNCTIONAL INTERPRETATION: Habitation/
Agriculture
DESCRIPTION: The site complex consists of three terraces
(Feature A,B, and D), one mound (Feature C) and one
enclosure (Feature E). The overall dimensions are c. 26.00 m
(north -south) by 10.00 m (east -west). (Figure A-2)
FEATURE A: Terrace
FUNCTION: Agriculture
DIMENSIONS: 2.40 in by 2.40 m by 0.45 in
DESCRIPTION: Feature A consists of an amorphous
depression or cavity that has been filled in with basalt cobbles
of varying sizes to fort a roughly level terrace with a paved
surface and a small mound. The mound is piled three to four
0 •
APPENDIX A
A-4
Figure A-1. Site 16113
courses high above the pavement, but appears to be part of
the fill. Feature A is located on the south end of the site,
c. 1.00 in east of the west face of bedrock, and c. 5.00 m at
55' from the north end of Feature A to the south end of
Feature B. Feature A is unaltered and is in good condition.
Three waterwom cobbles and two pieces of coral (c. 0.10 m
by 0.10 m in diameter) were found on the surface.
FEATURE B: Terrace
FUNCTION: Agriculture
DIMENSIONS: 2.80 in by 2.20 to by 0.40 m
DESCRIPTION: Feature B consists of a roughly square
paved area on the slope past the base of the south end of a
north -south running westward facing outcrop. The terrace is
constructed of basalt cobbles placed as paving on the slope,
forming a roughly even surface. Feature B is located c. 5.00 to
at 235' from the south end of Feature B. It is unaltered but is
inpoorcondition. A waterwomcobble was observed between
Feature B and Feature C.
FEATURE C: Mound
FUNCTION: Agriculture
DIMENSIONS: 350 m by 2.60 in by 0.60 m
DESCRIPTION: Feature C consists of alarge, well -piled
mound. It runs along the crest of a bedrock outcrop (which
runs north -south) and down its north slope. The mound is
constructed of cobbles and small boulders. Thecobbles and
small boulders are piled up to three courses high to form a
sizable mound. Feature C is located c. 1.50 in at 245' from
the north end of Feature B and c. 10.00 in at 3500 from the
north end of Feature D. It is unaltered and in good
condition. No portable remains were observed at this
feature, however, a waterworn cobble was noted between
Feature C and Feature B.
FEATURE D: Terrace
FUNCTION: Indeterminate
DIMENSIONS: 9.00 m by 6.50 to by 1.17 in
DESCRIPTION: Feature D consists of a stacked and faced
terrace which runs along the edge of a southeast -northwest
trending bedrock outcrop. It is constructed of basaltboulders
and cobbles of various sizes stacked three -five courses high
along the side abutting a bedrock outcrop facing wesL Thenarlh
end of Feat&e C to the north end of Feature D is c.10.00 m at
AREA COVERED WrrH TALL GRASS AND LANTAKAj%
AREA Or :ALLEI�
D AD
i��i���►{�� V\AND
SITE TAG
RGi
�.
STACKED WALL
BEDROCK
FLXr AREA
Figure A-1. Site 16113
courses high above the pavement, but appears to be part of
the fill. Feature A is located on the south end of the site,
c. 1.00 in east of the west face of bedrock, and c. 5.00 m at
55' from the north end of Feature A to the south end of
Feature B. Feature A is unaltered and is in good condition.
Three waterwom cobbles and two pieces of coral (c. 0.10 m
by 0.10 m in diameter) were found on the surface.
FEATURE B: Terrace
FUNCTION: Agriculture
DIMENSIONS: 2.80 in by 2.20 to by 0.40 m
DESCRIPTION: Feature B consists of a roughly square
paved area on the slope past the base of the south end of a
north -south running westward facing outcrop. The terrace is
constructed of basalt cobbles placed as paving on the slope,
forming a roughly even surface. Feature B is located c. 5.00 to
at 235' from the south end of Feature B. It is unaltered but is
inpoorcondition. A waterwomcobble was observed between
Feature B and Feature C.
FEATURE C: Mound
FUNCTION: Agriculture
DIMENSIONS: 350 m by 2.60 in by 0.60 m
DESCRIPTION: Feature C consists of alarge, well -piled
mound. It runs along the crest of a bedrock outcrop (which
runs north -south) and down its north slope. The mound is
constructed of cobbles and small boulders. Thecobbles and
small boulders are piled up to three courses high to form a
sizable mound. Feature C is located c. 1.50 in at 245' from
the north end of Feature B and c. 10.00 in at 3500 from the
north end of Feature D. It is unaltered and in good
condition. No portable remains were observed at this
feature, however, a waterworn cobble was noted between
Feature C and Feature B.
FEATURE D: Terrace
FUNCTION: Indeterminate
DIMENSIONS: 9.00 m by 6.50 to by 1.17 in
DESCRIPTION: Feature D consists of a stacked and faced
terrace which runs along the edge of a southeast -northwest
trending bedrock outcrop. It is constructed of basaltboulders
and cobbles of various sizes stacked three -five courses high
along the side abutting a bedrock outcrop facing wesL Thenarlh
end of Feat&e C to the north end of Feature D is c.10.00 m at
"TGWOMM
0
I Fea. A
SCORIA AS RADER
Figure A-2. Site 16115
❑ TEBT YMR
\\\ FLAT MEA
OSt81 FACED WAIL
ii'1T=1 BEDROCK
--- LIMITS OF CLEARED AREA
0 0
APPENDIX A
345°. It is unaltered and is in good condition. Marine shell
and waterwom cobbles were observed at this feature. No
cultural deposits were noted at this feature.
FEATURE E: Enclosure (Figure C-10 and C-11)
FUNCTION: Temporary habitation
DIMENSIONS: 5.70 m by 4.50 in by 0.60 in
DESCRIPTION: Feature E consists of a small stacked/piled
basalt oval enclosure. Most of it consists of stacks and piles,
but there are portions of a single tow alignment as well.
Construction materials are locally obtainable pahoehoe blocks
(large cobbles and small boulders) placed two to three courses
high in some portions. The feature is tied into a bedrock
outcrop. There are several stones scattered in the middle
which may have come from the walls. Feature E is located c.
20.00 in at 1200. (TN) from Feature A. It is unaltered and is
in fair condition One piece of waterworn coral was observed
in the interior of the feature. A deposit c. 0.10-0.15 in thick of
medium brown organic silts was also observed in the interior
of the feature.
SITE NO.: State: 16116 PHRI: 1067-26
SITE TYPE: Complex (8 Features)
TOPOGRAPHY: Gentle seaward sloping pahoehoe flows
with numerous bedrock outcrops. Gentle slope continues
through site, then flattens out at Site 16112.
VEGETATION: Kiawe, koa-haole, lantana, and guinea
grass.
CONDITION: Fair
INTEGRITY: Unaltered
PROBABLE AGE: Prehistoric -early historic
FUNCTIONAL INTERPRETATION: Agriculture -burial
DESCRIPTION: The site complex consists of one enclosure
(Feature A), four mounds (Feature B, C, G, and H), a
modified outcrop (Feature F), and two platforms (Feature D
and E).
FEATURE A: Enclosure (Figure C-12)
FUNCTION: Agriculture
DIMENSIONS: 25.00 in by 10.00 m by 1.80 m
DESCRIPTION: Feature A consists of a very rough
enclosure with connected mounds on the south and southwest
A rough piling or paving on the north terminates in the wall
alignment which passes an unknown distance to the north.
Feature A is constructed of pahoehoe stones (large cobbles -
medium boulders) roughly stacked and piled. The three
mounds which form the southern walls of the feature are
roughly faced on the interior. The southeast and east side are
made up of a modified outcrop which is also roughly faced
in one small area. Continuing counterclockwise, the enclosure
A-6
becomes almost a terrace, although there are three to four
pockets with bedrock and soil within the rocky bedrock
terrace. This feature lies at the west side of the site. It is c.
80.00-90.00 m east of the site tag of Site 16112. Feature A
is unaltered and ism fair condition. One waterwom basalt
breadloaf sinker was observed at this feature and was
collected. A c. 0.10-0.15 in thick deposit of organic silts was
also observed in pockets in the pahoehoe at this feature.
The rough wall beginning at the apex of Feature A was not
given a feature designation. Itispiledand stacked two to three
courses high, and about the same width at the south end. To
the north, the wall is more sparse.
FEATURE B: Mound (Figure C-13)
FUNCTION: Agriculture
DIMENSIONS: 4.00 m by 2.00 in by 1.40 m
DESCRIPTION: Feature B consists of a series of unshaped
basalt pieces, ranging from small cobbles to medium boulders,
built against the side of an outcrop. The exposure of the
mound is to the west-southwest and there is a basalt upright
(c. 0.60 m high) on the northern portion of the mound. Feature
B is unaltered and is in fair condition No portable remains
were observed at this feature. A c. 0.10-0.25 m thick deposit
of organic silts was observed in pockets at the base of the
mound.
FEATURE C: Mound (Figure C-14)
FUNCTION: Agriculture
DIMENSIONS: 21.00 m by 15.00 m by 2.30 in
DESCRIPTION: Feature C consists of a rather amorphous
mound with a few internal mounds and a stacked and paved
area to the south. It nets between Feature A and Feature B to
the south. Feature C is constructed of mostly small and
medium sized basalt boulderspiled nearand probably naturally
occurring across the Feature. Feature C is unaltered but is in
poor condition. No portable remains were observed at this
feature, however, a c. 0.10-0.15 m thick deposit of organic
silts was observed in pockets at this feature.
FEATURE D: Platform (Figure A-3 and C-15) '
FUNCTION: Burial
DIMENSIONS: 3.00 in by 2.50 in by 0.95 m '
DESCRIPTION: Feature D consists of a small but nicely
built platform. The platform lies east of Feature B acrd C
complex and in a flat spot just below Feature C. It is
constructed of pahoehoerangingftomsmallcobblestomedium '
boulders. The cobbles and boulders are stacked four -five
courses high. The stones present a rough facing on the
interior. The top is mostly flat and paved with a few smaller ,
stones. Feature D is unaltered and is in 82od condition. No
• a
APPENDIX A A-7
Figure A-3. Site 16116 Feature D, TU -1
0-
EAST FACE
20-
aERI30 -
ER
6
C
so -
f
N
T
I
70
Y
E
T
Go-
a
R
s
^
U
100
C�
LAYER 11
11 BtXML
120-
130-
1
C
Igo
CEN7RIETERt
ROCK
10
$0 30
00 EO
ROOT
Figure A-3. Site 16116 Feature D, TU -1
APPENDIX A
Portable remains were visible on and around this feature. An
orgastic silt (c. 0.10-0.20 m thick) was observed around this
feature.
FEATURE E: Platform
FUNCTION: Burial
DIMENSIONS: 2.90 m by 2.40 m by 0.70 m
DESCRIPTION: Feature E consists of a well-built, roughly
square platform. All four sides are stacked and faced with
easily discernible comers (especially the northwest). The
platform slopes slightly to the east, and in some portions
cobbles from the walls have fallen out. The east side of the
feature is lower than the westside. Distance from the southwest
comer of this feature to the northwest corner of Feature D is
c. 8.60 m at 2500. Feature E is unaltered and is in good
condition. No portable remains or cultural deposits were
observed at this feature.
FEATURE F: Modified outcrop
FUNCTION: Agriculture
DIMENSIONS: 13.00 m by 7.00 in by 1.50 in
DESCRIPTION: This long L-shaped outcrop is modified
along its entire length in a variety of ways: large aligned
boulders paralleling the outcrop with large cobbles and small
boulders piled and filling the space between; large cobbles
stacked three-four courses high against the outcrop's face,
forting a unifacial wall; and a large mound made up of large
and small boulders as well as cobbles piled along and in front
of the outcrop. The outcrop is modified in one of these ways
for is entire length.
FEATURE G: Mound
FUNCTION: Agriculture
DIMENSIONS: 5.20 m by 2.80 m by 0.70 in
DESCRIPTION: This northeast/southwest running mound
is piled over the northern end of anortheast/southwest trending
and westward facing low bedrock outcrop. The eastside of the
mound's piled one-two courses high, whereas the west is piled
three -five courses high The peak in the middle of the mound
suggests the passibility of a filled depression. Extending west
is a scattered alignment which terminates on a second low
bedrock outcrop a 5.0 m to the west.
FEATURE H: Mound
FUNCTION: Agriculture
DIMENSIONS: 2.60 m by 2.40 m by 0.50 m
DESCRIPTION: This is a roughly rectangular faced mound
constructed on a low outcrop. Side walls are built of small
basalt boulders to heights of 40.00 to 75.00 an, of three -six
courses. Thesurface is very slightly mounded and is composed
of mostly large basalt cobbles, with some small to medium
FE -1
cobbles. It is unaltered and in good condition. No portable
remains were observed on the surface of this feature.
SITE NO.: State: 16117 PBRI: 1067-36
SITE TYPE: Platform (Figure C-16)
TOPOGRAPHY: Almost flat pahoehoe lava flows with
exposed bedrock outcrops.
VEGETATION: Kiawe, lantana, 'ilima, kuawa, vines, and
guinea gam•
CONDITION: Fair
INTEGRITY: Unaltered
PROBABLE AGE: Prehistoric
FUNCTIONAL INTERPRETATION: Habitation/
agriculture
DIMENSIONS: 5.50 in by 5.70 in by 0.73 m (approx.)
DESCRIPTION: Thesite consists ofamedium-sized platform
with a small cupboard or well within. This platform is
constructed of small to medium basalt boulders piled
haphazardly to form most of the platform. It is sitting atop a
flat bedrock outcrop. There are two piles of stones, one on
each side. The one on the west appears to be a cupboard, and
the one on the east may be a sort of planting box since it
surrounds an opening. The south end of the platform is
composed of the bedrock outcrop. There isasnallagricultural
mound c. 2.00 in to the south of the platform. No portable
remains were observed at this site. However, c. 0.10-0.15 m
thick deposit of organic silts was observed in arras off the
sides of the platform.
SITE NO.: State: 16118 (Figure A-4)
PHRI: 1067-34
SITE TYPE: Enclosure (Figure C-17)
TOPOGRAPHY: The site sits atop a low flow ridge with a
bedrock outcrop present The land slopes slightly to the south
and west.
VEGETATION: koa-haole, kiawe, guinea grass, and vines.
CONDITION: Fair
INTEGRITY: Unaltered
PROBABLE AGE: Prehistoric
FUNCTIONAL INTERPRETATION: Habitation
DIMENSIONS: 5.00 m by 4.60 m by 0.75 m (approx.)
DESCRIPTION: The site consists of a single enclosure with
stacked walls. Theenclosureisconstnrctedofla:ge unshaped
pahoehoe cobbles and small to medium boulders. The wall of
the mostly circular structure is piled or stacked four -five
courses high. It is built atop a level bedrock outcrop around
a small dip c. 0.35 m deep in the center. There may be a small
entrance, marked by a dip in the outside wall, on the east side.
This site is located just south of the northern project ares
I
I
I
I
[J
[]
11
I
APPENDIX A A-9
Al ^
Kerr
Al
..r
aa,.nm• �w.. y,.
l .w• ar
Y w,
X4 aY"'
r K
OPEN GRASSY AREA
rAk
PIP
r+*µ rw
.W.
Aiv �711�
ah,
'4 STACKED WALL
BEDROCK
N ~x�
• it ar
Figure A4. Site 16118
boundary. No portable remains were observed atthis feature.
However, ac. 0.10-020 m of silty organic soil was observed
in pahoehoe pockets.
SPIE NO.: State: 16119 PHRI: 1067-28
SITE TYPE: Terrace - (Figure C-18 and C-26)
TOPOGRAPHY: Gently sloping pahoehoe flows trending
to the west There are numerous bedrock outcrops in the
immediate area.
VEGETATION: koa-haole, lantana, kiawe, vines, and
guinea grass.
CONDITION: Fair
INTEGRITY: Unaltered
PROBABLE AGE: Prehistoric
FUNCTIONAL INTERPRETATION: Habitation
DRAENSIONS: 19.00 m by 13.00 m by 0.62 m (approx.)
DESCRIPTION: The site consists of a single terrace which
is faced on the west side with a small paved area on the north-
northeasL The northern portion of the terrace is constructed
of small and medium basaltboulders atop a bedrock outcrop.
The western edge has a low linear mound and within c. 1.00 m,
the small paved area begins. It is c. 2.50 m (north -south) by
3.10 m and has an upright basalt slab (c. 0.45 to high) on the
south side. The southern portion of the terrace is also on an
outcrop and has medium basalt boulders and slabs in an
alignment along the face, and a rough alignment running
perpendicular to the long axis of the terrace. There is a small
agricultural mound just to the west and a small modified
outcrop off of the southwest comer. The comer pipe marked
"Lot #W' is immediately south of this site. A c. 0.15-0.20 m
thick deposit of organic silts was observed in bedrock pockets
at this site.
SITE NO.: State: 16133 (Figures A-5 and C-19)
PHRE 1067-29
SITE TYPE: Complex (3 Features)
TOPOGRAPHY: Roughly level, with a gradual westward
descent (ocean is c. 400.00 m west). Terrain is broken up by
bedrock outcrops, knobs, knolls, and ridges.
VEGETATION: Thickly covered by high dry grass
(California grass), lantana, kiawe, and koa-haole saplings.
CONDITION: Fair
•
APPENDIX A A-10
CREVICE FILLED
WITH COBBLES
i
` u
`?� r O 1,
1=ea.
4�
. o!
FALLEN KIAW a 517E TAO
Pai TU -4
e Q Fea. B
Fee. A
1t IIS b0
m to 1S
❑ TEST UNIT
AA► COSILE FILL cab
Z! KIAWE
MMM FACED WALL
ii BEDROCK - SITE 15114
Figure A-5. Site 16133
C
I
1
1
1
11
C
1
1
I
1
I
1
APPENDIX A
INTEGRITY: Unaltered
PROBABLE AGE: Prehistoric
FUNCTIONAL INTERPRETATION: Agriculture
DESCRIPTION: The site complex consists of one modified
outcrop (Feature A) and two terraces (Feature B and Q. The
overall dimensions are c. 30.00 in, (east -west) by 25.00 in
(north -south).
FEATURE A: Modified outcrop
FUNCTION: Retaining wall
DIMENSIONS: 16.00 in by 14.00 in by 2.25 in
DESCRIPTION: Feature A consists of a modified outcrop
and wall. The outcrop is long, narrow and westward facing.
It runs northeast -southeast and is modified by basalt cobbles
piled and stacked on top of and along the face of the outcrop
ridge. The ground is lower to the west. The wall extends east
from the midpoint of the outcrop and nuts c. 2.00 in short of
Feature B. The modified outcrop continues to Site 6337,
Feature E (large wall). The result is a T-shaped feature with
the stem of the T being the wall west of Feature B.
There is rubble scattered throughout the area, especially
west of the modified outcrop, but it is difficult to tell what
feature, if any, the rubble may have come from.
Feature A is located c. 16.50 in due west of Feature B,
which is c. 28.00 m north-northwest of Site 1067-25 (16112),
south end, and c. 10.00 in north of the stone wall (Site 6337,
Feature E). The north end is c. 11.00 in south of the fence line
(Site 6336) extension Feanne A is constructed of basalt
cobbles stacked two -three courses high and two -three courses
wide, is bi-faced and extends to the modified outcrop.
Feature A is located c. 16.50 m due west of Feature B, which
is a 28.00 in north-northwest of Site 16112. The south end is
c. 10.00 in, north of the stone wall (Site 6337 Feature E), and
the north end is c. 11.00 in south of the fence line (Site 6336)
extension. Feature A is unaltered and its in fair condition. No
portable remains were noted at this feature.
A-11
FEATURE B: Terrace (Figure C-19)
FUNCTION: Agriculture
DIIIIENSIONS: 5.00 m by 5.00 m by 0.60 m
DESCRIPTION: Feature B consists of a terrace. This
amorphous terrace extends off of a low wide bedrock knob
that is to the east -southeast -south The body of the terrace is
piled, and the edges are roughly stacked (due to weathering
and time rather than intended construction). Feature B is
constructed of basalt cobbles stacked two-four courses high
to fort a north-northwest facing retaining wall. The body of
the platform is made up of basalt cobbles piled between the
retaining wall and the bedrock outcrop. The terrace is paved.
The face is crumbled slightly but not to the detritnent of the
unit. The site tag is placed on this feature at the central -
northeast side. Feature B is located c. 25.00 in north-northwest
of Site 1067-25 (16112), c. 7.50 m south of Feature C, and c.
16.50 in east of the north end of Feature A. It is unaltered and
in fair condition. No portable remains or cultural deposits
were noted at this feature. TU -2 was placed on the central
north side of this feature.
FEATURE C: Terrace
FUNCTION: Agriculture
DIMENSIONS: 3.50 in by 3.00 in by 0.60 in
DESCRIPTION: Feature C consists of a terrace that extends
off of a bedrock outcrop that lies to the east The west end of
the terrace is well-stacked, fort -Ling a nicely faced, west -
facing retaining wall. The area between is piled basalt cobbles
forming the terrace body. This terrace is paved. The terrace
is constructed of basalt cobbles stacked three-four courses
high from a west -facing, faced retaining wall with otherbasalt
cobbles piled between the wall and the outcrop forming the
terrace body. Feature C is located c. 7.50 m north of Feature
B, and Site 6337 Feature D (1001-5) is c. 45.00 in. northeast
at 400. Feature C is unaltered and is in good condition. No
portable remains or cultural deposits were noted at this
feature.
0 •
B-1
HISTORICAL DOCUMENTARY RESEARCH
by Lehua Kalima, B.A.
The project area lies within the ahupua'a of Puapuaa
2nd, North Kona District, Island of Hawaii. The name
Puapuaahanslatesliterally as"piglet,"becauseofthesupposed
resemblance of two large rocks there to pigs (P" et al.
1974:192). Kahelo was the name of a land area in Puapuaa
where horse and foot races were held in the 1880s. King
Kalakaua is said to have attended them. Kahelo itself means
"going to and fro" (ibid:64).
Handy and Handy describe the importance of the god
Lono to the Kona area:
Disregarding the inconsistencies in orally
transmitted lore, the point of interest with respect
to Lono is that he is plainly identified with Kona,
Hawaii, and is said to have introduced the main
food plants, taro, sweet potato, yams, sugarcane,
and bananas to Hawaii, and also 'awa. Hogs were
likewise identified with Lono, but there is no
mention of his having brought them to Hawaii.
The fact that the Makahiki festival and the rituals
for inducing rainfall and fertility centered in Kona
comes outclearly in the description of theMakahiki.
EARLY HISTORICAL ACCOUNTS
Early accounts relevant to Puapuaa include accounts
concerning the Kailua-Kona area. These accounts indicate
that the high-ranking chiefs 'Umi-a-Liloa, Kalaniopu'u, and
Kamehameha I lived in Kona. During the early historic
period, Kailua was a preferred port as well as the center of
island government. Residences of aii'i reached from Kahelo,
at the makai end of Puapuaa 1st to Lanihau, north of Kailua
Bay. Native historian Samuel Kamakau wrote:
....There were chiefs and families of chiefs of Oahu,
Molokai, Kauai, Maui. The sands of Kaiakeakua
(Kailua Bay) were worn down like a dromedary's
back by the many feet of chiefs and chiefesses
tramping over them, and at Kamakahonu could be
seen at night the sparkle of lights reflected in the sea
like diamonds, from the homes of the chiefs from
Kahelo to Lanihau. The number of chiefs and
lesser chiefs reached into the thousands (1961:221-
222).
The earliestaccountspecific to thePuapuaa vicinity is by
English missionaryWilliamEllis. EllisdescribedthePuapuaa
areaasgreen and agriculturallyptoductive. Healsodescribed
KauakaiakaolaHeiauwhich issituated inPuapuaa 1st. Ellis'
observations are presented below:
Leaving Kairua, we passed through the villages
thickly scattered along the shore to the southward.
The country around looked unusually green and
cheerful, owing to the frequent rains, which for
some months past have fallen on this side of the
island. Even the barren lava, over which we
travelled, seemed to veil its sterility beneath frequent
tufts of tall waving grass, or spreading shrubs and
flowers.
The sides of the hills, laid out for a considerable
extentin gardens and fields,and generally cultivated
with potatoes, and other vegetables, were beautiful.
The number of heiaus, and depositories of the dead,
which we passed, convinced us that this part of the
island must formerly have been populous. The
latter were built with fragments of lava, laid up
evenly on the outside, generally about eight feet
long, from four to six broad, and about four feet
high. Some appeared very ancient, others had
evidently been standing but a few years.
At Ruapua (Puapuaa) we examined an interesting
heiau, calledKauaikaharoa,builtof immenseblocks
of lava, and found its dimensions to be 150 fat by
70. At the north end was a smaller enclosure, sixty
feet long and ten wide, partitioned off by a high wall,
with but one narrow entrance. The places where the
idols formerly stood were apparent, though the idols
had been removed (Ellis 1963:72-73).
In his catalogue of heiau throughout the islands, Thrum
recorded this heiau described by Ellis:
Kauaikahaola Puapua I; an early heiau, rebuilt by
Kamehameha: about 170 x 75 R in size, of two
divisions. Its walls yet in fair condition; entry way
on seaward side (1908:43).
In a 1948 article in Paradise of the Pacific, the area
behind the heiau is described:
Naluahine remembered the heiau as a center of
village life when he was a child, for the coast was
I
1
I
I
1
1
APPENDIX B
then inhabited by fishermen. Although the rituals
of the heiau had ceased, there were still kahunas
(priests) living in grass houses near the walls of the
heiau. Thesekahunas were men who could foretell
the time forgood fishing hauls. They continued the
worship of the old fishing gods, Kuula and Hina
On the flat lands above the heiau site, Naluahine
said, there was a racetrack in the 1880s.
Races were run there between the blooded horses of
Parker ranch and other Kona ranches. The races attracted
people from all over the islands, including King Kalakaua
and his court. By 1900, the people of the fishing village
drifted away to other places and the village of Luapua was
deserted. Nothing remained except the stone walls of the
heiau and the stone foundations of the village grass houses
(Taylor 1948:49).
Ellis goes on to describe smaller temples along the coast
whichwere dedicated to Kuura andHinaby fishermen. These
temples were probably fishing heiau, or Ku'ula.
LAND TENURE
In 1848, during the reign of Kamehameha III, the
traditional Hawaiian land ownership system was replaced
with a Western-style system. This radical restructuring was
called The Great Mahele (division). The Great Mahele
separated and defined the undivided land in terests of the King
and the high-ranking chiefs, and the konohiki, who were
originallythoseinchargeoftracts of Landon behalf of the king
or a chief (Chinn 1958:vii and Chinen 1961:13). More than
240 of the highest-ranking chiefs and konohiki in the kingdom
joined Kamehameha M in this division. The first mahelewas
signed on January 27, 1848 by Kamehameha III and Princess
VictoriaKamamalu,andby her guardians Mataio Kekuanaoa
and Ione li. The last mahele was signed by the King and E.
Enoka on March 7,1848 (Chinn 1958:16).
The mahele did not convey title to any land. The chiefs
and konohiki were required to present their claims to The
Land Commission to receive awards for lands quitclaimed to
them by Kamehameha III. They were also required to pay
commutations to the government in order to receive royal
patents on their awards. Until an award was issued, title
remained with the government. The lands awarded to the
chiefs and konohiki became known as Konohiki Lands.
Because there were few surveyors in Hawaii at the time of the
mahele, the lands were. identified by name only, with the
understanding that the ancient boundaries would prevail until
the land could be surveyed. This expedited the work of the
LandCommission and speeded the transfers (Cbinen 1961:13).
B-2
During this process all land was placed in one of three
categories: Crown Lands (for the occupant of the throne),
Government Lands, and Konohiki Lands. These were all
"subject to the rights of native tenants," (Laws of Hawaii,
1848:22). Native tenants were the common Hawaiian people
who lived on the land and worked it for their subsistence
Questions concerning the nature of these rights began to arise
as the King, the government, and konohW began selling
parcels of hind. On December 21, 1849 the Privy Council
attempted to clarify the situation by adopting fourresolutions
intended to protect the rights of native tenants referred to in
the 1849 law (Chinn 1958:29).
These resolutions authorized the Land Commission to
award fee simple title to all native tenants who occupied and
improved any portion of Crown, Government, or Konohiki
lands. These awards were to be free of commutation except
for house lots located in the districts of Honolulu, Lahaina,
and Hilo (ibid.).
Before receiving then awards from the Land Commission,
the native tenants were required to prove that they cultivated
the land for a living. They were not permitted to acquire
wastelands or lands which they cultivated "with the seeming
intention ofenlarging theirlots." Onceaclaimwas confirmed,
a survey was required before the Land Commission was
authorized to issue any award. These lands becameknown as
"KuleanaLands" (ibid:30). Untilits dissolution on Nlmh 3l,
1855, the Land Comm iss ion issued thousands of awards to the
native tenants for their kuleana; even so, less than 30,000
acres of land were awarded to the native tenants as Kuleana
Lands.
When the Great Mahele took place in 1848, 19 Land
Commission Awards (LCAs) were granted within thelAndof
Puapuaa Puapuaa 2nd was granted to Wm. C. Lunalilo as
LCA 8559-B. Although none of these awards are in the
projectarea areviewoftestimoniesforawards granted inthis
ahupua' a indicate that a large number of kihapai (cultivated
parcels, usually in taro or sweet potatoes) and houselots
existed there. Silva states that Puapuaa "was a populous and
productive residential area, apparently self-sufficient, with
abundant ocean and agricultural resources" (1985:A-7).
A comparison of ahupua'a boundaries between the
USGS map and Copies of Surveys and Maps of Lands
Belonging to the Estate ofLunalilo indicates thatPuapuaa 1st
and 2nd were also known as Puapua'aiki and Puapua`anui
respectively.
Figure B -I is a portion of a tracing of the Kailua Section
ofNorth Kona made in the late 1920s by J.S. Emerson. Note
0 NrV °b/E
d
P
L
Oona e.7
P2ek.; P/
U
4
Gb
CGr/f r37 -
-- .��uhwkeee br.l�«
LSOKOUP
.'A. p,
L Q Lelyg 6. P• 51z !t'�..� _�..
�u / —..
F N P
I�
�' o L
— — —
I_ . A h a .G ..- - J. U
vane/•- ,n h•
tirr'1113
l
�.
I•CA,..I .367 W^IA"- /rc "AAm. H
A-
M4�
.,
or
9es 1 rr. Nirhe
..--./ -
__ _ '�- \ 60vernrn,n7
c
�j
Nee MvPen] lE,l
n'
-�-a
uraiF„ -�
--• ----A-- _- , Br 922 -.�
P i
.�WIt
_ of ,a
�• h.una P.� ��-XvhiP.r^r Y:� rNr<Gh l
/7aa ._ �..
l
--BGS:
'• 4r ]rtelM.rec/,er-
•O.,v.. t,.,,�,;,
l
�.
I•CA,..I .367 W^IA"- /rc "AAm. H
A-
A
-. __ ,
d ;n A' ihu/vi-
Pohaelrerr
bnnl LN7 . u elm
..
. _
Nee MvPen] lE,l
..
/
Or-29GI Qir�r�
. -. --.. �'-"— ByIG u i _ 2
Ger!' 15
9
J HAWAII TERRITORY SU RV E`(
K+ohnluiE=rr
K A H U L CO.
T.Y Awena, Surveyor
_�
KAILUA, SECTION
PaPifir p/ ! I'
Kahe%-'C'q qp8
''
NORTH ICON A r HAWA I t
Papsa/es F/, r
P UA PUAA N''I% .1—/ 955T8
Lumllle
- Survcu and Map by J.5.Emarxn
LCA•
u AP
l
7719
1�n f
C.A.
Ahnruha/e PA LOA
_-li
)-
i!A
IOiMlle/
770 V,00,24
's_.�O.W ♦'•JIY�-.. `Ije/..�Certl r lea
,rc]�
LC.A
. ifs
273
ra
— �•^2a L o
7 hm
—
3,-- L p A i� O
Leleioh
./' 1 �r1571 lfoolawalwL
..>j�—o.. _
-
L V ��' 9971
L.GA.
J/ea �1 vele Iprren
A L
-- N1 A
– o M•
,y/�/
K
_-.—..
p7,�.ryf, ti'ekauonehi
Figure B-1. Portion of the Kailua Section of North Kona in the /ate 1920s, by J.S. Emerson
(From a 1952 tracing by Herman X Aki; State Survey Office, Reg. Map No. 1280)
�Z
b
w
If
• 0
APPENDIX B
the presence of the Kuakini Wall crossing through the
ahupua'a mauka of the present project area and the location
of Kahelo, the racetrack area, which lies north of the project
area but close to the coastal road, as the project area lies close
to Alii Drive.
On a Certificate of Boundaries, dated March 4, 1885 for
Puapua'anui is written, "e H.N. Greenwell, ka mea nova keia
aina is manawa," (to H.N. Greenwell, for whom the land is
for at this time).
Another reference is found at the Bureau for 1891. In
Book 120, page387, Grantor J.S. Antonio, regarding interest
in leasehold and fixtures in Puapua'anui:
...in consideration of the cancellation and surrender
to me of my note of $1,000 to Greenwell ... and for
$1...I hereby transfer ... all of my right...in and to the
leasehold premises called Puapuaanui, together
with the fixtures and appurtenances but to no
portion of the furniture, dairy fixtures or
appurtenances, cattle or other livestock, which I
will reserve the right to remove.
From this entry we can conclude that there was a dairy in
the area during the late 1800s.
The project area is within zone known as the KonaField
System, alargeagricultural strip that extended from Kaawaloa,
South Kona, to beyond the back of Kailua Town, North Kona,
B-4
a distance of 13 miles. T. Stell Newman did extensive
documentary research on the area and noted its importance:
The Kona Field System is without equal in Hawaii,
and probably in the nation in terms of the
extensiveness of a prehistoric modification of the
land ...It is a physical demonstration of the highly
developedfamting economy of ancient Hawaii and
illustrates the complexity and advanced state of
aboriginal Hawaiian culture ....thephysicalremains
aresufficiently well preservedand in such generally
good condition that they may still be detected on
the ground...In all, itis a magnificent monument to
the exhaustive labors and industry of the ancient
Hawaiians (Newman 1970:126).
The Kona Field System is registered in the Hawaii
Register of Historic Places and has been deemed eligible for
the National Register.
By the mid- to late 1800s, as western contact drastically
altered traditional Hawaiian land -use practices, and as
epidemics from introduced diseases greatly reduced the
native population, the Kona Field System fell into disuse.
Except for small individually owned farms and Large coffee
plantations near Captain Cook and Kealakekua, traditional
farming was replacedby ranching. Dependence on ranching,
coffee cultivation, and small-scale fainting continued until
the late 1950s when economic emphasis shifted toward
developing the tourist industry.
0 0 t
APPENDIX B B-5 I
REFERENCES CITED I
Board of Commissioners '
1929 Indices of Awards made by the Board of Commissioners to Quiet Land Titles in the Hawaiian Islands. Star '
Bulletin Press, Honolulu.
Chinen, J.J.
1958 The Great Mahele: Hawaii's Land Division of 1848. Honolulu: University of Hawaii Press. ,
1961 Original Land Titles in Hawaii. Privately published
Ellis, W.
1963 Journal of William Ellis. Honolulu: Advertiser Publishing Co., Ltd
Kamakau, S.M.
1961 Ruling Chiefs of Hawaii. Honolulu: The Kamehameha Schools Press.
Newman, T.S.
1970 Hawaiian Fishing andFarming on the Island of Hawaii in A.D. 1778. State of Hawaii, Dept. Land and Natural
Resources, Div. State Parks.
Silva, C.L.
1985 Appendix A: IN Walker and Rosendahl: Full Archaeological Reconnaissance Survey, Kahakai Development
Project Area, Lands of Puapuaa 1st and 2nd, North Kona, Island of Hawaii TMK: 3-7-5-20:1 PHRI Report
141-111984. Prepared for KG (Hawaii) Construction.
Taylor, C.B.
1948 The Restoration of a Heiau. Paradise of the Pacific Holiday Edition:46-49,125.
Thrum, T.G.
1908 List of Heiaus. The Hawaiian Almanac and Annual for 1908. Honolulu: T.G. Thrum.
1908 Tales from the Temples. The Hawaiian Almanac and Annual for 1908. Honolulu: T.G. Thrum.
I G1
' APPENDIX C
' Information to Upgrade Original Inventory Survey
This appendix includes the following information to upgrade the current report to current inventory -
level standards:
I. Summary of archaeological work conducted subsequent to the fieldwork for the
initial inventory survey (Head, Goodfellow, and Rosendahl 1992);
2. A review of the present status of significance assessments and general mitigation
' treatments for all sites for which further archaeological work (data recovery and/or
preservation) remains to be done;
' 3. A discussion of revisions to Table 10 (General Significance Assessments and
Recommended Treatments) of the (Head, Goodfellow, and Rosendahl 1992) initial
report;
' 4. A discussion of settlement patterns and predicted site patterns for the project area;
and
' 5. Additional figures, including selected photographs of sites and features, and
additional site plan maps (at end).
SUBSEQUENT ARCHAEOLOGICAL WORK
' Since the fieldwork and draft report for the current project was completed in 1992, two archaeological
inventory surveys and an archaeological mitigation program have taken place near and or partially within
.the current project boundaries: (a) Alii Highway Phased Mitigation Program (Haun et al. 1998); (b)
Archaeological Inventory Survey of Two Parcels in HSlualoa 2nd and 3rd (Wolforth 2000); and (c)
Archaeological Inventory Survey, Walua Apartment Project (Corbin 2001).
During the Alii Highway Phased Mitigation Program (Haun et al. 1998) 177 sites with 1,548 features
' were identified in the project area. Most sites had been identified during previous work. Fifty-eight sites
were assigned a permanent habitation function. Four of these sites were also assigned a burial function, and
two of the four were assigned a ceremonial function as well. A temporary habitation function was assigned
' to 28 sites. Of these, four were also assigned a burial function, one was assigned a ceremonial function, and
two were assigned a burial/ceremonial function. The most common non -habitation site function was
agriculture (40 sites), followed by ranching (livestock control; 16), ahupua'a boundary (14); burial (11),
' transportation (7), and water catchment (1). The 1,584 features had the following functions: agriculture
(1,029 features), permanent habitation (306), burial (53), temporary habitation (43), livestock control (30),
religious or ceremonial (15), marker (14), ahupua'a boundary (14), transportation (12), storage (3), water
catchment (2), communication (2), and recreation (1). Three features were assigned a temporary habitation
' and burial function. The function of 21 features was undetermined.
C-2
During the archaeological inventory survey of the Two Parcels in H61ualoa 2nd and 3rd project area,
seven sites with 26 features were recorded: one heiau (Site 3829), three residential sites (5600, 6317,
6374), and three walls (6316, 6340, 21391). Site 5600 consisted of a wall, two midden deposits, three
platforms, a terrace/pavement, five enclosures, two pahoehoe outcrops with bedrock mortars, a burial cave,
and a papamu. Functional interpretations included habitation, recreation, boundary enclosures, house floor
pavement, recreation, and boundary walls. Sites 6316 and 6340 were ahupua'a boundary walls. Site 6317
consisted of an enclosure, a wall, and a platform functioning for permanent habitation. Site 6374 consisted
of an enclosure, three platforms, a mound, a modified outcrop, and a terrace all functioning for permanent
habitation. Site 21391 was an enclosure wall.
During the archaeological inventory survey for the Walua Apartment Project, 27 sites were identified.
Eight of the 27 had been previously identified during an earlier inventory survey that covered a portion of
the current project area (Head et al. 1994). Nineteen sites consisting of 22 features were newly identified.
Seven of these sites were tested. The 22 features comprised the following formal types: modified outcrops
(8), walls (5), enclosure (1), terrace (1), platform (2), lava blister cave (1), rock alignment (1), shrine (1),
paved area (1), and papamu (1).
REIDENTIFICATION OF PREVIOUSLY
IDENTIFIED FEATURES
During the fieldwork for the additional inventory survey for the current project, it was discovered that
several features of Site 6325, identified during the Alii Highway Phased Mitigation Program (Haun et al.
1998), were actually within the current project boundary. The features, which are near the northeast
boundary of the project area (see Figure 2 of the main test), had apparently not been recorded because they
were thought to be outside the project area. The features include: E (E-1, E-2), J, K, L, M, N, and O. These
features are described in detail below, and are shown in plan view in Figure C-20. All of these additional
features have been described, mapped, and photographed, while Feature K was tested. These features have
been assessed under Criteria D as important for information content. No further work is recommended for
these features (Haun et al. 1998).
Feature El: Enclosure
Function: Habitation
Dimensions: 7.00 by 4.40 by 0.65 in
Condition: Fair
Integrity: Unaltered
Description: This enclosure is oval in plan view and has an entrance in the middle of the southeast wall. It
is built entirely on an outcrop that is 60-70 cm higher than the surrounding ground surface. The walls of
the enclosure are built of basalt boulders 25-50 cm in diameter and are mostly collapsed. In the most intact
section, boulders are stacked four courses high, with larger stones on the bottom; the lower courses are two
boulders wide, and the upper are three stones wide. In another fairly well preserved wall section there are
large boulders on the bottom outside of the enclosure, and smaller stones on the inside with large boulders
stacked on top. The floor of the enclosure is flat bedrock.
Feature E2: Terrace
Function: Possible Habitation
Dimensions: 10.00 by 2.60 by 1.00 in
Condition: Fair
Integrity: Unaltered
1
I
I
I
1
I
I
0
C-3
Description: On the southwest end of the Feature E enclosure is a roughly constructed wall built on an
outcrop. This wall extends southward for about 10.0 in and is 1.0-1.5 in wide by c. 1.0 in high. The first 4.0
in of the wall defines a terrace, flat on top, with the terrace face toward the west. The remaining portion of
the feature less formally constructed.
Feature J: Modified outcrop
Function: Agriculture
Dimensions: 9.00 by 3.00 by 0.75 in
Condition: Good
Integrity: Unaltered
Description: This feature consists of an outcrop, generally linear in plan view, modified with large
boulders (40-60 cm in diameter). The boulders have been piled on the southeast end of the outcrop; the rest
of the outcrop is bare.
Feature K: Enclosure
Function: Habitation
Dimensions: 7.60 by 6.00 by 0.80 in
Condition: Fair
Integrity: Unaltered
Description: Feature K is an enclosure. The southeast wall is 80 cm high and is built on an outcrop that is
2.0 in wide. Much of the wall is made of outcrop; the rest is large boulders. The southwest and northeast
walls are 25-80 cm high. These walls are built with boulders, 30-80 cm in diameter and are stacked 1-2
courses high. The walls are collapsed and are 1.20-1.40 in wide. The northwest wall consists of a single
row of boulders, except at the north comer, where it spreads into two rows -wide, and the west comer,
where it is stacked two courses high and two rows wide. There is no bedrock under this wall. Inside the
enclosure, in the east comer, is a smaller enclosure c. 1.0 in square. There is also an alignment of three flat
boulders near the northeast corner. There is an opening.in the northeast wall, near the north comer; this
may have been an entrance. No portable remains were found at the feature.
A 1.0 by 1.0 in test unit (TU -1320-33) was placed in the east comer of the enclosure, in a small space
bounded on two sides by the enclosure walls and by single stone alignments on the other two sides (Figure
C-2/). The unit was excavated in a single 12-28 cm thick layer of cobbly silt loam (0-28 cmbs). Inspection
of the profile, revealed that the base of the architecture rested within the upper zone of the Layer I soils.
Excavation of the unit was terminated at bedrock, and no cultural materials or evidence of human skeletal
remains were recovered.
Feature L: Modified outcrop
Function: Agriculture
Dimensions: 7.40 by 2.00 by 0.80 in
Condition: Fair
Integrity: Unaltered
Description: This feature, irregular in plan view, consists of stones piled on an outcrop. The stones are
C. 30-50 cm in diameter. Some of the stones at the feature appear to have broken off the outcrop.
Feature M: Terrace
Function: Agriculture
Dimensions: 2.60 by 1.80 by 1.00 in
Condition: Fair
Integrity: Unaltered
Description: This terrace is oval in plan view and is constructed of piled boulders and cobbles 15-30 cm in
diameter. The terrace retaining wall is partially collapsed; where it hasn't collapsed, it is three courses high
and may have originally been faced.
C -a
Feature N: Modified outcrop
Function: Agriculture
Dimensions: 3.10 by 2.20 by 0.60 in
Condition: Fair
Integrity: Unaltered
Description: Feature N is irregular in plan view and consists of boulders, 30-40 cm in diameter, piled
informally, 1-3 courses high, on an outcrop.
Feature O: Mound
Function: Agriculture
Dimensions: 3.00 by 1.60 by 0.85 in
Condition: Good
Integrity: Unaltered
Description: Feature O is oval in plan view and consists of boulders informally piled 2-3 courses high on
an outcrop. The boulders are 30-40 cm in diameter.
SETTLEMENT PATTERN FOR THE
PROJECT AREA AND VICINITY
Settlement Pattern Previous to the Head,
Goodfellow, and Rosendahl (1992) Survey
Prior to the Head, Goodfellow, and Rosendahl (1992) survey, archaeological work within the project
area and vicinity included investigations by Ching et al. (1973), Soehren (1978), Hommon and Rosendahl
(1983), and Walker and Rosendahl (1985).
Ching's findings during the survey of the Alii Drive Realignment Corridor included wall shelters, a
platform, walls, and U-shaped shelters. These features functioned as habitation areas, possible burials, and
boundary walls (Ching et al 1973).
Soehren (1978) noted a possible burial on the subject property, while Hommon and Rosendahl
identified habitation features and two additional possible burial features on the subject property (Hommon
and Rosendahl 1983: field records). Walker and Rosendahl (1985) assigned boundary functions to some
previously recorded sites within the project area; outside the area, habitation enclosures, terraces, modified
outcrops, platforms, boundary walls, burial mounds, C -and U -shapes, cave shelters, and agricultural
mounds were recorded. Other archaeological work near the project area by Dye (1978), Harnmatt (1980),
Welch (1982), Landrum at al. (1995), and Robins et al. (1990) also found sites and features having these
functions.
In general, these findings substantiate the historical record and early historical accounts, which picture
this area as heavily populated, with vast agricultural tracts laid out with boundary walls, burial areas, and
habitation structures. Several major heiau also existed in the vicinity (Walker and Rosendahl 1985:
Appendix A).
1 0 0
C-5
' Settlement Pattern Established to the Present Day
Since the fieldwork for the Head, Goodfellow, and Rosendahl (1992) survey was undertaken in 1991,
' several investigations, referred to above in the Subsequent Archaeological Work section, have taken place
on or near the current subject property. These projects have revealed the presence of the feature types
mentioned above, and have additionally substantiated the conclusions regarding prehistoric and historic
' settlement patterns, i.e., that Kailua-Kona was prehistorically and historically a heavily populated area with
numerous residences, temporary and permanent habitations, agricultural areas with boundary walls and
terraces, burials, shrines, and heiau. Indicated also is the fact that many prehistoric agricultural boundary
walls were used and added onto into the historic period during cattle controlling and ranching activities.
The following is a detailed summary of the present-day, established settlement pattern for the general
vicinity. The summary is based on several settlement models generated by researchers such as Cordy
' (1985, 1995, 2000), Newman (1970), Kelly (1983), and others. Though differing in detail, these models
generally divide up the region into five basic environmental zones: the Shoreline, Kula, Kaluulu, 'Apa'a,
and 'Ama'u.
tShoreline
This zone extends, typically, from the high -tide line inland approximately 200 meters or 600+ feet. In
Kailua this is the area from the shore to approximately Alii Drive. Thus, the shoreline zone's eastern
extent is the western edge of the current project area. In this zone, permanent settlement began c. AD
1000-1200 (Cordy 2000:248). Several large and densely populated royal centers were situated at several
locations along the shoreline between Kailua and H6naunau (Cordy 1985;1995) — at Kailua, H61ualoa,
Kahalu'u, and Kealakekua (Cordy 2000:248). These centers included dwellings for rulers, chiefs, and the
supporting populace, places of refuge, and other structures. Also present are large and small heiau, sporting
' areas, and burial clusters. Burials are present in caves, within finely built platforms, rock mounds, and
houses in the shoreline, and are more often to be found in the near -shore Kula zone (Cordy 1995; Haun et
al. 1998; Schilt 1984; Tainter 1973). Fishing and farming, of course, were the major economic activities in
this zone. Farming was done in clearings in the forest uplands where annual rainfall was sufficient for
reliable crops, probably at the ca. 900 to 1,000 ft elevation, which corresponds to the 40 -inch rainfall line.
Trails facilitated movement between the shoreline and the upper regions.
Kula
This zone, which includes the current project area, consists primarily of dry and open land with few
trees and considerable grass cover. Soil development is limited, with a fair amount of exposed lava
bedrock. The zone was planted primarily in scattered sweet potato patches. However, behind Kailua,
breadfruit, taro, and forest banana were also grown (Cordy 2000:255), at least in the historic period. Use of
this zone appears to have occurred as early as c. AD 1000-1300s. It is considered to extend to the 500 ft
elevation mark, although it may extend further, to approximately the 600-800 ft elevation (the 40-50 inch
rainfall line). Archaeologically, this contains clearing mounds, terraces, small soil clearings, and planting
pits. Some permanent habitations are found, but at a much lower density than at the shore. Permanent
habitation in this zone may have first started in the AD 1400's to 1500's, at least in the nearby ahupua'a of
Pua'a (Cordy 2000:255).
Kolu`ulu
This zone is also referred to as the breadfruit zone. It is located immediately above the Kula zone.
Early explorers described this zone as planted in breadfruit, with sweet potatoes and wauke (paper
mulberry) planted underneath the breadfruit trees (cf. Menzies 1920:75-76). The zone may have been
perhaps one-half mile wide (Kelly 1983:62). Here walled fields occur at the 600-800 ft elevation.
0 V
C-6
•Apa•a
In historic accounts this zone is described as an area divided by low stone and earth walls into cleared
rectangular fields in which sweet potato and dryland taro were planted. On the edges of the walls,
sugarcane and ti were planted (cf. Menzies 1920:75-76). Also, bananas and wauke were present (cf. Ellis
1963:32). Newman estimated that this zone began at the 1,000 ft elevation and extended to the 2,500 ft
elevation, although recent archaeological research has found formal walled fields beginning more
commonly at the 600-800 ft elevation. In reality, it has been found that there is much zonal variation within
the Kona Field System (cf. Cordy 1985:10-13).
`Ama`u
This is the banana zone, which may extend from the 2,000 ft elevation to 3,000 ft. The zone is
characterized by bananas and plantains being grown in cleared forest areas.
Chronology Established to the Present Day
The Kona Field System was not brought to Kona as a fully developed system. Rather, it grew out of,
and integrated with, the evolving socio-political structure and increasing population in the island chain.
The first inhabitants of Hawai' i Island probably arrived by at least AD 600 and occupied the windward side
of the island (Burtchard 1993; Kirch 1985; Hommon and Rosendahl 1986). To date, there is no
archaeological evidence for occupation of the Kona region during this initial, or Colonization (AD 300 to
600), stage of island occupation.
There is also little indication that during the subsequent period, Early Expansion (AD 600 to 1100),
much activity was taking place in Kona (Burtchard 1993: Table 3-3). Through the first half of the Early
Expansion Period, permanent habitation was still concentrated on the windward side. It is likely that
windward residents traveled to the leeward Kona coast to fish and collect other resources (Cordy 1995).
By the latter half of the Early Expansion Period, permanent habitation was beginning in Kona (Cordy 1981,
1995; Schilt 1984). Habitation was concentrated along the shoreline and lowland slopes, and informal
fields were probably situated in the Kula zone and higher elevations, areas with the higher rainfall.
Agricultural fields and habitation areas expanded across the slopes and coastal area of Hualalai during
the Late Expansion Period (AD 1100 to 1400) (Burtchard 1993; Cordy 1995). The earliest fields may have
been located in the southern portion of the system (Schilt 1984; Wolforth and Rosendahl 1998), with new
fields expanding northward over time (Haun et al. 1998).
The development of the extensive formal walled fields sometime during the initial stages of the
Intensification Period (AD 1400 to 1600) is taken as a mark of the initiation of the Kona Field System
(Schilt 1984). The development of formal walled fields may be in part a by-product of the need to extract
more subsistence resources from an increasingly limited agricultural base. The population in Kona
increased dramatically during this period. Radiocarbon dates from habitation structures, shelter caves, and
agricultural soils are plentiful from this period (Burtchard 1995; Haun et al. 1998; Schilt 1984). During this
period, the stratified chiefdom structure becomes clearly developed in the archaeological record. Large
residential complexes and heiau reflect the segregation of places and power for the growing hierarchy of
0
0
C-7
high and lower chiefs, and ceremonial stewards (Cordy 1981; Haun et al. 1998; Hommon and Rosendahl
1986). The produce from the formal walled fields was distributed to higher chiefs through a hierarchy of
lower chiefs responsible for management and collection of the cultivated and wild resources.
' By the time of the Competition Period (AD 1600 to 1800), the chiefly centers and larger heiau were in
place, reflecting the growth in power of the rulers and chiefs in the region (Barrera 1971; Hamman and
Folk 1980). Resources may have reached their maximum carrying capacity, resulting in social stress
between neighboring groups. Hostility between groups is reflected archaeologically with the development
of refuge caves during this period (Schilt 1984). This volatile period was probably accompanied by
internal rebellion and territorial annexation (Hommon and Rosendahl 1986; Kirch 1985). The population at
this time continued to grow up to the time of European contact (Burtchard 1993). Afterwards, up to time of
' the last of the ruling chiefs (1800 to 1819), settlement and land use patterns are primarily the same as
previously. But the next period, the period of the merchants and missionaries, 1820 to 1847, saw the
introduction of foreign ideas, plants, animals, diseases, religion, and trade, and the end of the kapu system.
' The royal centers were no longer functioning as focal points for religious and political activity, and the
population at the royal centers and the population of the commoners dropped overall. During the next
period, the Great Mahele and Its Legacy, 1848-1899, the implementation of privately owned land resulted
in major changes to the settlement and land use patterns in Kona. By the end of this period, foreign
' landowners and business people had greater control over broad land use practices. The upland agricultural
fields were modified to coffee growing, and permanent habitations were built with modern materials upland
and along the shore. The population, due to disease, reached a low during this period, but began to climb as
' foreign laborers and more business people arrived. Finally, during the last period 1900-1959, the Territorial
Period, the population remained relatively stable and lowland occupation was concentrated in the small
villages of Kailua and Keauhou, with permanent residences with gardens and pens scattered along the
shoreline, while upland habitation was associated with agricultural and ranching pursuits (Haun et al.
' 1998).
The current project is situated in the Kula zone. The current findings substantiate what is currently
' archaeologically known concerning the settlement pattern of this zone. Current research indicates that
within the Kula zone were agricultural clearing mounds, walls, terraces, and planting pits. Current
investigations within the project area reveal that walls, clearing mounds, terraces, and planting pits also
exist. However, although some permanent habitations are thought to occur in this zone, none are thought to
exist within the current project area. Concerning temporal use of the project area, radiocarbon age
determinations fall within currently accepted early and late parameters with the exception of Feature D at
' Site 6377, a platform, the age date range of which, AD 680-1170, is wide, and which, if correct, may
demonstrate at least temporary occupation of the site at an unusually early date. Thus, this investigation of
the project area has added chronological data that contributes to the refinement of the present
archaeological chronology for this area of Kona.
I REVIEW OF THE PRESENT STATUS OF SIGNIFICANCE
' ASSESSMENTS AND GENERAL MITIGATION TREATMENTS
' As part of the current project, a review of general significance assessments and recommended
treatments for all sites identified in the project area was conducted. The review has resulted in no changes
to the original significance assessments made in 1991. In addition, the significance table in the original
report has been revised to reflect current evaluation criteria (see pages 39 and 40). As noted, several
' features of Site 6325, identified during the AIN Highway Phased Mitigation Program (Haun et al. 1998),
were found to be within the current project boundary. These features have been assessed as important for
information content only, and no further work has been recommended for these features (Haun et al. 1998).
1p •
NOTE ON BULLDOZED FEATURE
During the fieldwork for the additional inventory survey conducted by PHRI on July 18 and 19, 2003
(see preface for details of the survey), Site 16113, identified during the original inventory survey in 1991,
was relocated. When a search for the individual features of the site was made, Feature B of the site could
not be found. It appeared that Feature B had been destroyed by bulldozing, as the area of the feature was
grubbed and filled with loose stones.
REFERENCES CITED
Barrera, W., Jr.
1971 Archaeological Excavations and Survey at Keauhou, North Kona, Hawaii.
Department of Anthropology, B.P. Bishop Museum, Honolulu. Prepared for
Kamehameha Development Corporation.
1978 Archaeological Surface Survey of the Old Gomes Property Belonging to Pacific
Basin Resorts, Inc., Kahului, Kona, Hawaii Island. Archaeological Research Center
Hawaii. Prepared for Gerald Park.
Burtchard, G.C.
1993 Population and Land Use on the Keauhou Coast: The Mauka Land Inventory Survey,
Keauhou, North Kona, Hawaii Island. IARII Draft Report prepared for Belt,
Collins and Associates.
1995 Population and Land -use on the Keahou Coast, the Mauka Lands Inventory Survey,
Keauhou, North Kona, Hawaii Island, Part I: Narrative Volume. International
Archaeological Research Institute, Inc. (IARII). Submitted to Belt, Collins, and
Associates and Kamehameha Investment Corporation.
Ching, FXW., E. Neller, S.L. Palama, and P.B. Griffin
1973 The Archaeology of North Kona, from Ahupua`a of Kahului to the Ahupua`a of
Kahaluu. Surface Survey: Realignment of Alii Drive. Archaeological Research
Center Hawaii, Inc., Hawaiian Archaeological Journal 73-2.
Corbin, A.B.
2001 Archaeological Inventory Survey Walua Apartment Project, Land of Waiaha 1,
North Kona District, Island of Hawaii (TMK:3-7-5:18:7). Report 2086-030101.
PHRI. Submitted to Maryl Group, Inc.
Cordy, R.
1985 Working Paper I: Hawaii Island Archaeology, Ooma and Kalaoa Ahupua`a, Kekaha,
North Kona (TMK:7-3). Historic Sites Section, Division of State Parks, Department
of Land and Natural Resources.
1995 Central Kona Archaeological Settlement Patterns. State Historic Preservation
Division, DLNR, State of Hawaii. Prepared for the Planning Department, County of
Honolulu.
1 C-9
' 2000 Exalted Sits the Chief the Ancient History ofHawai'i Island. Mutual Publishing
'
Dye, T.
1978
An Archaeological Reconnaissance Survey of Four Alternative Sites for the
Bishop
Kailua-Keauhou Elementary School. Department of Anthropology, B.P.
Museum, Honolulu, Ms. 031078.
'
Ellis, W.
1963
Journal of William Ellis, Narrative of a Tour of Hawaii, or Owhyee... Honolulu:
Advertiser Publishing Co.
'
H.H.
Hammatt,
1980
Archaeological Survey of a Shoreline Property, TMK:7-5-20:22,34, Puapua'a, Kona,
Hawaii Island. Archaeological Research Center Hawaii Report 14-158.1. Prepared
'
for McClad Enterprises Ltd.
Hammatt, H.H., and W. M. Folk
1980 Archaeological Survey, Phase 1: Portions of Keauhou-Kona Resort, Keauhou and
'
Kahaluu, Kona, Hawaii Island. Archaeological Research Center Hawaii, Inc. Report
14-177 IL 1. Prepared for Kamehameha Investment Corp.
Haun, A. E., J. D. Henry, J. A. Jimenez, M. A. Kirkendall, K. Maly, and T. R. Wolforth
1998
Alii Highway Phased Mitigation Program Phase I - Archaeological Intensive
Survey, North Kona District, Island of Hawaii, vol. 1, Summary. Report 1320-
052798. PHRI. Submitted to County of Hawaii c/o R.M. Towill Corporation.
Head, J.A.,
1992
S.T. Goodfellow, and P.H. Rosendahl
Archaeological Inventory Survey, Alii Drive Family Housing Project. Land of
Puapua`a 2nd, North Kona District, Island of Hawaii (TMK:3-7-5-20:71,72). PHRI
Report 1067-092691. Prepared for CRL Development, Inc.
1994
Archaeological Inventory Survey, Ali'i Drive Sewer Project, Land of Pua'a 2ntl and
3'd and Waiaha I' and 2n", North Kona District, Island of Hawaii (TMK:7-5-18:7,8).
'
PHRI Report 937-080894. Prepared for M & E Pacific.
Hommon, R.J., and P.H. Rosendahl
1983 Archaeological Investigation of the Alii Drive Realignment Corridors, North Kona,
Island of Hawaii. Science Management, Inc. Prepared for Belt, Collins & Associates.
1986
Social Evolution in Ancient Hawaii. IN Kirch, P.V. (ed.), Island Societies: Archaeo-
t
logical Approaches to Evolution and Trans formation: 55-88. Cambridge: University
Press.
' Kelly, M.
1983 Na Mala O Kona: Gardens of Kona. A History of Land Use in Kona, Hawaii.
Departmental Report Series 83-2. Department of Anthropology, B.P. Bishop
' Museum, Honolulu. Prepared for the Department of Transportation, State of Hawaii.
Kennedy, J.
1990 Inventory Survey for TMK:7-8-14:35, Located at Kahalu`u, North Kona, Hawaii.
' Prepared for Mr. Art Nebu by J. Kennedy.
1 - -
1
C-10
Kirch, P.V.
1985 Feathered Gods and Fishhooks: An Introduction to Hawaiian Archaeology and
Prehistory. Honolulu: University of Hawaii Press.
Landrum, J. (III), A.E. Haun, and P.H. Rosendahl
1995 Archaeological Inventory Survey and Test Excavations, Kahakai Development.
Project Area, Lands of Puapuaa 1 st and 2nd, North Kona, Island of Hawaii (TMK:3-
7-20:1). PHRI Report 157-070185. Prepared for KG (Hawaii) Construction and
Wilson Okamoto & Associates. (With K. Delimont)
Menzies, A.
1920 Hawaii Nei, 128 Years Ago. Edited by William F. Wilson. Honolulu: The New
Freedom Press.
Newman, T.S.
1970 Hawaiian Fishing and Farming on the Island of Hawaii in A.D. 1778. Department of
Land and Natural Resources, Division of State Parks.
Robins, J., P.O. Walsh, M. Heidel, and H.H. Hammatt
1994 Archaeological Inventory Survey of a 5 -Acre Parcel in Puapua`a 2, North Kona,
Hawaii (TMK:7-5-20:70). Cultural Surveys Hawaii, Inc. Prepared for Eric von
Platen Luder and Keith F. Unger.
Schilt, R.
1984 Subsistence and Conflict in Kona, Hawaii. An Archaeological Study of the Kuakini
Highway Realignment Corridor. Departmental Report Series 84-1. Department of
Anthropology, B.P. Bishop Museum, Honolulu. Prepared for the Department of
Transportation, State of Hawaii.
Soehren, L.J.
1978 An Archaeological Reconnaissance Survey of a Portion of Puapuaa, North Kona,
Hawaii. Project 78-06.
Tainter, J.A.
1973 The Social Correlates of Mortuary Patterning at Kaloko, North Kona, Hawaii.
Archaeology and Physical Anthropology. In Oceania 11:91-105.
Walker, A.T., and P.H. Rosendahl
1985 Full Archaeological Reconnaissance Survey, Kahakai Development Project Area,
Puapuaa 1 at and 2nd, North Kona, Island of Hawaii (TMK:3-7-5-20:1). PHRI Report
141-111984. Prepared for KG (Hawaii) Construction.
Welch, D.J.
1982 Archaeological Survey and Excavations of the Kahakai (Kailua-Keauhou) Elementary
School Site, North Kona, Hawaii. Ms. 051082, Department of Anthropology, B.P. Bishop
Museum, Honolulu. Prepared for State of Hawaii, Division of Public Works, Department
of Accounting and General Services.
0 0
c-11
Wolforth, T.R., and P.H. Rosendahl
1998 Interim Report Archaeological Inventory Survey 60 -Acre Agricultural Zoned QLT
Parcel, Land of Keahuolu, North Kona District, Island of Hawaii (TMK:3-7-4-
08:Por.1). PHRI Report 1854-010897. Prepared for Queen Liliuokalani Trust c/o
Belt Collins Hawaii.
Wolforth, T.R, J.D. Henry, and R.B. Rechtman
1999 Archaeological Inventory Survey of Two Parcels in H61ualoa 2nd and 3'd: Settlement
Distribution near the Shoreline at H61ualoa Bay, Lands of H6lualoa 2nd and 3r°, North
Kona, Island of Hawai'i (TMK: 3-7-7-4:22 and 47). Report 1941-092500. PHRI.
Submitted to Ralph Berezan, Langley, B.C., Canada.
0 0
C-12
Additional Figures
Selected Photographs
Figure C-1. Site 6335, Wall C-13
Figure C-2. Site 6336, Wall C-14
Figure C-3. Site 6337, Feature C, View to West -Southwest C -IS
Figure C-4. Site 6337, Feature D, Platform, View to West -Southwest C-16
Figure C -S. Site 16111, Feature C, Windmill Platform, View to North C-17
Figure C-6. Site 16112, Feature A (Wall), Feature B (Mound), View to South -Southwest C-18
Figure C-7. Site 16113, Feature A, Enclosure, View to East -Northeast • C-19
Figure C-8. Site 16113, Feature B, C -shape, View to West -Northwest • C-20
Figure C-9. Site 16114, Terrace, View to West -Northwest C-21
Figure C-10. Site 16115, Feature E, Enclosure, View to East C-21
FigureC-11. Site 1611S, Feature E, Enclosure, TU -1, Post Excavation • C-13
Figure C-12. Site 16116, Feature A, Mound, View to North -Northwest • C-24
Figure C-13. Site 16116, Feature B, Upright and Mound, View to East -Northeast C -2S
Figure C-14. Site 16116, Feature C, Mound, View to North -Northwest C-26
Figure C -IS. Site 16116, Feature D, Platform, View to North -Northwest C-27
(board incorrectly reads Feature B)
Figure C-16. Site 16117, Platform, View to North -Northeast C-28
Figure C-17. Site 16118, Enclosure • C-29
Figure C-18. Site 16119, Terrace, Northwest Corner, West Face, View to East -Southeast • C-30
Figure C-19. Site 16133, Feature B, Terrace, View to East -Southeast • C-31
Additional Drawings
Figure C-20. Plan View of Site 6325 • C-32
Figure C-21. Site 6315, Feature K, TU -1320-33, East Face Profile • C-33
Figure C-21. Site 6337, Feature B C-34
Figure C-23. Site 6337, Feature C C -3S
Figure C-24. Site 6337, Feature D C-36
Figure C-15. Site 15108 • C-37
Figure C-26. Site 16119, Feature A C-38
�• •� ` c r -- 835
12
if • 41 ...'�, E > Fij t c f. 't "�'`—. . _ ,a,., Y:=. t 4 �- {�
6 V��I
.., / v ri `. � "6 -,� �`'+� r1t k •'L.� F V� cs t^ !J :- .� '• ' t'.
' it -]''3 - r ao-s -: �t C i 6i i -:. tx i t � x > t � l •� N
o"A
wee-. a+ , -�•-•` •. . ' •:• , - + ,
Uf
� .�- -�y cam` - . ' j .�'.• ; v- c :'� �T-r rr '` ' � +. •,, -4 �..- ,a''�
._'9. � �"r /• �._ ` !w . y':, .. '. •' • •.c _ • J + •tom •��. .� t 7, s ,. �" \.
'4 r
To - ^ -
. s «":n is � .... - R - '-� _..,. - • �
r -• r P'.>•� s •.�.. rk_`�i'3ill"q�r7.Y ... �,4:` s A - - �'._�•�'.� ♦ -.r :� g -
e-
j a^ vc- { `sa.:. k `.r t E -. r Y'.,j . i f♦ ♦:: f q,:,a°♦ -:- x �- ,:
► .i .i` ' S `v i. +,' a. r'1 -• r % T � ' Y
.t r!i y,iY 1_" tom•. ;�+ �'�, x '�� ems`�.e. 1.1Ls _•'� tl ♦.,+1 t' lN-M i e :,,in+'4�L� :
**- 4 +c f i J F v pi •. Sti .ec a. :.� ♦ ♦ �" i ,; ♦ ± „�, s
se r� f i� •.rJ F � ,, F f `=3V.~ F{♦M1. f�: fir, i- * •��.,cam �. r 1y1.F; � � s Frr'a• � � c "�'.r�r.�� : '� �' fr
.c#' i. F =�.� k. ♦ G:.� a t. �.i 1,�' J 1+ _e,r r. .f ♦ _ .yf R ; .'€..-t�'a y }, {
i r.. � � ,�..n �}i.c i .s 1 1 �' 3 Yy • ]" �' it- : Y. r� �t �.'.. �y i '� t 3" il.4 • d. a r v Y, �,� 2'._
�. s,; z £t z .. P ► h r y - « i, fj ► b r :a . 4
Y,� s a ° �# �' t .'.a t. ' f cad .T� :sl .: 4 r ♦M_� { .>t� r�11 ! _ j. t5. �y :�1 z rg� "♦-! f a SiiK, �.,�c,Ss f 1 }y.,'�x �.
�' ..,F `' ; . J • Y Y .r. > i i � . s +Ya j '�"4 � � � 7'rs, �i •' Sr r r a .t a. F 5 ' r ; .y o<.
i r :4F ` {Y t F .yk t' < i ; r fin; i > 1 r' ` a , T t • K ♦e f `+Jt t rr ^ r�r:.
�c ,$a t ", 2 a ,;. :+" f { •t F �, r .� � ♦ f � yr, s ,� f.;� ,r . ry t _ ; f - 1'�: h "`} � °" r'` � ?'7';.
.41
i i l
{ T 1
k `+a.E �' Y .'7'� a �'`�t'.i ^*l, J,✓ ¢vy 4` w y-r y.
$ fi � 1 - s .z�,,.y `7' w:: s. .%'S• 't' e' ri, y.. !ti oe�
Y a•� r, a r. —J.
r -F
� kaG � r ' • � M `� .tom t t�.� o - � ' i' � � � ` �f �+, � F` � i �'
j Cyr 3
11 ''F, f x rx d ^} •✓ c t. °a c 1' • �i}v# yj �'
'.� t� "`k _ ., a -, , 53t s '"` � � �.:t ♦ >�'i.0 -c. h • '� � 4;,
t..x t♦= :€ s. to e �a •,
't'r� moi:' '� C'- � Y � t✓'�' L ta.' 7 S -' � �ri1 • :5 3 i "t' Y S � : � ♦ T �° t `i.:
-Pr�,i� a- ro4-a � � c � .t• .'r1 '�:`.� rr a' tr ,. �' e* � ,• v#y -r f: • ` a� �' rs..* ?
,� c Ty .i c +w - • 4. yn � _i,'�F .x 4.,_ X ., z 1 � �+, � r
Fri71
s +'•s s c µ '•r yt.::u "yi 4z l sr , f *,.. : 1 �c a P �..rr y "W' ♦ a..
i .tl '�.� ; �'"+r.� ' � • it - t 4✓ x-�i -:✓a � � a � 'bF �'. • A .O,r �A `�;'. 4t 4 �.�:; c,tt '• 'a' t a
2.
tt
'i F~^+ � �1 F.s � t� t C �- 4 ; �"..r A ;... �i ncr�,°,ra .. h'� � .. i'' k.. � •�' �s 7 �`" � -, y,.. a ��. - Y
� :,z a i '+ � - ` '- � +rl ""` ''e 4 •t '�1t.I 1 y r� .,�;� a sy.. "`" �u .j i s'
s
s+� - T -.a T a - r 4 .' t '' 'sl t r C `r "4 3 s �+ v o �. . x s� a("r.�' j i "• i ±
t
v- #` R ;.:x u S s i. .t t .:;..,tg ter.,..♦ CA. o T
may, t� „� � Y �� a � ; a ^' � , # .�....�. ''" ,= f t �'� a c t Y , t •.:
fit• •-k' 7y t
T'` vH—i t w +' t -
�,
�.-i
~S.1'' a wt
*�� •u' =•3'•a r �'+
� � ,r �A a.,- f a s g a.. t-�- t S ,. � 1r.-4 • y -[ <. +}r r-t � � ... '' ' t'. ,.I
,a g_. -t• ° s `• •^ r- - Y r y s 'Xq y . V y
aiW-41
t
- r 5 ` u. ,: s. !, F t Y r# a'v.' -• y C Vrt a F ti } %',
Jthk
.r y n .ria' e r • C ::t' i Ii:`^3. I>;. ',I'"..Cl
nEs• r { �, t _ e s •:., f R ♦t .c. Y.. "y �_ • l - ry w •``Jq �. ty ,«� y'W �� `,:.
� �� �1 � 4 �'� i � ,t i,A t 7 V • �r� { t .� i -�,} .1 i +Txi+ s ` rr � G aY.:- ,a ; 'c <
� � �. '6 fff--- � •ate a+�J-�j �-3.1 { � a I '. s � . �♦ � w �' ,, 'N i � i., { fi�-r*
s {K t t M� 'si _I�i. c�L 1 i _ 4• .s..r a/ Y~ i� �"7i 1 . Y/ s rr r,4 k cts r_�• "
' t t jam^ l2't -:L•�,_Q� � i:,2 � 't% �:...+ r: a! -`-�` -, .L '� � . a _z—:1z�-. ,_
i� 1 l 1r 4
Z~ 1 . ).;.., i J r 1 '{' + 6 I. i
l n r a
a • , %s tl \, r �' a. ' � + � - � y a..�`.,
tk. �T ir-
`. . t-T(,_
a.�r :. e � r`� r s.ti +• �_' T`e.- v s �.' .�. `� � :. Lt:.�
.,."lnc .` • �7.i z a +
a. gr ! Ytf - i tL ' •H 11 l,,� -C n :er •�' !'s .� rt - Xis tea' `si Y-•'FY S '• 1:~ •
1 1 i 1 ? ,{, • r� L a Z n F t �,. � a n ✓,'a i
Ys . � 1 s �\ � FZ i � ��/> r f r �. ti �` sc J' .r• 3 _ s. '^ 4 5 n r.•.
2 '. 8 7 •, 1 4 .5' { ,, 4' +" t e aysc i •f`�-�.� `_- a f - 1
i � �. .1 r f � :g � .`Hl _ �t t -tea Y • s <�/ti. �...ra.--"� .:_. .+- f�^� � ''"�--wrs....e.T f_ `� � .i `r (jCC
�'rK � m � 'w `�-� �[ 1 � � � a a. fir... +.� ?1" � ' ��-.' - +•>'��c� a � �� •�-1 � • ... p�A.l{.ir, t � � "'' �.+.i...� , .9-' x i a
F ' 9i,yy
Zr
r� � $% �: i {� o F'9 i _ t � � ' i -.". � �'� -t- ^ri.+,�` r�. j s_'._'.r. � t ✓'r )' -
n.
'p•s= � F � �\ t ..v1 ♦.� die-r'.� ~..�+.e '.'^`-!• ,[-. 'tis-��-��'6�{, � r "r e r ti.f. � x, x r �r- J3 ..
�� �`� f,�. - .. jc •�` t J '�` �,pi�,r. •bM. �,.t..r�-...�, '1' .e a .L - �• d J - !ry �` 4 .
�,.{r. ••a„ ! �� �� f i..o,, w- yy+ � es `�.,'=l � � 1 � "4. .! : ..t 1 j a ` �d �"� r' r+ �, �e .� _ �f!'" „` `'.
.d f r l ! `-� �, I •.ry •r- 1 �+ . „ if a 1 / t --8. q..t
�/ /•r r(� a- � �.f� a p c��rl 77
'rL' !+` � `✓� _-� ;� r-� t Y. �" -a � f +.7 \ .. ..a ._ .,>... � " •� ;5 ' r r , c rr r
mw
.[�; >� ��. s ,•r'/ � -. %s4 7 ,t+ � , � i } r:Y a F4' � l - �l�jvF�� xr�' � '�,r �"`e'^"' r'�f -s i -• .f.
`J/�_,,,.r* �/ r ,,,..-.. _v�� _,t. (� a 3 e � �., - -Y . <a a -•_, L' _.+ j
••j '� r -"� }•� ✓ / \ j� �.�' Y$_�w• ���.. � _ �,9'g1 i.. is �� Y e��.
-rh `1.•.ni
i� r . .�-i .r M S � a� �� Fy r/`6 � � { •+"•�- -� � is �^•w.. a �`.,��
:,.` -,� 1�. }41`_ a9` 3 . aha' 1..>' �� •,1 -+.
E. ( 1 � ,�,.. Oa-'a• a ,Fi-r `rte } � �` - :9( 'S "` _moi
1 It—
,Rsa ` r ,r �!; � o+r ..a a.. ` �? 'j; ♦
�: mal �^.♦. `f^v r, r' _-i _pJ_�T.-�., " i:..�r.,• ; aim R, �..i j k, ,-} s` .' -X
I "� ,'•� o ►C r L ((tLe .t.r A ----�• ',S''' :�'r F tE. r s r i
r. ��Y �r F � •.- /{ _ FF ps • � '� � � _ r�r.-- f� "'" r ^it ti� s .. -
w� z,
RE � ♦ ti�i/ � � L �3 ]
Nr-
Jyj''• } `fin" i
16 4
51
t a �
• �4� �4 u z � J:r•Y'�J
RET� � a Vii► +� s�•
� b-� � - ; '• /r � • 4 1i C � ~
'-
i..,ta..� 4a LV;z
•3.a yyr r nx€ u. r .s. ,.
�� f .+•�� 't ,. i- �� rs�.r r Lam►,;.
a
Y } L f gad 4p .+K
AZ -
137
! i' i a t .,,e t r'4 Fes, .,t f' x r;�•. * "WA
�•,�:_ r '� < x 'S. e�' s s, �yfi-j � `rr 1i' i 'e o :n k �,- j4 t 9x' ,. �,,:.,iv, t .
i � `f' �• t ." s- ta. :' t L .T» �,.( •:. t +Gp � t � d t .� i -F'r F a.^ .^ .a r i�' fz F:. 3 T�,kr I t :i
'r i.z t , � f �s _) +`� r '�_ �. ?. v s-r� � ra' y,} � �, .�; k. ✓. -r � x ti '..
w
',i �,yr ;_r c' fi s c r r E rr x ,t cit r r r •r
Cs _ I
s� s j � x, t -= a ' t �.4 fit E ,3 �;t � � S! 2- , -t_ 3s Lf -y, • f r ` x:. f '� � e rt7 i a i
ti Sy r f- i h x t >s r% i� z , ,,� t ,� s IA sjr� e` •`.l._ s t.•
;1 r { ` { A �� � �, r � k r sx $ -`r. ; 1� s f ,�.: �- �y L � _ � - - � %� [ .•s, j 4 a ti _ }
a. ! Y" '• d r ,+.s. ,fl N f ^,n b f 'vt us ,S a '* ''. ; = t t x � �w.z{ `' t - r' , � .,, "� t ! j t`
rawf
tri }�"�
r `.rr },t f : ti 4
s wtRr r'ci r�. • f s`" a # a j-xS �' ti r i •�"� ; l j4��
''Sr :� s t. r V. i C Y ' i h 2. s� • i t$ 1 a
a wJo ,• +r. ?-.. / �__' _� a f •r' x �a k t "_v A- s n }`c, + - > A
�4 l 1—
s � rt n< 'bd ;_{t "�� ;�, � er r ._t ♦.s _" 4 :� •. i ��R t �lfu r� } �-; �
tS r.71
"A' r-
in r
+' " t s. k s 'hY A i .g x z rx f ±y? ^ * _ e$.. _ (•< g tti. dr t r +>„ s u: ...._
f w-,7 r - t ;✓ ' rift '7 Vie-", f a Y.} R,/ W .Y• r a - r .� f - •1
'. f._ �l
s '^ s "^ :.
i r
��' x � q._ � K i "� -+`.. } r- -`- r Si �i�•,TMy 3- tv �z v � 'yv a ••9: �` e,e. �. k ,.� ,-r -d L
,'rrrkr } r"?` Jr h { r rt i ..,+ i ! y r i.`
{ l
21
rt :dab e4�+I i f~k `�:;1:-* 4 r�'�'n> '�+{,..3 . s:.. Fp` u+.t i „� t' t ` h-5 .+c i "'+.k z-'`d'.�vs:, q `• �^ ''�
U1,'�.„wtt' t 'S.•, :� y
{�_ w .� 4 rr r .. .s:. " aj f � i ��' � -� tea t ,a fi'�� i +` �=✓ r � 9 �,..ys �. -ter � c'tRR,� i t � f�`. J �� ,y � u ".
ti- -- .5�.+ �' S .4dr+ �
r xr Y i" T .iA .y fi .A yy i� *std,•^,', ♦ w 3 «* f _'' .`�! , `t AW
x
V �"! na Al j ;y '3. _ ♦ S ,{f J Y K tJ
y � � f -r = � .5 +* � .�• �. � N � � �-'�s'9' vt a +r + i t K+� st1•�1 3 .y 't ,i •. ,+
.'C L s- i/ -•tR i :� r f"j.-r'3 „i3. `c:i �" -� A•M v.t f �t A 1 } : i'`t ,',
e
"r t 1t
g"a� �� .�. ?� r� ... •. x „ da:: r ._tom 4n - a �,� �,,,.'ti ' i T ': c� e?'�t F "'x 4. k nr R n n
F r 1. �• �� s �. Ry rY • t . r r 3 pta : 1 - !: �' �: r � di "4 r i ` i
�._•df#.
A!�
K.
s*y5.� } .rf jj �-;T � .�l�S _:.;� 4f Y"y .'='Z � .rt yar *. � f rl rr..e i Y` � .r ey�'y�� ,,,,.�Ft,�;�.,,7 v1 � _. t z. •r..t�° F�` �� - r."� ?t
�� ; ..6,°--�• .".-•rte �R :'+� z . v' - s4 't.... s -
r
■' ■
-W71
6+�
Ilk,� ,jts f.zo I� ?;.nth ��.t °_ ag `i : �a`k ►IASSt�y:�.
��iS r,����,.v -+i• y � o r
�t'n° '}* s t.. �,.?{'r �a ,�i4 (.+.-: :w i.' 5; t :\ 7 r.Y t a t �_' i1+ xg.• 8
t� r V� - .:� ��t'� y.+�i�� tne�. �a'•...bb r,":` .s .i�r I �r �'' ^ � :b h i s ;,�
26r. t
Wo q NotON
l P 4 fp .Rp �.s1 Sb INKK - f ; ynto
R
lot-
Sf_
1 t !z.i
PC OIL
oo
-us tf i0 OW i1
2 TAY
•i '1�1� J� .r ,t � 4 � � n
i -ft -Y4f s•J - yWoo Y t i % N .. i .
s.t
SAW
Onot my 7 sr s r t -, -xfx r eon
�.
met
i
v w
Aa
lie
jr 4
P - � -: t �i^ t�"J ,� q_` � _„•.mac :� !P+ r ar"r : / Y � A 1 f r� -
ve
•
S�If � ,.. • � t r ` Vt
QA' ' r te n-!};= t ►`. a �� ` r a i,. r
' c•^'`•$�s,r� t' / ♦_ / �. � �. is sv. •+`J 't. •'a ,i+ � c � � f .
-7 r .1.-�, y� t -_ �s �.....-1 'Ay Srw •�_ ra, kr � 1 � :� i � �~'r s /_ y '! -.
..'s • � � % '-f�' .r /. (f.+. i a .� �. i .f � Z�1 r ,3 `, t F r t r
•s�/ -t1 r F<S > -., .✓._r 1. d- a?� :`' �. r j r 4 _ �•r t+r'.. ,� _t �'�fir S'-•
:.. -�, �' r. o -n sem_ i a� '" 3-- y +�' �. :'Cs..- .ci .r,• ! t �`or' r- ,�, - r
71.
~ ! .t ` ,i�.rl 'r K \�.e i ? f i <� .:r •.ed "s• �y .1.>aa •--•/ t. t i M1* p E ..r"1"f-ea
-•�/�: Y �..F.f rQ ti. •C =s-Sr„� tea~ t r ..7'._� ,. ♦ >`�, :`.`- f ':
i `� _ i'�., t .�' 1 4 fir- � E S� '� � • •. 1, �- r }::. t ' c �a ,/''
�• � ' t � .t � t - � ��.tr c � ,f d+. `, � d 7 ` S t �. .:ssY ../ �{�. 5 •.r”=�-� � a 'ti.r s'z � y� ?.'��v� G �.iu >, °.:{
11+ r i Z-,..`" r r J ^ 1 1 c -- - 'i G,[ •' ,tea. a - s+.-. .may k. �r <
j` -�E-- R* e '`�'ti r _ ra . � ' { 'G ,il, ,:o '1S n. ;S •_ 1�.. f ,E. yI i 1.`. ,
�1. ff��, -€� �s 4i ,*✓v%i) �{{ •l �.t. �.j-�19' ��� �i7� /Mfi J���.L 2rte. �-{ - -� r� f ! Z •,��� PY: ate,. 21: ...`J!� ��t tf -.�-'
ii a'. c / - z' 7 : f - 4�-. � f - ra L.yG, /.fs��'... \ � ' )`' �: "S_�.�` _-�.,r,''1'� •-�`• � r r f F+ r, .z .r
�} a j - / � � FF'v, � � '.i:�i f �.' �%.h �,+. r a s�'�. h ��„i �F ` 1. .� r.` p �4; h� L f. - `�r�_,,,j . �r'•= j � jj � � •`
4 �� i � [�. Y i �.. � >, + : �a a' a: i... Y � r .4 4 i � a �1 . J 2� t�r4'"� ,�--..rte-' J2` •circ - •t
�, d ., Y ��1 "� g . u°�•; `o- _1 �. � -�,; r.[� �� �Lf.f � -t• • 1 `!1n 'na~ t�`1 �.��Ya.- -t S"1 -- L �e.y� •.l , j��r•�-? � •`� `•i { ..
ct }r y , E. i @ ! �^ � y{ •1 �' r 4: - 'P in±r �'l:.Y.� �.1��. Ra���-, a -�i x r - [
.,t ♦ ..� ! 1''-1..•f,Js
,' _ �r a''. •., S � t ' � �. �-,a <t e Z_ r:"_ -�"'a ►••�+"�.i �'c�'�-j �!t^ts .�: J a t t
v
r z_r f ,i, � �3�. � �` ^ r t,,. aY. * r B ,;•_, /� �rl 4'ti' .1r.� i E i ii � � '.� t �: ♦� i � 'S. jn S „!' 1 _
.��,a _ -rr r1'z. z-' ;-�f y _ ? Vii- ((@ a ..�r'3ri rr p "•A.'_' - _ .,i -. �" a-:.1 �r' r < r �. A. S
c,. .-.� f'" F �" � A ; r . • i r2 u 1 ti _.� _ f y l _ � o�� _' i >� � r y .�{,l �j�31�.` ,.,' it `T- / s�''� v stir z, �� .i� � L��t l
.y �� rt. +:�.. c r 's -'� ` Y Ls b\ r �+ � r{.-." ��l_. ...t.�, �''�-- �-- S6 r y � t �o- a ',/� ¢' '\• t .
/t �..�f �' t �P� ! �i..0 � ✓ •_ SK_...� i n �-` y •� r - a, -r 4 r t.� �� ,���•'�>t C'.
t.. , r 1111111`````` : Y �' �".1, i t •�. - "`r _ ' : '�'•- �• ti +,, �T .- � l � r'
fe
,.•r ���f p.• e�-•' �•.�t� �- � a'` - `�_�r-r!. _ a.-tlri 1• r1� .. �f-s. -\` ti J .�'o'o.t, .`a w -.. ,e r �.I
,_� _.� s.•s` ti °yt'•f t � � �� �.. _yat �., z%tr� ilt, l j , �.� i d'�. { 1 4-r,�.�_ ...Q ,,,. h,F.-• � a�'
ti, t -..-. J � < i - p� r3l a,t.�"�_a. ��- - ^^�.�'/!� •. ,i tx �t.-:. .lt;'�� Jy
� I
z > r
t a I t rL -. ♦ '.
t
4� �,z t f� ►•. �
X:1, ,
•L M L l 4 4 ?' S) t•
Al
k �L � C : ,• r n
r
i t
lyr•�� ..,�, y.rt„ �-.. v^�� t a .Pik t€t' �,.ii ..
�x
s ,
* r
� 1 ✓F i'2� ci r '' C l
eve ! r5 ''' '�.�, ."�'i i r:;+'c - � {• ,I S "e
� r; z _k -,r r :� Ix{,t j 1 itrf� S'+" l c�}. r".(Z Yz y'x.'� d_'�T.✓�,i 1ft�*� �;:�ici }%tiY �j.
Ad
-Nor
r t 1 ` 'fF ►� he 'r� �f 'r. l.tX."r rl:tt �Tt�.:.lSC •"LLe b�.s°..j
' ,l1 > r ri r f:. , .1 '.+ 7s+' �+ ..,y z. 3 ... -}L rt;;• J� �zrR > tj j4 h1
't • ttr a iii r,
t. tt"` i.-A� i >`j £t_ �'•
i T" r .•i i Jz � i i F t r �. �
oil
t.G I � °•ti.� �-f'1"j� T t f^ T7`"_�+:-
tlf
..• � NOVA � � 3L � ,e
ZOO
91
i j T r i will
Lyn
NO —Liz
too AWK An
Ila
r
L a }
,. • •.. � -' Lam^►-rz"+�. a Yy ` ` _ �_
Y
L V
fstoop 1001�--
F
4 y
T„( k
-41
m y r
s a
- - �
. _ .�,� • r .
:�'Q,. - ¢,+::�� a .<r-� . S �`
9
tp
_
• `� � r� � - � �
f •'.;i .r _ - r "lea - .,.
_ c
-::
f�
r
-_
'
+ 1
tA
r' , 4'L 1, l' Y,''°f 79t` 11 f; •..
t s t:
�1 1 y �,t. � 1 J�. �! 4`�.. r 1 W J ', JI , pf ++I r�J Ju.r, n{1. t ''a 'S`.•� t j +
a � �, �'(,tf ` jf r ..� ` >�fl'•la�' "D�1 ! , I e >;.,'" '.• i f yX ..,
`111 ti n s r�,r �t3ir SF
Ail,lix �" ,+ \ :a } , Ir s i •.
41
/ J,4Y1./r) II. `.� w�,ljf ,;r'd rt /�1. T 1 T sYt �.S,J �, 3rKJwrAki�, Y rf{� h y ,, ' tl } � ' 1 1:•
i'`.t "ara ..1 � � i. •�� 'dl;i r'...` \ f'i 1 f j- � ' I �: i ,fir nl '
a. +t.9 K,`1, ri •")(•ter �l g•J 'l, � � 1 t1+�r 1� 1� ,. .S yl tit.' � n! ✓rwl,
• Oi�t�� � I � / � f y t 1 , ` , 4 o i ti � 5 `a: I a- � , r , �,!l
�� ,. '' I Ytr. •t + S. J\ : 3 - a ' d 1 1 ab.�, 7� .x ,Y� til t � t ✓ p. } _
G -•�* � ! \ 3 r LJ+ 5 � R 'A7 L j3 y^ +. • f 1� r 1
i''. 1 � 1'f ���� e � f � \. .... - • �� rpt � `w.y, - 1.. , , r, ,• t .,may
tJ �1 .} J 1 1� � I � ti � •
a � u 11 ♦r1',+ k �•`M SK ..ti �1 `i y a 5�u�� 4y '1� ;' S - ,. rt ..'�1.
I .ate" 1 �4M j^ �y 1.. ,• S,'• i r a l � �� y} (• r x � f I
t � f a y Iir' �• , r 4 J �� � r 5; = 1 L + �.` �" V �� al 1 ..
,.. ,� +, y ,5 J4 .� .F'`,d; 1 y . : p•,s � :.. .r 1 1 .r '} r J.
c * r;. ii � it y 5� � l ,r \ , � ,q • y ! r,. ; 1 Y�s13 �FS`r r " v y�L: k ." �:. Jr a I.yfit ,
L iJ y/ ( L •iY t\ � • '{`Y"'+ J A�� i .5 SI '"'•S'�3 •1 ^I {, � JJ5
r ...+1 `t l � tiL l { lr` 4 �'xr � t .:..�y� A `• '�, 1 \ i_' ty '` � T' i F •�
. A �-I + ,1 u' 11.. f'�. s. 1..1 4y1-�, -I. ( ,�,a-.. ru , •,:a t r.. ' � 7. +:,�,t
.' 7 R Z -. t ! r .•+ ! at c s t i a � r,�` Y ti f.y t y �. a .a'
_ a' \.. \ \ 4.; `" �: � � i•f L: + tt _.,w ♦ � � e ti .3 t ;� � l ��.. F i 4'` '4, '..
` ' ! _7 4r �.Ir a k • a � � 3 �� �. i � F ar ....c � �* '/' � _ r -.F `} v ! � _ r .� ; ! —sr. a i � Y� __ � _, ! .
•• - • � .. i` yv '' t � pS�+r' ah x. 1 o I , t � � �; f C". f f t ,' t t "� r t r \ 'r
1 r
=]0. L � ,. l .t i ''r s f .� '1C t z'' r w ,�, p � �. { w c ..s..Ft -! ,# � .,•- � �
I S J ':i � ... l4 �_ l,+7. • Y .y "SYy14t.I l JJ i T j � I1"i Y.. I �l��rt P �i $ YY 2 U .
! 'Tr Yti •- V Y^ t �'x ! a 11- � s• f I ^rC -.+ s {s �:
fit.,. •>..� -`r '+r�--r t 7 ;r a �
-F ! f F c i ` •': `_ � °<4 f ♦ "� } , � �y y �-'•' rte-:;
� ' � +fit � •Oil•x1 r �{� ;\ 'J - f
e - � f t 5 _ 'x✓• 1 - v ^- 1 . r •' T '{s• f J ! L � �F � 1 o d 1. 1 j`= '� -' f �C.� =•r 'ii: ``
• `• v -Y .1. 1 tZ` i7.�n r` 5 � a r�
. � " ` c� �� ` �' - ~ Zi ` l :9 � �l y2: } cT•` a ..�3.. fJ�t`ir>7 1.� 1• • Ste' .'� a---� V -i-+.,
� }J' dh t• I F � t -. (� i 'aE we �.j�l� �� c � t f` e �l-. ^... ��: �a'tT'.
14
WIZA
- r1, _ a t fz ?r' �,A it Y�--+'°'" +l -4�:R♦ i=�„dN Y X � � ..t �� frie '�.
4,J 'Js'u'•: K �:a r rem .. 'Fx•
.. t' '.Ti J - .fir ��t r a�.�s•• C ]�.
. ! .. .. �.•� ► � } :sf F - i ar ' °4r �; �-�`wr-'°"9 't t -\l
+ _ ►- ~ ~ 4 c3 7 r t i t tom. G to .w° ,ef "* \ v r �` - , ♦" Y Yp� ~ 1 B
` t a � �,.- r '`y F' ps7�_ t7 ;� 't � s d rf a ;6 �FW"=f �' � ► �gf'a ! � YP' +`•-
Wj
_� S'yQ,+�irl �4 '� .•+ y Sc Ca-^ � �,, •. � •,�, ! r '.
�N � # �' eiA!'r,An••� ! .' 'amu � ,.�h ^` ti
�
c - ta' t r:• ., e f � - ^a ,,,, < + { z r � Y 4 � t rT "• ?? M ;. f � 'y-G e r ° 7 S � �
S s i t 4 �: s �. ♦ xr' a <.as K S; �� t � s^ t :� f"' C r
i*-, r..� rf -F.: �. t '. "' � e !< � '„e �•.c ,.Ery ti
t c � }5 !, y f ,a � '^r ,(' i J "'_ i +- ' p t 3`f. Y r > f 1 - s �"..�w-•
:.! : � / ,; � i� ` ��ti �..- :r fn �xx .,s ,. ,,,� ...SY" 2 _: `g• r t �.• � tF« _- ; # a t ,x.: t 1 F '
r ,F
'>c
F x
N
♦r� R
If r V.
z:�., P <H.-_= i rya �,��.1 1 r:;, i . �` •� 3 �., -.'r' �M,.,
-' w. ,!, l e � E E� � � E L ,< `�Y„��. `•. 'S �� ,.,r � 7 .'.ps ! 3 i
.r j � r�� � � � s �~ � q' t <�s;j-`�t 1 f ;.e ,rf ' y r �'7` r 4 ` T� r f E. r t •<
-
+ j : �. •_ N '.F 4 `'C' k ',T i., . yli.3w .`!'.' # .S} i y"S < f 1 " - �' Y C p Y 't .» s f
,� ,� ` .i f.. f •-•-_'�y ` '- _� '��7 ,. ¢ SC-.. ,�5. i ar �` 2 � -�, g �� i.'« rf .•'�S s * µ
s r
11 _c fr. _°at/ i m� 3-. rF?� sr:+r• � s rr";a ,:fa / � � � :: � f= o , r ,�. � �,_4 � • r � r ,� { Mit
- ,• � peva < r � S f �
Y 341
3. p
�7..J'�? Tk s f h b
Wl
. `�'KS tom`^_- y" >�� ,l � +r { �r•§'+`i. �FT..i^,>'t � !+'-'#'�`Y s.� a f*r+ �5� i ,F. ..� 1 c '> '._4 ti Svr i� � ` '� s?.�...i.Cv .,�.
• 5�..ne"S"�:..
� , cr='�'' � .J '�A � � i r•v.� � '^ Y.tai �J%# t .�"* ..n;c .anti `�z't`:�S �k` Fly `, t �� ,� .aq. �.'- %sv !r�" y �� y s � 1 � ,�' � ��... sT :.R'
,_ �`_ (i ! �-..• . s 1 #Sr^ sti r ri. __ a r,^.` ',,T" "yv f i t xis.?'''4: r _.±r�� r +,G ; a „�+,, r�... N
r<' r� ,1 /".�'S... i i { , y_ • r t, ♦,r,,-s' »t n �+c' a r ? < r r 1 y..
a _
ya �.s. - J "�""'^ � •.ti '$xs s 1 Via' f.., � . +� T'�''xra" �+tr ;sxr � „� � s y�d� 'u ids �c+ii �(�t,,,r ' r� »,� --�_
y : C t T �'' r � > ss `.✓ Y r y� LF�a.. _ �+ i .,;r< �T �, s �,7' R3 „t � "t sr�� f :ire ,,, } ?,:� �.�_•
T y T �'°"Sns. �: w Sr G' - 4sn i'.. ¢•'� � ,3.)r ,r t �, sw ii .Mr''�� P q ca,• fill f +t r i
� S .. -c .x -•� � �{ A s <"o..'F+j Y�?'"'ti 4'S �'..i �'��,... i r, 24^ 1 �� �. � r. sJ�r.. r a_�` r.
N � � �� .. t.
' j' "� t t-: '• � .s''"r"y J'!— j,� : - #3^_ � -\rx� xTr.�`'� to ' t, "`r.' � � x - f LS'`r � ' i;
Y .,r '� i -1 x •� � 4 Y� •��, 7 X � 'i, a �,� * s - s
�.a..., t, c a � � .�. r .� rr ? � a. x - i� `�� • s --� a, �'-i-: + x! n_&. { S - "4.,� t,-s !' ! £ E "s �.-' ; �
?{1" s ,y +„ r � j .f r � F S..rk! :" S ✓. 22s..y lt�.€, _'3 E '4`: � ��l * � :' � ,� e F. !
. r x 1 � i � �� .,�s, } in :? ,r'`'"• ; _y ��k; ��,3` f �}x y t ,_� � ��� � � 1 Fes•;"�i��•'rf -^ �y� � s•�# q i � � ��� �-Sr � }
rs !• ¢ Q. '~ na i va. 3 4 K '�i`Z 51 'Y.''9.. . ,S�
{ c'} .r � � � - '� xy ,'d,{' T :`y""r� r �-'rea' a � ur :. � j � u, -t '-!,• ''•n- : t � .
t ; 3 P + :< '{ w.r
r.'x a,a5 xrY; } yr,z E♦ % s. f iy;,,-yJ y, as E n Sx c
t .'ra. '� .,�f T _ fX\�. `tet � �t'S.. �•{�`rra.��y �.�: _ r ; '" � �+l t:� 1 � } sf � rl�
- `s:;,,r,�a 1 «J,i�4.yf2+ „�'�'%y���i+.;V:�'�f � ~i 'Y "%;:S?" ��3's �"y"h'r�',+.yr:` �..i '.?'qs"'��! k$,�•i.�i.�'�. �."� 't �;� ,�' •4 ,
". � _r �:. �x/ •: �'; a.� ,� � s �v"rt+5�.,$. :' Tci ��.�F xR•-•2,y -:v ^4 -•sc � '�'.�i�` #+<' ."� n�b�v-+�: h"v„,ry3T.5 .,., 'a*-' A.r't � x wa�� ��� T� �:: � r'a
�,. .:. �s..... '�:�c`fi '�x i ::.-.� .!. �Eiat+ry,� 'ss-x:�aC. ,i"- r'i=F.'�,c> ';t"-.i ¢,'��.'= '$ Y't �"�7c��""^��h«-,,,,•� _.;rr •.� � -r
f o .� � � r �s`• f:* �. _ y;�°� „s&' 7� r �+,' r'tit: _�4Y{' �{, .lr:,,. .s r � �'Y� e a�.✓y,�`" �"" E _ ,uzT' {-.:._- 3 �- 3 •,r a � ., "cam ,'c j ' :�, t.
+,- g r �, �>^T'S _���• ��sr r=.../ R L s}i s`-� r rt-+.,� t �,-.,� '6' 1i -s �� T-'M e..•s t.x'x ,a'�i'-`.�V �,,1� � - ,i
• - �"* �� "Y f i� ay a � � .a< ai rB� fir.. s^ �#�� �,..+� Li ; t.,.4 i r�r ,!'� �h � . �` y°`' �: S:. S e �y .. f,�a :. �, t _ m �' 'sx 4 'iF� ;.
tl
bloom�Also
7.f 1 - t 3:•il > �'- 8 ; ;ZG s .,a'V.
,rr s♦ A+ t �/ :.�j I ! t to rw < '7:. '''h'' 5` .tiV ..t' -i �, ;w �r�� 1� d t
'E;o < .ry a} _-.1 +'�'. p7Te Y i aY �1 v i 4 P t
' i iF" F• ! "•'� Ta f� _ -'a.'� v t i.» .f�- tS ,7 i •I - f I,..r I s' r i,
*x -!
t�� A
IT0 G f S S' Y was 0 t xi { , .
itrt`` ":• t,! ;-r * t r.. �-• r 4 + _y J/ , s ,�:� t t .,�., 6 r
q'Itp�r{ e.'�1
♦ VY ' �I' ,•
f�X P--�Q"' -•s 'c,, � �` x ? r a f � # � S •3 s ` 4 •, 4�
-lop
Ono
4 wow
. !4 J r � � � a d ! kl^� � � � 4 q„ A �• � y •�
J R d
; � L
� a7 F - 'tCr
Me
low
A,
YX
} Y ice= :� r ,
f
ta
•a is �rh ° a rtX� v- Cr'xa I �'.v. y `sz T
� -• 7 � '� ,� a c� X � ak;� � � i 4 ?I.�l�} � t . '•sy, t� `'` a .� • z �+ y x `'' ry r ty
we
MEN
won
F at C „fie,GANT
VA Mon Rx
A. e• .cu' f� 1- "{ y f
ir 4-4
Mn
A 5
SAW yf_
'x L Cx v ,s' -��-• # .p s ! :s �,. `a r 3 xf :. r ys. ; sOR uq�
•} - �, i
S C
IQ
'tJy ' y ), a f j,/ .? r �, S 1 j f _ti r � �,- � .F r� •.
" y _ � .l L s'�,y T I •! i kty �_ � 4 �;'\ } �� fix' 1. ~ 5.{ -
SITE 6325
1
� awnuae n.0
I.®w.LL
♦ r4TAe D.iun -
❑ SpTvrn (PrJ�q�Ci eO+l
___ wavv ewro.n
Figure G20. Plan View of Site 6325
F Fey M
E
is Fez E 2
Fey 1
Mvaa�
Fea. 8
Fey A
}��MIa10.:1
3�n
'=Fey D
v
r
Fr C
_ = p
Fs Q-1
Fez Q-2 ,
Fez Q –
SITE 6312
Fa A
1 I
I �
1
0
i
C-33
— EASTFACE
0 e bo +
1
l
n
20-
30-
40. 3 4 11111.11 1�
SOJ
0 10 20 10 10 so 60 10 BO 90 100
CENTIMET2"
La� 0.28 ,lbs, r.Vnj hem 12-29 m dlidc wry dwk gayah brown (IOYR 32 moist): cob* silt kam dark
brawn (I OYR 32 dry): weak. very fin~ trarlublr so mm sdc very hvble: non-sodry, non'Piesoe mrestarKM
coffw a% fine roots: noncultural srer.
Figure C-21. Site 6325, Feature K TU -1320-33, East Face Profile
qw
C-34
Site 6337, Feature B
C& ROCKS
FACED
Figure Cr22. Site 6337. Feature 8
I
i
1
1
1
1
f
i
1
1
1
1
1
1
1
1
1
1
0 0
Site 6337, Feature C
Figure C-23. Site 6337, Feature C
-C) ROCKS
FACED
C-35
0 a
G36
Site 6337, Feature D
Oft 5 10
o2
ROCKS e. 1 PLANTING AREA
Lr
t SLOPE DIRECTION C�7n ROUGHLY FACED
9rrr BEDROCK �,'� CRACKED BEDROCK
Figure GI4. Site 6337, Feature D
0 0
Site 15108
FLAT SOIL AREA
Figure C-25. Site 15108
G37
I
DEAD TREE
Oh S 10
Om I 2 3
BEDROCK PLANTING AREA
tyv
SLOPE DIRECTION fS' 1 SINGLE FACED AREA
W PILED COBBLES
r ]D
Figure G26. Site 16119, Feature A
NLP �v',•'I�,��I]
���
t�����fffYS}x_��iii�___»''�`__��x�,
lY :r
�If'I►��f.
al��S�ff_.}
s�.
CLEAR RAT �W
GRASSYAREA
+:fir►���
f
TRUNK
�f
CLEAR FLAT•�►��+GRASSYAREA
'
,�..
,�•'�•�
J'glih
�r ON
.
ail.
•�1�
ak
4z/
GRASS AND LANTANA
'�1i�r���►r::'iJ`�i�
�.
e
FEATURE DATUM
PILED .::
__..-40-
ALIGNED:. .
PAVING
Figure G26. Site 16119, Feature A
' APPENDIX B
' Lehua Lani, A Planned Unit Development
Kailua-Kona, Hawaii
! Traffic Impact Analysis
!
Witcher Engineering LLP
' August 2003
!
i
1
1
1 -
!
LEHUA LANI, A PLANNED UNIT DEVELOPMENT
KAILUA-KONA, HAWAII
TRAFFIC IMPACT ANALYSIS
AUGUST, 2003
PREPARED FOR:
LEHUA LANI LLC
PREPARED BY:
WITCHER ENGINEERING LLP
75-5751 KUAKINI HIGHWAY, SUITE 106
KAILUA-KONA, 111 96740
(808)334-0322 (808)334-0831 Fax
W •
TABLE OF CONTENTS
I.
INTRODUCTION AND SUMMARY..........................................I
A. Purpose and Study Objectives ....................................... 1
B. Executive Summary ..............................................1
H.
PROPOSED DEVELOPMENT..............................................1
A. Site Location...................................................1
III.
STUDY AREA CONDITIONS..............................................2
A. Study Area.....................................................2
B. Site Accessibility ................................................ 2
C. Land Use......................................................2
IV.
ANALYSIS OF EXISTING CONDITIONS ...................................... 2
A. Physical Characteristics ........................................... 2
B. Traffic Volumes.................................................2
Table 1 Peak Hours of Traffic Flow .................................. 3
Table 2 Traffic Counts for Peak Hours ................................ 3
C. Level of Service.................................................4
Table 3 Levels of Services, Existing Conditions, Peak Hours ............... 4
V.
PROJECTED TRAFFIC..................................................4
A. Methodology...................................................4
B. Trip Generation.................................................5
Table 4 Trip Generation ........................................... 5
C. Traffic Distribution ......................... ..................... 5
Table 5 Traffic Distribution ........................................ 6
Table 6 Turning Movements for Lunapule Road ......................... 6
D. Trip Assignments................................................6
Table 7 Trip Distribution and Assignment .............................. 7
VI.
TRAFFIC AND IMPROVEMENT ANALYSIS ......... . ......................... 8
Table 8 Levels of Service Comparison ................................ 8
VII.
CONCLUSION AND RECOMMENDATIONS .................................... 9
' i •
'
TABLE OF CONTENTS (Continued)
'
APPENDIX A
Location Map and Tax Map Key Map
APPENDIX B
Level of Service Criteria
'
APPENDIX C
Level of Service— Alii Drive and Royal Poinciana Street (Computer Printout)
• Existing Conditions AM and PM Peak Traffic
'
Future Conditions AM and PM Peak Traffic
APPENDIX D
Level of Service— Alii Drive and Lunapule Road (Computer Printout)
'
Existing Conditions AM and PM Peak Traffic
• Future Conditions AM and PM Peak Traffic
tAPPENDIX
E
Level of Service— Development Entrance (Computer Printout)
• Existing Conditions AM and PM Peak Traffic
'
Future Conditions AM and PM Peak Traffic
APPENDIX F
Traffic Movement Diagrams— Alii Drive and Royal Poinciana Street
'
Existing Conditions AM Peak Traffic
Existing Conditions PM Peak Traffic
'
Future Conditions AM Peak Traffic
'
Future Conditions PM Peak Traffic
Lunapule Road
APPENDDt G
Traffic Movement Diagrams— Alii Drive and
'
Existing Conditions AM Peak Traffic
Existing Conditions PM Peak Traffic
'
Future Conditions AM Peak Traffic
• Future Conditions PM Peak Traffic
'
APPENDIX H
Traffic Movement Diagrams— At the Development Entrance
• Future Conditions AM Peak Traffic
'
Future Conditions PM Peak Traffic
U
I
- --
I
r • I
TRAFFIC IMPACT ANALYSIS r
LEHUA LANI9 A PLANNED UNIT DEVELOPMENT
KAILUA-KONA, HAWAII ,
I. INTRODUCTION AND SUMMARY
A. Purpose and Study Objectives
The purpose of this report is to provide data showing how the Lehua Lani ■
development of a 10+ acre, 59 -unit, single-family project on the mauka side of Alii
Drive south of Lunapule Street will affect traffic along Alii Drive at the development. '
In addition, the impact upon the intersection of Lunapule Street and Alii Drive and
at the intersection of Royal Poinciana Street and Alii Drive will be analyzed. Also,
since Lunapuli Street and Alii Drive have been seriously impacted in the last several
years by developments such as Alii Lani, Kona Hawaiian Village and Sea Ridge, a
comparison will be made with traffic of three years ago at these two intersections. ■
B. Executive. Summary
The construction of this development will have little affect on the traffic on Alii Drive
at the development. Providing a left turn lane into the development will not
appreciably improve the flow of traffic on Alii Drive. Therefore, no recommendation
concerning a left turn lane is made.
The level of service at Royal Poinciana Street is not changed by this development.
The level of service at Lunapule Road is not changed by this development.
H. PROPOSED DEVELOPMENT
A. Site Location
The proposed development is located in Kailua-Kona, Hawaii on the mauka side of
Alii Drive approximately one and one-half miles south of Lunapule Road and
approximately one-half mile north of Royal Poinciana Street. The tax map key is
TMK (3)7-5-020:71 & 72.
Current planning is for a 59 -unit single-family development containing some open
space with recreational amenities.
Page 1 of 9
' III. STUDY AREA CONDITIONS
A. Study Area
' The area of the proposed development is surrounded by areas of condominiums,
hotels, vacation rental developments with some single-family and multi -family
' housing. There are currently other developments being proposed or under
construction in this area.
' Since traffic from this development could have some impact on the adjacent streets,
Lunapule Road and Royal Poinciana Street are considered in this report. It is
' expected that there will be additional mauka-makai connecting streets constructed in
the foreseeable future. These will, in all likelihood, alleviate any impact that may
occur at the above mentioned intersections.
' B. Site Accessibility
I This site is accessed from Alii Drive. Traffic to and from the development will use
Alii Drive and Lunapule Road and Royal Poinciana Street to Alii Drive.
' C. Land Use
The site is currently vacant land zoned Resort. In the past it has been used for cattle
' pens and cattle watering.
IV. ANALYSIS OF EXISTING CONDITIONS
A. Physical Characteristics
' Alii Drive is a two-lane road running north and south along the ocean side of Kailua-
Kona, Hawaii. This road has paved shoulders which are used by pedestrians and
' bicyclists. There are no sidewalks. The speed limit is 30 mph. There is transit service
serving this area. However, pedestrian traffic and transit service were not considered
in this study. It should be noted that if transit service is taken into consideration, then
' the trip generations would be reduced.
B. Traffic Volumes
' Traffic counts were taken at the intersection of Lunapule Road and Alii Drive and at
the intersection of Royal Poinciana Street and Alii Drive on Tuesday, August 19,
1 2003. The period of the counts was from 6:30 AM to 9:00 AM and from 3:00 PM
to 6:00 PM. The peak hours were determined and are tabulated below and are also
compared to counts taken on Thursday, September 21, 2000.
Page 2 of 9
0 • '
TABLE 1
PEAK HOURS OF TRAFFIC FLOW
Location
Time
Vehicles
Per Hour
(vph)
Vehicles
Per Hour
(vph) 2003
Alii Dr & Royal Poinciana
7:15 AM to 8:15 AM
945
1002
Alii Dr & Royal Poinciana
4:15 PM to 5:15 PM
1133
1116
Alii Dr & Lunapule Road
7:15 AM to 8:15 AM
1 785
1 1038
Alii Dr & Lunapule Road
4:15 PM to 5:15 PM
1 978
1 1237
The following table gives a breakdown of each peak traffic period at the two locations
by traffic movement.
TABLE 2
TRAFFIC COUNTS AND TURNING MOVEMENTS FOR PEAK HOURS
Alii Drive and Royal Poinciana Street
Direction
AM
PM
Northbound Through
270
372
Northbound Right
77
81
Southbound Left
111
104
Southbound Through
220
360
Westbound Left
104
117
Westbound Right
220
82
Alii Drive and Lunapule road
Northbound Through
484
503
Northbound Right
144
80
Southbound Left
3
19
Southbound Through
292
479
Westbound Left
97
132
Westbound Right
18
24
Page 3 of 9
I � A
1
1 C. Level of Service
Levels of service were calculated for these intersections using the data gathered on
1 August 19, 2003. The following table shows the existing conditions.
TABLE 3
1 LEVELS OF SERVICES, EXISTING CONDITIONS, PEAK HOURS
2000 Vs 2003
1
1
L
1
1 V.
1
1
1
1
1
1
1
1
1
Direction
Level of Service
Level of Service
Royal Poinciana Street
Lunapule Road
AM
PM
AM
PM
2000
2003
2000
2003
2000
2003
2000
2003
Westbound
C
C
E
D
C
C
C
E
Southbound
A
A
A
A
A
A
A
A
PROJECTED TRAFFIC
A. Methodology
Highway capacity analysis was performed in accordance with the "Highway Capacity
Manual, Special Report 209, 2"" Edition" ofthe Transportation Research Board, 1992
and the Highway Capacity Software from the Federal Highway Administration and
McTrans, University of Florida, Gainesville, Florida. Levels of service for the various
intersections were computed for the existing condition in accordance with the
Highway Capacity Manual.
Level of service is defined as "a qualitative measure describing operational conditions
within a traffic stream; generally described in terms of such factors as speed and travel
time, freedom to maneuver, traffic interruptions, comfort and convenience, and
safety." There are six levels of operational conditions defined as follows:
Level of Service A
Level of Service B
Level of Service C
Level of Service D
Level of Service E
Level of Service F
Little or no traffic delays
Short traffic delays
Average traffic delays
Long traffic delays
Very long traffic delays
Extreme traffic delays
Page 4 of 9
W •
Level of service calculations and volume -capacity -ratios are tabulated herein for both
AM and PM peaks for existing and the post development condition. Each intersection
is diagramed in the appendix showing existing and post development conditions.
The trip generation methodology used in this report is based upon applications
developed by the Institute of Transportation Engineers (ITE) and published in "Trip
Generation", 5' Edition, 1991. Trip generations have been developed for a variety
of land uses (or facility types) which correlate trips with dwelling units, area,
population, vehicle ownership and intensity of use. Each facility type has a catalog
number for identification purposes. In this case, 210, single-family dwelling was used.
It should be noted that no adjustments are made to reflect the impact of less than full-
time residents which would be normal for a condominium in the study area.
B. Trip Generation
As stated above, this is a condominium development, therefore, Classification 210,
or Single -Family Dwelling was used for trip generation. Since the peak hour trips for
this development generate less than 100 peak hour trips, the horizon is the opening
year. The following are the trips generated.
TABLE 4
TRIP GENERATION
Time
I Quantity
Generation
Entering
Exiting
AM
59
0.74
11
26%
32
59
1.01
39
65%
21
],7140/loPM
%
Daily
59
9.48
_ 559
C. Traffic Distribution
Traffic counts were also taken on Alii Drive at the site of the proposed development.
The following is a breakdown of those counts.
Page 5 of 9
1i
D.
00 A
Table 5
Traffic Distribution
Direction
AM (%)
PM (0/0)
PM
Count
%
Northbound Right
7
Northbound
613
62
V
50.2
Southbound
374
38
49.8
Total
987
20
The turning movements from the project are based upon these percentages and are
as follows:
TABLE 6
TURNING MOVEMENTS FOR LEHUA LANI PLANNED DEVELOPMENT
The existing turning movements at Royal Poinciana Street and Lunapule Road were
used to proportion the traffic within these intersections, thereby distributing traffic
generated by the development.
Trip Assignments
Trips were assigned in accordance with the above traffic distribution discussion. For
comparison purposes, the distribution and assignment is shown for the existing
condition and future condition in the following table.
Page 6 of 9
Direction
AM
PM
ENTERING
Northbound Right
7
20
Southbound Left
4
19
EXITING
Westbound Left
12
10
Westbound Right
20
11
The existing turning movements at Royal Poinciana Street and Lunapule Road were
used to proportion the traffic within these intersections, thereby distributing traffic
generated by the development.
Trip Assignments
Trips were assigned in accordance with the above traffic distribution discussion. For
comparison purposes, the distribution and assignment is shown for the existing
condition and future condition in the following table.
Page 6 of 9
0 1 w
TABLE 7
TRIP DISTRIBUTION AND ASSIGNMENT
Direction
LLQ
PM
2000
2003
Future
2000
2003
Future
ROYAL POINCIANA STREET AND ALIT DRIVE
Northbound Through
274
270
274
334
372
i
388
Northbound Right
95
77
77
118
81
81
Southbound Left
72
ill
115
102
360
106
Southbound Through
179
220
228
337
104
360
Westbound Left
116
104
104
145
117
117
Westbound Right
209
220
233
97
82
86
Total VPH
945
1002
1021
1133
1116
1138
LUNAPULE ROAD AND ALIT DRrVE
Northbound Through
417
484
499
388
503
512
Northbound Right
63
144
149
50
80
82
Southbound Left
19
3
3
21
19
19
Southbound Through
214
292
298
386
479
494
Westbound Left
59
97
98
115
132
136
Westbound Right
13
18
18
18
24
24
Total VPH
785
1038
1065
978
1237
1267
AT THE DEVELOPMENT
Northbound Through
613
613
514
514
Northbound Right
----
7
----
20
Southbound Left
----
4
----
19
Southbound Through
374
374
510
510
Westbound Left
12
---
10
Westbound Right
18
11
Page 7 of 9
1 0 0
1
' It should be noted that the total traffic count at the intersection of Royal Poinciana Street and
AN Drive has changed little since 2000, however, the turning movement distribution has
changed. This could be due in part to the speed bumps which have been placed on Royal
' Poinciana for the slowing of traffic. People may be taking another route.
It should also be noted that there has been a considerable increase in traffic at the intersection
' of Lunapule Road and Alii Drive between 2000 and 2003. This is probably due to the build-
out of the Alii Lani development, Sea Ridge development, and Kona Hawaiian Village. To
' a much lesser degree, some rerouting of traffic is due to other influences.
VL TRAFFIC AND IMPROVEMENT ANALYSIS
I
1
d
1
I
Level of service was performed for the existing and future conditions for the intersections at
Royal Poinciana Street and at Lunapule Road. This analysis was also performed for the
proposed entry of this development with and without a left turn lane southbound.
The following table shows the levels of service comparison of providing a left turn lane and
not providing a left turn lane at the development.
TABLE 8
LEVELS OF SERVICE COMPARISON
Direction
AM
PM
2000
2003
1 Future
2000
2003
Future
ROYAL PONCIANA STREET AND ALIT DRIVE
Westbound
C
C
C
E
D
D
Southbound
A
A
A
A
A
A
Intersection LOS
C
C
D
D
Approach Delay
21.4
22.2
30.8
33.1
LUNAPULE ROAD AND ALII DRIVE
Westbound
Southbound
Intersection Delay
Approach Delay
Page 8 of 9
W
PROJECT INTERSECTION
W
Direction
AM
PM
w/o Left Lane
w/Left Lane
w/o Left Lane
w/ Left Lane
Westbound
C
C
C
C
Southbound
A
A
A
A
Intersection LOS
C
C
C
C
Approach Delay
15.4
15.4
16.1
16.1
VII. CONCLUSION AND RECOMMENDATIONS
The levels of service at the intersections of Alii Drive and Royal Poinciana Street and Alii
Drive and Lunapule Road are not significantly impacted by this development. In the case of
Lunapule Road, the intersection has been impacted seriously by several developments,
whereas, these developments seem to have little impact on the intersection of Royal Ponciana
and Alii Drive.
In the case of requiring a left turn lane for the development, it cannot be shown why this
would be necessary since the level of service and approach delay remain the same. Therefore,
it is recommended that no left turn improvements be required. The same holds true at Alii
Drive and Royal Poinciana Street. Adding a left turn lane at Lunapule Road still leaves the
intersection westbound with a level of service of "E".
Page 9 of 9
I
1
1
1
1
1
1
0 0
APPENDIX A
LOCATION MAP & TAX MAP KEY MAP
)CATION
40
w
OWN
WITCHER ENGINEERING LLP
751 kuokWHay Ste. 106 Comullinq C'vi Cnglnur�
rkono Waoii�6740 Com Vuc lion Mmogen
1 334 b322
LOCATION MAP
J
Il
L
1
AA PP� .1 ,
2�
7-
z
IWh
raw
Ft
<
`4A -r j4
42
rA
P"j --- Z-&7. 1-11.,.
fA
L7 A.
J631 - -- - -1 '1&.1%-' 5 4, Jr
_6W
njveo
704: �26e-
t� 76 "17,
2
34
42 J.Paty Z. AlMo
L4
a -d'67 A—
- -----------
o,
-.rzz
-4/-
L
7
22
4
24
'7".f fa
JJ.A.f
LaJA
a
"All KA
ti D
211oreA
GAD
',t-,qA
,L AT C !1
3 A'.
P1 A;r 17 D
W01
4 0?-. -
A
62.V. 4
CX
cv. r
60
A
i of Its
72
'4j"
T
r
CL
Q)
All. 18'e
AN
70 2-A 7
ea
ff&—e
P. 6-11fy 02 66 A SA
7 -"Se 01 12, gx_ e.,-". 9r8A
r-." >01,
30
'117VE
t;/. 19
7 77 pLAT
74
C.A
wo.m /1,7'
2
4--ttcA dr
L.C.Aw. oj/rlr!� f% PUAPUAA I ST 2 ND�� TAXA.T10N,?AAPS BUREAU
UNLOCAT : TERRITORY OF HAWAII
AP, OWNER I AREA I TITLE Y
TAX MAP
0 oq,4
A :f� - �- L. " - 1�•\
7rl le 84 -
-i-114IRD DIVISION
ONE
17 SEC. PC
I fL.,4 r
A 7- 0 -A-1
r
®TACH CONTAINING PARCELS
SURIEU TO CHAAGE I IN.= 200 FT
I -or. PuArlsr•A'- cp�= N. KONA, HAWAII.
C]
10
APPENDIX B
LEVEL OF SERVICE CRITERIA
LEVEL OF SERVICE CRITERIA
AVERAGE TOTAL LEVEL OF EXPECTED DELAY TO
DELAY (SecondsNehicle) SERVICE MINOR STREET TRAFFIC
z5
A
Little or no delay
5.1 to 10.0
B
Short traffic delays
10.1 to 20.0
C
Average traffic delays
20.1 to 30.0
D
Long traffic delays
30.1 to 45.0
E
Very long traffic delays
>45
F
Extreme traffic delays
Appendix B
op w
APPENDIX C
LEVEL OF SERVICE
ALII DRIVE & ROYAL POINCIANA STREET
' HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
'Analyst: BEW
Agency/Co.: Farleigh
Date Performed: 08/22/2003
nalysis Time Period: AM peak existing
Intersection: tee
urisdiction: Hawaii Cc
Analysis Year: 2003
Project ID: 435-OIT-03
East/West Street: Royal Poinciana
orth/South Street: Alii Dr
Intersection Orientation: NS Study period (hrs): 1.00
'
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 4 5 6
E L T R L T R
Peak -Hour Factor, PHF
'Hourly Flow Rate, HFR
Percent Heavy Vehicles
Median Type Undivided
RT Channelized?
,Lanes
Configuration
Upstream Signal?
Movement 7
L
Peak Hour Factor, PHF
Hourly Flow Rate, HFR
Percent Heavy Vehicles
,Percent Grade (4)
Median Storage
Flared Approach: Exists?
Storage
ERT Channelized?
Lanes
Configuration
Delay,
Approach NB
Movement 1
Lane Config
1.00
1.00
1.00 1.00
270
77
111 220
--
--
0 --
1 0
0 1
TR
A
LT
No
No
bound
Eastboun
8
9
I 10 11
T
R
L T
1.00 1.00 1.00
104 0 220
0 0 0
0
No
0 1 0
LTR
Queue Length, and Level
SB Westbound
4 I 7 8
LT LTR.
:=v �vyuj
i C(m) (vph)
--
1223
542
` v/c
0.09
0.60
' 954 queue length
0.30
8.2
4.29
21.4
' control Delay
LOS
A
C
Approach Delay
21.4
Approach LOS
C
�., HCS2000:
Bruce E. Witcher, P.E.
,tWitcher Engineering LLP
74-5588 C Pawai Place
Kailua-Kona, HI 96740
r
12
R
of Service
Eastbound
9 10 11 12
Unsignalized Intersections Release 4.1
M W
E -Mail: bewitch@ilhawaii.net
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: BEW
Agency/Co.: Farleigh
Date Performed: 08/22/2003
Analysis Time Period: AM peak existing
Intersection: tee
Jurisdiction: Hawaii Co
Analysis Year: 2003
Project ID: 435-OIT-03
East/West Street: Royal Poinciana
North/South Street: Alii Dr
Intersection Orientation: NS Study period (hrs): 1.00
Vehicle Volumes and Adjustments
Major Street Movements 1 2 3 4 5 6
L T R L T R
Volume
270
77
111
220
Peak -Hour Factor, PHF
1.00
1.00
1.00
1.00
Peak -15 Minute Volume
68
19
28
55
Hourly Flow Rate, HFR
270
77
111
220
Percent Heavy vehicles
--
--
0
-- --
Median Type Undivided
RT Channelized?
Lanes
1 0
0
1
configuration
TR
LT
Upstream Signal?
No
No
Minor Street Movements 7
8
9
10
11 12
L
T
R
L
T R
Peak Hour Factor, PHF
Peak -15 Minute volume
Hourly Flow Rate, HFR
Percent Heavy Vehicles
Percent Grade (B)
Median Storage
Flared Approach: Exists?
Storage
RT Channelized?
Lanes
Configuration
1.00
1.00
1.00
26
0
55
104
0
220
0
0
0
4.0
0
4.0
No
1 0
LTR
Pedestrian Volumes and Adjustments
Movements 13 14 15 16
Flow (ped hr)
0
0
0
0
Lane Width (ft)
12.0
12.0
12.0
12.0
Balking Speed (ft/sec)
4.0
4.0
4.0
4.0
Percent Blockage
0
0
0
0
Upstream Signal Data
Prog. Sat Arrival Green Cycle Prog. Distance
Flow Flow Type Time Length Speed to Signal
vph vph sec sec mph feet
Through
55 Left -Turn
Through
worksheet 3 -Data -for Computing Effect of Delay to Major Street Vehicles
Movement 2 Movement 5
Shared In volume, major rt vehicles:
Sat flow rate, major th vehicles:
'Sat flow rate, major rt vehicles:
Number of major street through lanes:
4 -Critical Gap and Follow-up Time Calculation
0
0
1700
1700
1
Critics al
Gap Calculation
2.20
0.90 0.90
3.50
0.90
0.90
0.90 0.90 0.90 0.90
t(f,HV)
1
4
7
8
9
10
11
12
'Movement
2.2
L
L
L
T
R
L
T
R
t(c,base)
4.1
7.1
6.5
6.2
(c,hv)
tc
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
;'t(P(hv)
0
0
0.20
0
0.20
0
0.10
0.20
0.20
0.10
B)
Grade/100
0.00
0.00
0.00
0.00
0.00
0.00
t(3,1t)
0.00
0.70
0.00
0.00
n(c,T):
1 -stage
2
0.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
t(c)
-stage
1 -stage
4.1
6.4
6.5
6.2
2 -stage
0 ow -Up Time Calculations
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
4 00 3 30
Worksheet 5 -Effect of Upstream Signals
Oomputation 1 -Queue Clearance Time at Upstream signai
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
prog
otal Saturation Flow Rate, s (vph)
Arrival Type
ffective Green, g (sec)
ycle Length, C (sec)
p (from table 9-2)
Proportion vehicles arriving on green P
(ql)
�(q
(q))
omputation -Proportion of TWSC Intersection Time, blocked
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
alpha
eta
ravel time, t(a) (sec)
Smoothing Factor, F
Proportion of conflicting flow, f
ax platooned flow, V(c,max)
in platooned flow, V(c,min)
uration of blocked period, t(p)
Proportion time blocked, p 0.000 0.000
omputation -P atoon Event Periods Result
IF
p(2) 0.000
(5) 0.000
(dom)
(subo)
Constrained or unconstrained?
( ,base)
2.20
0.90 0.90
3.50
0.90
0.90
0.90 0.90 0.90 0.90
t(f,HV)
P(HV)
0
0
0
0
c
st(f)
2.2
3.5
4.0
3.3
Worksheet 5 -Effect of Upstream Signals
Oomputation 1 -Queue Clearance Time at Upstream signai
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
prog
otal Saturation Flow Rate, s (vph)
Arrival Type
ffective Green, g (sec)
ycle Length, C (sec)
p (from table 9-2)
Proportion vehicles arriving on green P
(ql)
�(q
(q))
omputation -Proportion of TWSC Intersection Time, blocked
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
alpha
eta
ravel time, t(a) (sec)
Smoothing Factor, F
Proportion of conflicting flow, f
ax platooned flow, V(c,max)
in platooned flow, V(c,min)
uration of blocked period, t(p)
Proportion time blocked, p 0.000 0.000
omputation -P atoon Event Periods Result
IF
p(2) 0.000
(5) 0.000
(dom)
(subo)
Constrained or unconstrained?
0 0
for minor Single -stage Two -Stage Process
movements, p(x) Process Stage I Stage II
Computation 4 and 5
Single -Stage Process
Movement 1 4 7 8 9 10 11 12
T. L L T R L T R
c r,x
C plat,x
Two -Stage Process
� g 10 11
Stagel Stage2
Stagel Stage2
V(c, x)
s 1700 1700
P(x)
V(c, u, x)
`mak+ -I
C(plat,x)
Worksheet 6 -Impedance and Capacity Equations
Stagel Stage2 Stagel Stage2
Step 1: RT from Minor St.
9
12
Conflicting Flows
308
Potential Capacity
737
Pedestrian Impedance Factor
1.00
1.00
Movement Capacity
737
Probability of Queue free St.
- 0.70
1.00
Step 2: LT from Major St.
4
1
Conflicting Flows
- 3471
Potential Capacity
1223
Pedestrian Impedance Factor
1.00
1.00
Movement Capacity
1223
Probability of Queue free St.
0.91
1.00
Maj L -Shared Prob Q free St.
0.90
Step 3: TH from Minor St.
8
11
Potential Capacity 342
Pedestrian Impedance Factor 1.00 1.00
Cap. Adj. factor due to Impeding mvmnt 0.90 0.90
Movement Capacity 306
Probability of Queue free St. 1.00 1.00
Step 4: LT from Minor St. 7 10
Conflicting Flows 750
Potential Capacity 382 -
Pedestrian Impedance Factor 1.00 1.00
Maj. L, Min T Impedance factor 0.90
Maj. L, Min T Adj. Imp Factor. 0.92
Movement Capacity 347
7 -Computation of the Effect of Two-stage Gap Acceptance
rom
'OPart 1 - First Stage
Conflicting Flows
Potential Capacity
''Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
.Probability of Queue free St.
,OPart 2 --second Stage
Conflicting Flows
Potential Capacity
'Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Part - Single Stage
Conflicting Flows
750
Potential Capacity
342
Pedestrian Impedance Factor
1.00 1.00
Adj. factor due to Impeding mvmnt
0.90 0.90
,Cap.
ovement Capacity
306
i
Result for 2 stage process:
aj. L, Min T Adj. Imp Factor.
a
t
C t
306
Probability of Queue free St.
1.00 1.00
ep 4: LT from Minor sc.
Part 1 - First Stage
Conflicting Flows
f�otential Capacity
edestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
art 2 Second Stage
L Conflicting Flows
otential Capacity
edestrian Impedance Factor
ap. Adj. factor due to Impeding mvmnt
Movement Capacity
3 - Single Stage
Tart
onflicting Flows
750
Potential Capacity
382
Pedestrian Impedance Factor
1.00
1.00
aj. L, Min T Impedance factor
0.90
aj. L, Min T Adj. Imp Factor.
0.92
f
Cap. Adj. factor due to Impeding mvmnt
0.91
0.65
Movement Capacity
347
e
process:
I t 347
Worksheet 8 -Shared Lane Calculations
5ovement - 7 8 9 10 11 12
1 L T R L T R
ity (vph) 347 306 737
1P W
Worksheet 9 -Computation of Effect of Flared Minor Street Approaches
Movement 7 8 9 10 11 12
L T R L T R
C Sep Jy, Juo ,J,
volume 104 0 220
Delay
Q Sep
Q Sep +1
round (Qsep +1)
n max
C eh 542
SUM C Sep
n
C act
Worksheet 10 -Delay, Queue Length, and Level of Service
Movement 1 4 7 8 9 10 11 12
Lane Config LT LTR
v (vph)
111
324
C(m) (vph)
1223
542
v/c
0.09
0.60
95% queue length
0.30
4.29
Control Delay
8.2
21.4
LOS
A
C
Approach Delay
21.4
Approach LOS
C
Worksheet 11 -Shared Major LT Impedance and Delay
Movement 2 Movement 5
P(o)) 1.VV V.71
v(il), Volume for stream 2 or 5 220
v(i2), Volume for stream 3 or 6 0
S(il), Saturation flow rate for stream 2 or 5 1700
s(i2),. Saturation flow rate for stream 3 or 6 1700
P'(oj) 0.90
9(M,LT), Delay for stream 1 or 4 8.2
N, Number of major street through lanes 1
9(rank,l) Delay for stream 2 or 5 _ 0.9
u
•
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
0
Analyst: HEW
Agency/Co.: Farleigh
Date Performed: 08/22/2003
Analysis Time Period: PH peak existing
Intersection: tee
Jurisdiction: Hawaii Co
Analysis Year: 2003
Project ID: 435-01T-03
East/West Street: Royal Poinciana
North/South Street: Alii Dr
Intersection Orientation: NS Study period (hrs): 1.00
Vehicle Volumes and Adjustments
-' Major Street: Approach Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume
372 81
104
360
Peak -Hour Factor, PHF
1.00 1.00
1.00
1.00
.. Hourly Flow Rate, HFR
372 81
104
360
Heavy Vehicles
-- --
0
-- --
fercent
edian Type Undivided
T Channelized?
Lanes
1 0
0
1
Configuration
TR
LT
,lUpstream Signal?
No
No
Movement
Peak Hour Factor, PHF
'Hourly Flow Rate, HFR
Percent Heavy Vehicles
Percent Grade (8)
Mediad Storage
Flared Approach: Exists?
Storage
RT Channelized?
Lanes
=Configuration
1.00 1.00 1.00
117 0 82
0 0 0
0
No
1 0
LTR
10 11 12
L T R
Delay, Queue Length, and Level of Service
ApproacH NB SB Westbound Eastbound
'Movement 1 4 17 8 9 10 11 12
Lane Config LT LTR
-_-
' C(m) (vph)
v/c
958 queue length
Control Delay
LOS
Approach Delay
Approach LOS
1118
337
0.09
0.59
0.31
4.08
8.6
30.8
A
D
30.8
D
BCS2000: Unsignalized Intersections Release 4.1
'Bruce E. Witcher, P.E.
Witcher Engineering LLP
74-5588 C Pawai Place
�Kailua-Kona, HI 96740
0
E -Mail: bewitch@ilhawaii.net
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst:
BEW
81
Agency/Co.:
Farleigh
Peak -Hour Factor, PHF
Date Performed:
08/22/2003
1.00
Analysis Time Period:
PM peak existing
93
Intersection:
tee
90
Jurisdiction:
Hawaii Co
81
Analysis Year:
2003
Percent Heavy Vehicles
Project ID: 435-OIT-03
--
East/West Street:
Royal Poinciana
Median Type Undivided
North/South Street:
Alii Dr
Intersection Orientation:
NS
Study period (hrs): 1.00
Vehicle Volumes
and Adjustments
Major Street Movements
1 2
3 4 5 6
0
L T
R L T R
Volume
372
81
104
36C
Peak -Hour Factor, PHF
1.00
1.00
1.00
1.00
Peak -15 Minute Volume
93
20
26
90
Hourly Flow Rate, HFR
372
81
104
360
Percent Heavy Vehicles
--
--
0
-- --
Median Type Undivided
RT Channelized?
Lanes
1 0
0
1
Configuration
TR
LT
Upstream Signal?
No
No
Minor Street Movements 7
8
9
10
11 12
L
T
R
L
T R
Peak Hour Factor, PHF
Peak -15 Minute Volume
Hourly Flow Rate, HFR
Percent Heavy Vehicles
Percent Grade (8)
Median Storage
Flared Approach: Exists?
Storage
RT Channelized?
Lanes
Configuration
1.00
1.00
1.00
29
0
20
117
0
82
0
0
0
4.0
0
4.0
No
1 0
LTR
Pedestrian Volumes and Adjustments
Movements 13 14 15 16
Flow (ped hr)
0
0
0
0
Lane Width (ft)
12.0
12.0
12.0
12.0
Balking Speed (ft/sec)
4.0
4.0
4.0
4.0
Percent Blockage
0
0
0
0
Upstream Signal Data
Prog. Sat Arrival Green Cycle Prog. Distance
Flow Flow Type Time Length Speed to Signal
vph vph sec sec mph feet
Through
35 Left -Turn
Through
worksheet 3 -Data for Computing Effect of Delay to Major -street Vehicles —
Movement 2 Movement 5
1 0 0
Shared In volume, major rt vehicles: 0
Sat flow rate, major th vehicles: 1700
Sat flow rate, major rt vehicles: 1700
Number of major street through lanes: 1
', Worksheet
4 -Critical Gap and Follow-up Time Calculation
critical Gap Calculation
' Movement- 1 4 7 8 9 10 11 12
L L L T R L T R
t(c,base)
4.1
7.1
6.5 6
1.00
1.00
1.00
1.00 1
't(c,hv)
P(hv)
0
0
0 0
t(c,g)
1 4
0.20
0.20 0
Grade/100
0.00
0.00 0
t(3,lt)
0.00
0.70
0.00 0
t(c,T): 1 -stage 0.00
0.00
0.00
0.00 0
2 -stage 0.00
0.00
1.00
1.00 0
t(c) 1 -stage
4.1
6.4
6.5 6
2 -stage
' t(f)
2.2
3.5
00 1.00
10 0.20
00 0.00
00
00 0.00
00 1.00
2
H H L*L�w.re,
0.20 0.10
0.00 0.00
0.00 0.00
1.00 0.00
Worksheet 5 -Effect of Upstream Signals
r' Computation 1 -Queue Clearance Time at Upstream Signal
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
Total Saturation Flow Rate, s (vph)
Arrival Type
JEffective Green, g (sec)
Cycle Length, C (sec)
Rp (from table 9-2)
Proportion vehicles arriving on green P
9(91)
'g(g2)
g(g)
,,computation 2 -Proportion of TWSC Intersection Time, blocked
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
beta
Travel time, t(a) (sec)
Smoothing Factor, F
Proportion of conflicting flow, f
,'Max platooned flow, V(c,max)
Min platooned flow, V(c,min)
L Duration of blocked period, t(p)
Proportion time blocked, p 0.000 0.000
-p(1) U.000
p(5) - 0.000 -
p(dom)
p(subo)
Constrained or unconstrained?
' Proportion
Follow -Up
Time Calculations
Movement
1 4
7
8
9 10 11 12
L L
L
T
R L T R
�J t( ,base)
2.20
3.50
-4. U0
3.30
t(f,HV)
0.90 0.90
0.90
0.90
0.90 0.90 0.90 0.90
P(HV)
0
0
0
0
' t(f)
2.2
3.5
4.0
3.3
Worksheet 5 -Effect of Upstream Signals
r' Computation 1 -Queue Clearance Time at Upstream Signal
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
Total Saturation Flow Rate, s (vph)
Arrival Type
JEffective Green, g (sec)
Cycle Length, C (sec)
Rp (from table 9-2)
Proportion vehicles arriving on green P
9(91)
'g(g2)
g(g)
,,computation 2 -Proportion of TWSC Intersection Time, blocked
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
beta
Travel time, t(a) (sec)
Smoothing Factor, F
Proportion of conflicting flow, f
,'Max platooned flow, V(c,max)
Min platooned flow, V(c,min)
L Duration of blocked period, t(p)
Proportion time blocked, p 0.000 0.000
-p(1) U.000
p(5) - 0.000 -
p(dom)
p(subo)
Constrained or unconstrained?
' Proportion
1p W
for minor Single -stage Two -Stage Process
movements, p(x) Process Stage I Stage II
P(1)
p(4)
P(7)
p(8)
P(9)
POO)
P(11)
p(12)
Computation 4 and 5
Single -Stage Process
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
V c,x
e
PX
V c,u,X
c r,x
C plat,x
rocess
7 8 10 11
Stagel Stage2 Stagel Stage2 Stagel Stage2 Stagel Stage2
V(c,x)
s 1700 1700
P(x)
V(c, u, x)
,x)
Worksheet 6 -Impedance and Capacity Equations
Step 1: RT from Minor St.
9 12
Conflicting Flows
412
Potential Capacity
644
Pedestrian Impedance Factor
1.00 1.00
Movement capacity
644
Probability of Queue free St.
0.87 1.00
Step 2: LT from Major St. 4 1
Conflicting Flows - 453
Potential Capacity 1118
Pedestrian Impedance Factor 1.00 1.00
Movement Capacity 1118
Probability of Queue free St. 0.91 1.00
Maj L -Shared Prob Q free St. 0.88
Step 3: TH from Minor St.
8
11
Conflicting Flows
980
?otential Capacity
252
?edestrian Impedance Factor
1.00
1.00
Cap. Adj. factor due to Impeding mvmnt
0.88
0.88
Movement Capacity
222
?robability of Queue free St.
1.00
1.00
step 4: LT from Minor St.
7
10
Conflicting Flows
980
?otential Capacity
279 -
?edestrian Impedance Factor
1.00
1.00
Maj. L, Min T Impedance factor
0.88
Maj. L, Min T Adj. Imp Factor.
0.91
Movement Capacity 253
E
worksheet 7 -Computation of the Effect of Two-stage Gap Acceptance
,Step j: Tn rrum nrnur au.
—Part 1 - First Stage
Conflicting Flows
otential Capacity
ede§trian Impedance Factor
ap. Adj. factor due to Impeding mvmnt
Movement Capacity
Probability of Queue free St.
art 2 - Second Stage
Conflicting Flows
Eotential Capacity
edeatrian Impedance Factor
ap. Adj. factor due to Impeding mvmnt
Movement Capacity
art 3 - Single Stage
onflicting Flows
Potential capacity
�Pedeatrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
�.fovement Capacity
980
252
1.00
0.88
222
�������RaRaRayesult for 2 stage process: -
C t 222
.Probability of Queue free St. 1.00
.Step 4: LT rrom Minor SL.
Part - First Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
1.00
0.88
1.00
Cdri c - aca:uuu a�cyc
Conflicting Flows
otential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
l
art 3 - Single Stage
conflicting Flows
980
_ Potential Capacity
279
Pedestrian Impedance Factor
1.00
1.00
aj. L, Min T Impedance factor
0.88
aj. L, Min T Adj. Imp Factor.
0.91
Cap. Adj. factor due to Impeding mvmnt
0.91
0.79
11Movement Capacity
253
a
1C t
s for Two-stage process:
at 8 -Shared Lane Calculations
253
Movement S 7 lu 11 1L
L T R L T -` R
117 0 62
ity (vph) 253 222 644
W
•
Worksheet 9 -Computation of Effect of Flared Minor Street Approaches
Movement 7 8 9 10 11 12
L T R L T R
C Sep 253 222 644
Volume 117 0 82
Delay
Q Sep
Q Sep +1
round (Qsep +1)
n max
C sh
SUM C Sep
n
C act
337
Worksheet 10 -Delay, Queue Length, and Level of Service
Movement
1 4 7
8 9 10 11 12
Lane Config
LT
LTR
v (vph)
104
199
C(m) (vph)
1118
337
v/c
0.09
0.59
958 queue length
0.31
4.08
Control Delay
8.6
30.8
LOS
A
D
Approach Delay
30.8
Approach LOS
D
Worksheet 11 -Shared Major LT Impedance and Delay
Movement 2 Movement 5
P(o)) -.,-
v(il), Volume for stream 2 or 5 360
v(i2), Volume for stream 3 or 6 0
s(il), Saturation flow rate for stream 2 or 5 1700
5(i2), Saturation flow rate for stream 3 or 6 1700
e*loj>
0.88
d(M,LT), Delay for stream 1 or 4 8.6
N, Number of major street through lanes 1
d(rank,l) Delay for stream 2 or 5 1.0
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: BEW
'Agency/CO.: Farleigh
Date Performed: 08/22/2003
Analysis Time Period: AM peak future
Intersection: tee
;'Jurisdiction: Hawaii Co
Analysis Year: 2003
Project ID: 435-01T-03
East/West Street: Royal Poinciana
'North/South Street: Alii Dr
Intersection Orientation: NS Study period (hre): 1.00
v wpcy
C(m) (vph)
v/c
959 queue length
Control Delay
LOS
Approach Delay
Approach LOS
J
1219
Vehicle Volumes and
Adjustments
0.61
0.31
Major Street: Approach
8.3
Northbound
A
C
Southbound
22.2
Movement
1
2
3
4
5 6
L
T
R
L
T R
Volume
274
115
228
Peak -Hour Factor, PHF
1.00
11.
. 00
1.00
1.00
Hourly Flow Rate, HFR
274
77
115
228
Percent Heavy Vehicles
--
--
0
----
Median Type Undivided
i
RT Channelized?
Lanes
1 0
0 1
Configuration
TR
LT
'
Upstream Signal?
No
No
t
Minor Street: Approach
Westbound
Eastbound
Movement
7
8
9
10
11 12
L
T
R
L
T R
ume
104
0
223
t.Vo
Peak Hour Factor, PHF
1.00
1.00
1.00
Hourly Flow Rate, HFR
104
0
223
Percent Heavy Vehicles
0
0
0
Percent Grade (8)
0
0
Median Storage
Flared Approach: Exists?
No
Storage
I
RT Channelized?
Lanes
0 1 0
Configuration
LTR
j
Delay,
Queue
Length, and Level
of Service
Approac NB
SB
Westbound
Movement 1
4
7
8 9
10 11 12
Lane Config
LT
LTR
v wpcy
C(m) (vph)
v/c
959 queue length
Control Delay
LOS
Approach Delay
Approach LOS
J
1219
534
0.09
0.61
0.31
4.54
8.3
22.2
A
C
22.2
C
HCS2000: Unsignalized Intersections Release 4.1
' Bruce E. Witcher, P.E.
Witcher Engineering LLP
74-5588 C Pawai Place
' Kailua-Kona, HI 96740
lop W
E -Mail: bewitch@ilhawaii.net
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: BEW
Agency/Co.: Farleigh
Date Performed: 08/22/2003
Analysis Time Period: AM peak future
Intersection: tee
Jurisdiction: Hawaii Cc
Analysis Year: 2003
Project ID: 435-OIT-03
East/West Street: Royal Poinciana
North/South Street: Alii Dr
Intersection Orientation: NS Study period (hrs): 1.00
Vehicle Volumes and Adjustments
Major Street Movements 1 2 3 4 5 6
L T R L T R
Volume
274
77
115
228
Peak -Hour Factor, PHF
1.00
1.00
1.00
1.00
Peak -15 Minute Volume
68
19
29
57
Hourly Flow Rate, HFR
274
77
115
228
Percent Heavy Vehicles
--
--
0
-- --
Median Type Undivided
_
Flared Approach: Exists?
RT Channelized?
Storage
Lanes
1 0
0
1
Configuration
TR
1
LT
Configuration
Upstream Signal?
No
No
Minor Street Movements 7
8
9
10
11 12
L
T
R
L
T R
volume
lvY
0
0
Peak Hour Factor, PHF
1.00
1.00
1.00
Peak -15 Minute Volume
26
0
56
Hourly Flow Rate, HFR
104
0
223
Percent Heavy Vehicles
0
0
0
Percent Grade ($)
0
0
Median Storage
_
Flared Approach: Exists?
No
Storage
RT Channelized?
Lanes
0
1
0
Configuration
LTR
Pedestrian Volumes and Adjustments
Movements 13 14 15 16
Flow (ped hr)
0
0
0
0
Lane Width (ft)
12.0
12.0
12.0
12.0
Walking Speed (ft/sec)
4.0
4.0
4.0
4.0
Percent Blockage
0
0
0
0
Upstream Signal Data
Prog. Sat Arrival Green cycle Prog. Distance
Flow Flow Type Time Length Speed to Signal
vph vph sec sec mph feet
Through
S5 Left -Turn
Through
Worksheet 3 -Data .for Computing Effect of Delay to Major Street Vehicles
Movement 2 Movement 5
'
Worksheet
4 -Critical
Gap and
Follow-up Time
Calculation
Critical
Gap calcu at ion
Shared In
volume, major
rt vehicles:
0
Sat flow
rate, major th
vehicles:
1700
4
Sat flow
rate, major rt
vehicles:
1700
11
Number of
major street
through lanes:
1
'
Worksheet
4 -Critical
Gap and
Follow-up Time
Calculation
Critical
Gap calcu at ion
Movement
1
4
7
8
9
10
11
12
L
L
L
T
R
L
T
R
t(c,base)
4.1
7.1
6.5
6.2
t(c,hv)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
'P(hv)
0
0
0
0
t(c,g)
0.20
0.20
0.10
0.20
0.20
0.10
Grade/100
0.00
0.00
0.00
0.00
0.00
0.00
t(3,lt)
0.00
0.70
0.00
0.00
t(c,T):
1 -Stage 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
�.'
2 -stage 0.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
t(c)
1 -stage
4.1
6.4
6.5
6.2
2 -stage
Calculations
Follow -Up
Time
Movement
1
4
7
8
9
10
11
12
L
L
L
T
R
L
T
R
''
t( ,base)
2.20
3.50
4.00
3.30
t(f,HV)
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
P(HV)
0
0
0
0
Et(f)
2.2
3.5
4.0
3.3
Worksheet 5 -Effect of Upstream Signals
nce
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
Total Saturation Flow Rate, s (vph)
Arrival Type
'Effective Green, g (sec)
Cycle Length, C (sec)
Rp (from table 9-2)
Proportion vehicles arriving on green P
g(gl)
' g(g2)
g(g)
Computation 2 -Proportion of TWSC Intersection Time, blocked
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
alpha
beta
Travel time, t(a) (sec)
Smoothing Factor, F
Proportion of conflicting flow, f
'Max platooned flow, V(c,max)
Min platooned flow, V(c,min)
Duration of blocked period, t(p)
Proportion time blocked, p 0.000 0.000
computation 3 -Plat Event Periods Resu t
p(2) 0.000
'p(5) 0.000 _
p(dom)
p(subo)
- Constrained or unconstrained?
IProportion
10 1 W
for minor Single -stage Two -Stage Process
movements, p(x) Process Stage I Stage II
p(4)
p(7)
p(8)
P(9)
P(10)
P(II)
p(12)
Computation 4 and 5
Single -Stage Process
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
v c,x
s
Px
V c,u,x
* r,x
C plat,x
Two -Stage Process
7 B 10 11
Stagel Stage2 Stagel Stage2 Stagel Stage2 Stagel Stage2
v(c,x)
B 1700 1700
P(x)
V(C,n,x)
r,x
C(plat,x)
Worksheet 6 -Impedance and Capacity Equations
Step 1: RT from Minor St. 9 12
Conflicting Flows - 312
Potential Capacity 733
Pedestrian Impedance Factor 1.00 1.00
Movement Capacity 733
Probability of Queue free St. 0.70 1.00
Step 2: LT from Major St.
4 1
Conflicting Flows
351
Potential Capacity
1219
Pedestrian Impedance Factor
1.00 1.00
Movement capacity
1219
Probability of Queue free St.
0.91 1.00
Maj L -Shared Prob Q free St.
0.89
Step 3: TH from Minor St. 8 11
Potential Capacity 333
Pedestrian Impedance Factor 1.00 1.00
Cap. Adj. factor due to Impeding mvmnt 0.89 0.89
Movement capacity 297
Probability of Queue free St. 1.00 1.00
Step 4: LT from Minor St. 7 10
conflicting Flows 770
Potential Capacity 372 -
Pedestrian Impedance Factor 1.00 1.00
Naj. L, Min T Impedance factor 0.89
Naj. L, Min T Adj. Imp Factor. 0.92
Movement Capacity 337
Worksheet 7 -Computation of the Effect of Two-stage Gap Acceptance
'Step 3: TM from Minor St.
B
11
Part 1 - First Stage
Conflicting Flows
Capacity
'Potential
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding
mvmnt
Movement Capacity
Probability of Queue free St.
1
Part 2 - Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding
mvmnt
Movement Capacity
.,Part 3 - Single Stage
770
Conflicting Flows
Potential Capacity
333
Pedestrian Impedance Factor
1.00
- 1.00
Cap. Adj. factor due to Impeding
mvmnt
0.89
0.89
Movement Capacity
297
Result for 2 stage process:
a
y
C t
297
Probability of Queue free St.
1.00
1.00
Step 4: LT from Minor St.
7
10
` Part 1 - First Stage
Conflicting Flows
Potential Capacity
i' Pedestrian Impedance Factor
' Cap. Adj. factor due to Impeding
mvmnt
,lMovement Capacity
Part 2 - Secon Stage
• Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj: factor due to Impeding
mvmnt
Movement Capacity
Part 3 - Single Stage
Conflicting Flows
770
Potential Capacity
372
Pedestrian Impedance Factor
1.00
1.00
.'Maj. L, Min T Impedance factor
Factor.
0.89
0.92
Maj. L, Min T Adj. Imp
Cap. Adj. factor due to Impeding
mvmnt
0.91
0.64
Movement Capacity
337
;, Results for Two-stage process:
y
C
337
Worksheet 8 -Shared Lane Calculations
Movement - 7 8 9 10 1] 1
L T R L T R
ity (vph) 337 297 733
0 W
Worksheet 9 -Computation of Effect of Flared Minor Street Approaches
Movement 7 8 9 10 11 12
L T R L T R
C Sep 337 297 733
volume 104 0 223
Delay
Q Sep
Q Sep +1
round (Qsep +1)
n max
C sh
SUM C Sep
n
C act
534
Worksheet 10 -Delay, Queue Length, and Level of Service
Movement - 1 4 7 8 9 10 11 12
Lane Config LT LTR
v (vph)
115
327
C(m) (vph)
1219
534
vac
0.09
0.61
958 queue length
0.31
4.54
Control Delay
8.3
22.2
LOS
A
C
Approach Delay
22.2
Approach LOS
C
Worksheet 11 -Shared Major LT Impedance and Delay
Movement 2 Movement 5
p(o3) 1.00 0.91
v(il), Volume for stream 2 or 5 228
v(i2), Volume for stream 3 or 6 0
s(il), Saturation flow rate for stream 2 or 5 1700
s(i2), Saturation flow rate for stream 3 or 6 1700
P*(oj) 0.89
d(M,LT), Delay for stream 1 or 4 8.3
N, Number of major street through lanes 1
d(rank,l) Delay for stream 2 or 5 0.91
I
.1
0
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
0
Study period (hrs): 1.00
Vehicle Volumes and Adjustments
J Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R L T R
Analyst:
HEW
106
Agency/CO.:
Farleigh
1.00
Date Performed:
08/22/2003
1.00
Analysis Time Period:
PM peak future
81
Intersection:
tee
Percent Heavy Vehicles
Jurisdiction:
Hawaii Co
'Analysis
Year:
2003
Project ID: 435-OIT-03
East/West Street:
Royal Poinciana
North/South Street:
Alii Dr
Lanes
1 0
Intersection Orientation: NS
0
Study period (hrs): 1.00
Vehicle Volumes and Adjustments
J Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R L T R
■
Peak Hour Factor, PHF
!'Hourly Flow Rate, HFR
Percent Heavy Vehicles
Percent Grade ($)
'- Median Storage
Flared Approach: Exists?
Storage
RT Channelized?
Lanes
ssConf igurat ion
1.00 1.00 1.00
117 0 86
0 0 0
0
hC
1 0
LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement - 1 4 7 8 9 I 10 11 12
U
f ane Config LT LTR
v (vph) 106 203
c(m) (vph) 1103 329
v/c 0.10 0.62
95%queuelength 0.32 4.51
Control Delay 8.6 33.1
'LOS A D
Approach Delay 33.1
Approach LOS D
HCS2000: Unsignalized Intersections Release 4.1
Bruce E. Witcher, P.E.
Witcher Engineering LLP
74-5588 C Pawai Place
'Kailua-Kona, HI 96740
398
81
106
368
,,volume
Peak -Hour Factor, PHF
1.00
1.00
1.00
1.00
Hourly Flow Rate, HFR
388
81
106
368
Percent Heavy Vehicles
--
--
0
-
Median Type- Undivided
.J RT Channelized?
Lanes
1 0
0
1
Configuration
TR
LT
'Upstream Signal?
No
No
Minor Street: Approac
Westbound
Eastbound
' Movement 7
8
9
10
11 12
M,- L
T
R
L
T R
■
Peak Hour Factor, PHF
!'Hourly Flow Rate, HFR
Percent Heavy Vehicles
Percent Grade ($)
'- Median Storage
Flared Approach: Exists?
Storage
RT Channelized?
Lanes
ssConf igurat ion
1.00 1.00 1.00
117 0 86
0 0 0
0
hC
1 0
LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement - 1 4 7 8 9 I 10 11 12
U
f ane Config LT LTR
v (vph) 106 203
c(m) (vph) 1103 329
v/c 0.10 0.62
95%queuelength 0.32 4.51
Control Delay 8.6 33.1
'LOS A D
Approach Delay 33.1
Approach LOS D
HCS2000: Unsignalized Intersections Release 4.1
Bruce E. Witcher, P.E.
Witcher Engineering LLP
74-5588 C Pawai Place
'Kailua-Kona, HI 96740
E-Mail: bewitch@ilhawaii.net
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst:
BEW
Agency/Co.:
Farleigh
Date Performed:
08/22/2003
Analysis Time Period:
PM peak future
Intersection:
tee
Jurisdiction:
Hawaii Co
Analysis Year:
2003
Project ID: 435-OIT-03
East/West Street:
Royal Poinciana
North/South Street:
Alii Dr
Intersection Orientation: NS
Study period (hrs): 1.00
Vehicle Volumes and Adjustments
Major Street Movements 1 2 3 4 5 6
L T R L T R
volume
388
81
106
368
Peak -Hour Factor, PHF
1.00
1.00
1.00
1.00
Peak -15 Minute Volume
97
20
26
92
Hourly Flow Rate, HFR
388
81
106
368
Percent Heavy Vehicles
--
-'
0
-- --
Median Type Undivided
RT Channelized?
Lanes
1 0
0
1
Configuration
TR
LT
Upstream Signal?
No
No
Minor Street Movements 7
8
9
10
11 12
L
T
R
L
T R
Peak Hour Factor, PHF
Peak -15 Minute Volume
Hourly Flow Rate, HFR
Percent Heavy Vehicles
Percent Grade (8)
Median Storage
Flared Approach: Exists?
Storage
RT Channelized?
Lanes
Configuration
1.00
1.00
1.00
29
0
22
117
0
86
0
0
0
4.0
0
4.0
No
1 0
LTR
Pedestrian Volumes and Adjustments
Movements 13 14 15 16
Flow (ped hr)
0
0
0
0
Lane Width (ft)
12.0
12.0
12.0
12.0
Walking Speed (ft/sec)
4.0
4.0
4.0
4.0
Percent Blockage
0
0
0
0
Upstream Signal Data
Prog. Sat Arrival Green Cycle Prog. Distance
Flow Flow Type Time Length Speed to Signal
vph vph sec sec mph feet
Through
S5 Left -Turn
Through
Worksheet 3 -Data for Computing Effect of Delay to Major Street Vehicles
Movement 2 Movement 5
-' Worksheet 4 -Critical Gap and Follow-up Time Calculation
Critical Gap Calculation
,Movement 1 4 7 8 9 10 11 12
L L L T R L T R
t(c, ase)
4.1
0
0
_1
t(f,HV)
0.90 0.90
0.90
t(c,hv) 1.00
Shared In volume, major
rt vehicles:
0
1.00
Sat flow rate, major th
vehicles:
1700
'
-P(hv)
Sat flow rate, major rt
vehicles:
1700
.Number
of major street
through lanes:
1
-' Worksheet 4 -Critical Gap and Follow-up Time Calculation
Critical Gap Calculation
,Movement 1 4 7 8 9 10 11 12
L L L T R L T R
t(c, ase)
4.1
-/.1
b.�
b.L
t(f,HV)
0.90 0.90
0.90
t(c,hv) 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
'
-P(hv)
0
0
0.20
0
0.20
0
0.10
0.20
0.20
0.10
t(c,g)
Grade/100
0.00
0.00
0.00
0.00
0.00
0.00
t(3,1t)
0.00
0.70
0.00
0.00
-' t(c,T): 1 -stage 0.00
2 -stage 0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
t(c) 1 -stage
4.1
6.4
6.5
6.2
_ 2 -stage
Follow -Up Time calculations
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
a(f,base)
2.20
3.bu
4.uu
J.JU
t(f,HV)
0.90 0.90
0.90
0.90
0.90 0.90 0.90 0.90
- P(HV)
0
0
0
0
Et(f)
2.2
3.5
4.0
3.3
.- Worksheet 5 -Effect of Upstream Signals
,Computation 1 -Queue clearance rime aL up5Lream aryl)=.
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
Wprog
Total Saturation Flow Rate, s (vph)
Arrival Type
ffective Green, g (sec)
ycle Length, C (sec)
p (from table 9-2)
Proportion vehicles arriving on green P
(ql)
(q2)
(q)
C
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
Orravel time, t(a) (sec)
Smoothing Factor, F
Proportion of conflicting flow, f
ax platooned flow, V(c,max)
in platooned flow, V(c,min)
uration of blocked period, t(p)
-- Proportion time blocked, p 0.000 0.000
plc/ -
5) 0.000
(dom)
(-
(subo))
- Constrained or unconstrained?
W W
for minor Single -stage Two -Stage Process
movements, p(x) Process Stage I Stage II
P(4)
p(7)
p(8)
P(9)
P(10)
P(11)
p(12)
Computation 4 and 5
Single -Stage Process
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
V c,x 469 1008 1008 428
s
Px
V c,u,x
C r,x
C plat,x
age Process
7 8 10 11
Stagel Stage2 Stagel Stage2 Stagel Stage2 Stagel Stage2
v(c,x)
a 1700 1700
P(x)
V(C,U,x)
c(r,x)
C(plat,x)
Worksheet 6 -Impedance and Capacity Equations
Step 1: RT from Minor St.
9
12
Conflicting Flows
428
Potential Capacity
631
1.00
Pedestrian Impedance Factor
1.00
1.00
Movement Capacity
631
1.00
Probability of Queue free St.
0.86
1.00
Step 2: LT rom Mal or St.
4
1
Conflicting F ows
469
Potential Capacity
1103
Pedestrian Impedance Factor
1.00
1.00
Movement Capacity
1103
Probability of Queue free St.
0.90
1.00
Maj L -Shared Prob Q free St.
0.88
Step 3: TH from Minor St.
8
11
Conflicting Flows
1008
Potential Capacity
242
Pedestrian Impedance Factor
1.00
1.00
Cap. Adj. factor due to Impeding mvmnt
0.88
0.88
4ovement Capacity
212
1.00
1.00
Probability of Queue free St.
itep 4: LT from Minor St.
7
10
Conflicting Flows
1008
Potential Capacity
269 _
Pedestrian Impedance Factor
1.00
1.00
daj. L, Min T Impedance factor
0.88
4aj. L, Min T Adj. Imp Factor.
0.91
1 � •
Movement Capacity 243
'Worksheet 7 -Computation of the Effect of Two-stage Gap Acceptance
Step 3: TH from Minor St. 8 11
' Part 1 - First Stage
Conflicting Flows
Potential Capacity
'Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Probability of Queue free St.
' Part 2 - Secon Stage
Conflicting Flows
Potential Capacity
,'Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Conflicting Flows 1008
Potential Capacity 242
Pedestrian Impedance Factor 1.00 1.00
JCap. Adj. factor due to Impeding mvmnt 0.88 0.88
Movement Capacity 212
Result for 2 stage process:
a
y 212
C t
Probability of Queue free St. 1.00 1.00
Step : LT from Minor St. 7 10
Part 1 - First Stage
ftConflicting Flows
'Potential Capacity
Pedestrian Impedance Factor
Cap. Adj.. factor due to Impeding mvmnt
=Movement Capacity
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
ap. Adj. factor due to Impeding mvmnt
Movement Capacity
,Conflicting "Flows 1008
Potential Capacity 269
Pedestrian Impedance Factor 1.00 1.00
Maj. L, Min T Impedance factor 0.88
aj. L, Min T Adj. Imp Factor. 0.91
Cap. Adj. factor due to Impeding mvmnt 0.90 0.78
Movement Capacity 243
243
Worksheet 8 -Shared Lane Calculations
irovement - 7 B 9 10 11 1
L T R L T R
ty (vph) 243 212 631
0 0
Worksheet 9 -Computation of Effect of Flared Minor Street Approaches
Movement 7 8 9 10 11 12
L T R L T R
C Sep 243 212 631
Volume 117 0 86
Delay
Q Sep
Q Sep +1
round (Qsep +1)
n max
C sh
SUM C Sep
n
C act
329
Worksheet 10 -Delay, Queue Length, and Level of Service
Movement
1 4 7
8 9 10 11 12
Lane Config
LT
LTR
v (vph)
106
203
C(m) (vph)
1103
329
v/c
0.10
0.62
959 queue length
0.32
4.51
Control Delay
8.6
33.1
LOS
A
D
Approach Delay
33.1
Approach LOS
D
Worksheet 11 -Shared Major LT Impedance and Delay
Movement 2 Movement 5
P(o3) �.
v(il), Volume for stream 2 or 5 368
v(i2), Volume for stream 3 or 6 0
s(il), Saturation flow rate for stream 2 or 5 1700
s(i2), Saturation flow rate for stream 3 or 6 1700
P*(03) 0.88
d(M,LT), Delay for stream 1 or 4 8.6
N, Number of major street through lanes 1
d(rank,l) Delay for stream 2 or 5 1.1
•
APPENDIX D
LEVEL OF SERVICE
ALII DRIVE & LUNAPULE ROAD
It
L'
f�
I,
t
* •
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst:
BEW
Agency/Co.:
Farleigh
Date Performed:
08/22/2003
Analysis Time Period:
AM peak existing
Intersection:
tee
Jurisdiction:
Hawaii Cc
Analysis Year:
2003
Project ID: 435-OIT-03
East/West Street:
Lunapuli
North/South Street:
Alii Dr
Intersection Orientation: NS
Study period (hrs): 1.00
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R L T R
Volume
484
144
3
292
Peak -Hour Factor, PHF
1.00
1.00
1.00 1.00
Hourly Flow Rate, HFR
484
144
3
292
Percent Heavy Vehicles
--
--
0
-- --
Median Type Undivided
Median Storage
RT Channelized?
Exists?
No
Lanes
1 0
RT Channelized?
0 1
Configuration
TR
Lanes
LT
Upstream Signal?
No
No
Minor Street: Approach
Westbound
Eastbound
Movement 7
8
9
I 10
11 12
L
T
R
L
T R
Volume
Delay,
�1
Length, and Level of Service
Peak Hour Factor,
PHF
1.00
1.00 1.00
Hourly Flow Rate,
HFR
97
0 18
Percent Heavy Vehicles
Lane Config
0
0 0
Percent Grade (8)
20.2
Approach LOS
0
Median Storage
Flared Approach:
Exists?
No
Storage
RT Channelized?
Lanes
0
1 0
Configuration
LTR
v (vpn)
C(m) (vph)
Delay,
Queue
Length, and Level of Service
Approach
NB
SB
Westbound Eastbound
Movement
1
4
7 8 - 9
10 11 12
Lane Config
C
LT
LTR
20.2
v (vpn)
C(m) (vph)
964
---
352
v/c
0.00
0.33
95% queue length
0.01
1.44
Control Delay
8.7
20.2
LOS
A
C
Approach Delay
20.2
Approach LOS
C
HCS2000: Unsignalized Intersections Release 4.1
Bruce E. Witcher, P.E.
Witcher Engineering LLP
74-5588 C Pawai Place
Kailua-Kona, HI 96740
E-Mail:
0
bewitch@ilhawaii.net
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: BEW
Agency/Co.: Farleigh
Date Performed: 08/22/2003
Analysis Time Period: AM peak existing
Intersection: tee
Jurisdiction: Hawaii Co
Analysis Year: 2003
Project ID: 435-01T-03
` East/West Street: Lunapuli
North/South Street: Alii Dr
I' Intersection Orientation: NS
Ci
Study period (hrs): 1.00
l�Peak Hour Factor, PHF
Vehicle
Volumes
and Adjustments
Peak -15 Minute Volume
24
Ma or Street Movements
1
2
3
4
L
5
T
6
R
0
L
T
R
0
i
Flared Approach: Exists?
No
volume
{ Storage
RT Channelized?
- 484
144
3
292
0
r, Peak -Hour Factor, PHF
0
1.00
1.00
1.00
1.00
Peak -15 Minute Volume
121
36
1
73
Hourly Flow Rate, HFR
484
144
3
292
Percent Heavy Vehicles
Median Type
Undivided
--
--
0
--
--
I' RT Channelized?
Lanes
1 0
0
1
Configuration
TR
LT
Upstream Signal?
No
No
t Minor Street Movements
7
8
9
10
11
12
L
T
R
L
T
R
l�Peak Hour Factor, PHF
1.00
1.00
1.00
Peak -15 Minute Volume
24
0
4
Hourly Flow Rate, HFR
97
0
18
( Percent Heavy Vehicles
0
0
0
Percent Grade (8)
0
Median Storage
Flared Approach: Exists?
No
{ Storage
RT Channelized?
Ij
Lanes
0
1
0
Configuration
LTR
-
Pedestrian Volumes and Adjustme
Movements 13 14 15 46
[ Lane Width (ft)
Walking Speed (ft/sec)
+' Percent Blockage
12.0 12.0 12.0 12.0
4.0 4.0 4.0 4.0
0 0 0 0
L Upstream Signal Data
Prog. Sat Arrival Green Cycle Prog. Distance
j Flow Flow Type Time Length Speed to Signal
vph vph sec sec mph feet
S2 Le t -Turn
Through
S5 Left -Turn
Through
Worksheet 3 -Data for Computing Effect of Delay to Major street Vehicles
' Movement -f Movement 5
0
Shared In volume, major rt vehicles: 0
Sat flow rate, major th vehicles: 1700
Sat flow rate, major rt vehicles: 1700
Number of major street through lanes: 1
Worksheet 4 -Critical Gap and Follow-up Time Calculation
Critical Gap Calculation
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
t(c,Dase)
1.00
1.00
t(c,hv)
1.00
1.00
P(hv)
0.20
0
t(c,g)
0.00
0.00
Grade/100
0.00
0.00
t(3,lt)
0.00
0.00
t(c,T):
1 -stage 0.00
0.00
6.4
2 -stage 0.00
0.00
t(c)
1 -stage
4.1
2 -stage
1.00
1.00
1.00
0
0
0
0.20
0.20
0.10
0.00
0.00
0.00
0.70
0.00
0.00
0.00
0.00
0.00
1.00
1.00
0.00
6.4
6.5
6.2
1.00 1.00 1.00
0.20 0.20 0.10
0.00 0.00 0.00
0.00 0.00 0.00
1.00 1.00 0.00
Follow -Up Time Calculations
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
r(r,Dabu) r.. _ ....... ..__ -.-_
t(f,HV) 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
P(HV) 0 0 0 0
t(f) 2.2 3.5 4.0 3.3
Worksheet 5 -Effect of Upstream Signals
Computation 1 -Queue Clearance Time at Upstream Signa
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
Total Saturation Flow Rate, s (vph)
Arrival Type
Effective Green, g (sec)
Cycle Length, C (sec)
Rp (from table 9-2)
Proportion vehicles arriving on green P
g(gl)
g(g2)
g(g)
F-lizz o TWSC Intersection Time, blocked
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
beta
Travel time, t(a) (sec)
Smoothing Factor, F
Proportion of conflicting flow, f
Max platooned flow, V(c,max)
Min platooned flow, V(c,min)
Duration of blocked period, t(p)
Proportion time blocked, p 0.000 0.000
Computation 3-P atoon Event Periods Result
Nde) 0.000
P(5)
p(dom) -
p(subo)
Constrained or unconstrained?
' 0 A
for minor Single -stage Two -Stage Process
.' movements, p(x) Process Stage I Stage II
p(4)
'p(7)
P(8)
P(9)
P(10)
'p(ll)
p(12)
Computation 4 and 5
i' Single -Stage Process
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
I'V c,x 628 854 854 556
s
' Px
V c,u,x
J
C r,x
C plat,x
' Two -Stage Process
7 B 10 11
Stagel Stage2 Stagel Stage2 Stagel Stage2 Stagel Stage2
V(c,x)
s 1700 1700
P(x)
V(o,n,x)
(r, x)
(plat,x)
6 -Impedance and Capacity Equations
Potential Capacity - 534
Pedestrian Impedance Factor 1.00 1.00
Movement capacity 534
Probability of Queue free St. 0.97 1.00
i'ConriicLing riuwe ---
Potential Capacity 964
Pedestrian Impedance Factor 1.00 1.00
Movement Capacity 964
Probability of Queue free St. 1.00 1.00
,, Maj L -Shared Prob Q free St. - 1.00
Step 3: TH rom Minor St. a. 11
'Con actingCapacF ows
potential ity
I Pedestrian Impedance
Cap. Adj. factor due
�' Movement Capacity
Probability of Queue
298
Factor 1.00 1.00
to Impeding mvmnt 1.00 1.00
297
free St. 1.00 1.00
Step 4: LT from Minor St. 7 10
■
Potential Capacity
Pedestrian Impedance Factor
'Maj. L, Min T Impedance factor
Maj. L, Min T Adj. Imp Factor.
332
1.00
1.00
1.00
1.00
a 0
Movement Capacity 331
Worksheet 7 -Computation of the Effect of Two-stage Gap Acceptance
Step 3: TH from Minor St.
8
11
Part 1 - First Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding
mvmnt
Movement Capacity
Probability of Queue free St.
Part 2 - Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding
mvmnt
Movement Capacity
Part 3 - Single Stage
Conflicting Flows
854
Potential Capacity
298
Pedestrian Impedance Factor
1.00
1.00
Cap. Adj. factor due to Impeding
mvmnt
1.00
1.00
Movement Capacity
297
Result for 2 stage process:
a
y
C t
2
97
Probability of Queue free St.
1.00
1.00
Step 4: LT from Minor St.
7
10
Part 1 - First Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding
mvmnt
Movement Capacity
Part 2 - Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding
mvmnt
Movement Capacity
Part 3 - Single Stage
Conflicting Flows
854
Potential Capacity
332
Pedestrian Impedance Factor
1.00
1.00
Maj. L, Min T Impedance factor
1.00
Maj. L, Min T Adj. Imp Factor.
1.00
Cap. Adj. factor due to Impeding
mvmnt
1.00
0.96
Movement Capacity
331
Results for Two-stage process:
y
C t
331
Worksheet 8 -Shared Lane Calculations
Movement 7 8 9 10 11 12
L T R L T R.—
Volume (vpn) 11 -
Movement Capacity (vph) 331 297 534
' Worksheet 9 -Computation of Effect of Flared Minor Street Approaches
Movement 7 8 9 10 11 12
L T R L T R
C Sep 331 297 534
Volume 97 0 is
Delay
Q Sep
Q Sep +1
round (Qsep +1)
.n max
C sh
SUM C Sep
n
'C act
352
f
Worksheet 10 -Delay, Queue Length, and Level of Service
�' Movement 1 4 7 8 9 10 11 12
Lane Config LT LTR
v (vph)
' C(m) (vph)
v/C
95% queue length
'l Control Delay
LOS
j Approach Delay
_ Approach LOS
964
352
0.00
0.33
0.01
1.44
8.7
20.2
A
C
stream 3 or 6
20.2
J
C
Worksheet 11 -Shared Major LT Impedance and Delay
P(o3)
1.uu
�.....
292
v(il), volume for
stream 2 or 5
0
v(12), volume for
stream 3 or 6
1700
J
s(il), Saturation
flow rate for stream 2 or 5
1700
s(i2), Saturation
flow rate for stream 3 or 6
f`(oj)
d(M,LT), Delay for
stream 1 or 4
1.00
s.7
�
N, Number of major
street through lanes
i
0.0
d(rank,l) Delay for
stream 2 or 5
t
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst:
BEW
Agency/Co.:
Farleigh
Date Performed:
08/22/2003
Analysis Time Period:
PM peak existing
Intersection:
tee
Jurisdiction:
Hawaii Cc
Analysis Year:
2003
Project ID: 435-01T-03
East/West Street:
Lunapuli
North/South Street:
Alii Dr
Intersection Orientation: NS
Vehicle
Major Street: Approach
Movement 1
L
1P
Study period (hrs): 1.00
Volumes and Adjustments
Northbound Southbound
2 3 I 4 5 6
T R L T R
volume
503
80
19
479
Peak -Hour Factor, PHF
1.00
1.00
1.00 1.00
Hourly Flow Rate, HFR
503
80
19
479
Percent Heavy Vehicles
--
--
0
-- --
Median Type Undivided
E
0
0
RT Channelized?
Lanes
1 0
No
0 1
Configuration
TR
LT
Upstream Signal?
No
No
Minor Street: Approach
Westbound
0
1
Eastbound
Movement 7
8
9
I 10
11 12
L
T
R
L
T R
Volume
Delay,
132
0
24
Peak Hour Factor,
PHF
1.00
1.00
1.00
Hourly Flow Rate,
HFR
132
0
24
Percent Heavy Vehicles
0
0
0
Percent Grade ($)
E
0
0
Median Storage
Flared Approach:
Exists?
No
Storage
RT Channelized?
Lanes
0
1
0
Configuration
LTR
C(m) (vph)
Delay,
Queue
Length, and Level of Service
Approach
NB
SB
Westbound Eastbound
Movement
1
4
7 8 9
10 11 12
Lane Config
E
LT
LTR
36.7
C(m) (vph)
1001
268
v/c
0.02
0.58
958 queue length
0.06
3.91
Control Delay
8.7
36.7
LOS
A
E
Approach Delay
36.7
Approach LOS
E
HCS2000: Unsignalized Intersections Release 4.1
Bruce E. Witcher, P.E.
Witcher Engineering LLP —'
74-5588 C Pawai Place
Kailua-Kona, HI 96740
t • •
E -Mail: bewitch@ilhawaii.net
r
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Study period (hrs): 1.00
Vehicle Volumes and Adjustments
Ma3or Street Movements
Analyst:
BEW
3
Agency/Co.:
Farleigh
o
Date Performed:
08/22/2003
PM existing
T
Analysis Time Period:
peak
T
Intersection:
tee
132
Jurisdiction:
Hawaii Cc
f'
Year:
2003
'Analysis
Project ID: 435-01T-03
503 ___0_19
East/West Street:
Lunapuli
479
North/South Street:
Alii Dr
Peak -Hour Factor, PHF
Intersection orientation: NS
Study period (hrs): 1.00
Vehicle Volumes and Adjustments
Ma3or Street Movements
1
2
3
4
D
o
r,
L
T
R
L
T
R
Hourly Flow Rate, HFR
132
0
24
f'
Percent Heavy Vehicles
0
Volume
0
503 ___0_19
Percent Grade M
479
0
• Median Storage
Peak -Hour Factor, PHF
1.00
1.00
1.00
1.00
,
'
Peak -15 Minute Volume
126
20
5
120
Hourly Flow Rate, HFR
- Lanes
503
80
19
479
Percent Heavy Vehicles
--
--
0
--
--
Type
Undivided
'Median
RT Channelized?
Lanes
1 0
0
1
- Configuration
TR
LT
Signal?
No
No
JUpstream
Minor Street Movements
7
8
9
10
11
12
L
T
R
L
T
R
I'
Volume
132
0
24
!.
Peak Hour Factor, PHF
1.00
1.00
1.00
i - Peak -15 Minute Volume
33
0
6
Hourly Flow Rate, HFR
132
0
24
f'
Percent Heavy Vehicles
0
0
0
Percent Grade M
0
0
• Median Storage
Flared Approach: Exists?
No
Storage
RT Channelized?
- Lanes
0
1
0
.Configuration
LTR
Pedestrian Volumes and Adjustment
13 14 15 16
.�.... 'r__,.__(fr
Lane Width t) 12.0 12.0 12.0 12.0
Walking Speed (ft/sec) 4.0 4.0 4.0 4.0
fercent Blockage 0 0 0 0
' Upstream Signal Data
Prog. Sat Arrival Green Cycle Prog. Distance
' Flow Flow Type Time Length Speed to Signal
vph vph sec sec mph feet
Through
S5 Left -Turn
Through
Worksheet 3 -Data for Computing Effect of Delay to Major street Vehicle`s
Movement 2 Movement 5
for minor
movements, p(x)
P(1)
p(4)
P(7)
P(8)
P(9)
p(10)
p(11)
p(12)
Single -stage
Process
Two -Stage Process
Stage I Stage II
W
Computation 4 and 5
single -Stage Process
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
V c,x 583 1060 1060 543
a
Px
V c,u,x
r,x
C plat,x
rocess
7 g 10 11
Stagel Stage2 Stagel Stage2 Stagel Stage2 Stagel Stage2
✓(c,x)
3 1700 1700
?(x)
✓(c,u,x)
(r, X)
J(plat, x)
9orksheet 6 -Impedance and Capacity Equations
Step 1: RT from Minor St. 9 12
?otential Capacity 544
?edestrian Impedance Factor 1.00 1.00
4ovement capacity 544
?robability of Queue free St. 0.96 1.00
Step 2: LT from Major
St.
4
1
;onflicting F owe
- 583.
?otential Capacity
1001
?edestrian Impedance
Factor
1.00
1.00
4ovement Capacity
1001
?robability of Queue
free St.
0.98
1.00
4aj L -Shared Prob Q free
St.
0.97
;tep 3: TH from Minor
St.
8
11
Jon acting Flows
1060
?otential Capacity
226
?edestrian Impedance
Factor
1.00
1.00
Jap. Adj. factor due
to Impeding mvmnt
0.97
0.97
4ovement Capacity
220
?robability of Queue
free St.
1.00
1.00
;tep 4: LT from Minor
St.
7
10
Jonf11ct1ng Flows _ 1060
?otential Capacity 250 -
?edestrian Impedance Factor 1.00 1.00
4aj. L, Min T Impedance factor 0.97
4aj. L, Min T Adj. Imp Factor. 0.98
,1 0 0
Movement capacity 245
N�orksheet 7 -Computation of the Effect of Two-stage Gap Acceptance
mart i - rirsc stage
Conflicting Flows
Capacity
edestrian Impedance
faotential
Factor
p. Adj. factor due
to Impeding mvmnt
Movement Capacity
probability of Queue
free St.
Part 3 - Single Stage
PFart - Second Stage
Conflicting Flows
Conflicting Flows
i_ Potential Capacity
Capacity
Pedestrian Impedance Factor
.otential
edeetrian Impedance
Factor
ap. Adj. factor due
to Impeding mvmnt
0.97
Movement Capacity
L, Min T Adj. Imp Factor.
0.98
i. Cap. Adj. factor due to Impeding mvmnt
0.98
art 3 - Single Stage
Rovement Capacity -
245
onflicting Flows
1060
Potential Capacity
226
edeetrian Impedance
Factor
1.00 1.00
ap. Adj. factor due
to Impeding mvmnt
0.97 0.97
ovement-Capacity
220
eeulL IOr L Uiage PrUUUaU;
C t 220
.Probability of Queue free St. 1.00
ptep-a: Lw rrom minor st.
Part 1 - First Stage
onflicting Flows.
otential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
1.00
-rart t - secona stage
t -Conflicting Flows
Capacity
;'Potential
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
L Movement Capacity
1
Part 3 - Single Stage
Conflicting Flows
1060
i_ Potential Capacity
250
Pedestrian Impedance Factor
1.00
1.00
L, Min T Impedance factor
0.97
J.
L, Min T Adj. Imp Factor.
0.98
i. Cap. Adj. factor due to Impeding mvmnt
0.98
0.94
Rovement Capacity -
245
- -
a
t
s;
Worksheet 8 -Shared Lane Calculations
ume (vpn)
ement Capacity (vph)
245
L T R L T R
245 220 544
0 4P
Worksheet 9 -Computation of Effect of Flared Minor Street Approaches
Movement 7 8 9 10 it 12
L T R L T R
C Sep 1�1 « �
volume 132 0 24
Delay
Q Sep
Q Sep +1
round (Qsep +1)
n max
C sh 268
SUM C Sep
n
C act
Worksheet 10 -Delay, Queue Length, and Level of Service
Movement 1 4 7 8 9 10 11 12
Lane Config LT LTR
C(m)p(vph)
1001
268
v/c
0.02
0.58
95% queue length
0.06
- 3.91
Control Delay
8.7
36.7
LOS
A
E
Approach Delay
36.7
Approach LOS
E
Worksheet 11 -Shared Major LT Impedance and Delay
Movement 2 Movement 5
P(03) �..,,, _....
v(il), Volume for stream 2 or 5 479
v(i2), Volume for stream 3 or 6 0
s(il), Saturation flow rate for stream 2 or 5 1700
s(i2), Saturation flow rate for stream 3 or 6 1700
P'(oj) 0.97
d(M,LT), Delay for stream 1 or 4 8.7
N, Number of major street through lanes 1
d(rank,l) Delay for stream 2 or 5 0.2
I
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
•
Analyst: BEW
'Agency/Co.: Farleigh
Date Performed: 08/22/2003
Analysis Time Period: AM peak future
Intersection: tee
Jurisdiction: Hawaii Cc
Analysis Year: 2003
Project ID: 435-01T-03
East/West Street: Lunapuli
North/South Street: Alii Dr
' Intersection Orientation: NS Study period (hre): 1.00
Vehicle Volumes and Adjustments
Major Street: Approach .Northbound Southbound
Movement 1 2 3 14 5 6
L T R L T R
volume
Peak -Hour Factor, PHF
1:00
1.00
1.00 1.00
Hourly Flow Rate, HFR
499
149
3
295
Percent Heavy vehicles
--
--
0
-- --
Median Type Undivided
RT Channelized?
Lanes
1 0
0 1
Configuration
TR
LT
'Upstream Signal?
No
No
Minor Street: Approach
Westbound
Eastbound
Movement 7
8
9
10
11 12
M L
T
R
L
T R
Peak Hour Factor, PHF 1.00 1.00 1.00
,Hourly Flow Rate, HFR 98 0 18
Percent Heavy Vehicles 0 0 0
Percent Grade (%) 0 0
Median Storage
'Flared Approach: Exists? No
Storage
f RT Channelized?
Lanes 0 1 0
.Conficuration LTR
Delay, Queue Length, and Level of Service
Approac NB SB Westbound Eastbound
lMovement 1 4 17 8 9 10 11 12
Lane Config LT LTR
i
v '(vph) 3 116 C(m) (vph) 947 341
v/c
0.00 0.34
95% queue length 0.01 1.53
Control Delay 8.8 21.0
OS A C
Approach Delay 21.0
Approach LOS C
HCS2000: Unsignalized Intersections Release 4.1
ruce E. Witcher, P.E.
itcher Engineering LLP
74-5588 C Pawai Place
'Kailua-Kona, HI 96740
E -Mail: bewitch@ilhawaii.net
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst:
BEW
149
Agency/Co.:
Farleigh
Peak -Hour Factor, PHF
Date Performed:
08/22/2003
1.00
Analysis Time Period:
AM peak future
125
Intersection:
tee
74
Jurisdiction:
Hawaii Co
149
Analysis Year:
2003
Percent Heavy Vehicles
Project ID: 435-OIT-03
--
0
East/West Street:
Lunapuli
North/South Street:
Alii Dr
Intersection Orientation:
NS
Study period (hrs): 1.00
Vehicle Volumes
and Adjustments
Major Street Movements
1 2
3 4 5 6
1
L T
R L T R
volume
499
149
3
295
Peak -Hour Factor, PHF
1.00
1.00
1.00
1.00
Peak -15 Minute Volume
125
37
1
74
Hourly Flow Rate, HFR
499
149
3
295
Percent Heavy Vehicles
--
--
0
-- --
Median Type Undivided
RT Channelized?
Lanes
1 0
0
1
Configuration
TR
LT
Upstream Signal?
No
No
Minor Street Movements 7
8
9
10
11 12
L
T
R
L
T R
volume
Peak Hour Factor, PHF
Peak -15 Minute Volume
Hourly Flow Rate, HFR
Percent Heavy Vehicles
Percent Grade (i)
Median Storage
Flared Approach: Exists?
Storage
RT Channelized?
Lanes
Configuration
1.00 1.00 1.00
24 0 4
98 0 18
0 0 0
0
No
1 0
LTR
Pedestrian Volumes and Adjustments
Movements 13 14 15- 1,6
Flow (pe hr)
0
0
0
0
Lane Width (ft)
12.0
12.0
12.0
12.0
Walking Speed (ft/sec)
4.0
4.0
4.0
4.0
Percent Blockage
0
0
0
0
Upstream Signal Data
Prog. Sat Arrival Green Cycle Prog. Distance
Flow Flow Type Time Length Speed to Signal
vph vph sec sec mph feet
Through
S5 Left -Turn
Through
Worksheet 3 -Data for Computing Effect of Delay to Major -Street Vehicles
Movement 2 Movement 5
Worksheet
4 -Critical
Gap and
Follow-up
Time
Calculation
Critical
Gap Calculation
Shared In
volume, major
rt vehicles:
0
12
Sat flow
rate, major th
vehicles:
1700
1700
7
Sat flow
rate, major rt
vehicles:
T
R
Number of
major street
through lanes:
I
Worksheet
4 -Critical
Gap and
Follow-up
Time
Calculation
Critical
Gap Calculation
10
11
12
1
4
7
8
9
L
T
R
'Movement
L
L
L
T
R
t(c,base)
1.00
4.1
1.00
7.1
1.00
6.5
1.00
6.2
1.00
1.00
1.00
1.00
t(c,hv)
0
0
0
0
;P(hv)
,t(c,g)
0.20
0.20
0.10
0.20
0.20
0.10
Grade/100
0.00
0.00
0.00
0.00
0.00
0.00
t(3,lt)
0.00
0.70
0.00
0.00
t(c,T):
1 -stage
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
('
2 -stage
0.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
t(c)
1 -stage
4.1
6.4
6.5
6.2
2 -stage
Movement I
L
t(f HV) 0.90 0.90 0.90
P(HHV)V)
t( 0 0
t(f) 2.2 3.5
Worksheet 5 -Effect of Upstream Signals
8 9 10 11
T R L T
4.00 3.30
0.90 0.90 0.90 0.90
0 0
4.0 3.3
12
R
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
INTotal-Saturation Flow Rate, a (vph)
-Arrival Type
'Effective Green, g (sec)
Cycle Length, C (sec)
Rp (from table 9-2)
Proportion vehicles arriving on green P
'4(ql)
g(42)
g(4)
Computation 2 -Proportion of TWSc Intersectiom Time, blocM
Movement 2
V(t) V(l,prot)
Movement 5
V(t) V(l,prot)
inTravel time, t(a) (sec)
Smoothing Factor, F
Proportion of conflicting flow, f
Max platooned flow, V(c,max)
Min platooned flow, V(c,min)
Duration of blocked period, t(p)
Proportion time blocked, p 0.000 0.000
!'Computation 3-P atoon Event Periods Result
P(Z) - 0.000
'p(5)
p(dom)
p(subo)
constrained or unconstrained?
'Proportion
for minor Single -stage Two -Stage Process
movements, p(x) Process Stage I Stage II
P(1)
p(4)
P(7)
P(8)
P(9)
p(10)
P(11)
p(12)
Computation 4 and 5
Single -Stage Process
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
V c,x 648 875 875 574
s
Px
V c,U,x
c r,x
C plat,x
MO
Stagel Stage2
v(c,x)
s 1700
P(x)
V(c, U, X)
vµ n�
C(plat,x)
8 10
Stagel Stage2 Stagel Stage2
1700
Worksheet 6 -Impedance and Capacity Equations
11
Stagel Stage2
Step 1: RT from Minor St.
9 12
Conflicting Flows
574
Potential Capacity
522
Pedestrian Impedance Factor
1.00 1.00
Movement Capacity
522
Probability of Queue free St.
0.97 1.00
Step 2: LT from Major St. 4 1
Conflicting Flows - 648
Potential Capacity 947
Pedestrian Impedance Factor 1.00 1.00
Movement Capacity 947
Probability of Queue free St. 1.00 1.00
Maj L -Shared Prob Q free St. 1.00
Step 3: TH from Minor
St.
8
11
Conflicting Flows
875
Potential Capacity
290
Pedestrian Impedance
Factor
1.00
1.00
Cap. Adj. factor due
to Impeding mvmnt
1.00
1.00
Movement Capacity
289
Probability of Queue
free St.
1.00
1.00
Step 4: LT from Minor St. 7 10
Conflicting Flows 875
Potential Capacity 322
Pedestrian Impedance Factor 1.00 1.00
Maj. L, Min T Impedance factor 1.00
Maj. L, Min T Adj. Imp Factor. 1.00
Movement Capacity 321
Worksheet 7 -Computation of the Effect of Two-stage Gap Acceptance
'Step 3: TH Irom Minor St. B 11
Part 1 - First Stage
Conflicting Flows
'Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Probability of Queue free St.
I
Part 2 - Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Part 3 - Single Stage
j Conflicting Flows 875
potential Capacity 290
Pedestrian Impedance Factor 1.00 1.00
Cap. Adj. factor due to Impeding mvmnt 1.00 1.00
Movement Capacity 289
Result for 2 stage process:
I( a
i y
C t 289
—Probability of Queue free St. 1.00 1.00
Part 1 - First Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
■ Movement Capacity
(--Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Part 3 - Single Stage
Conflicting Flows
875
Potential capacity
322
Pedestrian Impedance Factor
1.00
1.00
Maj. L, Min T Impedance factor
1.00
Maj. L, Min T Adj. Imp Factor.
1.00
Cap. Adj. factor due to Impeding mvmnt
1.00
0.96
_ Movement Capacity
321
process:
y321
I
,C t
` Worksheet 8 -Shared Lane Calculations
!'Movement - 7 8
L T
:,Vo ume (vph) 98 0
Movement capacity (vph) 321 289
522
L
R
0 0
Worksheet 9 -Computation of Effect of Flared Minor Street Approaches
Movement 7 8 9 10 11 12
L T R L T R
C Sep 1
1.
volume 98 0 18
Delay
Q Sep
Q Sep +1
round (Qsep +1)
C sh 341
SUM C Sep
n
C act
Worksheet 10 -Delay, Queue Length, and Level of Service
Movement 1 4 7 8 9 10 11 12
Lane Config LT LTR
C(m) (vph)
v/c
958 queue length
Control Delay
LOS
Approach Delay
Approach LOS
947
341
0.00
0.34
0.01
1.53
8.8
21.0
A
C
21.0
C
Worksheet 11 -Shared Major LT Impedance and Delay
Movement 2 Movement 5
v(il), Volume for stream 2 or 5 295
v(i2), Volume for stream 3 or 6 0
s(il), Saturation flow rate for stream 2 or 5 1700
s(i2), Saturation flow rate for stream 3 or 6 1700
P'(oj) 1.00
d(M,LT), Delay for stream 1 or 4 8.8
N, Number of major street through lanes 1
d(rank,l) Delay for stream 2 or 5 0.0
HCS2000: Unsign• zed Intersections Release 4.1 •
TWO-WAY STOP CONTROL SUMMARY
' Intersection Orientation: NS
Vehicle Volumes and
i Major Street: Approach Northbound
' Movement 1 2
L T
512
Peak -Hour Factor, PHF
Hourly Flow .Rate, HFR
Percent Heavy Vehicles
Median Type Undivided
RT Channelized?
Lanes
Configuration
Upstream Signal?
Study period (hrs): 1.00
Adjustments
Southbound
3 I 4 5 6
R L T R
1.00 1.00 1.00 1.00
512 82 19 494
-- -- 0 --
1 0 0 1
TR LT
No No
Minor Street: Approach Westbound Eastbound
i Movement 7 8 9 I 10 11 12
L T R L T R
ume
Analyst:
HEW
0
Agency/Co.:
Farleigh
PHF
Date Performed:
08/22/2003
1.00
Analysis Time Period:
PM peak future
136
Intersection:
tee
Percent Heavy Vehicles
Jurisdiction:
Hawaii Cc
0
Analysis Year:
2003
Project ID: 435-01T-03
0
tPercent
Median Storage
East/West Street:
Lunapuli
North/South Street:
Alii Dr
' Intersection Orientation: NS
Vehicle Volumes and
i Major Street: Approach Northbound
' Movement 1 2
L T
512
Peak -Hour Factor, PHF
Hourly Flow .Rate, HFR
Percent Heavy Vehicles
Median Type Undivided
RT Channelized?
Lanes
Configuration
Upstream Signal?
Study period (hrs): 1.00
Adjustments
Southbound
3 I 4 5 6
R L T R
1.00 1.00 1.00 1.00
512 82 19 494
-- -- 0 --
1 0 0 1
TR LT
No No
Minor Street: Approach Westbound Eastbound
i Movement 7 8 9 I 10 11 12
L T R L T R
ume
992
136
0
24
!'Vo
Peak Hour Factor,
PHF
1.00
1.00
1.00
Hourly Flow Rate,
HFR
136
0
24
Percent Heavy Vehicles
0
0
0
Grade (9)
E
0
0
tPercent
Median Storage
Flared Approach:
Exists?
No
,_.
Storage
'RT Channelized?
Lanes
Configuration
l
0 1 0
LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 - 9 I 10 11 12
—Lane Config LT LTR.
—C(m)_ (vph)
992
259
`- v/c
0.02
0.62
queue length
0.06
4.45
,954
Control Delay
8.7
40.7
LOS
A
E
Approach Delay
40.7
MApproach LOS
E
1 HCS2000: Unsignalized Intersections Release 4.1
Bruce E. Witcher, P.E.
Witcher Engineering LLP
74-5588 C Pawai Place
Kailua-Kona, HI 96740
0 0
E -Mail: bewitch@ilhawaii.net
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst:
BEW
Agency/Co.:
Farleigh
Date Performed:
08/22/2003
Analysis Time Period:
PM peak future
Intersection:
tee
Jurisdiction:
Hawaii Cc
Analysis Year:
2003
Project ID: 435-01T-03
East/West Street:
Lunapuli
North/South Street:
Alii Dr
Intersection Orientation: NS Study period (hra): 1.00
Vehicle Volumes and Adjustments
Major Street Movements 1 2 3 4 5
L T R L T
volume
512
82
19
494
Peak -Hour Factor, PHF
1.00
1.00
1.00
1.00
Peak -15 Minute Volume
128
20
5
124
Hourly Flow Rate, HFR
512
82
19
494
Percent Heavy Vehicles
--
--
0
--
median -Type Undivided
Flared Approach: Exists?
RT Channelized?
Storage
Lanes
1 0
0
1
Configuration
TR
1
LT
Configuration
Upstream Signal?
No
No
Minor Street Movements 7
8
9
10
11 12
L
T
R
L
T R
volume
136
0
24
Peak Hour Factor, PHF
1.00
1.00
1.00
Peak -15 Minute Volume
34
0
6
Hourly Flow Rate, HFR
136
0
24
Percent Heavy Vehicles
0
0
0
Percent Grade (i)
0
0
Median Storage
Flared Approach: Exists?
No
Storage
RT Channelized?
Lanes
0
1
0
Configuration
LTR
Pedestrian Volumes and Adjustments
Movements 13. 14 15- 3.6
Flow (ped hr)
0
0
0
0
Lane Width (ft)
12.0
12.0
12.0
12.0
Walking Speed (ft/sec)
4.0
4.0
4.0
4.0
Percent Blockage
0
0
0
0
Upstream Signal Data
Prog. Sat Arrival Green Cycle Prog. Distance
Flow Flow Type Time Length Speed to Signal
vph vph sec sec mph feet
S2 Left -Turn
Through
S5 Left -Turn
Through
Worksheet 3 -Data for computing Effect of Delay to Major Street Vehicles
Movement 2 Movement 5
--'Worksheet 4 -Critical Gap and Follow-up Time Calculation
Critical Gap Ca cu ation
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
t(c,base)
t(c,hv) 1.00
'P(hv)
t(c,g)
Grade/100
t(3,1t)
f (c,T): 1 -stage 0.00
2 -stage 0.00
t(c) I -stage
2 -stage
4.1
/.1
•
•
1.00
Shared In
volume, major
rt vehicles:
0
flow
rate, major th
vehicles:
1700
JSat
Sat flow
rate, major rt
vehicles:
1700
Number of
major street
through lanes:
I
--'Worksheet 4 -Critical Gap and Follow-up Time Calculation
Critical Gap Ca cu ation
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
t(c,base)
t(c,hv) 1.00
'P(hv)
t(c,g)
Grade/100
t(3,1t)
f (c,T): 1 -stage 0.00
2 -stage 0.00
t(c) I -stage
2 -stage
4.1
/.1
0.0
0.4
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0
0
0
0
( ase)
2.20
3.50
0.20
0.20
0.10
0.20
0.20
0.10
0.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.70
0.00
0.00
3.5
4.0
3.3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
4.1
6.4
6.5
6.2
` Worksheet 5 -Effect of Upstream signals
omputation 1 -Queue Clearance Time at Upstream Signal
i OCMovement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
W prog
Total Saturation Flow Rate, s (vph)
Arrival Type
Affective Green, g (sec)
yCle Length, C (sec)
���RRRp (from table 9-2)
Proportion vehicles arriving on green P
��99(ql)
f3
(q2)
(q)
pomputation 2 -Proportion of rwsc lnterscu�Lun
II Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
0
'ETravel time, t(a) (sec)
Smoothing Factor, F
roportion of conflicting flow, f
ax platooned flow, V(c,max)
in platooned flow, V(c,min)
Duration of blocked period, t(p)
`=Proportion time blocked, p
c/
5)
dom)
subo)
or unconstrained?
sm
Follow -Up
Time Calculations
Movement
1 4
7
8
9 10 11 12
L L
L
T
R L T R
( ase)
2.20
3.50
4.00
3.30
t(f,HV)
0.90 0.90
0.90
0.90
0.90 0.90 0.90 0.90
P(HV)
0
0
0
0
I(f)
2.2
3.5
4.0
3.3
` Worksheet 5 -Effect of Upstream signals
omputation 1 -Queue Clearance Time at Upstream Signal
i OCMovement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
W prog
Total Saturation Flow Rate, s (vph)
Arrival Type
Affective Green, g (sec)
yCle Length, C (sec)
���RRRp (from table 9-2)
Proportion vehicles arriving on green P
��99(ql)
f3
(q2)
(q)
pomputation 2 -Proportion of rwsc lnterscu�Lun
II Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
0
'ETravel time, t(a) (sec)
Smoothing Factor, F
roportion of conflicting flow, f
ax platooned flow, V(c,max)
in platooned flow, V(c,min)
Duration of blocked period, t(p)
`=Proportion time blocked, p
c/
5)
dom)
subo)
or unconstrained?
sm
W V
for minor Single -stage Two -Stage Process
movements, p(x) Process Stage I Stage II
p(4)
P(7)
P(8)
P(9)
P(10)
P(11)
p(12)
Computation 4 and 5
Single -Stage Process
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
V c,x 594 1085 1085 553
s
Px
V c,u,x
C r,x
c plat,x
Two -Stage Process
7 8 10 11
Stagel Stage2 Stagel Stage2 Stagel Stage2 Stagel Stage2
V(c,x)
0 1700 1700
P(x)
V(c, u, x)
c(r,x)
C(plat,x)
Worksheet 6 -Impedance and Capacity Equations
Step 1: RT from Minor St.
9
12
Conflicting Flows
553
Potential Capacity
537
Pedestrian Impedance Factor
1.00
1.00
Movement Capacity
537
Probability of Queue free St.
0.96
1.00
Step 2: LT from Major St.
_ 4
1
Conflicting Flows -
594
Potential Capacity
992
Pedestrian Impedance Factor
1.00
1.00
Movement Capacity
992
Probability of Queue free St.
0.98
1.00
Maj L -Shared Prob Q free St.
0.97
Step 3: TH from Minor St.
8
11
Conflicting Flows
1085
Potential Capacity
218
Pedestrian Impedance Factor
1.00
1.00
Cap. Adj. factor due to Impeding mvmnt
0.97
0.97
Movement Capacity
212
Probability of Queue free St.
1.00
1.00
Step 4: LT rom Minor St.
7
10
Conflicting Flows
1085 -
Potential Capacity
242
Pedestrian Impedance Factor
1.00
1.00
Maj. L, Min T Impedance factor
0.97
Maj. L, Min T Adj. Imp Factor.
0.98
0
' Movement Capacity 237
Worksheet 7 -Computation of the Effect of Two-stage Gap Acceptance
NSteo - : TH from Minor St. 8 11
rarz .i - rirsc bcage
Conflicting Flows
'Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Probability of Queue free St.
i.—Part 2 - Second Stage
Conflicting Flows
1.00
Potential Capacity
0.97
Pedestrian Impedance Factor
0.98
0.98
Cap. Adj. factor due to Impeding mvmnt
237
Movement Capacity
Part 3 - Single Stage
Conflicting Flows
1085
Potential Capacity
218
Impedance Factor
1.00 1.00
,'Pedestrian
Cap. Adj. factor due to Impeding mvmnt
0.97 0.97
Movement Capacity
212
process:
C t
Probability of Queue free St.
rarc 1 - r iraa. al aye
Conflicting Flows
( Potential Capacity
Pedestrian Impedance Factor
Cap. Adj, factor due to Impeding mvmnt
Movement Capacity
rarc z - oeconu acaye
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
i Movement Capacity
i Potential Capacity
'Pedestrian Impedance Factor
Maj. L, Min T Impedance factor
Maj. L, Min T Adj. Imp Factor.
Cap. Adj. factor due to Impeding mvmnt
MMovement Capacity
a
t
s
prUue ;
Worksheet 8 -Shared Lane Calculations
r•.,
Capacity (vph)
212
1.00
1.00
1085
242
1.00
1.00
0.97
0.98
0.98
0.94
237
237
7 8 9 10 11 —12
L T R L T R
237 212 537
Worksheet 9 -Computation of Effect of Flared Minor Street Approaches
Movement 7 8 9 10 11 12
L T R L T R
C Sep cam, «t 3u
Volume 136 0 24
Delay
Q Sep
Q Sep +1
round (Qsep +1)
n max
c sh 259
SUM C Sep
n
C act
Worksheet 10 -Delay, Queue Length, and Level of Service
Movement 1 4 7 8 9 10 11 12
Lane Config LT LTR
V (vpn)
.I
....,
C(m) (vph)
992
259
v/c
0.02
0.62
95% queue length
0.06
4.45
Control Delay
8.7
40.7
LOS
A
E
Approach Delay
40.7
Approach LOS
E
Worksheet 11 -Shared Major LT Impedance and Delay
Movement 2 Movement 5
p(o))
v(il), Volume for stream 2 or 5 494
v(i2), Volume for stream 3 or 6 0
s(il), Saturation flow rate for stream 2 or 5 1700
s(i2), Saturation flow rate for stream 3 or 6 1700
p.(oj) 0.97
d(M,LT), Delay for stream 1 or 4 8.7
N, Number of major street through lanes 1
d(rank,l) Delay for stream 2 or 5 0.2
I
0
APPENDIX E
LEVEL OF SERVICE
0
DEVELOPMENT ENTRANCE
a
a
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst:
BEW
Agency/Co.:
Farleigh
Date Performed:
08/22/2003
Analysis Time Period:
AM peak, project
Intersection:
tee
Jurisdiction:
Hawaii Co
Analysis Year:
2003
Project ID: 435-OIT-03
East/West Street:
Project
North/South Street:
Alii Dr
Intersection Orientation: NS
complete
Study period (hrs): 1.00
Vehicle Volumes and Adjustments
Major Street: Approach Northbound southbound
Movement 1 2 3 14 5 6
L T R L T R
volume
Peak -Hour Factor, PHF
Hourly Flow Rate, HFR
Percent Heavy Vehicles
Median Type Undivided
RT Channelized?
Lanes
Configuration
Upstream Signal?
1.00 1.00 1.00
613 7 4
-- -- 0
1 0
TR
No
1.00
374
0 1
LT
No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R L T R
volume
4
+z
U
LV
Peak Hour Factor,
PHF
1.00
1.00
1.00
Hourly Flow Rate,
HFR
12
0
20
Percent Heavy Vehicles
0
0
0
Percent Grade (i)
15.4
Approach LOS
0
C
Median Storage
Flared Approach:
Exists?
No
Storage
RT Channelized?
Lanes
0
1
0
Configuration
LTR
Delay,
Approach NB
Movement 1
Lane Config
Queue Length, and LevEl
SR Westbound
4 I 7 8
LT LTR
0
of Service
I Eastbound
9 1 10 11 12
v (vpn)
4
oc
C(m) (vph)
970
378
v/c
0.00
0.08
958 queue length
0.01
0.28
Control Delay
8.7
15.4
LOS
A
C
Approach Delay
15.4
Approach LOS
C
HCS2000: Unsignalized Intersections Release 4.1
Bruce E. Witcher,-P.E.
Witcher Engineering LLP
74-5588 C Pawai Place
Kailua-Kona, HI 96740
' 0 0
E -Mail: bewitch@ilhawaii.net
TWO-WAY STOP CONTROL(TWSC) ANALYSIS
Analyst: BEW
�' Agency/Co.: Farleigh
Date Performed: 08/22/2003
Analysis Time Period: AM peak, project complete
Intersection: tee
('Jurisdiction: Hawaii Co
Analysis Year: 2003
Project ID: 435-01T-03
East/West Street: Project
,North/South Street: Alii Dr
Intersection Orientation: NS
Vehicle
,Major Street Movements 1
L
I
Vo ume
,Peak -Hour Factor, PHF
Peak -15 Minute Volume
i Hourly Flow Rate, HFR
Percent Heavy Vehicles
Median Type Undivided
1 RT Channelized?
Lanes
Signal?
Study period (hrs): 1.00
Volumes and Adjustments
2 3 4 5 6
T R L T R
1.00 1.00 1.00 1.00
153 2 1 94
613 7 4 374
-- 0 -- --
0 0
TR LT
No No
R
Peak Hour Factor, PHF 1.00 1.00 1.00
Peak -15 Minute Volume 3 0 5
'Hourly Flow Rate, HFR 12 0 20
{ Percent Heavy Vehicles 0 0 0
IL Percent Grade (B) 0 0
Median Storage
'Flared Approach: Exists? No
( Storage
![ RT Channelized?
Lanes 0 1 0
'Configuration LTR
{
Pedestrian Volumes and Adjustments
�A/nvomont a 13 14 15 16
_ Lane Wtidth (ft) 12.0 12.0 12.0 12.0
Walking Speed (ft/sec) 4.0 4.0 4.0 4.0
i' Percent Blockage 0 0 0 0
R
�- Upstream Signal Data
Prog. Sat Arrival Green Cycle Prog. Distance
Flow Flow Type Time Length Speed to Signal
j vph vph sec sec mph feet
Through
S5 Left -Turn
Through
Worksheet 3 -Data for Computing Effect of Delay to Major Street Vehicles
0 a
Shared In volume, major rt vehicles: 0
Sat flow rate, major th vehicles: 1700
Sat flow rate, major rt vehicles: 1700
Number of major street through lanes: 1
Worksheet 4 -Critical Gap and Follow-up Time Calculation
Critical Gap Calculation
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
t(c, base)
t(c,hv) 1.00
P(hv)
t(c,g)
Grade/100
t(3,It)
t(c,T): 1 -stage 0.00
2 -stage 0.00
t(c) 1 -stage
2 -stage
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0
0
0
0
0
0
0
0
0.20
0.20
0.10
0.20
0.20
0.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
4.1
6.4
6.5
6.2
Follow -Up Time Calculations
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
t(f,base)
2.20
3.50
4.00
3.30
t(f,HV)
0.90 0.90
0.90
0.90
0.90 0.90 0.90 0.90
P(HV)
0
0
0
0
t(f)
2.2
3.5
4.0
3.3
Worksheet 5 -Effect of Upstream Signals
Computation 1 -Queue Clearance Time at Upstream Signal
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
V prog
Total Saturation Flow Rate, s (vph)
Arrival Type
Effective Green, g (sec)
Cycle Length, C (sec)
Rp (from table 9-2)
Proportion vehicles arriving on green P
g(gl)
g(42)
g(g)
Computation 2 -Proportion of TWSC Intersection Time blocked
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
beta
Travel time, t(a) (sec)
Smoothing Factor, F
Proportion of conflicting flow, f
Max platooned flow, V(c,max)
Min platooned flow, V(c,min)
Duration of blocked period, t(p)
Proportion time blocked, p 0.000 0.000
Computation 3 -Platoon Event Periods Result
P(Z)
p(5) 0.000
p(dom) -
p(subo)
Constrained or unconstrained?
for minor Single -stage Two -Stage Process
■ movements, p(x) Process Stage I Stage II
P(1)
4
'P(7)
p(8)
P(9)
POO)
'p(11)
P(12)
computation 4 and 5
Single -Stage Process
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
r'V C,X Ulu 77o 170 vav
s
PX
V c,u,x
'C r,x
c plat,x
Two -Stage Process
7 8 10 11
Stagel Stage2 Stagel Stage2 Stagel Stage2 Stagel Stage2
i
Iva(c,x)
1700 1700
jP(X)
V(c,u,x)
C(r,x)
C(plat,x)
L
('Worksheet 6 -Impedance and Capacity Equations
Sten 1: RT from Minor St. 9 12
i:onzii��i�I ri.,..=
( Potential Capacity 494
i Pedestrian Impedance Factor 1.00 1.00
1 Movement Capacity 494
'Probability of Queue free St. - 0.96 1.00
Step 2: LT from Major St. 4 1
I
conrliczing riuwn
Potential Capacity 970
Pedestrian Impedance Factor 1.00 1.00
Movement Capacity 970
'Probability of Queue free St. 1.00 1.00
Maj L -Shared Prob Q free St. 0.99
Step : TH from Minor St. 8 11
M
fConf icting F ows 99b
Potential Capacity 246
L Pedestrian Impedance Factor 1.00 1.00
Cap. Adj. factor due to Impeding mvmnt 0.99 0.99
Movement Capacity 245
Probability of Queue free St. 1.00 1.00
Pedestrian Impedance Factor l.Uu i.Uu
'Maj. L, Min T Impedance factor 0.99
Maj. L, Min T Adj. Imp Factor. 1.00
Muvement Capacity 272
Worksheet 7 -Computation of the Effect of Two-stage Gap Acceptance
Step 3: TH from Minor St. 8 11
Part 1 - First Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Probability of Queue free St.
Part 2 - Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Part 3 - Single Stage
Conflicting Flows 998
Potential Capacity 246
Pedestrian Impedance Factor 1.00 1.00
Cap. Adj. factor due to Impeding mvmnt 0.99 0.99
Movement Capacity 245
Result for 2 stage process:
a
y
C t 245
Probability of Queue free St. 1.00 1.00
Step 4: LT from Minor St. 7 10
Part 1 - First Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Part 2 - Second Stage
Conflicting Flows
Potential Capacity
.
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Part 3 - Single Stage
Conflicting Flows
998
Potential Capacity
273
Pedestrian Impedance Factor
1.00
1.00
Maj. L, Min T Impedance factor
0.99
Maj. L, Min T Adj. Imp Factor.
1.00
Cap. Adj. factor due to Impeding mvmnt
1.00
0.96
Movement Capacity
272
Results for Two-stage process:
y
C t 272
Worksheet 8 -Shared Lane Calculations
Movement 7 8 9 10 11 12
L T R L T R—
volume (vpn) 14 U zu
Movement Capacity (vph) 272 245 494
' Worksheet 9 -Computation of Effect of Flared Minor Street Approaches
Movement 7 8 9 10 11 12
L T R L T R
' C eep 272 245 494
Volume
Delay
Q sep
Q eep +1
round (Qsep +1)
;I n max
C sh
SUM C sep
n
C act
I
12 0 20
378
heet 10 -Delay, Queue Length, and Level of Service
!MMovement
1 4 7
8
L Lane Config
LT
LTR
'v (vph)
4
32
C(m) (vph)
970
378
v/c
0.00
0.08
95i queue length
Control Delay
0.01
8.7
0.28
15.4
( LOS
A
C
! Approach Delay
15.4
_ Annroach LOS
C
Worksheet 11 -Shared Major LT Impedance and Delay
I P(o))
v(il), Volume for stream 2 or 5
'v(i2), Volume for stream 3 or 6
( s(il), Saturation flow rate for stream 2 or 5
I
s(i2), Saturation flow rate for stream 3 or 6
p*(oj)
'd(M,LT), Delay for stream 1 or 4
N, Number of major street through lanes
d(rank,l) Delay for stream 2 or 5
374-
0
1700
1700
0.99
8.7
1
0.0
0
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst: HEW
Agency/Co.: Farleigh
Date Performed: 08/22/2003
Analysis Time Period: PM peak, project complete
'Intersection: tee
Jurisdiction: Hawaii Co
Analysis Year: 2003
Project ID: 435-OIT-03
East/West Street: Project
North/South Street: Alii Dr
a
Intersection Orientation: NS Study period (hrs): 1.00
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R L T R
volume
514
20
19
510
Peak -Hour Factor, PHF
1.00
1.00
1.00 1.00
Hourly Flow Rate, HFR
514
20
19
510
Percent Heavy Vehicles
--
--
0
-- --
Median Type Undivided
v/c
0.02
0
0
RT Channelized?
0.19
Control Delay
8.5
16.1
Lanes
1 0
C
No
0 1
Configuration
TR
C
LT
Upstream Signal?
No
-
No
Minor Street: Approach Westbound
0
Eastbound
Movement 7
8
9
30
11 12
L
T
R
L
T R
volume
SB
10
0
11
Peak Hour Factor,
PHF
1.00
1.00
1.00
Hourly Flow Rate,
HFR
10
0
11
Percent Heavy Vehicles
0
0
0
Percent Grade (%)
v/c
0.02
0
0
Median Storage
0.19
Control Delay
8.5
16.1
Flared Approach:
Exists?
C
No
16.1
Storage
C
RT Channelized?
Lanes
0
1
0 _.
Configuration
LTR
Delay, Queue Length, and Level of Service
Approach NB
SB
Westbound Eastbound
Movement 1
4
7 8 9
10 11 12
Lane Config
LT
LTR
v (vph)
19
21
C(m) (vph)
1044
344
v/c
0.02
0.06
958 queue length
0.06
0.19
Control Delay
8.5
16.1
LOS
A
C
Approach Delay
16.1
Approach LOS
C
HCS2000: Unsignalized Intersections Release 4.1
Bruce E. Witcher, P.E.
Witcher Engineering LLP
74-5588 C Pawai Place
Kailua-Kona, HI 96740
0
E-Mail: bewitch@ilhawaii.net
- TWO-WAY STOP CONTROL(TWSC) ANALYSIS
.Analyst: HEW
'Agency/Co.: Farleigh
" Date Performed: 08/22/2003
Analysis Time Period: PM peak, project
Intersection: tee
'Jurisdiction: Hawaii Co
Analysis Year: 2003
Project ID: 435-OIT-03
East/West Street: Project
'North/South Street: Alii Dr
Intersection orientation: NS
complete
Study period (hrs): 1.00
Vehicle Volumes and Adjustments
major Street Movements 1 2 3 4 5 6
L T R L T R
Peak -Hour Factor, PHF
Peak -15 Minute Volume
Hourly Flow Rate, HFR
Percent Heavy Vehicles
..'Median Type Undivided
RT Channelized?
Lanes
Configuration
Upstream Signal?
L
1.00 1.00 1.00 1.00
128 5 5 128
514 20 19 510
1 0
TR
No
8
T
'Peak Hour Factor, PHF
0
1
1.00
- Peak -15 Minute Volume
LT
0
3
Flow Rate, HFR
10
No
11
'Hourly
Percent Heavy Vehicles
0
0
0
V-1 0
11
12
R L
T
R
'Peak Hour Factor, PHF
1.00
1.00
1.00
- Peak -15 Minute Volume
2
0
3
Flow Rate, HFR
10
0
11
'Hourly
Percent Heavy Vehicles
0
0
0
Percent Grade ($)
0
•-Median Storage
Approach: Exists?
No
,'Flared
Storage
RT Channelized?
-Lanes
0
1 0
WConfiguration
LTR
C
ian Volumes and Adjustments
13 14 15- 1,6
mr-iow (peu/nr) - - - -
Lane Width (ft) 12.0 12.0 12.0 12.0
Walking Speed (ft/sec) 4.0 4.0 4.0 4.0
'Percent Blockage 0 0 0 0
Upstream Signal Data
Prog. Sat Arrival Green Cycle Prog. Distance
Flow Flow Type Time Length Speed to Signal
vph vph sec sec mph feet
Through
S5 Left -Turn
-- Through
3 -Data for Computing Effect of Delay to Major Street Vehicles
0 a
Shared In
volume, major
rt vehicles:
0
Sat flow
rate, major th
vehicles:
1700
Sat flow
rate, major rt
vehicles:
1700
Number of
major street
through lanes:
I
Worksheet 4 -Critical Gap and Follow-up Time Calculation
critical Gap Ca culation
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
t(c, ase)
t(c,hv)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
P(hv)
0
0
0
0
t(c,g)
0.20
0.20
0.10
0.20
0.20
0.10
Grade/100
0.00
0.00
0.00
0.00
0.00
0.00
t(3,lt)
0.00
0.70
0.00
0.00
t(c,T):
1 -stage
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2 -stage
0.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
t(c)
1 -stage
4.1
6.4
6.5
6.2
2 -stage
Follow-up
Time Calculations
Movement
1
4
7
8
9
10
11
12
L
L
L
T
R
L
T
R
0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
,
t(fHV)
-P(HV) 0 0 0 0
t(f) 2.2 3.5 4.0 3.3
Worksheet 5 -Effect of Upstream Signals
Computation 1 -Queue Clearance Time at Upstream Signa
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
V prog
Total Saturation Flow Rate, s (vph)
Arrival Type
Effective Green, g (sec)
Cycle Length, C (sec)
Rp (from table 9-2)
Proportion vehicles arriving on green P
9(41)
g(42)
g(4)
Computation -Proportion of TWSC Intersection Time, blocked
Movement 2 Movement 5
V(t) V(l,prot) V(t) V(l,prot)
Travel time, t(a) (sec)
Smoothing Factor, F
Proportion of conflicting flow, f
Max platooned flow, V(c,max)
Min platooned flow, V(c,min)
Duration of blocked period, t(p)
Proportion time blocked, p 0.000 0.000
Computation 3 -Platoon Event Periods Result
P15) 0.000
p(dom)
p(subo)
Constrained or unconstrained?
for minor Single -stage Two -Stage Process
movements, p(x) Process Stage I Stage II
P(l)
P(4)
JP(7)
P(e)
P(9)
'P(1o)
p(12)
Computation 4 and 5
Single -Stage Process
Movement 1 4 7 8 9 10 11 12
L L L T R L T R
r,x
plat,x
Two -Stage Process
7 e 10 11
Stagel Stage2 Stagel Stage2 Stagel Stage2 Stagel Stage2
V(c, x)
e 1700 1700
P(x)
V(C,u,X)
,c(r,x)
j C(plat,x)
r
L
6 -Impedance and Capacity Equations
step a:
Conflicting Flows "I
Potential Capacity 557
Pedestrian Impedance Factor 1.00 1.00
- Movement Capacity 557
Probability of Queue free St. 0.98 1.00
Step 2: LT from Major St. 4 1
jtconriicting eiowy
Potential Capacity 1044
Pedestrian Impedance Factor 1.00 1.00
- Movement Capacity 1044
'Probability of Queue free St. 0.98 1.00
Maj L -Shared Prob Q free St. 0.97
Step : TH from Minor St. 8 11
JConflicting Flows
1072
Potential capacity
222
Pedestrian Impedance
Factor
1.00
1.00
_
Cap. Adj. factor due
to Impeding mvmnt
0.97 -
0.97
Movement Capacity
216
�' Probability of Queue
free St.
1.00
1.00
Step 4: LT from Manor
St.
7_1
0
'
'gCon acting F ows lu7[-
Potential Capacity 246
Pedestrian Impedance Factor 1.00 1.00
'Maj. L, Min T Impedance factor 0.97
Maj. L, Min T Adj. Imp Factor. 0.98
Movement Capacity 242
Worksheet 7 -Computation of the Effect of Two-stage Gap Acceptance
Step 3: TH from Minor St.
8 11
Part 1 - First Stage
Conflicting Flows
Conflicting Flows
Potential Capacity
Potential Capacity
Pedestrian Impedance Factor
Pedestrian Impedance
Factor
Cap. Adj. factor due
to Impeding mvmnt
Movement Capacity
Part 3 - Single Stage
Probability of Queue
free St.
1072
Part 2 - Second Stage
Potential Capacity
246
Conflicting Flows
Pedestrian Impedance Factor
1.00
Potential Capacity
Maj. L, Min T Impedance factor
Pedestrian Impedance
Factor
Cap. Adj. factor due
to Impeding mvmnt
0.98
Movement Capacity
Movement Capacity
242
Part 3 - Single Stage
Conflicting Flows
1072
Potential Capacity
222
Pedestrian Impedance
Factor
1.00 1.00
cap. Adj. factor due
to Impeding mvmnt
0.97 0.97
Movement Capacity
216
Result for 2 stage process:
y 2
C t 16
Probability of Queue free St. 1.00 1.00
Step 4: LT from Minor St. .7 10
Part 1 - First Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Part 2 - Second Stage
Conflicting Flows
Potential Capacity
Pedestrian Impedance Factor
Cap. Adj. factor due to Impeding mvmnt
Movement Capacity
Part 3 - Single Stage
Conflicting Flows
1072
Potential Capacity
246
Pedestrian Impedance Factor
1.00
1.00
Maj. L, Min T Impedance factor
0.97
Maj. L, Min T Adj. Imp Factor.
0.98
Cap. Adj. factor due to Impeding mvmnt
0.98
0.96
Movement Capacity
242
Results for Two-stage process:
y 2
C t 42
Worksheet 8 -Shared Lane calculations
Movement 7 8 9 10 11 12
L T R - L T 8_
Volume (vph) 10 0 11
Movement Capacity (vph) 242 216 557
I
IWorksheet
Movement 7 8 9 10 11 12
L T R L T R
' C sep 242 216 557
volume 10 0 11
Delay
Q 8ep
Q Sep +1
round (Qsep +1)
E
0
9 -Computation of Effect of Flared Minor Street Approaches
n max
C sh 344
SUM C sep
'n
C
act
Worksheet 10 -Delay, Queue Length, and Level of Service
Lane Config
LT
LTR
(vph)
19
21
C(m) (vph)
,'v
1044
344
vac
0.02
0.06
95%. queue length
0.06
0.19
8.5
16.1
i1Control-Delay
LOS
A
C
Approach Delay
16.1
Approach LOS
C
11 -Shared Major LT Impedance and Delay
Movement 2 Movement 5
0 1.00 0.98
v( 3)
- il), Volume for stream 2 or 5 510
v(i2), Volume for stream 3 or 6 0
r' s(il), Saturation flow rate for stream 2 or 5 1700
s(i2), Saturation flow rate for stream 3 or 6 1700
p"(oj) 0.97
d(M41,T), Delay for stream 1 or 4 8.5
-'N, Number of major street through lanes 1
d(rank,l) Delay for stream 2 or 5 0.2
J
0 0
APPENDIX F
TRAFFIC MOVEMENT DIAGRAMS
ALII DRIVE & ROYAL POINCIANA STREET
Alii Drive - Royal Poinciana Street
Traffic Movement - Existing Conditions
AM Peak Hour
490
270
331
111
220
1N 435-OIT-03
8/18/03
188
111 77
77
(347
270
104
324
220
WITCHER ENGINEERING LL
Keilue Konek HnwHwy,,
YBe<0106 C.� 1a., Ci.il E.4i.wn
'BOB' 334-0322 C..rtrwai. Moyan
Alii Drive - Royal Poinciana Street
Traffic Movement - Existing Conditions
PM Peak Hour
454
372
104
360
JN 435-01T-03
8/18/03
185
104 8
453
72
117
477
360
a
Y
w
Y
Q
J
Q
w
Y
-A WITCHER
ENGINEERING LLP
-sass Eu ,n. Hry sie. ,o9
C .... Ili., Ci.il E.yi.—
RnJue-Kona H...n 96149
1809, 33<-0322 _�
Q.4rv[(i.e %gym. [...
I
Alii Drive - Royal Poinciana Street
Traffic Movement - Future Conditions
AM Peak Hour
a 497
o (274
Y
Q
a
115
Y
343
228
JN 435-O1T-03
8/18/03
327
'3 104
192
115 7
A
351 Q
?74 Y
w
X
Q
104 w
332 Y
228
WITCHER ENGINEERING LLI
75-5751 Kuakmi Hwy Ste 106 C.. Ik:y Ci.a Egia»w
Kaaue-Kona. B.,i 66740
(BOB) 339-0322 K'�
Alii Drive - Royal Poinciana Street
Traffic Movement - Future Conditions
PM Peak Hour
187
106 E
474
388
474
106
368
JN 435 -DIT -03
8/18/03
469
388
117
485
368
'vk WITCHER ENGINEERING LLP
75-5751 Au.kmi HvV.. Ste 105 Ca Jfi.( Ci.il Egi...n
1,1v.-K.n.. x....11 9B04o —� M...r..
18081334-0322
1
I
1
�1
1
TRAFFIC MOVEMENT DIAGRAMS
ALU DRIVE & LUNAPULE ROAD
Alii Drive - Lunapule Street
Traffic Movement - Existing Conditions
AM Peak Hour
�I
li
i
115 147
18 97 3 144
J
18 144
Q 502 628 Q
0 )484 484 w
Q Q
a 3 97 w
Y 295 389 Y
292 292
WITCHER ENGINEERING LLP
SN 435-01T-03 ]5595] Kuekini x. Ste 106
8/18/03 Keil ue-Kone. Hewefi90740 �� Cu �4q :,,il Egi.wn
<B0B1 334-0322 Cw6vdiw tt,..
Alii Drive - Lunapule
Traffic Movement - Existing
PM Peak Hour
99
19 8
A i
527
503
.•N
19
479
JN 435-O1T-03
8/18/03
Street
Conditions
583
503
132
479
611
WITCHER ENGINEERING LLF
4V&
05-5951 Ku -kin] Hwy Ste 106 G. 16.E CiA E..;.»n
Keilue-Kan e. New eii 96040
IB061334-0322
Alii Drive - Lunapule Street
Traffic Movement - Future Conditions
AM Peak Hour
Q 517
o (499
Y
a
a 3
Y
298
295
JN 435-O1T-03
8/18/03
648
99
98
393
295
Q
Y
W
Y
a
J
Q
w
Y
'Nk WITCHER ENGINEERING LLP
75- 5751 nuexini Hwy Ste 106
K,J.. Hone. Hvv eJ 96140
18001334-0322
z
z
0
Y
Q
J
a
Y
Alii Drive - Lunapule Street
Traffic Movement - Future Conditions
PM Peak Hour
536
512
513
19
494
JN 435-01T-03
B/18/03
101
19 82
1,
II
82
(594
512
136
630
494
-A WITCHER
ENGINEERING LLF
75-5/51 6uek)ni Nwy., Sle ]O6
n.ilu,K.... H.w.11 asv.o
(`�fi.� Qidl E.si.—n
C..a...6.. M...�..,
(808) 394-0322
r
APPENDIX H
w
TRAFFIC MOVEMENT DIAGRAMS
AT DEVELOPMENT ENTRANCE
Alii Drive - Project Site
Traffic Movement - At Build Out
PM Peak Hour
\i
21
Z�
1 10
Q 525
o
Y 514
Q
J
Q 19
Y
529 {
(� 510
JN 435-01T-03
8/18/03
39
19
Gv � 534 a
514 )
Y
W
Y
Q
J
10 w
520 Y
510
WITCHER ENGINEERING LLP
95-5951 Nuekmi Hay Ste 108 Coe W., Cidl E.6.—.18W 33Kone. R. '6"
88960 CeeAeeNio M.ee
Kee, o 23400322 _� {e^
§ 25-5-166
Section 25-5-166.
Minimum yards.
HAwAii COUNTY CODs
'There shall be no minimum yards in the O district, except as specified as a condition of approval
attached to any plan approval. For this purpose, the minimum yard regulations in the adjoining districts shall
be used as guides.
(1996, Ord. No. 96-160, sec. 2; ratified April 6, 1999.)
Section 25-5-167. Other regulations.
Plan approval shall be required for all new structures and additions to existing structures in the O district.
(1996, Ord. No. 96-160, sec. 2; ratified April 6, 1999.)
Article 6. Optional Development Regulations.
Division 1. Planned Unit Development (P.U.D.).
Section 25-6-1. Purpose.
The purpose of planned unit development (P.U.D.) is to encourage comprehensive site planning that
adapts the design of development to the land, by allowing diversification in the relationships of various uses,
buildings, structures, open spaces and yards, building heights, and lot sizes in planned building groups, while
still insuring that the intent of this chapter is observed
(1996, Ord No. 96-160, sec. 2; ratified April 6, 1999.)
Section 25-6-2. Minimum land area required.
The minimum land area required for a P.U.D. shall be two acres.
(1996, Ord No. 96-160, sec. 2; ratified April 6, 1999.)
Section 25-6-3. Application for P.U.D. permit; requirements.
An application for a P.U.D. permit shall be on a form prescribed for this purpose by the director and
shall be accompanied by:
(1) A filing fee of $500.
(2) A written description of the proposed project, including the following information:
(A) A description of the property in sufficient detail to determine the precise location of the
property involved;
(B) A statement of objectives and reasons for the requested P.U.D. permit, including an analysis
of how the request satisfies the standards contained in section 25-6-10;
(C) A list of all requested deviations or variances from the requirements of chapter 23
(subdivisions) and chapter 25 (zoning) of the County Code;
(D) A schedule for the timetable of the proposed development; and
(E) An analysis of the relationship of the proposed development to the general plan.
(3) Drawings and plans comprising a general development plan covering the entire area of the P.U.D.,
and providing the following information:
(A) Uses, dimensions, and locations of proposed structures;
(B) Widths, alignments, and improvements of proposed streets and pedestrian and drainage ways;
(C) Any proposed subdivision of property for individual parcel sale;
(D) Parking areas;
(E) Public areas and uses; and
(F) Landscaping and open spaces.
(4) Architectural drawings for all buildings other than single-family dwellings demonstrating the design
and character of the proposed buildings and uses.
EXHIBIT
(Hawaii Cosy 7.1-00) 25-92 _ V
ZONING § 25-6-3
(5) A list of the names, addresses and tax map key numbers of all surrounding owners and lessees of
property interests in property within the boundaries established by section 25-2-4.
(6) Any other information or plans required by rules adopted by the director in accordance with chapter
91, Hawaii'Pevised Statutes.
(1996, Ord. No. 96-160, sec. 2; ratified April 6, 1999.)
Section 25-6-4. Notice of action on P.U.D. application.
(a) Upon acceptance of a P.U.D. application, the director shall fix a date for the d'irector's action on the
application. Within ten days after receiving notice of such date, the applicant shall serve notice of the
application on surrounding owners and lessees of record, as provided by section 25-2.4. The applicant
shall also serve notice on owners and lessees of record of interests in other properties which the director
may find to be directly affected by the P.U.D. permit sought.
(b) The director shall publish notice of the date of the proposed decision by the director and the date by
which written comments must be received by the director in at least two newspapers of general
circulation in the County, at least ten days prior to the director's proposed decision.
(1996, Ord. No. 96-160, sec. 2; ratified April 6, 1999.)
Section 25-6-5. Procedure for processing application when use not permitted in districL
An application for a P.U.D. permit that proposes a use not permitted either directly or as a conditional
use within a district may be considered by the director only if a separate application for a change of zone is
filed concurrently with or prior to the P.U.D. permit application. The P.U.D. permit application and the change
of zone application shall be considered concurrently, and any P.U.D. approved by the director shall be
effective only when the change of zone ordinance becomes effective.
(1996, Ord. No. 96-160, sec. 2; ratified April 6, 1999.)
Section 25-6-6. Actions by director on P.U.D. permit applications.
(a) Except as provided in section 25-6-5, the director shall, within sixty days after acceptance of a P.U.D.
permit application, deny the application or approve it subject to conditions.
(b) The conditions imposed by the director shall bear a reasonable relationship to the P.U.D. permit issued,
and to the approved uses, plans, and variances of district standards; provided, however, that no
improvements or alterations off-site of the project shall be required as a condition of a P.U.D. permit
The conditions may include, but not be limited to the following:
(1) Commencement and completion time frame for the project;
(2) Boundary and density changes approved in the project;
(3) Uses that are prohibited or limited;
(4) Specifications for the minimum development standards;
(5) Specifications for street improvement and dedication;
(6) Utilities to be furnished; and
(7) The extent and limitations upon the variances permitted.
(c) The director may, within the sixty-day period after acceptance of a P.U.D. permit application, grant a
partial approval of the request where all plans and drawings have not been submitted with the original
application. Provided, however, that no building permit shall be issued, nor shall any construction on the
property commence until the drawings have been reviewed and approved by the director and full P.U.D.
permit approval has been issued for the portion of development comprising the proposed construction.
(d) When plans and drawings are submitted after a partial approval of a P.U.D. permit application has been
issued under subsection (c) above with a request for further partial approval or frill approval, the director
shall review the drawings and shall either approve or deny the request within thirty days from the date
that the drawings are filed by the applicant In the event of a denial of such request, the applicant may
25-93 _ (Hawaii Cam 7-1.00)
§ 25-6-6
HAWAII COUNTY CODE
resubmit a revised request for further partial or full P.U.D. permit approval of the application and in
accordance with this subsection.
(e) If the director fails to act upon a P.U.D. permit application within the prescribed sixty-day period as
required by subsection (a) above, the application shall be considered as having been denied and the
director shall immediately inform the applicant of such denial. If the director fails to act upon filed plans
and drawings within the thirty -day period required by subsection (d) above, the plans shall be
considered as having been approved and a full P.U.D. permit issued.
(1996, Ord. No. 96-160, sec. 2; ratified and amended April 6, 1999.)
Section 25-6-7. Reserved.
(1996, Ord. No. 96-160, sec. 2; ratified April 6, 1999; Am. 1999, Ord. No. 99-112, sec. 12.)
Section 25-6-8. Reserved.
(1996, Ord. No. 96-160, sec. 2; ratified April 6, 1999; Am. 1999, Ord No. 99-112, sec. 14.)
Section 25-6-9. Reserved.
(1996, Ord No. 96-160, sec. 2; ratified April 6, 1999; Am. 1999, Ord No. 99-112, sec. 15.)
Section 25-6-10. Criteria for granting a P.U.D. permit.
A P.U.D. permit may be granted by the director upon finding that:
(a) The construction of the project can begin and be completed within a reasonable period of time from the
date of full approval.
(b) The proposed development substantially conforms to the general plan.
(c) Any residential or agricultural development shall constitute an environment of sustained desirability and
stability for the district that is in harmony with the character of the surrounding area, that results in an
intensity of land use no higher than that otherwise specified for the district, and that maintains the
standards of open space at least as high as that otherwise specified for the district in which the
development occurs.
(d) Any commercial development shall not create traffic congestion which exceeds that which would have
been produced under conventional development patterns, practices and standards in the district or
interfere with any projected public improvements, shall provide for proper entrances and exits along with
proper provisions for internal traffic and parking, and be an attractive center which does not adversely
impact upon adjacent and surrounding existing or prospective developments.
(e) Any industrial development shall be in conformity with desirable performance standards and shall
constitute an efficient and well organized development with adequate provisions for freight service and
necessary storage, and shall not adversely impact upon adjacent and surrounding existing or prospective
development.
(f) The development of a harmonious, integrated whole justifies exceptions, if required, to the normal
requirements of this chapter, and the contemplated arrangements or use make it desirable to apply
regulations and requirements differing from those ordinarily applicable under the district regulations.
(1996, Ord No. 96-160, sec. 2; ratified April 6, 1999.)
Section 25-6-11. Height exceptions authorized.
(a) A building approved under a P.U.D. permit may exceed the height limit specified under the zoning
district of the property and the height limits under section 25-4-22; provided, that the maximum height
of the building shall not exceed seventy-five feet.
(b) A building approved under a P.U.D. permit and situated within a zoning district which exceeds the height
limits specified under subsection (a) may be permitted at the higher height limits prescribed for that
zoning district.
(nawaii county 7.1-00) 25-94
ZONING
(1996, Ord. No. 96-160, sec. 2; ratified April 6, 1999.)
§ 25-6-11
Section 25-6.12. Approval of variances, use permits and plan approvals issued under P.U.D.
permit.
(a) No separate or additional variance permit or use permit shall be required for any variance or use
approved under a P.U.D. permit, and any variance or use approved under a P.U.D. permit shall be
considered to be in compliance with the required procedures for obtaining a variance or use permit.
(b) Plan approval shall be considered issued when completed drawings are approved under a P.U.D. permit,
and no further action is required for the issuance of plan approval under this chapter.
(1996, Ord. No. 96-160, sec. 2; ratified April 6, 1999.)
Section 25-6-13. Effect of P.U.D. permit on other zoning provisions.
Any P.U.D. permit issued shall be subject to all of the conditions imposed in the permit and shall be
exempted from other provisions of this chapter only to the extent specified in the permit
(1996, Ord. No. 96-160, sec. 2; ratified April 6, 1999.)
Section 25-6-14. Time extensions and amendments.
(a) Any request for a time extension or an amendment to a P.U.D. permit or to the conditions of a P.U.D.
permit may be granted by the director upon finding that no change has occurred in relation to the
property since the P.U.D. permit was issued or that the approval is still valid with respect to any changed
conditions.
(b) The director shall act on any request for a time extension or amendment within forty-five days after the
receipt of the request In granting any time extension or amendment, the director may impose additional
conditions to meet the intent of the P.U.D. permit
(1996, Ord No. 96-160, sec. 2; ratified April 6, 1999.)
Section 25-6-15. Appeals.
(a) If the director denies a P.U.D. permit, such decision is final except that, within thirty days after the date
of the written decision, the applicant may appeal such action to the board of appeals, pursuant to the
rules of practice and procedure of the board of appeals.
(b) Any person aggrieved by the decision of the director in the issuance of a P.U.D. permit decision may
appeal the director's action to the board of appeals, in accordance with this chapter, within thirty days
after the date of the director's written decision.
(1999, Ord No. 99-112, sec. 13.)
Division 2. Cluster Plan Development (C.P.D.).
Section 25-6-20. Purpose.
The purpose of cluster plan development (C.P.D.) is to provide exceptions to the density requirements
of the single-family residential (RS) district so that permitted density of dwelling units contemplated by the
minimum building site requirements is maintained on an overall basis and desirable open space, tree cover,
recreational areas, or scenic vistas are preserved
(1996, Ord No. 96-160, sec. 2; ratified April 6, 1999.)
Section 25-6-21. Minimum land area required.
The minimum land area required for a C.P.D. shall be two acres.
(1996, Ord. No. 96-160, sec. 2; ratified April 6, 1999.)
25-95 _ (Rma Coomy 7-1-00)
DEPARTMENT OF PUBLIC WORKS
COUNTY OF HAWAII
HILO, HAWAII
DATE: October 28, 2003
TO Christopher J. Yuen, Planning Director
Planning Department
FROM Galen M. Kuba, Division Chief
Engineering Division
SUBJECT Change of Zone Application (REZ 03-025 )
SMA Use Permit Application (SMA 03-015 )
Applicant: Lehua Lani, LLC
Location: Puapua'a 2nd, N. Kona, HI
TMK: 3 / 7-5-020:071 and 072
We reviewed the subject application and our comments are as follows:
DRAINAGE
All development generated runoff shall be disposed of on-site and shall not be
directed toward any adjacent properties.
2. The applicant shall be informed that if they include drywells in the subject
development, an Underground Injection Control (UIC) permit may be required from
the Department of Health, State of Hawaii.
3. A drainage study shall be submitted prior to issuance of a grading permit, and the
recommended drainage system shall be constructed meeting with the approval of
DPW. Although the property is not located in a designated special Flood Hazard
Area on the Flood Insurance Rate Maps, the applicant is advised of existing
drainage reports on file with DPW for the area and shall identify and address
offsite flows through the subject property as required by the Subdivision Code and
the Storm Drainage Standard in a manner meeting with the approval of the DPW.
The study shall address the proposed culverts on the Kahului to Keauhou Parkway
(Alii Highway) Phase 1 plans, the existing drainage easement on the subject
property and a concrete box culvert in Alii Drive fronting the subject property.
EARTHWORK
All earthwork and grading shall conform to Chapter 10, Erosion and Sediment
Control, of the Hawaii County Code.
EXHIBIT
C
DPW to Planning Director REZ 03-025
Lehua Lani, LLC
October 28, 2003
p.2of2
2. The applicant shall comply with chapter 11-55, Water Pollution Control, Hawaii
Administrative Rules, Department of Health, which requires an NPDES permit for
certain construction activity.
ROADWAYS
The eastern boundary of the subject property is or will be the Kahului to Keauhou
Parkway (Alii Highway) Phase 1 right-of-way. Acquisition of the right-of-way has
not been completed as of the date of this memorandum. The subject property
owner shall be required to provide any additional right-of-way, at no cost to the
County, as established by and upon completion of the final right-of-way maps by
our consultant.
2. Access to Alii Drive, including the provision of adequate sight distances shall be
limited to one approach, located to avoid turning conflicts with existing
developments, meeting with the approval of DPW. The applicant shall provide a
minimum of 45 feet of vehicle storage and a turnaround on the Alii Drive side of
any gated vehicle access. All driveway connections to a County road shall conform
to Chapter 22, Streets and Sidewalks, of the Hawaii County Code.
3. Vehicular access to the individual lots shall not be from any major collector or
arterial roadways. An emergency vehicular egress, with a breakaway gate, may be
provided to Alii Highway, meeting with the approval of the DPW.
4. Alii Drive, fronting the subject property, is a County road. It has an approximate
20 -ft. wide pavement in good condition, with 6 -ft. wide paved shoulders all within
an approximate 50 -ft. right-of-way. Alii Drive, shall be improved to a 60 -ft. right-of-
way according to the County's General Plan. Accordingly, the applicant shall
dedicate one-half the difference between the existing width of Alii Drive and 60
feet to the County as a condition of final subdivision approval or issuance of a
certificate of occupancy.
(SEE TRAFFIC) To serve the subject property and intermediate properties, the
applicant shall extend the existing two-way left turn lane improvements, along the
Alii Drive frontage of the subject property, consisting of, but not limited to,
pavement widening, drainage improvements, street lights, signs and markings and
any relocation of utilities; meeting with the approval of the DPW. The applicant
shall construct and dedicate all improvements at no cost to the County.
5. All roadways within the proposed development shall follow the guidelines
incorporated in the Hawaii Statewide Uniform Design Manual for Streets and
Highways. These roadways shall also meet the requirements of DPW. Concrete
curbs, gutters, and sidewalks should be required in areas of pedestrian traffic.
DPW to Planning Director REZ 03-025
Lehua Lani, LLC
October 28, 2003
p. 3 of 2
6. In the interests of pedestrian and bicyclist safety, the applicant shall provide a
paved shoulder extending to the right-of-way property line. Pavement transitions,
signs and markings, drainage improvements, and relocation of utilities may be
required. Utility meter and pressure reducing valve vaults shall be located in
easements out of the right-of-way.
TRAFFIC
We reviewed the TZAR, dated July 9, 2003. According the report, a left turn lane is not
warranted based on level of service criteria for an intersection. However, traffic in the
southbound lane will experience some delay when left turns are made to the project
during peak hours. We can expect additional delays caused by pedestrian traffic where,
as on Alii Drive, pedestrians and vehicular traffic share the road. In addition, no
increase in traffic volumes on Alii Drive over the build -out period is accounted for in the
report. If the existing turn lane is extended, it will serve intermediate properties as well.
We recommend that the existing two-way left turn lane fronting the adjacent property to
the north be extended to serve the entry to the subject project. The entry to the
proposed project shall be located to avoid turning conflicts with existing developments.
Should there be any questions concerning this matter, please feel free to contact Kiran
Emler of our Kona Engineering Division office at 327-3530.
KE
copy "NG-HILO/KONA
PLNG-KONA
Harry Kim
Mayor
Barbara Bell
Director
2,103 PrT 6 Pn 2 32
Cnuutu of �ttiutzii
Pi,,.,
,.
L� RTMENT OF ENVIRONMENTAL MANAGEMENT
25 Aupuni Street, Room 208 a Hilo, Hawaii 967204252
(808) 961-8083 • Fax (808) 961-8086
MEMORANDUM
Date October 2, 2003
To . CHRISTOPHER YUEN, Planning Director
From : XARBARA BELL, Director--�
SUBJECT: Change of Zone Application (REZ 03-025) �-
Request: A -5a to RS -7.15
Special Management Area Use Permit Application (SMA 03-015)
Request: Development of 58 Single Family Lots and Dwelling Units
And Related Improvements
Applicant: Lehua Lam, LLC
TMK: 7-5-20:71 & 72
We have reviewed the subject application and offer the following recommendations:
DEPARTMENT COMMENTS:
WASTEWATER DIVISION: rw
( v� No comments
( ) Require connection of existing and/or proposed structures to the public sewer in
accordance with Section 21-5 of the Hawaii County Code.
( ) Require extension of the sewer system to service the proposed subdivision in accordance
with Section 23-85 of the Hawaii County Code.
) Other:
SOLID WASTE DIVISION:
( X No comments
( ) Commercial operations may not use transfer stations for disposal.
( ) Aggregates and any other construction/demolition waste should be reused to its fullest
extent.
( ) Ample room should be provided for recycling.
( ) Greenwaste may be disposed of only at the drop sites located at the Kailua and Hilo
transfer stations.
( ) Other:
EXHIB
cc: SWD, WWD 3933 D
0414- bl"
Harry Kim
Mayor
I_
=; County
of Hawaii
POLICE DEPARTMENT
j
349 Kapiolmi Street
• Hilo, Hawaii 96720-3998
(808)935-3311
• Fax(808)961-2389
October 20, 2003
TO : CHRI HER J. N, NIG DIRECTOR
FROM MAS HICC , �OLICE CHIEF,
AREA II OPERA ONS
Lawrence K. Mahuna
Police Chief
Harry S. Kubojiri
Deputy Police Chief
SUBJECT Change of Zone Application (REZ 03-025)
Request: A -5a to RS -7.15
Special Management Area Use Permit Application (SMA 03-015)
Request: Development of 58 Single Family Lots and
Dwelling Units and Improvements
Applicant: Lehua Lani, LLC
Tax Map Key: 7-5-20:71 & 72
Staff has reviewed the above -referenced applications and has the following
concern. Staff was concerned with the report stating that a left-hand turn lane
from Alii Drive to the project site is not needed. As with all new requests for
rezoning along Alii Drive for multi -unit subdivisions, we are requesting left -turn
storage lanes.
Should you have any comments or questions, please feel free to contact our
Kona District Commander Captain John Dawrs at Phone No. 326-4211.
EXHIBIT
E
-10 .. f .t C,
Harry Kim
Alayor
Countp of'abiail
FIRE DEPARTMENT
=-u:a 25 Aupuni Street • Suite 103 • Hilo, Hawaii 96720
(808)961-8297 • Fax (808) 961-8296
October 15, 2003
TO : CHRISTOPHER J. YUEN, PLANNING DIRECTOR
FROM : DARRYL OLIVEIRA, FIRE CHIEF
Darryl J. Oliveira
Fire Chief
Desmond K. Wery
Deputy Fire Chief
SUBJECT: CHANGE OF ZONE APPLICATION (REZ 03-025)
REQUEST: A -5a TO RS -7.15
SPECIAL MANAGEMENT AREA USE PERMIT APPLICATION (SMA 03-015)
REQUEST: DEVELOPMENT OF 58 SINGLE FAMILY LOTS AND DWELLING
UNITS AND RELATED IMPROVEMENTS
APPLICANT: LEHUA LANI, LLC
TAX MAP KEY: 7-5-20:71 & 72
Fire apparatus access roads shall be in accordance with UFC Section 10.207:
"Fire Apparatus Access Roads
"Sec. 10.207. (a) General. Fire apparatus access roads shall be provided and
maintained in accordance with the provisions of this section.
"(b) Where Required. Fire apparatus access roads shall be required for every
building hereafter constructed when any portion of an exterior wall of the first story is
located more than 150 feet from fire department vehicle access as measured by an
unobstructed route around the exterior of the building.
"EXCEPTIONS: 1. When buildings are completely protected with an approved
automatic fire sprinkler system, the provisions of this section may be modified.
"2. When access roadways cannot be installed due to topography, waterways,
nonnegotiable grades or other similar conditions, the chief may require
additional fire protection as specified in Section 10.301 (b).
'XHIBIT 000
Christopher J. Yuen
Page 2
October 15, 2003
"3. When there are not more than two Group R, Division 3 or Group M
Occupancies, the requirements of this section may be modified, provided, in
the opinion of the chief, fire -fighting or rescue operations would not be
impaired.
"More than one fire apparatus road may be required when it is determined by the chief
that access by a single road may be impaired by vehicle congestion, condition of
terrain, climatic conditions or other factors that could limit access.
"For high -piled combustible storage, see Section 81.109.
"(c) Width. The unobstructed width of a fire apparatus access road shall meet the
requirements of the appropriate county jurisdiction.
"(d) Vertical Clearance. Fire apparatus access roads shall have an unobstructed
vertical clearance of not less than 13 feet 6 inches.
"EXCEPTION: Upon approval vertical clearance may be reduced, provided
such reduction does not impair access by fire apparatus and approved signs
are installed and maintained indicating the established vertical clearance.
"(e) Permissible Modifications. Vertical clearances or widths required by this
section may be increased when, in the opinion of the chief, vertical clearances or
widths are not adequate to provide fire apparatus access.
"(f) Surface. Fire apparatus access roads shall be designed and maintained to
support the imposed loads of fire apparatus and shall be provided with a surface so as
to provide all-weather driving capabilities." (20 tons)
"(g) Turning Radius. The turning radius of a fire apparatus access road shall be as
approved by the chief." (45 feet)
"(h) Turnarounds. All dead-end fire apparatus access roads in excess of 150 feet in
length shall be provided with approved provisions for the turning around of fire
apparatus.
"(i) Bridges. When a bridge is required to be used as access under this section, it
shall be constructed and maintained in accordance with the applicable sections of the
Building Code and using designed live loading sufficient to carry the imposed loads of
fire apparatus.
Christopher J. Yuen
Page 3
October 15, 2003
"Q) Grade. The gradient for a fire apparatus access road shall not exceed the
maximum approved by the chief." (15%)
"(k) Obstruction. The required width of any fire apparatus access road shall not be
obstructed in any manner, including parking of vehicles. Minimum required widths and
clearances established under this section shall be maintained at all times.
"(1) Signs. When required by the fire chief, approved signs or other approved notices
shall be provided and maintained for Fre apparatus access roads to identify such
roads and prohibit the obstruction thereof or both"
Water supply shall be in accordance with UFC Section 10.301:
"(c) Water Supply. An approved water supply capable of supplying required fire flow
for fire protection shall be provided to all premises upon which buildings or portions of
buildings are hereafter constructed, in accordance with the respective county water
requirements. There shall be provided, when required by the chief, on-site fire
hydrants and mains capable of supplying the required fire flow.
"Water supply may consist of reservoirs, pressure tanks, elevated tanks, water mains
or other fixed systems capable of providing the required fire flow.
"The location, number and type of fire hydrants connected to a water supply capable
of delivering the required fire flow shall be protected as set forth by the respective
county water requirements. All hydrants shall be accessible to the fire department
apparatus by roadways meeting the requirements of Section 10.207."
kARL OLIVEIRA
Fire Chief
RK:lk
33 err p
Harry, Qm
Mayor-
-
a;:
October 22, 2003
Countp of �abiaC i
DEPARTMENT OF PARKS AND RECREATION
101 Pauahi Street, Suite 6 • Hilo, Hawai'i 96720
(808) 961-8311 • Fax (808) 961-8411
Christopher J. Yuen, Director
Planning Department
County of Hawaii
101 Pauahi Street, Suite 3
Hilo, Hawaii 96720
Subject: Change of Zone Application (REZ 03-025)
Request: A -5a to RS -7.5
Patricia G. Engelhard
Director
Pamela N. Mizuno
Deputy Director
Special Management Use Permit Application (SMA 03-015)
Request: Development of 58 Single Family Lots/Dwelling Units in a Planned
Unit Development (PUD) w/related improvements
Applicant: Lehua Lani, LLC
TMK: 7-5-20:071 & 072
Dear Mr. Yuen:
Thank you for the opportunity to review and comment on the subject Change of Zone
Application and Special Management Use Permit Application with the attached Planning and
Environmental Report.
The aforementioned report states that "the proposed improvements should not have any adverse
impact to the recreational resources of the area". However, it is our contention that the South
Kona district is currently under -served by existing active public recreational facilities and
amenities. Any increase in available dwelling units without a corresponding increase in active
recreational amenities should be considered an adverse impact.
The Planned Unit Development (PUD) does propose to set aside common areas for a passive
park site and for conservation of an existing historic burial site. We concur that both will be
valuable assets to the residents of the PUD. However, these sites are not sufficient to service the
active recreational needs of the PUD's residents who will be forced to seek active recreation
opportunities primarily at nearby public facilities.
EXHIBIT -
G lk4.1
Change of Zone Application (REZ 03-025) (SMA 03-015) October 22, 2003
Lehua Lani, LLC (TMK: 7-5-20: 71 & 72) Page 2
Accordingly, we ask that the appropriate Fair Share Contributions be assessed the applicant in
conjunction with the proposed actions. Furthermore, we request that appropriate measures be
taken to ensure that the proposed passive park sites be preserved and cared for in perpetuity as
such by the applicant.
In conclusion, and for the record, we would like to state that it is the position of the Department
of Parks and Recreation that we have no interest in assuming any responsibility, at any capacity,
for the subject "park" sites.
Please contact our staff planner, James Komata at 961-8531 should you have any questions or
wish to discuss any of the issues presented herein.
Re ectfully,
�atrici G. Engelhard
Director
Harry Kim
Mayor
CnnUUfLT of 'eitxfunii
CIVIL DEFENSE AGENCY
920 Ululani Street . Hilo, Hawai'i 96720-3958
(808) 935-0031 • Fax(808)935-6460
TO: Christopher J. Yuen, Director, Planning Department
FROM: Troy M. Kindred, Administrator
DATE: October 7, 2003
SUBJECT: Change of Zone Application (REZ 03-025),
Request: A -5a to RS -7.15
Troy M. Kindred
Administrator
Special Management Area Use Permit Application (SMA 03-015)
Request: Development of 58 Single Family Lots and Dwelling Units
and Related Improvements
Applicant: Lehua Lani, LLC
Tax Map Key: 7-5-20:71 & 72
The hazards are adequately described by this plan, however the following issues are
addressed below:
• The proposed site is located beyond the acceptable range of the nearest Emergency
Outdoor Warning Siren. Recommend developer purchase and install an approved
Emergency Outdoor Warning Siren.
I have reservations with the applicant's assessment on "Traffic Impact Analysis, (Study
by Witcher Engineering LLP)," that an additional 58 -single family home sub -division,
will have no adverse impact on traffic congestion. Any additional development along
Ali'i Drive without a corresponding "Mauka-Makai" access route will have an adverse
effect on traffic in the event of an emergency evacuation for the tsunami evacuation
zone.
EXHIBIT
H
Harry Kim
Mayor
October 2, 2003
MEMORANDUM
�ottn�r�€ pati
OFFICE OF HOUSING AND 3
COMMUNITY DEVELOPMENT;
50 Wailuku DriW,' 7Ilo, Hawaii 96720-2484. '
. .
VlI7 (BOB) 961-8379 : FAX (808) 961-8685
TO: Christopher J. Yuen, Director
Planning Department
FROM: Edwin S. Taira �\
Housing Administrator
SUBJECT: Change of Zone Application (REZ 03-025)
Lehua Lani, LLC
Tax Map: 7-5-20:71 & 72
Edwin S. Taira
Housing Administrator
Housing conditions, pursuant to the requirements of Chapter 11,
Article 1, Hawai'i County Code, relating to Affordable Housing
Policy, are applicable to the residential portions of this
application.
Thank you for the opportunity to comment.
Please call us at ext. 8379 if you have any questions or need
additional information.
4715dmko.doc
EXHIBIT
qa
EQUAL HOUSING OPPORTUNITY
'AN EQUAL OPPORTUNITY EMPLOYER'
LINDA LINGLE
GOVERNOR
DATE: October 20, 2003
4� O♦ N1
4� ,Y'J• 7yy
5
a
STATE OF HAWAII
DEPARTMENT OF HEALTH
P.O. BOX 916
HILO, HAWAII 96721-0916
TO: Christopher J. Yuen
Planning Director, County of Hawaii
FROM: Aaron A. Ueno AM
District Environmental Health Program Chief
SUBJECT: Change of Zone Application (REZ 03-025)
Request: A -5a to RS -7.15
Special Management Area Use Permit Application (SMA 03-015)
Request: Development of 58 Single Family Lots and Dwelling Units
and Related Improvements
Applicant: Lehua Lani, LLC
Tax Map Key: 7-5-20:71 & 72
CHIYOME L. FUKINO, M.D.
DIRECTOR OF HEALTH
The subject project is located within or near proximity to the County sewer system. Wastewater
Branch supports the sewer requirements made by the County for the proposed project.
The Army Corps of Engineers should be contacted at (808) 438-9258 to identify whether a
Federal license or permit (including a Department of Army permit) is required for this
project. Pursuant to Section 401(a)(1) of the Federal Water Pollution Act (commonly
known as the "Clean Water Act'), a Section 401 Water Quality Certification is required for
"[a]ny applicant for Federal license or permit to conduct any activity including, but not limited
to, the construction or operation of facilities, which may result in any discharge into the
navigable waters...."
A National Pollutant Discharge Elimination System (NPDES) general permit coverage is
required for the following activities:
a. Storm water associated with industrial activities, as define in Title 40, Code of
Federal Regulations, Sections 122.26(b)(14)(i) through 122.26(b)(14)(ix) and
122.26(b)(14)(xi);
EXHIBIT-
S
Planning Director, County of Hawaii
October 20, 2003
Page 2
b. Construction activities, including clearing, grading, and excavations, that
result in the disturbance of equal to or greater than one (1) acre of total
land area. The total land area includes a contiguous area where multiple
separate and distinct construction activities may be taking place at
different times on different schedules under a larger common plan of
development or sale. An NPDES permit is required before the
commencement of the construction activities.
C. Discharge of treated effluent from leaking underground storage tank
remedial activities;
d. Discharge of once through cooling water less than one (1) million gallons
per day;
C. Discharge of hydrotesting water;
f. Discharge of construction dewatering effluent;
g. Discharge of treated effluent from petroleum bulk stations and terminals;
h. Discharge of treated effluent from well drilling activities;
i. Discharge of treated effluent from recycled water distribution systems;
j. Discharges of storm water from a small municipal separate storm sewer
system; and
k. Discharge of circulation water from decorative ponds or tanks.
The Clean Water Branch (CWB) requires that a Notice of Intent (NOI) to be covered by a
NPDES general permit for any of the above activities be submitted at least 30 days before the
commencement of the respective activities. The NOI forms may be picked up at our office or
downloaded from our website at httl2://www.state.hi.us/doh/eh/cwb/forms/2enl-index.html
The applicant may be required to apply for an individual NPDES permit if there is any type of
activity in which wastewater is discharged from the project into State waters and/or coverage of
the discharge(s) under the NPDES general permit(s) is not permissible. An application for the
NPDES permit is to be submitted at least 180 days before the commencement of the respective
activities. The NPDES application forms may also be picked up at our office or downloaded
from website at htty://www.state.hi.us/doh/eh/cwb/forms/indiv-index,html.
Hawaii Administrative Rules, Section 11-55-38, also requires the owner to either submit a copy
of the new NOI or NPDES permit application to the State Department of Land and Natural
Resources, State Historic Preservation Division (SHPD) or demonstrate to the satisfaction of the
DOH that the project, activity, or site covered by the NOI or application has been or is being
reviewed by SHPD. Please submit a copy of the request for review by SHPD or SHPD's
determination letter for the project.
If you have any questions, please contact the CWB at 586-4309.
Planning Director, County of Hawaii
October 20, 2003
Page 3
Underground Injection Systems (Ph. 586-4258) which receive wastewater or storm run-offs from
the proposed development need to address the requirements of Chapter 23, Hawaii State
Department of Health Administrative Rules, Title 11, "Underground Injection Control."
W ORD: REZ03-025 SMA03-015.my
LINDA LINGLE
GOVERNOR
DATE: October 22, 2003
STATE OF HAWAII
DEPARTMENT OF HEALTH
P.O. eox 916
HILO, HAWAII 96721-0916
TO: Christopher J. Yuen
Planning Director, County of Hawaii
FROM: Aaron A. Ueno
District Environmental Health Program Chief
017 zy pm,
;iw
SUBJECT: Change of Zone Application (REZ 03-025)
Request: A -5a to RS -7.15
Special Management Area Use Permit Application (SMA 03-015)
Request: Development of 58 Single Family Lots and Dwelling Units
and Related Improvements
Applicant: Lehua Lam, LLC
Tax Map Key: 7-5-20:71 & 72
CHIVOME L. FLIKINO, M.D.
DIRECTOR OF HEALTH
x,n3
The subject project is located within or near proximity to the County sewer system. Wastewater
Branch supports the sewer requirements made by the County for the proposed project.
WORD:2REZ03-025.my
LINDA LINGLE
GOVERNOR
Mr. Christopher Yuen
Director
Planning Department
County of Hawaii
101 Pauahi Street, Suite 3
Hilo, Hawaii 96720-3043
o Fw�
RODNEY K. HARAGA
w
DIRECTOR
( -
Deputy Prev.,
!'
Bruce Y. Matsui
STATE OF HAWAII•`�r
1.
IN REPLY REFER TO
DEPARTMENT OF TRANSPORTATION
"T
869 PUNCHBOWL STREET
S�P 8.0909
HONOLULU, HAWAII 96813-5097
C, ' O
October 8, 2003.
I
01
Dear Mr. Yuen:
Subject: Lehua Lam LLC
Change of Zone Application (REZ 03-025) and
Special Management Area Use Permit Application (SMA 03-015)
TMK: (3) 7-5-20: 71 & 72
Thank you for requesting our review of the subject applications for this project of a
58 lot/dwelling planned unit development.
The proposed project is not anticipated to have a significant impact on our State highway
facilities.
We appreciate the opportunity to provide our comments.
Very truly yours,
l�
i
6D' E K. GA
Direct of Transportation
EXHIBIT
`���xa
® 01-
STATE
LINDA LINGLE _X
GWERNG'R OF HAWAH
DEPARTMENT OF EDUCATION
PO. BOX 2360
HONOLULU, HAWAII 96804
OFFICE OF THE SUPERINTENDENT
October 29, 2003
Mr, Christopher J. Yuen
Planning Director
County of Hawaii
101 Pauahi Street, Suite 3
Hilo, Hawaii 96720-3034
Dear Mr. Yuen:
Subject: Lehua Lani, LLC Applications
Special Management Area Permit (SMA 03-015) and
Change of Zone Application (REZ 03-025)
North Kona Hawaii TMK: 7-5-20: 71 & 72
PATRICIA HAMAMOTO
SUPERINTENDENT
The Department of Education (DOE) has reviewed the applications for Lehua Lani, LLC
(Applicant) a single-family subdivision, fronting Alii Drive between Kailua and Keauhou.
The Applicant is proposing 58 lots and homes on a 10.1+ acre parcel 500 feet north and
makai of Kahakai Elementary School.
The DOE requests that the County of Hawaii include, as a condition of zoning, a school
contribution using the standard fair -share language used in rezoning. The proposed
wording is:
The Applicant shall contribute to the development, funding, and/or
construction of school facilities, on a fair -share basis, as determined by
and to the satisfaction of the Department of Education. Terms of the
contribution shall be agreed upon in writing by the Applicant and the
Department of Education prior to obtaining building permits for any area
of the project.
The DOE would also like to request that special efforts be made to coordinate
construction activity with the principal of Kahakai Elementary School so that
construction -related dust and noise could be minimized during school hours. The
principal should be fully informed in advance of inconveniences such as blasting, earth
moving, street closures, traffic detours, and interruptions of utility services.
_ EXHISIT
L
AN AFFIRMATIVE ACTION AND EQUAL OPPORTUNITY EMPLOYER
Mr. Christopher J. Yuen
Page 2
October 29, 2003
If you have any questions, please call Rae M. Loui, Assistant Superintendent of the
Office of Business Services, at 586-3444 or Raynor M. Minami, Director of the Facilities
and Support Services Branch, at 733-4860.
Very truly yours,
Patricia Hamamoto
Superintendent
PH:hy
c: Rae M. Loui, OBS
Raynor M. Minami, FSSB
CAS/Kealakehe Complex
Principal, Kahakai Elementary
ONA TRAFFIC
Ccuk"ITTEE
77-180 KEKAI PLACE z KAILUA-Ko NA z HAwAC1 96740 z 808-331-2765 z ktsc@hawaii.rr.com
promoting a safe environment for all modes of land transportation in the districts of North and South Kona
October 19, 2003
Chris Yuen, Director
Hawaii County Department of Planning
25 Aupuni Street,
Hilo, Hawaii 96720
Re: Lehua Lani, LLC Applications for SMA and Rezoning
Dear Mr. Yuen:
Thank you for forwarding the subject applications to the Kona Traffic Safety Committee
(KTSC) for review and comment. We greatly appreciate the opportunity to participate in the
planning process and trust that our observations and suggestions regarding traffic issues will
prove helpful to the Planning Department's and Commission's deliberations.
Our examination of the applications discloses several traffic issues that should be carefully
addressed and thoroughly questioned: project density; pedestrian safety; effect on Alii Drive
and mauka-makai traffic; emergency and service vehicle access; and school transportation.
Project Density
Project density will, of course, affect traffic; the more homes, the more vehicles. The applicant
proposes 58 home sites ranging from 4000 to 6000+ square feet per site. (Page 6).
Multiplying 58 by an average of 5000 square feet per site results in a total unit area of
290,000 square feet, leaving approximately 150,000 square feet for streets and open space.
The RS -7.5 zone, however, requires at least 7500 square feet for each unit. The KTSC sees no
compelling reason for permitting greater density than that permitted by law. Indeed, the
reduced setbacks planned by the developer for homes in the projected price range ($350,000
to $400,000) will probably have an adverse effect on sales. We urge that the Planning
Commission require the developer to comply with the density permitted in the RS -7.5 zone
while retaining the 150,000 square feet of open space, and to limit the number of units to 39
(290,000 divided by 7500). E X H I B I T
M
Pedestrian Safety
The application states: "In addition to the grassed swales, there will be trees and flowering
landscaping within the balance of the road rights-of-way. This will help create a friendly,
pedestrian -oriented streetscape, where the roads and their rights-of-way would not be
limited to vehicles. They would have multiple functions, serving also as jogging/walking
paths, overflow parking, and a visual amenity." (Page 3).
While the inclusion of grassed swales, trees and flowering shrubs within the road rights-of-
way is commendable and desirable, the KTSC is concerned that the contemplated multiple
functions, namely jogging/walking paths, vehicles and overflow parking, will compete and be
unsafe. We therefore suggest that to create a "pedestrian -oriented streetscape," the
developer be required to designate jogging/walking paths that are separate from overflow
parking and vehicular traffic lanes.
Effect on Alii Drive and Mauka-Makai Traffic
The application cites a Traffic Impact Analysis (TIA) that concluded that the levels of service at
the Alii Drive/Royal Poinciana and Alii Drive/Lunapule intersections "are not significantly
impacted by this development," and that "a left turn lane from Alii Drive to the project was
not needed." Our review of the TIA disclosed that it failed to adequately take into account the
likelihood that additional development on presently vacant land in the area would contribute
more traffic on Alii Drive and the two closest mauka-makai streets, which are a mile -and -a -
half apart. Although some Alii Drive traffic may eventually be diverted to the proposed Alii
Parkway, we don't anticipate its completion for some time. Moreover, access to the Parkway
will be limited, so residents and visitors of Lehua Lani and other Alii Drive developments will
still use Alii Drive.
Please note: Within the last two years, four pedestrians and one cyclist have died
in crashes with motor vehicles on Alii Drive. There have been at least one
motorist death and innumerable crashes with injuries among all user groups in
this same time.
Furthermore, the TIA did not address the problem of emergency evacuation in case of
tsunami that will be exacerbated by this development. At present, only two mauka-makai
streets, one of which has been fitted with speed humps, are available to move evacuation
traffic to safe ground. A third route, the Lako Street extension to Alii Drive, has been planned
but its design and the timing of its completion remain uncertain, and its junction with Alii
Drive will be located well south of Royal Poinciana. The RTSC therefore recommends that the
county plan another mauka-makai connector along the sewer line road to Kahakai Estates
that abuts the Alii Lani subdivision. A roundabout is planned for the Alii Parkway/Sewer Line
Road junction, and our tax dollars should be spent on a traffic -calming feature that can
maximize its use for the public good. We also recommend that area developers contribute to
the cost of the needed mauka-makai connector road.
Although the absence of a left -turn lane from Alii Drive into the property may not
"appreciably improve" the flow of traffic on Alii Drive, it poses a safety concern because
southbound drivers, moving at the posted speed (30 mph) or, as is often the case, somewhat
faster, might not anticipate suddenly having to stop while vehicles in front of them wait to
execute a left turn. Therefore, the KTSC strongly recommends that a left -turn lane from Alii
Drive into the development be required. We are surprised that a project of this size without
turn lanes would even be considered.
Please note: The KTSC repeatedly hears from businesses, churches, private
schools, and residents in neighborhoods without turn lanes, that turn lanes are
needed. But when we investigate, we learn that "the County approved the plans."
Emergency and Service Vehicle Access
Although the proposed 20 foot -wide primary road pavement might satisfy legal
requirements, the 18 foot pavement for the rear access lanes (Page 3) will not be adequate to
handle large emergency and service vehicles such as fire trucks, ambulances, and garbage
trucks. We therefore urge that the rear access lanes also have 20 -foot pavements.
School Transportation
The nature of the development and the size of its homes indicate that there will likely be
many families with school-age children. Although the Kahakai Elementary School is only 500
feet southeast of the site (Page 1), it is 2/3 of a mile away when walking along streets, and
the nearest public intermediate and high schools are many miles away. Accordingly, school
bus transportation will be required. Students, however, will have to cross Alii Drive at least
once a day to board or exit the bus, which can be hazardous. It may therefore be appropriate
to require that the applicant fund installation of a direct pedestrian link between the
development and Kahakai Elementary School and button -activated crosswalk lights for
intermediate and high school students using the bus.
We again thank you for the opportunity to comment, and will be pleased to orally summarize
our concerns when the Planning Commission considers this proposal.
Sincerely yours,
Joel Gimpel, Chair
Government Relations
Kona Traffic Safety Committee
t1aWa11 ciecuic Lrgni kc,npany, if IC. • r-, o,, • -ins r i i,�,
October 17, 2003
Planning Department
Attn: Mr. Christopher J. Yuen, Planning Director
County of Hawaii
101 Pauahi Street, Suite 3
Hilo, Hawaii 96720-3043
Gentlemen:
Subject: Lehua Lani Change Of Zone (REZ 03-025)
58 -Unit Single Family Residential Development
TMK: 7-5-20:71 & 72
Thank you for the opportunity to review the subject plans.
We do not have any objections to the subject application; however, have the following
comments and requirements:
Section VILD Utilities:
HELCO's current system peak load is 177,900 KW and our total generation system
capability is 233,700 KW. Our reserve margin is 31 % and has adequate generation
to serve the project.
The existing area is served from HELCO's Kailua 15 circuit and Kailua substation
transformer #1. The existing substation transformer is close to 90% of the
nameplate rating. HELCO is planning to install a new substation on the mauka
corner of Palani Road and Henry Street to relief the Kailua transformer #1 loading
and other nearby substations.
2. The project consultants and engineers are urged to contact HELCO's Engineering
Department as soon as practicable to open a service request to insure timely
procurement of long lead equipment. The service request include the calculation of
the anticipated electrical demand and phasing schedule that are required to
determine the final electrical requirements for this project.
Distribution line easements will be required within the project location.
We strongly recommend that energy efficient and conservation features suitable to
reduce the peak electrical demand are part of the development's plans. We
recommend that this development take full advantage of waste heat recovery
equipment to recycle and reuse the waste heat rejected by air conditioning and
refrigeration equipment. If this equipment is incorporated in the development's
original design, the amount of energy required will be substantially reduced.
EXHIN-T
N
Planning Department
Page 2
October 17, 2003
A remote meter reading option is now available using the electrical lines as
communication medium to a central master receiver at the substation. This option
will require additional equipment in the HELCO meters and the substation. A cost
estimate for this option may be requested from the Engineering Department.
Should you have any questions, please contact me at (808) 969-0321 or Hal Kamigaki at
(808) 969-0322.
Sincerely,
q4K U
Clyde H. Nagat , P.E.
Manager, Engineering Department
CHN:HK:In
CC: H. Kamigaki
S. Tomita
81-948 Waena'Oihana Loop #101 -
Hi 196750 - (661[4 32/2-2484
vHAWAIIAN ISLANDS
Q o
ISLAND A October 20, 2003
COUNTY OF MNWNII
Chris Yuen
Planning Department
101 Pauahi Street, Suite # 3
`-\Hilo, Hawaii 96720-3034
De Chris Yuen,
The Kona Soil and Water Conservation District reviewed the following
1 application regarding: Change of Zone Application: (REZ 03-025)
\� REZ\\Q3-025-(SMA) 03-015): Lehua Lani, LLC TMK: 7-5-20:71 & 72
_ IVo comment or objections.
Nciiun c; hvoc n��s ` �
\\ rBob Nelson, Chairman
Kona Soil and Water Conservation District
i cc: Kiran Emler C.E.
BN/ls
I 1 I,
I
EXHIBIT
0
FAX (808) 322-3735
II , ,=r."Z, x.A
SidneyFuke, Planning Consultant
100 Pauahi Street, Suite 212 • Hilo, Hawaii 96720
Telephone: (808) 969-1522 • Fax: (808) 969-7996
Mr. Christopher Yuen, Director
Planning Department
COUNTY OF HAWAII
101 Pauahi Street
Hilo, HI 96720
Dear Mr. Yuen:
0,'7
3
11r 73
October 12. 2001 l
• Planning • Variance • Zoning
• Subdivision • Land Use Permits
• Environmental Reports
1757
Subject: Rezoning (REZ 03-025) and SMA 03-015 Applications
Lehua Lani, LLC, TMK: 7-5-20: 71 & 72
Transmitted herewith for your appropriate action are the original requests for
standing in a contested case hearing on the subject matter which I received this date in the
mail. A couple, Robert Russell and Lillian Fox, and Devra Wijet made these requests.
Please note that although the requests noted objections to the project, there was no filing
fee attached.
In relation to the Office of Housing and Community Development's comments,
please note that the applicant intends to comply with the County's Affordable Housing
Code. This will probably come in the form of ah in lieu contribution.
If there are further questions/comments on this matter, please feel free to contact
me. Thank you very much.
incerely,
SIDNE�KE
Planning Consultant
Copy — OHCD
Lehua Lani LLC w/ enclosures
EXHIBIT u -q,
Sidneycuke, consultant
miff
100 Pauahi Street, Suite9-1S 212 •Hilo, Hawaii 96720
Telephone: (808) 969-1522 •Fax: (808) 969-7996
October 22, 2003
Mr. Christopher Yuen, Director
Planning Department
COUNTY OF HAWAII
101 Pauahi Street
Hilo, HI 96720
Dear Mr. Yuen:
• Planning • Variance • Zonina
I • Subdivision . Land Use Permits
i,'J� 11nT • Environmental Reports
7
rim 1J
Subject: Rezoning (REZ 03-025) and SMA 03-015 Applications
Lehua Lani LLC, TMK: 7-5-20: 71 & 72_
Thank you for providing me with agency and related comments to date regarding
the subject matter. In response to the comments, we would like to note the following:
Hawaii Electric Light Company
The utility company noted that there is sufficient capacity to service this project.
Further, the applicant's consulting engineer will confer with the company later this year
to review scheduling and related matters. Please also note that the project is designed to
be energy efficient, wherein the design and placement of structures will take into account
natural airflow and light. Additional energy reduction measures would include the use of
heat reduction material, particularly for the windows, solar systems, and the like.
Fire Department
The requirements of the Fire Department relative to access, water pressure, and
fire hydrants will be complied with. These issues will be addressed in detail during the
building and infrastructure permitting process.
Kona Traffic Safety Committee
Generally, the comments of the KTSC are well taken and constructive. It should
be noted that the applicant or, for that matter, any other single applicant/developer cannot
reasonably implement many of the recommendations, as they require considerable funds
and/or participation by other parties as well as regional issues. Nevertheless, to the extent
the applicant can address the comments and take action to mitigate impacts directly
associated by this project, the applicant would.
In the area of density, the applicant notes that most of the surrounding areas
fronting Alii Drive have relatively high density zoning. The zoning includes RM -4,
RM -2, and RM -1.5, which translate to 10 to 29 units/acre). The applicant is seeking a
r.
S 0 Li• C
Mr. Christopher Yuen
October 22, 2003
Page 2
less dense zoning of RS -7.5 zoning (5-6 units/acre). At the same time, the County
General Plan LUPAG map designates this general area for Resort and Urban Expansion,
which would allow consideration for a density higher than the requested RS -7.5 zoning.
Then, too, the draft Kona Regional Plan also suggests this area would be appropriate for
RES -10 (10 units/acre) density.
This is not to suggest that the existing and planned higher density zonings are
appropriate or a trend to be followed. It is more to factually state that the requested
RS -7.5 zoning would result in a density that would be considerably less than many of its
neighbors.
Notwithstanding the above, it has been the applicant's intent to have 58 units on
the property. Accordingly, the requested rezoning could have been RM -7.5. However,
under that basis, the design of the project would probably be different, as that zoning
would allow multiple -family structures with heights up to 45 feet and a concentrated
parking area. With the RS -7.5 zoning, the project would be restricted to single-family
units, with heights limited to 35 feet and parking dispersed throughout the site. The
applicant thus chose to proceed with the RS -7.5 instead of the RM -7.5 zoning to
eliminate the possibility of having multiple family units with taller structures and
concentrated parking areas.
In the area of Pedestrian Safety within the project area, the applicant will look
into the possibility of having dedicated pedestrian paths throughout the site to minimize
vehicular conflicts. This will be specifically addressed in conjunction with the Planned
Unit Development (PUD) application that would be filed if the pending applications were
approved.
Relative to external Traffic, a copy of the KTSC's letter has been provided to the
consulting traffic engineer for comments. A follow up response will be provided you
upon its receipt.
In terms of Emergency and Service Vehicle Access, the access requirements of
the Fire Department will have to be complied with. The Fire Department requires access
and turnaround areas. We would also note that the planned 18 -foot pavement would he
generally consistent with the Subdivision Code for private roads. The Code calls for a
16 -foot pavement serving a 6 -lot subdivision. Not counting the proposed "corner" lots,
the rear access lanes will service 5 lots on one side. Additionally, the applicant would
like to emphasize that the roadway design is intended to be similar to the Malulani
Subdivision, a project which has met with appropriate fire and emergency vehicle
requirements. Accordingly, the applicant maintains that the 18 -foot rear access road is
sufficient.
Mr. Christopher Yuen
October 22, 2003
Page 3
The issue of pedestrian safety for students walking along Ali' i Drive (or for that
matter, any street) is understandable. There will regrettably be motorists who do not
always heed the requirement to stop when a bus picks up and drops off students. With
the completion of the Alii Parkway, it may be possible for students to gain direct access
to Kahakai School along the Parkway rather than from Alii Drive. This may also be
achievable sooner if property owners to the south agree to provide a pedestrian access
over their properties. The applicant, however, does not have the ability to mandate an
access over those. Furthermore, it would not be feasible for the applicant to purchase
these properties and/or easement rights.
Again, thank you for this response opportunity. If there are further questions
and/or comments on this matter, please feel free to contact me. Thank you very much.
Sincerely,
�P 4 �V0"
SONEY M. FUKE
Planning Consultant
Copy — HELCO
Fire Department
Kona Traffic Safety Committee
Lehua Lani LLC w/ enclosures
Bruce Witcher Engineering w/ enclosure
11OV- 5-03 WED ;i::07 N FN;.
SidneyFuke, Planning Consultant
too PaUahi Street, Suite 212 • Hilo, Hawaii 96720
Telephone: (900) 969-1522 • Fax: (808) 969-7996
Mr. Christopher Yuen, Director
Planning Department
COUNTY OF HAWAII
101 Pauahi Street
Hilo, HI 96720
Dear Mr. Yuen:
October 31, 2003
7il93 NU 9 pm 1 05
TI,AT-NT
Psi % ;U
M.
Subject: Rezoning (REZ 03-025) and SMA 03-015 Applications
Lehus Lani LLC TMK• 7-5-20: 71 & 72
• Planning • VarianCB • ZOnky
• Subdimson • tend Use Pencils
• Ewrwmenlal ReRons
Thank you for providing me with additional agency comments regarding the
subject matter. We acknowledge that the Kona Soil and Water Conservation District did
not have any objections or comments on these applications. Relative to the other
agencies' comments, however, we would like to note the following:
State Department of Health
As recommended by the Department of Health, the applicant will have the project
connect to the County's sewer line fronting Alii Drive. Furthermore, the consulting
engineer is aware of the possible need of National Pollutant Discharge Elimination
System (NPDES) and UIC permits. As such, if needed, said permit(s) will be secured
prior to commencement of any construction activity on the subject site.
Police Department
The consulting traffic engineer concluded that a left -tum storage lane was not
necessary, as having such a lane would not affect the existing and/or projected level of
service on Ali' i Drive. However, in light of the Police Department's comments, I am
requesting comments from the engineer on this matter and will get back to you again
upon receipt of the engineer's comments.
Department of Parks and Recreation
We would like to initially note that the subject property is located in the North
and not in the South Kona district. Notwithstanding that clarification, the applicant is
aware of the County's requirement — as part of the rezoning process — of a recreational
impact fee as a condition of any residential rezoning. The applicant is prepared to
contribute to such an assessment to further the cause for additional recreational
improvements in the area. `, ��'�., .J
WED 1'_':05 FM eAx Nv.
Mr. Christopher Yuen
October 31, 2003
Page 2
Additionally, the open space areas within the project site will be owned and
maintained by the project's association. There is no plan to have these areas converted in
the future for non -open space uses.
Again, thank you for this response opportunity. If there are further questions
and/or comments on this matter, please feel free to contact me. Thank you very much.
Vincerely,
S NEYKE
D
Planning Consultant
Copy — State Department of Health
Police Department
Department of Parks and Recreation
Lehua Lani LLC w/ enclosures
Bruce Witcher Engineering w/ enclosure
Monte SidneyFuke, Planning Consultant
100 Pauahi Street, Suite 212 • Hilo, Hawaii 96720 • Planning • variance • Zoning
arwTelephone: (808) 969-1522 • Fax: (808) 969-7996 `� `77^ • Subdivision • Land Use Permits
j (1 • Environmental Reports
October 31, 200'-,
L
003-
L
Mr. Christopher Yuen. Director
Planning Department
COUNTY OF HAWAII
101 Pauahi Street
Hilo, HI 96720
Dear Mr. Yuen:
Subject: Rezoning (REZ 03-025) and SMA 03-015 Applications
Lehua Lani, LLC, TMK: 7-5-20: 71 & 72
Pursuant to my discussion with Mr. Bennett Mark of your staff, please find
enclosed a copy of pertinent correspondences between the consulting archaeologist (Paul
Rosendahl, Ph.D. of PHRI) and the State Historic Preservation Division of the DLNR
regarding the archaeological inventory survey and related matters. Specifically, these
include:
a. Letter, dated July 15, 2003. from PHRI to SHPD requesting its review and
approval of the Archaeological Inventory Survey report;
b. Letter, dated August 26, 2003, from SHPD to PHRI commenting that the
inventory survey report needed some revisions;
C. Letter, dated October 6, 2003, from PHRI to SHPD submitting the revised
inventory survey report, and
d. Letter, dated September 16, 2003, from PHRI to SHPD requesting review and
approval of the Burial Treatment Plan (BTM).
Please note that as of this date. there have been no responses from SHPD
regarding the revised inventory survey report or the BTM. Upon their receipt. a copy
will be provided your office.
If there are further questions and/or comments on this matter, please feel free to
contact me. Thank you very much.
Sincerely
SIDNEY M. FUKE
Planning Consultant
Enclosures
Copy — Lehua Lani LLC w/ enclosures
M
10/31%2003 10:44 808-9t 998 PHRI PAGE 02
July 15, 2003
Paul H. Rosendahl, Ph.D., Inc.
• Historical • Cultural Resource Monoetment Studies & Servicer
Weanwamus Av.n.e • Hilo. Hawaii 96720 • (800) 969-1767 • FAX (8011) 961-
P.O. sox 27705 • G.M.F.. Guam 96911 . (671) 472.3117 • PAX (671) 612.1131
Dr. P. Holland McEldowncy, Acting Administrator
State Histone Preservation Division
Kakuhihewa Building, Room 555
601 Kamokila Boulevard
Kepolei, Hawaii 96707
Subteet: Submusion ofPHRI Report 1340-070103
Archaeological Inventory Survey
Alii Drive Parcels
Land ofPuapua'a 1"°, North Kona District
IslandofHawat'i (TMK:3.7.3.20:71,72)
Dear Dr. McEldowney:
At the instruction of our clients, Randy and Denise Farleigh, we are submitting for your review and comment a
copy of PHRI Report 2340.070203, an inventory survey report for the Alii Drive Parcels project area. This report is a
recently revised and upgraded version of a report originally written in 1991-1992 for fieldwork done in 1991. Prior to
revising and upgrading the report, the circumstances of the project were discussed in detail with Dr. Ross Cordy,
formerly of your office, and Dr. Patrick McCoy, SHPD staff archaeologist, and a course of action to complete the
project was agreed upon. This is explained in detail in the Preface of the enclosed report.
If you have any questions or comments. please call me at our Hilo office, (808)969.1763.
Sincerely yours,
Via_ ..x;1'1 ...r..9�
Paui H. Ro11endahl, Ph.D.
President and Principal
Archaeologist
$ncl: One bound copy of P11Rl Report :340-070103
cc Carrie Mcholson, Clark Realty Corporation. letter only
MaryAnne Margret, SHPD Kona office
A/31/22003 10:44
uwoA UMlolr
900-91 q9B PHRI
August 26, 2003
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
Dr. Paul Rosendahl
PHRI
224 Waianuenue Avenue
Hilo, Hawaii 96720
Dear Dr. Rosendahl
HISTORIC PRESERVATION DIVISION
KAKUHIHEWA BUILDING, ROOM 566
601 KAMOKILA BOULEVARD
KAPOLEI, HAWAII 96707
1 4U U J
FILE
P" T, mows
r� �rwuou w w.rtn woou�a� w,uo4se7
o 0R1 -w
9ANe0T Y.W. UU
OH V 1'I OIN�Ct011. vY1 V 1
LOG NO 2003.1563
DOC NO' 0308PMI I
SUBJECT: Chapter 6E-42 Historic Preservation Review of a Draft PHRI Report 2340-
070203: "Archaeological Inventory Survey Alii Drive Parcels" (Head,
Goodfellow and Rosendahl, 2003), Puapua'a, North Kona, Hawaii Island
TNM: (3) 7-5-20:71, 72
Thank you for the opportunity to review and comment on the above referenced draft report,
which was received in our office July 16, 2003. The report was prepared for Clark Realty
Corporation on behalf of their client, Randy and Denise Farleigh, who are the current owners of
the subject parcel. As you note in the Preface, a draft report on the archaeological inventory
survey of this parcel was completed in 1992 but never submitted to our office for review and
approval.
The 1992 draft report has been updated to meet current regulatory standards This involved a re-
survey of the property in 2003 to relocate all of the sites and reassess the original significance
evaluations and recommended site mitigation proposals. By prior agreement, new information
has been presented in appendices to the report, which otherwise stands as written in 1992.
The information presented in the historical and archaeological background sections of the report
(in the main body of the report and Appendix C) is generally adequate for predicting the kinds of
historic properties that might be found during the survey, In the Attachment we have noted the
need to update the information regarding the Pualani Makai project. The background
information is otherwise sufficient in terms of providing a context for understanding and
evaluating the significance of sites found in the survey.
We believe that the archaeological inventory survey of the roughly 10 -acre project area, which
has now been covered twice (in 1991 and again in 2003), probably identified most of the major
sites on the property. This is the conclusion reached by the authors, who in the process of
evaluating the survey methodology on page 33, did note, however, that vegetation often
RECEIVED SEP 2 2003
10/31/2003 10:44 808-P 3998 PHRI PAGE 04
Paul Rosendahl
Page 2
hampered field observations. This statement, which is not addressed again in the survey update
in Appendix C, suggests that vegetation may have been a limiting factor in achieving the goal of
a 100%, high-intensity ground survey. The effect of vegetation on survey completeness needs to
be addressed in the report. The number of sites in the project area is also in question.
Throughout the main report there is reference to 14 sites --three previously identified sites (6335,
6336, 6337) and 11 new sites (15108, 16111-16119, 16133). A portion of one other site (63 25)
is shown on the project area map and described in Appendix C, but not included in the inventory
even though it is located within the project area. The addition of Site 6325 would make 15 sites
There appears to be a sound basis for assigning even more site numbers (see Attachment for
details). We agree, for example, with the assessment on page 35 of the report that Feature E (a
probable ranch wall) of Site 6337 is functionally and chronologically unrelated to the other
features and should be regarded as a separate site. The number of sites in the project area needs
to be reassessed in preparing a revised report.
The sites found during the 1991 survey include a variety of pre -contact Hawaiian sites
(habitations, agricultural feature complexes, and burials) and historic ranching period sites (walls
and related animal husbandry features). Seventeen test units were excavated at six sites to aid in
the interpretation of site function. Most of the sites have been adequately mapped and described;
some have not, such as Site 16117, which lacks a pian map. There should be a plan map for
every site, except for the walls. More stratigraphic profiles need to be added to adequately
document the test excavations; only one was added to the report in Appendix C. We also have
questions about the inferred functions of some sites (see Attachment for details).
The discovery of two burials at Site 16116, amongst features previously thought or assumed to
be agricultural features, obviously raises questions about the potential for more burials and the
possible need for more testing as part of the inventory survey. This issue needs to be discussed
in some detail before we can conclude that the inventory survey is complete and acceptable. In
light of the several questions about survey completeness and site documentation, we cannot
concur at this time with either the proposed site significance evaluations or recommended site
treatments for the project area as a whole, except to say that we do not agree with the blanket
recommendation for no further work.
The number of problems that we have identified in the review of this report and recent reviews
of other old reports that were updated to meet current standards, indicates to us that "updating"
through the addition of new information in appendices is not a wholly successful strategy. One
of the chief problems in this particular case is that the primary site data (descriptions, maps,
photographs and excavation profiles) are presented in three different places in the report—in the
main report, Appendix A, and Appendix C. The report is extremely difficult to read as a result.
Another problem is that even though some of the background information has been updated in an
appendix (e.g. the review of a recently completed or ongoing archaeological project, such as
Pualani Mekai), the original overview of that project remains unchanged in the front of the
report. It doesn't make sense to us to retain the original, incomplete summary of a project and
10/91/2003 10:44 see -9E 999 PHRI
Paul Rosendahl
Page 3
then add an update of that project. We now believe that the only successful way to update an old
report is to undertake a thorough and complete revision and produce a single, coherent report. In
view of our prior agreement, we will not ask you to pursue this course of action, although you
might want to seriously consider it given the number of revisions to be made.
Please revise the report and resubmit it for our continued review and approval. If you should
have any questions about our review comments please contact our Hawaii Island archaeologist,
Patrick McCoy, at 692-8029.
Aloha,
`7? N•-<l� /sly i-/c%w.-4.`,
P. Holly McEldowney, Acting Administrator
State Historic Preservation Division
c. Chris Yuen, County of Hawaii Planning Department
Kai Emler, County of Hawaii Department of Public Works
Kamana'o Mills, SHPD Burial Sites Program
10/31/2003 10:44 808-� ;998 PHRI PAGE 06 .
Paul Rosendahl
Page 4
Attachment
Detailed Comments on Draft Report
"Archaeological Inventory Survey Alii Drive Parcels"
(Read, Goodfellow and Rosendahl, 2003)
Introduction
Page 9. Where are the ubiquitous agricultural features previously mentioned? How was the
sampling design developed to record and test a representative sample of agricultural features?
The sample area is described as 2$ square meters, but the map indicates that the area is 25 meters
by 25 meters, or 625 square meters. Please clarify.
Previous Archaeological Research
Pages 2.8 and Appendix C. The review of previous archaeological work in and near the project
area appears to be relatively complete. It is difficult to follow, however, in the absence of a
summary table and a map showing the locations of the various projects. Please add a project
summary table and map to Appendix C,
Page 2. According to the information presented here Features a and b of Site 6325 were
recorded within the current project area in the 1973 ARCH survey of the Ali' i Drive
Realignment Corridor, There is no further mention of Site 6325, however, until Appendix C,
although some other features of the site are shown on Figure 2. The status of Site 6325 needs to
be clarified,
Findings
Note: We have not undertaken a systematic review, of every site description and excavation.
Some of the comments below may apply to other sites as well. All of the site data should be
reviewed to ensure completeness and accuracy.
General Comment. Plan maps of Site 16116, Features B -D were added to Appendix C, but the
maps do not show the locations of the test units and there are no stratigraphic profiles for any of
10/31/2003 10:44 606-91 996 PHRI PAGE 07
Paul Rosendahl
Page 5
the units, except for the Feature D excavation. There is also no plan map for Site 16117. All
sites, except for the walls, should be depicted on a plan map. All excavation units should be
shown on a plan map. Stratigraphic profiles should be included for all excavation units, except
for possibly those with a single shallow layer with no cultural materials
Page 10, Figures 3 and 5. One location on these two maps of Site 16116 is identified with the
label "site tag/Pahoehoe sinker " What is a Pahoehoe sinker? Do you mean Pahoehoe sink?
Please review and change as needed Also, please identify the location of the burial.
Page 11. The summary of surface findings is incomplete because there is no discussion of the
ubiquitous agricultural features mentioned earlier. This should be addressed in the survey update
in Appendix C.
Page 11, Site 16116 is first described here as an agricultural/burial complex. While the burials
may have been found in the midst of a number of agricultural features, the decision to include the
burials in the agricultural complex seems questionable. This is different in our view from burials
in a habitation site. We suggest you give some thought to giving the burials a separate site
number. A 25 square meter by 25 square meter section of the site was mapped It is not clear,
however, how much area this site covers and what kind of sample this represents. Please clarify.
Where are the boundaries of Site 16116 and how was this site distinguished from all of the other
agricultural features distributed throughout the project area?
Page 16; Figures 5 and 6. The excavation unit shown on this map is labeled TU -7. On Figure 6
there is a TU -1, but no TU -7. Please review and make the necessary changes.
Figure 5 should show the locations of all of the test units that were excavated in this sample area
of the site.
Site 6337
Page 4; Figure 2 The definition of this site, as shown on this map, is highly questionable in our
view. It includes a long wall (Feature E) that seems to be the boundary wall between the two
lots, and three other scattered features 30 meters or more apart (Features B,C and D). There is
no discussion of why all of these features have been grouped together, but on page 3 5 there is an
admission that Feature E is probably not associated with the other features. We agree with this
assessment and recommend that Feature E be given a separate site number Feature A is missing
from this map. The description of this site on page 24 makes no reference to a Feature A which
according to Table 2 is an enclosure. Please add a description and map of this feature.
Page 25, Site 6337, Feature B The profile description should include bedrock. What kinds of
cultural materials were found in Layers II and III?
10/.31/2003 10:44 308-9 1999 PHRI PAGE 09
Paul Rosendahl
Page 6
You need to include a plan map of this site. Table 2 lists this as a habitation/agricultural
platform. The single test unit was inconclusive in terms of providing information to help
determine site function. This should have resulted in a recommendation for further work.
Data Analyses
Pages 26-27. The dates for Site 6337 appear to be much too early. The C 13/C 12 ratio is a clue
to some kind of problem, especially when compared to most of the other'dates. At the very least
there should be some further discussion of the Site 6337 dates in terms of their fit or lack of fit
with the other dates.
Pages 29 and 32. Tables 6 and 7. The cultural material from Site 6337, Feature B is not
summarized in either of these tables. Please check to see that all of the cultural materials from
the test excavations are summarized,
Conclusion
Page 37. What is the evidence that the burial found in Feature D of Site 16116 is historic?
Appendix A
Page A-1. Why are Sites 6335 and 6336 described as one?
Page A-1 Again, why is there no Feature A of Site 63371 The feature designations in the
description of Features B and D are reversed. Please check and change as needed.
Page A-1. The use of the term "vaults" to describe the "planting boxes" in Site 15108 suggests
something quite different. If these are actually vaults (arched masonry structures with a ceiling)
it is hard to see how they could have functioned as planting enclosures. Structures with vaults in
Hawai'i are more commonly burial features. The description and interpretation of this site needs
to be clarified Testing of this site would also seem to be warranted.
Appendix C
The update of recent work in the ahupua'a seems to be relatively complete, but we noted that
there is no reference to the work conducted in the Pualani Makai project area by Rechtman
Consulting. This needs to be added, along with an update on the PHRI survey report and data
recovery report (cited as Graves in prep, in the References Cited) for this project. The update
should refer back to the overview of this project on pages 6 and 7 of the main report. Better yet,
the relevant information for this project would all be summarized in one place.
10/31/1603 16:44 868-9 998 PHP: PAGE 69
Paul Aosendald
Page 7
The evaluation of the survey methodology used in 1991 (page 33) left some uncertainty
regarding the completeness of the survey because of less than optimal ground visibility due to
vegetation. The summary of the 2003 fieldwork is silent on the issue of survey completeness,
except that a portion of Site 6325 was found to be located in the project area. A more detailed
summary of the 2003 fieldwork should be added to the report, including any new observations on
the numerous agricultural features.
Page C-8. It would be helpful to show the extent of bulldozing in the project area on a map.
Page C-32. There is no Site 6325 in the inventory for this parcel in the main report, although it is
shown on Figure 2
Page C-34, Figure C-22. Please add the test unit to the map.
General Comment. The photographs that have been added to the report are too dark—at least in
the copy we were sent—and thus of little or no value in terms of documenting site
characteristics. We would hope that better photographs would be included in the revised report.
10/31;2003 10:44
October 6, 2003
Project 2340
Gee -9( 956
PHRI
PAGE 11
r�
Paul H. Rosendahl, Ph.D., Inc.
rchat010tic07 • Historical • Cultural aesoume Monalemsnt Studies & Services
'/'taianusnue Avenue • Hilo. Har•'al4 96720 • (lost N9.176) - FAX (908) 961 •6991
►.O. lo: 21105 • G.M.F., Guam 96911 • (671) 671.31 17 • 9AX (671) 471.3111
Dr. P. Holland McEldowncy, Acting Administrator
State Historic Preservation Division
Kakuhihewa Building, Room 555
601 Kamokila Boulevard
Kapolsi, Hawaii 96707
Subect. Submission for Review
PHA! Report 1340-093003
Archaeological Inventory Survey, Alii Drive Parcels
Land of Puapua'a 1, North Kona District
island ofHawai'i (TWK:3J4-10.71.71)
Dear Dr. McEldowney:
Enclosed for your approval is a copy of PHRI Report 2340-093003, for the Alit Drive Parcels project
area in North Kona. This is a revised version of a report recently reviewed by your office (SHPD icMer
dated 26 August 2003; Log No:2003.1563; Doc. No:0308PMI1). Revisions have been made per your
review comments; for your convenience, the comments aro reproduced hem (attached), and we have
individually addressed each comment and indicated on which page the revision is found.
Thank you for your assistance on this project. If you have any questions, please call me at our main
Hilo office (806) 969-1763.
Si �y yours
Paul . Rosendahl, D.
Pmsident and Principal
Archaeologist
Erick One bound copy of PHRI Report 1340-093003
Attachment: SHPD Review Comments and PHAI.Respon+es
cc: Carrie Nicholson, Clark Really Corporation, w10 report
10/31/2003 10:44 808-9E 998 PHRI P:,GE i2
Attachment
Detailed Comments on Draft Report
"Archaeological Inventory Survey AU'l Drive Parcels"
(Bead, Goodfellow and Rosendahl,2003)
Introduction
Page 9. Where ate the ubiquitous agricultural features previously mentioned?
Response. By ubiquitous we mean that, in general, the features are scattered throughout he project area
in varying concentrations,
}low was the sampling design developed to record and test a representative sample of agricultural features?
Response. As a standard procedure at PHRI, sampling designs or other strategies that are exceptions to
conventional practice, are first discussed with the SHPD and they are not implemented without SHPD
sanction. In this case, the strategy was discussed in detail between PHRI Hawaii Projects Director Alan T
Walker and Dr. Patrick McCoy of the SHPD (personal communication, Alan T. Walker, former PHRI
Hawai't Projects Director, 10101103). 1t was agreed upon that a 25 by 25 mater square sample area
deemed most representative of the features was to be selected and recorded in derail, and that this would be
sufficient to document the numerous, ubiquitous minor features of the Kona Field Sysrem in the project
area.
The sample arca is described as 25 square meters, but the map indicates that the area is 25 meters by 25
meters, or 625 square meters. Please clarify.
Response: no sentence now reads 21 meter square.
Previous Archaeological Research
Pages 2.8 and Appendix C. The review of previous archaeological work in and new the project area
appears to be relatively complete. It is difficult to follow, however, in the absence of a summary table and a
map showing the locations of the vatious projects. Please add a project summary table and map to
Appendix C.
Response: A project summary table and a map have been added ro Appendix C.
Page 2. According to the information presented here Features A and 8 of Site 6325 were recorded within
the current project area in the 1973 ARCH survey of the Ali'i Drive Realignment Corridor. There is no
further mention of Site 6325, however, until Appendix C, although some other features of the site aro
shown on Figure 2. The status of Site 6325 needs to be clarified.
Response: We checked the original Ching of al. (1973) report; the statement that Features A and B of Site
61J1 were recorded within the current project area is incorrect. Ching at al. (1973) shows Features A and
B just outside the project boundary. We have corrected the test, and Features A and 8 are shown as
outside the project area on Figure Z. We have also clarified the status of Site 6311 (tee Appendix C page
C -i, paragraph two.).
Findings
Note: We have not undertaken a systematic review of every site description and excavation. Some of the
comments below may apply to other sites as well. All of the site data should be reviewed to ensure
completeness and accuracy.
Rarponse: We have checked all site descriptions and excavations for the problems noted in the following
review comments.
General Comment. Plan traps of Site 16116, Features B -D were added to Appendix C, but the maps do not
show the locations of the test units sod them are no stratigraphie profiles for any of the units, except for the
Feature D excavation. There is also no plan map for Site 16117. All sites, except for the walls, should be
depicted on a plan map. All excavation units should be shown on a plan map. Strangraphie profiles should
be included for all excavation units, except for possibly those with a single shallow layer with no cultural
materials.
19!-1,11]193 19:44 99B-91 99B PHRI RAGE 13
Response: The plan malar for Site 16116, Feattazs B -D, now include locations of test units. All other site
maps have also been checked, and all units placed are present on the maps. Other than the profile for the
Feature D excavation, there are no excavation profiles, as they were not recorded in the fleid. As PH?! has
maintained in several communications with the SHPD, during the time of the survey in the early 1990s it
was standard PHRI practice to record only profiles that the supervising archaeologist deemed necessary;
in other words a profile that would show a relationship to a structure, a particular sequence of layers, ere.;
in other words. marten that could not be adequately described in a textual description. Of course, PHRI
now clearly understands that today's SHPb standards require that all excavations placed be shown in a
profile. The plan map for Site 16117 was not missing: it is on page I$ of the main rest.
Page 10, Figures 3 and 5. One location on these two temps of Site 16116 is identified with the label "site
tag/panoehoe sinker." What is a pahoehoe sinker? Do you mean pahoehoe sink? Please review and change
as needed. Also, please identify the location of the burial,
Response: The locations of the burials are now identified on Figure 3. "Pahoehoe sinker" has been
removed from the maps, It was in reference to what appeared to be a basalt breadloaftinker; later analysis
indicated the item was not a sinker at all, but a natural stone.
Page 11 The summary of surface findings is incomplete because there is no discussion of the ubiquitous
agricultural features mentioned earlier. This should be addressed in dee survey update in Appendix C.
Response: A short summary has been added to Appendix C (page C-3).
Page 11. Site 16116 is first described here as an aeculturallburial complex, While the burials may have
been found in the midst of a number of agricultural features, the decision to include the burials in the
agricultural complex seems questionable. This is different in our view from burials in at habitation site. We
suggest you give some thought to giving the burials a separate site number.
Response: After consideration, we have decided the buriais should remains as parr of the site, because we
cannot justify why a burial should be separaredfrom its contest, no matter whether the burial is (bund in a
cave, agricultural fields, or in a habitation structure.
A 25 square meter by 25 square meter section of the site was mapped. It is not clear, however, how much
area this site covers and what kind of sample this represents. Please clarify.
Response: Figure 3 shows the entire area of the site and the sample area. So the total site area is clear, and
the sample area is also clear. Who; kind of sample this represents is explained in paragraph three of the
Field Methods and Procedures. and on page C-4, paragraph one, of Appendix C,
Where are the boundaries of Site 16116 and how was this site distinguished from all of the other
agricultural features distributed throughout the project area?
Response: The boundaries of the site are now clearly shown on Figure 2, Site Location Map. The site was
distinguished by its spatial contiguity. In other words, even though minor agricultural features are present
throughout the vicinity they are not so continuous as to necessitate assigning arbitrary boundaries; sites
were still distinguished by the normal processes ofspatiallfuncrional association.
Page 16; Figures 5 and 6. The excavation unit shown on this map is labeled TU•7. On Figure 6 there is a
TU -1, but no TU -7. Please review and make the necessary changes.
Response We do not see any changes are necessary. Figure 3 shows both TU -7 and TU -3 of Site 16116.
This is in agreement with the plan map of the site, which is Figure 3 on page 10. Figure 6 shows TU -1, Slid
16114, which is the onlv unit placed at the site. All other units placed at the site are shown on Figure 3,
page 10. If we are missing something, please let us know.
Figure 5 should show the locations of all of the test units that were excavated in this sample area of the site.
Response: As mentioned immediately above, only TU -S and 771-7 were excavated in the sample area, and
these are shown.
site 6337
Page 4; Figure I. The definition of this rte, as shown on this map, is highly questionable in our view. It
includes a long wall (Feature E) that seems to be the boundary wall between the two lots, and three odor
scattered features 30 meters or more apart (Features B, C and D). There is no discussion of why all of these
16!31/2063 10:44 868-9 ,998 PHRI PAGE 14
features have been grouped together, but on page 35 there is an admission that Feature E is probably not
associated with the other features. We agree with this assessment and recommend that Feature F be given a
separate site number.
Response: As indicated in the report, this site was initially identified during the Ching st al. (1973) survey.
Hommon and Rosendahl (1983) added new features to the site, The its* was lard redefined by Walker
(1991), and by Dunn and Rosendahl (1991). Subsequent to the current project the site was again totally
redefined so that it currently has 14 features Noun et al. (1998). We believe it would not be wise to
remove a feature from the site at this point. and give it a new sire number. That would create a discrepancy
with the subsequent Haun et al. (1998) report and discrepancies with all previous reports in which that site
has been described.
Feature A rs missing from this map. The description of this site on page 24 makes no reference to a Feature
A, which according to Table 2 is an enclosure. Please add a description and map of this feature.
Response: Table 2 is in error. There is no Feature A at the site The table has been corrected.
Page 25. Site 6337, Feature B. The profile description should include bedrock.
Response: We don't understand what you mean when you spy "The profile description should include
bedrock. " Please ecpiain We do not !pink you are re)etring to rhe test, since all other profiles it the
report, and for that matter, all PHRI reports, don't include the basal bedrock layer in the profile
descriptions.
What kinds of cultural materials were found in Layers 11 and II17
Response A check of the field records indicates that the layers were apparently designated "cultural'
because they had trace amounts of charcoal that were not collected. Since, in the absence of other cultural
remains, such amounts of charcoal are difficult to confirm as cultural, we have removed the designation
Site 16117
You need to include a plan map of this site.
Response. A check indicates that the plan map for this site is already in the report as
Figure 7.
Table 2 lists this as a habitation/ag-icultural platform. The single test unit was inconclusive in terms of
providing information to help determine site function. This should have resulted In a recommendation for
further work.
The platform was rested not for sirs function, but for presence absence of human remains (see page 13,
paragraph 2). ,The results of time single unit placed, outlined on page 13, indicate the unit contained a
small amount of charcoal and marine shell No burial remains were nored. The rest unit findings (the small
amount of charcoal and marine shell), along with other factors. such as the size of the site and structural
form) support a function of temporary habitation, which is a stated function of rhefeature. The agricultural
function for the feature is based on the presence of the planting box within the structurs. We donor see how
the findings of the single unit "should have resulted in a recommendation for further work " We contend
that the findings support and confirm the original stared,&nction of the feature.
Data Analyses
Pages 26-27. The dates for Site 6337 appear to be much too early. The C13/C12 ratio is a clue to sonic kind
of problem, especially when compared to most of the other clause. At the very least there should be some
further discussion of the Site 6337 dates in terms of their fit or lack of fit with the other dates.
Response. A /boniom in regard to the early ranges has been added to page 26.
Pages 29 and 32. Tables 6 and 7. The cultural material from Site 6337, Feature B is not summarized in
either of these tables. Please check to see that all of the cult usl matenals from the test excavations are
summarized,
Response: The errors were due to mislabeling Feature D as Feature B. Table 6 has been checked and was
found to be accurate, except for the mislabeling of Feature D as Feature B. hlasruports such as waterworn
rock and coral are not noted on the table but are referred to in the text. Table 7 u also accurate. Although
it is stated on page 31, paragraph 3, that midden was found in 20 units, 18 of the units had only sparse
amounts that were not retained by the 1;4 -,itch screen. Only 1/4-tcretn remains wen lobulated.
10/31/2003 10:44 808-S X998 PHRI
Conclusion
Page 37. What is the evidence that the burial found in Feature D of Site 16116 is historic?
Response: A radiocarbon sample from layer 1, the stones overlying the burial, yielded a most likely
radiocarbon range of AD 1790-1850 and an overall range of AD 1670-1955 (see page 16, paragraph7;
page 35, paragraph I).
Appendix A
Page A -l. Why are Sites 6335 and 6336 described w ons?
Response. The two sites are virtually identical in structural form; we have, however, separated them into
two discrete descriptions.
Page A -I. Again, why is there no Feature A of Site 63371
Response. Table 1 is in error. There is no Feature A at the site. The table has been corrected.
The feature designations in the description of Features B and D are reversed. Please check and change as
needed.
Response: This has been corrected.
Page A-1. The use of the term "vaults" to describe the "planting boxes" in Site 15108 suggests something
quite different. If these are actually vaults (arched masonry structures with a ceiling) it is hard to see how
they could have functioned as planting enclosures. Structures with vaults in Hawaii arc more commonly
burial features. The description and interpretation of this site needs to be clarified. Testing of this site
would 4130 seem to be warranted.
Response: The word "vauit" is a misnomer, and it has been removed from the text.
Appendix C
The update of recent work in the ahupua'a seems to be relatively complete, but we noted that there is no
reference to the work conducted in the Pualani Makai project area by Rechtman Consulting. This needs to
be added, along with an update on the PHRI survey report and data recovery report (cited as Graves in
prep. in the References Cited) for this project. The update should refer back to the overview of this project
on pages 6 and 7 of the train report. Better yet, the relevant information for this project would all be
summarized in one place.
Response: The Rechanan report, and the PHRI survey reporr and data recovery report, have teen added
to the update in Appendix C (see pages C-1 to C-3).
The evaluation of the survey methodology used in 1991 (page 33) left some uncertainty regarding the
completeness of the survey because of less than optimal ground visibility due to vegetation.
Response: On page 8, in the first paragraph of the Field Methods and Procedures, it states that 100% of
the project area was surveyed. In the "Evaluation of Survey Methodology" the text notes that the
methodology was "effective and then it goes on to say that although dense vegetation often "hampered
observations" visibility was ameliorated by the ciose spacing of transects, which averaged five to seven
meters apart. Although the purpose of these sentences was to assure the reader that the methodology was
adequate, they were taken as a suggestion that the survey might have been inadequate. The paragraph in
question has been rewritten to make it absolutely clear that the survey was effective and that vegetation did
not hamper observations. Seepage C-3, paragraph 4, for more derailed tnjbrmation on surface visibility to
the project area during she inventory survo�v.
The summary of the 2003 fieldwork is silent on the issue of survey completeness, except that a portion of
Site 6325 was round to be located in the project area. A more detailed summary of the 2003 fieldwork
should be added to the report, including any new observations on the numerous agricultural features.
Response: We have added a more detailed summary of the 2003 fieldwork to Appendix C (page C•3.
paragraph 4).
Page C-8. It would be helpful to show the extent of bulldozing in the project area on a map.
Response. The extent of the bulldozing has been added to Figure ?, page 4.
10/51/2005 10:44 668-S 3958 FHP: PAGE 1
Page C•32. Thele is no Site 6325 in the inventory for this parcel in the main report although it is shown on
Figure :.
Response: Since it was agreed upon that the updared portion would be separate from the main report, the
inventory information for the site (since the site was ldennfisd during the 1003 flddwork) is pan of the
update (Appendix C). The site v shown on Figure 1, however, since it did nor maks sense to have a
duplicate of the figure in Appendix C, just to show the location of the site. Appendix C also assesses Site
69.3 and presents a recommended treatment, both of which are in concordance with the recommendations
and treatments subsequently set forth in Hqun et al. (1998). We have added footnotes to Tables 2 and 8 to
indicate that Site 6325 was added to tits inventory of ev the f eldwork for the o4nal inventory was
completed and that the site ;s described in detail, and assessed Jor significance and treatment in
Appendix C.
Page G34, Figure C•22. Please add the test unit to the map.
Response: The test unit has been added. The report has been checked so that all units art present on maps.
General Comment. The photographs that have been added to the report are too dark—at least in the copy
we were sent—and thus of little or no value in terms of documenting site characteristics. We would hope
that better photographs would be included in the revised report.
Response: We have included original black and white photographs in the report.
Additional SHPD comment In the text of the letter, and not within the Attachment;
The discovery of two burials at Site 16116 amongst features previously thought or assumed to be
agricultural features, obviously raises questions about the potential for more burials, and the possible need
for more testing as part of the inventory survey. This issue needs to be discussed in some detail before we
can conclude that the inventory survey is complete and acceptable. In light of the several questions about
survey completeness and site documentation, we cannot concur at this time with either the proposed site
significance evaluations or recommended site treatment for the project area as a whole, except to say that
we do not agree with the blanket recommendation for no further work.
Response: We cannot find any statement that indicates the two burials were discovered in features
"thought or assumed to be agricultural fearures."Page /1, paragraph seven, however, states that 17 units
were placed in the project area in order to recover datable samples. to test for buried cultural deposits,
and to test for presence absence of burials. In the case of the two platforms at Site 16116 (Features D and
E), they were certainly tested because their structural form indicated they could be burials. In other words,
we do not agree that more resting for burials is necessary because the current project already included a
program for burial testing.
ID/31/OM3 10:4,
PHR
M MI) l
September 16, 2003
03-2341
PHRI
PAGE '0
$=ILE
Paul H. Rosendahl, Ph.D., Inc.
0
rchteola(kal • Historical • Culture) Resource Management Studies & Servicer
Walanuenu• Manu* • Hilo. Hawal'I 16770 • (804) 161,1763 • FAX (805) 1614T111
F.O. aog 133os • G.M.F.. Guam 16721 - (6711 471.311 i - FAX (671) 472.3131
Dr. P, Holland McEldowney, Acting Administrator
State Historic Preservation Division
Kakuhihewa Building, Room W
601 Kamokile Boulevard
Kapolei, Hawaii 96707
Attention: Kai Markell, Administrator, Burials Program
Subject: Submission ofPHRI Report 2341-071403
Burial Treatment Plan
Alii Drive Parcels
Land ojPuapua'a 2", North Kona DWrict,
Island ofMawal'i (TMK: J -7-S-20:71,77)
Dear Dr. McEldowney:
At the request of our client, Mr. and Mrs. Randy Farleigh, I am submitting for your review and
approval a copy of PHRI Report 2341.071403, for the treatment of burials identified to the Alii Drive
Parcels project area. At the same time I am requesting that the project be placed on the agenda of the
October 16, 2003 meeting of the Hawaii Island Burial Council (HIBC) for the purpose of determination
regarding the proposed treatment contained within the burial treatment plan. I am also submitting twelve
copies of the burial treatment plan for distribution and review by the HIBC members and burial program
staff.
If you have any questions or comments regarding this request, please call me at our Hilo office,
(808)969-1763.
Sincerely yours,
RoaandahI, Ph.D.
President and Principal
Archaeologist
Encl: Thirteen copies of'PXRI Report 2341-071403
cc: Mr. and Mrs. Randy Farleigh
10/31;2003
Oct 09
10:44 809-C 0998 PHRI rHut
03 12: ler -ehan h.Pore cud u-4:11)-,1 p..
!MDs, LW4L1 ,
ee!\MOR eR NMNu
STATE OF HAWAII
a 6 CEPARTNENT Of LAND ANO NATURAL RESOURC[S
.,rtti HISTCRIC PRtSERVATION OIMPON
KAKUHIHtWA BUILDING. ROOM SW
an•^'" 001 KAMOKILA eOULEVARO
KA►OLEI. HAWAII 9!707
AGENDA
HAWAII ISLAND BURIAL COUNCEL MEETING
DATE. THURSDAY, OCTOBER 16,10W
7mn: 10:00AM - 3:30PM
PLACE: PUUANAHLTLU COMMUMIN CENTER
71-1490 MAMA.LAHOA HWY.
KAXLUA-KONA, HI %740
L OPENING REMARKS
IL APPROVAL OF JULY 179 3005 MINUTES
W. BUSINESS
FILE
Aw..MYYY
IYMCI lM Yv61MT114
.RWYNR'.P N..\Y YY►QWY. YYI
eco 0/v�
.w«ff!
110"ra Y M, UU
bIMY 0/4Yw
«awfK YNRW!!
_ anc.uioaoaw uuuNe«
YW=eaMVNse
OeM1YOY.lF Ra/11 R!/MClM.T661f. f
@MRYl, YM W R W WCN MeR: eNlnl
Irh�NR/Y
w+,s�w.11o �N,bW1
�-/'OIK «/INMMf lai
.M/O..Ni4�NuY RNMN e'w..q/Wu
}I«i/ YMY
(A. AI I'I DRIVE PARCELS; LAND OF PUAPUA'A 2R°: NORTH KONA DISTRICT;
ISLAND OF HAWAt�1(TFIIC:3-7-3.20:71,72)
Iefornatfoo/Rtansseadatlon: Presentation ofburial treatment plan. Recognition of
IineaUcultura l dascandants.
B. HUALALAI VILLAGE DEVELOPMENT; WAIAHA; NORTH KONA DIST*CT;
ISLAND OF HAWAI'I (T.MK:3-7-5-10:"
InformatiolarRaeomuneadadon: PrasMation of burial trastment plan. Recognition of
Iineal/cukural deso"ants.
C. PU/ULAN! RANCH PHASE IL- PU'UANAMMU; NORTH KONA, ISLA14D OF
HAWAII CTMK:7-1-06:Various)
Determleatioe/Reeomnuadation: Formal council dew.. bunion to preserve in place or
relowe sffected burials, and council recommendations to the Department of Land and Natural
Rssourow regarding proposed burial treatment fbr site 50-10-20.20382. Discussion of burial
ttwtment for Site 50-10-ZO-19413. Departmental discussion ofsaid project. Recognition of
lineal/cultual descetdata.
D. HOKULIA
Iaformatioa/Recommeadstioa: Formal council datermnation to pteeene in place or
Sidne 4
)/. �_
._� fan _i?aia
100 Pauahi Street, Suite 212 • Hilo, Hawaii 96720
Telephone: (808) 969-1522 • Fax: (808) 969-7996
November I, 2003r r
1
� l
Mr. Christopher Yuen, Director
Planning Department
COUNTY OF HAWAII
101 Pauahi Street
Hilo, HI 96720
Dear Mr. Yuen:
Subject: Rezoning (REZ 03-025) and SMA 03-015 Applications
Lehua Lani, LLC, TMK: 7-5-20: 71 & 72
Pil • Vanance • Zon!po
Subdivision • Lana Use Permits
Environmental Reports
As you are aware, I deferred responding to the Police Department and a portion of
the Kona Traffic Safety Committee's comments pending receipt of the consulting traffic
engineer's review of this matter. After discussing this matter with the traffic engineer,
we would like to respond as follows:
Police Department
The applicant is aware that having dedicated left turn lanes to all streets and/or
projects would facilitate through traffic movement and could reduce "rear end" accidents.
However, having an abundance of such lanes could at times be hazardous, as through
traffic would have to continuously swerve or veer right. And that, in and of itself, could
be hazardous. Then, too, the additional lane must also take into account accesses on the
opposite side of the street.
As such, Federal studies and/or guidelines are available to help determine whether
left turn lanes or other traffic mitigation (such as traffic lights) are warranted for a
proposed land use. The reports, methodology, and guidelines utilized by the consulting
engineer included the Highway Capacity Manual Special Report 209, 2nd Edition of the
Transportation Research Board, 1992; Highway Capacity Software from the Federal
Highway Administration and McTrans, University of Florida, Gainesville, Florida; and
Institute of Transportation Engineers (ITE) manual). Based on the above, the consulting
engineer concluded that a left tum lane was not warranted for the proposed development.
Kona Traffic Safety Committee
Relative to the effects of this project on Alii Drive and mauka-makai traffic, the
consulting engineer noted that traffic analysis standards require an evaluation of potential
development of vacant land when a proposed development is over 100 units. In this case,
the proposed number of units is only 58; as such, the analysis took into account existing
traffic patterns and volume.
`.-#.3:-4--7-1
Mr. Christopher Yuen
November 17, 2003
Page 2
The consulting engineer also noted that a single -developer cannot determine the
location of escape routes. That would require a broader regional analysis, a task usually
assigned to the County. Additionally, the report did address the project's impact on the
existing mauka-makai roads (i.e.. Lunapule Street and Royal Poinciana Drive) and
concluded that the proposed development should not appreciably worsen the existing
conditions.
Relative to the comments of the Department of Public Works, we note the
following:
a. The applicant's consulting engineer will prepare the appropriate drainage
study and/or plan prior to issuance of any land disturbance permits for the
project. The plan will also reflect all project -generated water to be
disposed on-site, and, if needed, the appropriate UIC permit will be
secured to implement the approved plan.
b. A grading and/or grubbing permit will be secured prior to any land
disturbance activity. Additionally, in the event an NPDES permit is
needed, it will be applied for and secured by the applicant.
C. Relative to roadways, the applicant is willing to set aside additional right-
of-way for the proposed Parkway with the understanding that 1) the
additional area does not compromise the integrity of the applicant's
project; 2) the area is determined prior to submittal of plans for PUD; and
3) appropriate impact fee credit is given for the relinquished land.
Please note that an archaeological feature immediately makai side of the
Parkway will be preserved. As such, any additional right-of-way desired
by the County for the Parkway will have to address its intrusion into the
site's buffer area.
There will be only one access from the project to Alii Drive, the location
of which would be subject to the approval of the Department of Public
Works. The project will NOT be gated. As such, the depth of the access
should not be an issue. Furthermore, none of the lots will have direct
vehicular access to either Alii Drive or the Parkway. There will be direct
pedestrian access, however, between the proposed lots and Alii Drive.
The applicant may consider installing a "breakaway" gate to the Parkway
that meets with the approval of the Department of Public Works.
Mr. Upistopher Yuen
November 17, 2003
Page 3
Should an additional 5 -feet fronting Alii Drive be required, the applicant
again would have no objections with the understanding that appropriate
impact fee credit would be given.
Relative to the interior roadways, the applicant will be applying for a PUD
that will address the specific interior roadway and right-of-way
requirements. Although the proposed roadways and improvements within
the rights-of-way will not conform to County dedicable standards, they
will be sufficient to address safety and emergency access requirements.
d. Finally, in the area of traffic. I would like to direct your attention to our
responses to the Police Department and Kona Traffic Safety Committee.
In response to the State Department of Education's comments, the applicant will
have its contractor coordinate work schedules with the principal of Kahakai Elementary
School to minimize construction dust, noise, and related impacts to the school. In terms
of a school impact fee contribution, the applicant is hesitant to make such a commitment,
as that amount is unknown at this time. Additionally, the County Council has not
traditionally required such an imposition, and the applicant does not want to commit to a
request that is not accepted County policy at this time.
Again, thank you for this additional response opportunity. If there are further
questions and/or comments on this matter, please feel free to contact me. Thank you very
much.
"ncerely/��
SIDNEY M. FUKE
Planning Consultant
Copy — Police Department
Kona Traffic Safety Committee
Department of Public Works
Department of Education
Lehua Lani LLC
Bruce Witcher Engineering via FAX
Michael Riehm via FAX
NAME:
ADDRESS:
(Page 1 of 2)
&Szl1 �
7
STATUS
STATUS OF PETITIONER
Is your interest in this matter clearly distinguishable from that of the general public?
Yes }: No
If the
If
or threatened injury:
B. Are you a government agency whose jurisdiction includes the land involved in the
subject request? Yes _ No _
If the answer is "yes", please explain the nature of the agency's jurisdiction:
C. Do you lawfully reside on or have some property interest in the land involved in the
subject request? Yes _ No _
If the answer is "yes", please explain:
EXHIBIT
ealmow" _ O- _ ! - b
D. Are you a person or persons descended from native Hawaiians who inhabited the
Hawaiian Islands prior to 1778, who practiced those rights which were customarily
and traditionally exercised for subsistence, cultural, or religious purposes?
Yes _ No _
If the answer is "yes", please submit any geneological evidence and historical
evidence showing -the exercise of those rights to support the statement.
PETITIONER'S SIGN
STATE OF HAWAII )
) SS.
COUNTY OF HAWAII )
On this day of - - -- , 19_, before me personally appeared , to
me known to be the person described in and who executed the foregoing instrument, and
acknowledged that he executed the same as his free act and deed.
Notary Public, State of Hawaii
My commission expires:
NAME:
�Ma 01.161fflel• 100 100019021.2MX40-MG: Wall 11M
1.
Be ),-e+ C)i) -e f
ADDRESS:
7 5
A
c
,S
;4 ,
G
A.
0
C.
STATUS OF PETITIONER
Is your�interest in this matter clearly distinguishable from that of the general public?
Yes J_ No _
If the answer is "yes", please explain:
weVL!0
If the answer is "no", please explain how the proposed action will nevertheless cause
you actual or threatened injury:
-r L- T r _ 1
/S U e f f J- ,Pvt 1 A c jd--A.) a264 -_e noy s �—
Are you a government agency whos . risdiction includes the land involved in the
subject request? Yes — N
If the answer is "yes", please explain the nature of the agency's jurisdiction:
Do you lawfully reside on or have some property interest in the land involved in the
subject request? Yes _ No _
If the answer is "yes", please explain:
EXHIBIT
D. Are you a person or persons descended from native Hawaiians who inhabited the
Hawaiian Islands prior 1778, who practiced those rights which were customarily
and traditionally rctsed for subsistence, cultural, or religious purposes?
Yes _ No jEl_
If the answer is "yes", please submit any geneological evidence and historical
evidence showing,the exercise of those rights to support the statement.
PETITIONER'S SIGNATURE
STATE OF HAWAII )
) SS.
COUNTY OF HAWAII )
On this _ day of — --- , 19_, before me personally appeared
me known to be the person described in and who executed the foregoing instrument, and
acknowledged that he executed the same as his free act and deed.
Notary Public, State of Hawaii
My commission expires:
to
Harry Kim
Mayor
October 16, 2003
(90u fV of ClRiufvnii
PLANNING DEPARTMENT
101 Pauahi Street, Suite 3 • Hilo, Hawaii 96720-3043
(808)961-8288 • Fax(808)961-8742
Ms. Debra Wijet
P.O. Box 546
Kailua-Kona, HI 96745-0546
Dear Ms. Wijet:
Change of Zone Application (REZ 03-025)
SMA Use Permit Application (SMA 03-015)
Lehua Lam, LLC
TMK: 7-5-20:71 & 72
Christopher J. Yuen
Direcror
Roy R. Takemoto
Deputy Dirccror
We are in receipt of your Petition For Standing In Contested Case Hearing, which was
sent to the applicant's representative, Mr. Sidney Fuke. Please be informed that your
request is incomplete since the petition was not signed nor notarized. Further, you must
also remit a $100.00 filing fee along with the petition.
In light of the above, we are returning your petition. Please sign the petition and also
have the petition notarized. Please also include the filing fee. Please send the petition to
the County of Hawaii Planning Commission at 101 Pauahi Street. Suite 3, Hilo, Hawaii,
96720.
Should you have any questions, please feel free to contact Norman Hayashi of this office
at(808)961-8288.
Sincerely,
C�1R TOPHER J. YUEN
Planning Director
NH:syw
pwpwin60\norm\1etters\wilet lehua lane 10-15-03
cc: Mr. Sidney Fuke, Planning Consultant
Planning -Kona
Enclosure — Original Petition
EXHIBIT
S —
Harry Kim
Mayor
tnunfg of'aivafi
PLANNING DEPARTMENT
101 Pauahi Street, Suite 3 • Hilo, Hawaii 96720-3043
October 16, 2003 (808) 961-8288 • Fax (808) 961-8742
Mr. Robert Russell
Ms. Lillian Fox
75-6081 Alii Drive, # Y102
Kailua-Kona, HI 96740
Dear Mr. Russell and Ms. Fox:
Change of Zone Application (REZ 03-025)
SMA Use Permit Application (SMA 03-015)
Lehua Lani, LLC
TMK: 7-5-20:71 & 72
Christopher J. Yuen
Dido,
Roy R. Takemoto
Depwy Dimcior
We are in receipt of your Petition For Standing In Contested Case Hearing, which was
sent to the applicant's representative, Mr. Sidney Fuke. Please be informed that your
request is incomplete since the petition was not notarized. Further, you must also remit a
$100.00 filing fee along with the petition.
In light of the above, we are returning your petition. Please have the petition notarized
and also include the filing fee. Please send the petition to the County of Hawaii Planning
Commission at 101 Pauahi Street, Suite 3, Hilo, Hawaii, 96720.
Should you have any questions, please feel free to contact Norman Hayashi of this office
at(808)961-8288.
Sincerely,
Cl
HRISTOPHER J. YUEN
lanning Director
NH:syw
p:wpin60\north\letters\russeII — fox lehua Iani 10-15-03
cc: Mr. Sidney Fuke, Planning Consultant
Planning - Kona -1
Enclosure — Original Petition _
LINDA LINGLE
GOVERNOR OF HAWAII
��3 un
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
LAND DIVISION
POST OFFICE BOX 621
- HONOLULU, HAWAII 96809
November 14, 2003
LD -NAV
REZ03-025.RCM
Honorable Christopher J. Yuen
Planning Director
County of Hawaii
Planning Department
25 Aupuni Street, Room 109
Hilo, Hawaii 96720-4252
Dear Mr. Yuen:
Subject: Change of Zone Application
Special Management Area Use Permit
I. D. Nos.: REZ 03-025 and SMA 03-015
Applicant: Lehua Lani LLC
Authority: County of Hawaii Planning Department
Location: Puapuaa 2"d, North Kona, Hawaii
TMK: (3) 7-5-20: 071 and 072
PETER T. YOUNG
DIAIRPERSON
BOARD OF LAND ANO NATURAL RESOURCES
AWSVON ON WATER RESOLIRU MANAGEMEI.T
DAN DAVIDSON
DEP DIRECTOR - LAND
ERNEST Y.W. LAU
DEPUTY DIRECTOR- WATER
AQUATIC RESOURCES
BOATING AND OCEAN RECREATION
BUREAU OF CONVEYANCES
ODAMISSION ON WATER RESOURCE LIANAGEMENI
CONSERVATION AND COASTAL LANDS
CONSERVATION AND RESOURCES ENFORCEMENT
ENGINEERING
FORESTRY AND WILDLIFE
HISTORIC PRESERVATION
KA AWE IGLAND RESERVE COMMISSION
LAND
STATE PARKS
Thank you for the opportunity to review and comment on the subject
matter.
A copy of the document pertaining to the subject matter was distributed
or made available to the following Department of Land and Natural Resources'
Divisions for their review and comment:
- Division of Forestry and Wildlife
- Division of State Parks
- Engineering Division
- Office of Conservation and Coastal Lands
- Land -Hawaii District Land office
Attached is a copy of the Engineering Division comment.
Based on the attached responses, the Department of Land and Natural
Resources has no other comment to offer on the subject matter.
Should you have any questions, please feel free to contact Nicholas A.
Vaccaro of the Land Division Support Services Branch at 1-808-587-0384.
Very truly yours,
DIERDRE S. MAMIYA
Administrator
HDLO EXHIBIT
�T'
LINDA LINGLE
GOVERNOR OF HAWAII
LD/NAV
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
LAND DIVISION
POST OFFICE BOX 621
HONOLULU, HAWAII 96809
October 22, 2003
PETER T. YOUNG
CHAIRPERSON
BOARD O. IAND AND NATURAL RESOURCES
COMMISSION ON WATER RESOURCE MANAGEMENT
DAN DAVIDSON
DEPUtY DIRECTOR - UM
ERNEST Y.W. LAU
DEPUTY DIRECTOR. WATER
AQUATIC RESOURCES
BOATING AND OCEAN RECREATION
BUREAU OF CONVEYANCES
COMMISSION ON WATER RESOURCE MANAGEMENT
CONSERVATION AND COASTAL LANDS
CONSERVATION AND RESOURCES ENFORCEMENT
ENGINEERING
FORESTRY AND WILDLIFE
HISTORIC PRESERVATION
KAHOCI WE ISLAND RESERVE COMMISSION
LAND
STATE PARKS
REZ03-025
Suspense Date: 11/5/03
MEMORANDUM:r-
U%
.J.'.I
m
L�C')
TO:
.
XXX
Division of Forestry & Wildlife - ..
r -J
? r^
Division of Aquatic Resources
rn
Na Ala Hale Trails
n o
XXX
Division of State Parks = =
Iv
'
Division of Boating and Ocean Recreation —IN'
XXX
Engineering Division
-
Commission on Water Resource Management
XXX
Office of Conservation and Coastal Lands
XXX
Hawaii District Land Office
FROM: Dierdre S. Mamiya,
Adminis�
Land Division
SUBJECT: Change of Zone Application and Special Management Area Use Permit
SMA 03-015 and REZ 03-025 - TMK (3) 7-5-20: 71 and 72
Lehua Lani, LLC - Puapuaa 2nd, North Kona, Hawaii
Please review the document pertaining to the subject matter and submit your comments
(if any) on Division letterhead signed and dated by the suspense date.
Should you have any questions, please contact Nicholas A. Vaccaro at ext.: 7-038,4. If
this office does not receive your comments by the suspense date, we will assume there are no
comments.
( ) We have no comments.
P�Omments attached.
Date:
DEPARTMENT OF LAND AND NATURAL RESOURCES
ENGINEERING DMSION
LD/NAV
Rett r2J3_q�r
COMMENTS
Q/ We confirm that the project site according to the Flood Insurance Rate Map (FIRM) is located in Zone .
() Please note that the project site according to the Flood Insurance Rate Map (FIRM) is located in Zone
() Please note that the correct Flood Zone Designation for the project site according to the Flood Insurance
Rate Map (FIRM) is
() Please note that the project must comply with the rules and regulations of the National Flood Insurance
Program (NFiP), whenever work is required within a flood zone. If there are questions regarding the NFIP,
please contact the State Coordinator, Mr. Sterling Yong, of the Department of Land and Natural Resources
at 587-0248. If there are questions regarding flood ordinances, please call the applicable County
coordinators below:
() Mr. Robert Sumimoto at (808) 523-4254 or Mr. Mario Sin Li at (808) 5234247 of the City and
County of Honolulu, Department of Planning and Permitting.
() Mr. Kelly Gomes at (808) 961-8327 (Hilo) or Mr. Kiran Eniler at (808) 327-3530 (Kona) of the
County of Hawaii, Department of Public Works.
O Mr. Francis Cerizo at (808) 270-7771 of the County of Maui, Department of Planning.
() Mr. Wallace Kudo at (808) 241-6620 of the County of Kauai, Department of Public Works.
() The applicant should include project water demands and infrastructure required to meet water demands.
Please note that the implementation of any State-sponsored projects requiring water service from the
Honolulu Board of Water Supply system must first obtain water allocation credits from the Engineering
Division before it can receive building permit and/or water meter.
() The applicant should provide the water demands and calculations to the Engineering Division so that it can
be included in the State Water Projects Plan Update.
() Additional Comments:
() Other:
Should you have any questions, please call Mr. Andrew Monden of the Planning Branch at 587-0229.
Signed: (_:; {_ Z
ERIC T. HIRANO, CHIEF ENGINEER
Date: ID�ZY�er3
LINDA LINGLE
GOVERNOR OF HAWAII
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
LAND DIVISION
POST OFFICE BOX 621
HONOLULU, HAWAII 96809
October 22, 2003
PETER T. YOUNG
CHAIRPE^SON
BOARD OF I AND AND NATURAL RESOURCES
COMMISSION ON WATER RESOURCE MANAGEMENT
DAN DAVIDSON
DEPUTY DIRECTOR. NANO
ERNEST Y.W. LAU
DEPUTY DIRECTOR- WATER
AQUATIC RESOURCES
BOATING AND OCEAN RECREATION
BUREAU OF CONVEYANCES
COMMISSION ON WATER RESOURCE MANAGEMENT
CONSERVATION AND COASTAL U NOS
CONSERVATION AND RESOURCES ENFORCEMENT
ENGINEERING
FORESTRY AND WILDLIFE
HISTORIC PRESERVATION
KAHOOLAWE ISLAND RESERVE COMNESSION
LAND
STATE PARKS
LD/NAV
REZ03-025
Suspense Date:
11/5/03
MEMORANDUM:ADMINISTRATOR
—_ASST
ADMIN
_
DELA BE
TO:
C"
—_
c
XXX Division of Forestry & Wildlife
_foeNr'R
FSNIGTBE
c
Division of Aquatic Resources
_'.ERII:AL
/ Na Ala Hele Trailsxr
�.i�ttiP+ASST
BR
✓XXX Division of State Parks
_UITERP
m
Division of Boating and Ocean Recreation
ite
rte-
yQ
XXX Engineering Division
_CIRC/POST/STAFFRM
Commission on Water Resource Management
_L,iMMENTs&REC
v
XXX Office of Conservation and Coastal Lands
__OKAFTREPLr
C=
XXX Hawaii District Land Office
_FILE
UP
_FOLLOW
INFO
FROM:
Dierdre S. Mamiya, Adminis� �
_RUN COPIES
Land Division
_RUSH DUE
SEE ME
FAX/SEND COPY TO_
SUBJECT:
Change of Zone Application and Special Management Area Use Permit
SMA 03-015 and REZ 03-025 - TMK (3) 7-5-20: 71 and 72
Lehua Lani, LLC - Puapuaa 2ntl, North Kona, Hawaii
Please review the document pertaining to the subject matter and submit your comments
(if any) on Division letterhead signed and dated by the suspense date.
Should you have any questions, please contact Nicholas A. Vaccaro at ext.: 7-0384. If
this office does not receive your comments by the suspense date, we will assume there are no
comments.
(% Ne have no comments.
S -
Signed:
8S -8 V LZ 130 100Z
NO&I' Li � _lt/l
03AID38
( ) Comments attached.
Date: Id yo
LINDA LINGLE
GOVERNOR OF HAWAII
LD/NAV
REZ03-025
MEMORANDUM:
TO:
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
LAND DIVISION
POST OFFICE BOX 621
HONOLULU, HAWAII 96809
October 22, 2003
PETER T. YOUNG
CHAIRPE S
BOARD OF LAND AND NATURAL RESOURCES
COMMISSION ON WATER RESOURCE MARAGEMENT
DAN DAVIDSON
DEPUTY DIRECTOR - LAND
ERNEST Y.W. LAU
DEPUTY DIRECTOR - WATER
AQUATIC RESOURCES
BOATING AND OCEAN RECREATION
BUREAU OF CONVEYANCES
COMMISSION ON WATER RESOURCE MANAGEMENT
CONSERVATION AND COASTAL LANDS
CONSERVATION AND RESOURCES ENFORCEMENT
ENDMEERING
FORESTRYANO WILDLIFE
HISTORIC PRESERVATION
10` C WE ISLAND RESERVE COMMISSION
LAND
STATE PARKS
Suspense Date: 11/5/03
XXX Hawaii District Land Office
FROM: Dierdre S. Mamiya, Admd&i
> >R
Land Division _ '—
SUBJECT: Change of Zone Application and Special Management Area Use Permit
SMA 03-015 and REZ 03-025 — TMK (3) 7-5-20: 71 and 72
Lehua Lani, LLC — Puapuaa 2Dtl, North Kona, Hawaii `= <
D cn o
Please review the document pertaining to the subject matter and sutrtnit-your ommemIts
(if any) on Division letterhead signed and dated by the suspense date.
Should you have any questions, please contact Nicholas A. Vaccaro at ext.: 7-0384. If
this office does not receive your comments by the suspense date, we will assume there are no
COents.
( We have o comme ts.
( ) Comments attached.
Date: 1 2 7l4 10
XXX
Division of Forestry & Wildlife - -
_�
—
Division of Aquatic Resources
Na Ala Hele Trails
XXX
Division of State Parks
Division of Boating and Ocean Recreation =-
-
XXX
Engineering Division
Commission on Water Resource Management
)CXX
Office of Conservation and Coastal Lands
XXX Hawaii District Land Office
FROM: Dierdre S. Mamiya, Admd&i
> >R
Land Division _ '—
SUBJECT: Change of Zone Application and Special Management Area Use Permit
SMA 03-015 and REZ 03-025 — TMK (3) 7-5-20: 71 and 72
Lehua Lani, LLC — Puapuaa 2Dtl, North Kona, Hawaii `= <
D cn o
Please review the document pertaining to the subject matter and sutrtnit-your ommemIts
(if any) on Division letterhead signed and dated by the suspense date.
Should you have any questions, please contact Nicholas A. Vaccaro at ext.: 7-0384. If
this office does not receive your comments by the suspense date, we will assume there are no
COents.
( We have o comme ts.
( ) Comments attached.
Date: 1 2 7l4 10
RLehuaLaniREZ-11/17/03
COUNTY OF HAWAII PLANNING DEPARTMENT
RECOMMENDATION
LEHUA LANI, LLC
CHANGE OF ZONE APPLICATION (REZ 03-025)
Upon careful review of the request for a Change of Zone from an Agricultural (A -5a)
zoned district to a Single Family Residential (RS -7.5) zoned district to develop a 58 -unit
single-family Planned Unit Development (PUD) for approximately 10.1 acres of land against the
guidelines for granting a change of zone, the Planning Director is recommending that a
favorable recommendation for a Change of Zone request be forwarded to the County
Council. This recommendation does not, however, sanction the specific plans submitted with
the application as they may be subject to change given the specific code and regulatory
requirements of the affected agencies. Since this recommendation is made without the benefit of
public testimony, the Director reserves the right to modify and/or alter this recommendation
based upon additional information presented at the public hearing. This favorable
recommendation is based on the following findings:
The applicant is requesting a Change of Zone from an Agricultural (A -5a) zoned
district to a Single Family Residential (RS -7.5) zoned district to develop a 58 -unit single
family Planned Unit Development (PUD) for approximately 10.1 acres of land. The
applicant intends to construct 58 single-family residential dwellings on lots ranging from
4,000 to 6,000+ square feet, and about a %2 acre open space/archaeological preserve park
adjacent to the planned Alii Parkway.
In order to consider an area for any type of zoning designation, the applicable
goals, policies and standards of the General Plan must be adequately addressed. It is only
through such a comprehensive policy analysis approach that evaluations and decisions
can be made to better time and stage developments to achieve growth determined by the
General Plan and related planning documents. The implications of these evaluations and
decisions must be also considered as they may have an impact on similar areas in the
County.
The Change of Zone request from Agricultural (A -5a) to a Single Family
Residential (RS -7.5) zoned district will conform to, among others, the Land Use (Single
Family Residential) and Housing elements of the General Plan. The Land Use Pattern
Allocation Guide (LUPAG) Map component of the General Plan is a representation of
the document's goals and policies to guide the coordinated growth and development of
the County. It reflects a graphic depiction of the physical relationship among the various
land uses. The LUPAG Map establishes the basic urban and non -urban form for areas
within the County. The subject area is designated Medium Density Urban and Urban
Expansion Area. The Medium Density Urban designation may allow "Village and
neighborhood commercial and residential (up to 35 units per acre) and related functions."
Urban Expansion Area allows for a mix of high density, low density, industrial and/or
open designations in areas where new settlements may be desirable, but where specific
settlement pattern and mix of uses have not yet been determined. Within areas
designated for development as resorts, portions of the resort area may be included in the
urban expansion area. The proposed residential development would be consistent with
these General Plan land use designations.
The parcel to the north is zoned RM -2 and is developed with the AIN Lani
condominium. The parcel to the south is zoned A -5a and contains the Alis Garden
Marketplace. Ali'i Drive is located immediately to the west (makai) of the subject parcel.
Parcels on the makai side of Alii Drive are zoned RM -1.5 and are developed with the
Kona Riviera Villa and Kona by the Sea condominium projects. The proposed AIN
Parkway forms the upper boundary of the subject site. Mauka of the proposed Ali'i
Parkway, the area is zoned RS -10 and is developed with the Kahakai Estates
single-family residential project. Therefore, a favorable recommendation of this
change of zone request will be consistent with the emerging land use pattern being
established within this portion of North Kona.
To allow the 4,000 to 6,000 -square foot sized lots and lesser setbacks within the
RS -7.5 zoned district, the applicant intends to apply for a PUD permit after the change of
zone is approved. The Planned Unit Development (PUD) is intended to encourage
comprehensive site planning that adapts the design of the development to the land, by
allowing diversification in the relationships of various uses, buildings, structures, open
-2-
spaces and yards, building heights, and lot sizes in planned building groups, while still
insuring that the intent of the Zoning Code is observed. The minimum land area required
for a PUD is two acres.
The property is currently not used for any agricultural activities. The Federal
Emergency Management Agency Flood Insurance Rate Map (FIRM) designates the
property as Zone "X", an area determined to be outside of the 500 -year flood plain. The
property slopes from its eastern to its southern boundary at a grade between two and four
percent. The elevation of the site varies from approximately 40 feet at the southeastern
corner to less than 20 feet along the AIN Drive frontage. The property is unclassified by
the Agricultural Lands of Importance to the State of Hawaii (ALISH) System. Soils
within the property and surrounding area are classified as "E" or "Very Poor" for
agricultural productivity by the Land Study Bureau. While the potential for intensive
and/or extensive agricultural uses may exist, the soil conditions within the property and
surrounding area would preclude such intensive agricultural activities from being
conducted.
The access to the project site will be from Alii Drive. According to the
Department of Public Works (DPW), AIN Drive fronting the property is a two-lane
County road with 20 -foot -wide pavement in good condition, with 6 -foot -wide paved
shoulders, all within an approximately 50 -foot -wide right-of-way. According to the
General Plan, Alis Drive shall be improved to a 60 -foot wide right-of-way. As such, the
DPW requires the applicant to provide for the future road widening by dedicating one-
half of the difference between the existing width of Alii Drive and 60 feet to the County
as a condition of final subdivision approval, or issuance of a certificate of occupancy.
The DPW, in the interests of pedestrian and bicyclist safety, requires the applicant to
provide a paved shoulder extending to the right-of-way property line. The DPW may
require pavement transitions, signs and markings, drainage improvements, and relocation
of utilities. The DPW also requires the applicant to locate utility meter and pressure
reducing valve vaults out of the right-of-way.
The DPW requires that the applicant's access to Ali'i Drive provide adequate
sight distances, be limited to one approach, and be located to avoid turning conflicts with
existing developments, all of which must meet with the approval of DPW. The DPW
I2
requires that the applicant provide a minimum of 45 feet of storage and turnaround on the
Ali'i Drive side of any gated vehicle access. All driveway connections shall conform to
Chapter 22, Streets and Sidewalks, of the Hawaii County Code.
The eastern boundary of the subject parcel is or will be the Kahului to Keauhou
Parkway (Ali'i Highway) Phase 1 right-of-way. When this report was prepared,
acquisition of the right-of-way had not been completed. The DPW requires that the
subject property owner shall be required to provide any additional right-of-way, at no
cost to the County, as established by and upon completion of the final right-of-way maps
by DPW's consultant. The DPW requires that vehicular access to the individual lots shall
not be from any major collector or arterial roadways. An emergency vehicular egress,
with a breakaway gate, may be provided to AIN Highway, meeting with the approval of
DPW.
To serve the subject property and intermediate properties, the DPW requires that
the applicant extend the existing two-way left turn lane improvements along the Ali'i
Drive frontage of the subject property. The two-way left turn land improvements shall
consist of, but not limited to, pavement widening, drainage improvements, street lights,
signs and markings and any relocation of utilities, which must all meet with the approval
of the DPW. The DPW also requires the applicant to construct and dedicate all
improvements at no cost to the County.
The DPW requires that all roadways within the proposed development follow the
guidelines incorporated in the Hawaii Statewide Uniform Design Manual for Streets and
Highways. The DPW requires that these roadways also meet the requirements of DPW.
The DPW requires concrete curbs, gutters, and sidewalks, in areas of pedestrian traffic.
The site is serviced by County water and wastewater systems. Electrical,
telephone and cable services are available to the site. Police are located within 3 miles,
and fire facilities are located within 5 miles. Kona Hospital is about 7 miles from the
property.
The Civil Defense Agency has stated that the proposed site is beyond the
acceptable range of the nearest Emergency Warning Siren, and recommends that the
developer purchase and install an approved Emergency Outdoor Warning Siren.
-4-
The subject request is not contrary to Chapter 205A, Hawaii Revised
Statutes, relating to Coastal Zone Management Area. The property is situated within
the Special Management Area. It is located approximately 300 feet from the coastline
and therefore, will not be impacted by coastal hazard and beach erosion. There are no
identified recreational resources, public access to the shoreline or mountain areas, scenic
and open space preserves, coastal ecosystems, marine resources or other natural and
environmental resources in the project area. Thus, the proposed request and use of the
property will not adversely impact those resources. Vegetation on the site consists
primarily of introduced exotics. The site and much of the surrounding areas have or are
being developed with structures, and it is not anticipated that endangered or threatened
candidate species of flora or fauna are located within the subject property. The project
area has not been identified as containing any significant botanical or biological habitat.
An archaeological inventory survey of the subject site was performed by Paul H.
Rosendahl, Inc., (PHRI), and a report was prepared in July 2003 which indicated the
following: "During the survey 14 sites and 36 component features were identified. These
included wall, enclosure, C -shape, terrace, concrete structure, mound, platform, modified
outcrop, and well features. These features are prevalent in both the North Kona District
and the island of Hawaii. The functions of these features were largely for habitation,
agriculture, possible boundary, and burial. Of the 9 recorded terraces, 3 were thought to
be paepae or sleeping houses, while the remaining were thought to be agricultural in
nature. Of the 7 enclosures, 4 were thought to be related to animal/agricultural use, while
the remaining appeared to be associated with habitation. There were 5 platforms
identified, and all appeared to be of the late prehistoric or contact -era age. When tested,
2 of the features (features D & E at Site 16116) confirmed the presence of human
remains. The others did not. Five mounds were identified, and these appeared to be
agricultural in function, consistent with the Kona Field System. The 2 concrete features
appeared to be of recent vintage and for animal husbandry. The 4 walls, the 2 modified
outcrops, and the single C -shape appear to also have agricultural function. The C -shape
appeared to provide shelter associated with the agricultural activity. There was one well
found of the site. This well had a concrete and basal `apron' around it, a windmill tower,
and an engine shed. It thus appeared to be of recent vintage. Relative to the sites on the
-5-
subject property, the survey concluded that 13 of the 14 sites as being significant solely
for their informational content and that no further work was recommended for these sites.
The remaining site (16116), which consisted of 2 burial platforms, was recommended for
preservation `as is,' with possible landscaping. If they have to be relocated, the survey
recommended that further data collection be done. The applicant intends to preserve this
site and incorporate it as part of its landscaping/open space feature. In that event, a
Burial Treatment Plan for this site will be prepared and submitted to the Hawaii Burial
Council for its review and approval. The plan will essentially call for the establishment
of a landscaped buffer surrounding the site." The applicant believes that with the
approved mitigation, the archaeological impacts of the project will not be significant.
The applicant noted that should there be any inadvertent finds during construction of the
project, work will be stopped until clearance from the Planning Department has been
secured. The archaeological inventory survey prepared by PHRI was originally
conducted in 1991 and was updated in July 2003. To date, there is no record that the
archaeological inventory survey had been submitted to the State of Hawaii Department of
Land and Natural Resources -Historic Preservation Division (DLNR-HPD) for acceptance
and/or that the DLNR-HPD has approved a preservation and mitigation plan.
In view of the recent Hawaii State Supreme Court's "PASH" and "Ka Pa'akai O
Ka Aina" decisions, the issue relative to native Hawaiian gathering and fishing rights
must be addressed. These rights must be addressed in terms of the cultural, historical,
and natural resources and the associated traditional and customary practices of the site.
Investigation of valued resources: The applicant presented the following
information from which the Planning Commission can determine the valued cultural,
historical, and natural area within the sought for the rezoning: archeological
reconnaissance survey, including a historical survey of documentary records; botanical
study; and faunal study. According to the applicant, since the subject site is not adjacent
and/or nearby to the shoreline, and since there are no known identified trails going
through the site, fishing and/or coastal access should not be an issue. According to the
applicant, vegetation in this area consists primarily of introduced exotics. These include
kiawe (Prosopis pallida), `opiuma (Pithecellobium dulce), African tulip (spathodea
campanulata), koa-haole (Leucaena glauca), monkeypod (Samanea saman), lantana
In
(Lantana camara), guinea grass (Panicum maximum), bitter yam (Discorea bulbifera),
and other exotic grasses and weeds. During a field survey by the applicant's
archaeological consultant, one indigenous plant, ilima (Sida fallax) was noted. The
applicant stated that it would not be likely that rare or endangered plant life would be
found on the site, and that since the site and much of the surrounding areas have
structures or are being developed with structures, it did not appear likely that rare or
endangered animal life would be found on the site.
The valuable cultural, historical, and natural resources found in the area sought
for the Rezoning: Relative to the archeological and cultural sites on the subject property,
the archeological inventory survey concluded that 13 of the 14 sites as being significant
solely for their informational content and that no further work was recommended for
these sites. The remaining site (16116), which consisted of 2 burial platforms, was
recommended for preservation `as is,' with possible landscaping.
Possible adverse effects or impairment of valued resources: The setting of the
burials would be changed from the present condition of a relative natural setting to one
where modern single family residential dwellings will be nearby. Further, the setting for
the burials would be further altered by the close proximity of the future Kahului to
Keauhou Parkway (AIN Highway) Phase 1 right-of-way, which would be located mauka
of the burial sites. If the burial platforms have to be relocated, the survey recommended
that further data collection be done. Another concern would be whether access to the
burial sites by descendants would be possible through the private roads of this
development.
Feasible actions to protect native Hawaiian dZhIE The applicant intends to
preserve the burial sites and incorporate it as part of its landscaping/open space feature.
A Burial Treatment Plan for this site must be prepared and submitted to the Hawaii
Burial Council for its review and approval. The applicant has stated that the plan would
essentially call for the establishment of a landscaped buffer surrounding the site. The
applicant has stated that with the approved mitigation, the archaeological impacts of the
project will not be significant. Regarding the access to the burials on the project site by
descendants, the applicant has said that descendants will be allowed unfettered access to
the burial site, as will be reflected in the approved Burial Treatment Plan. There is no
record that DLNR-HPD has approved a preservation and mitigation plan, which would
include the Burial Treatment Plan. Conditions of approval will be included relating to
valued cultural resources to insure that impacts to these resources are minimized, and that
traditional and customary Hawaiian rights to these resources are continued.
Based on the above findings, the approval of the Change of Zone request from an
Agricultural (A -5a) to a Residential (RS -7.5) zoned district would result in an appropriate
land use pattern that will further benefit the public.
The accompanying draft bill to amend Section 25-8-3 (North Kona Zone Map) of
Chapter 25, Zoning Code, of the Hawaii County Code, is provided for your consideration of a
favorable recommendation to the County Council. Please note the proposed conditions of
approval attached to the draft bill.
-g-
Uehual a iREZ-11/17/03
LEHUA LANI, LLC
CHANGE OF ZONE APPLICATION (REZ 03-025)
CONDITIONS OF APPROVAL
A. The applicant, its successor or assigns shall be responsible for complying with all
stated conditions of approval.
B. Final subdivision approval shall be secured within five (5) years from the
effective date of this ordinance.
C. Only one access from Alii Drive shall be allowed for the proposed subdivision
meeting with the approval of the Department of Public Works. The subdivision
roadway from Alii Drive shall provide a minimum of 45 feet of storage and
turnaround on the Alii Drive side of any gated vehicle access. The roadway
connection with Alii Drive shall conform to Chapter 22, Streets and Sidewalks, of
the Hawaii County Code.
D. A 10 -foot wide no vehicular access planting screen easement shall be delineated
along all lots fronting Alii Drive. Vehicular access to the individual lots shall not
be permitted from Alii Drive.
E. A 5 -foot future road widening strip along the length of Alii Drive shall be
dedicated to the County prior to receipt of final subdivision approval.
F. A paved shoulder extending to the property line along the Alii Drive frontage of
the property shall be provided meeting with the approval of the Department of
Public Works. The paved shoulder improvements may include pavement
transitions, signs, markings, drainage improvements, and relocation of utilities.
Utility meter and pressure reducing valve vaults shall also be located outside of
the right-of-way in accordance with the requirements of the Department of Public
Works.
G. The existing two-way left turn lane on Alii Drive fronting the adjacent property to
the north shall be extended to serve the roadway entry of the subject property in
accordance with the requirements of the Department of Public Works. The
necessary improvements for the extension of the two-way left turn lane, which
shall consist of, but not limited to, pavement widening, drainage improvements,
streetlights, signs and markings, and relocation of utilities shall be provided in
accordance with the requirements of the Department of Public Works. These
improvements shall be constructed and dedicated at no cost to the County.
H. Any additional right-of-way necessary for the Kahului to Keauhou Parkway (aka
Alii Highway) as determined by the Department of Public Works shall be
dedicated at no cost to the County. No vehicular access shall be allowed unto the
Kahului to Keauhou Parkway. An emergency vehicular egress may be provided
from the Kahului to Keauhou Parkway, with a breakaway gate, meeting with the
approval of the Department of Public Works.
1. All development -generated runoff shall be disposed of on-site and shall not be
directed toward any adjacent properties.
I A drainage study shall be prepared for review and the recommended drainage
system shall be constructed meeting with the approval of the Department of
Public Works. The drainage improvements shall be constructed prior to receipt of
final subdivision approval.
K. Comply with Chapter 11-55, Water Pollution Control, Hawaii Administrative
Rules, Department of Health, which requires an NPDES permit for certain
construction activity.
L. During construction, measures shall be taken to minimize the potential of both
fugitive dust and runoff sedimentation. Such measures shall be in compliance
with construction industry standards and practices utilized during construction
projects of the State of Hawaii.
M. All earthwork and grading shall conform to Chapter 10, Erosion and Sediment
Control of the Hawaii County Code.
N. The U.S. Department of Army Corps of Engineers shall be contacted to identify
whether a Federal Permit (including a Department of Army permit) is required for
this project. The Planning Director shall be notified in writing as to whether such
permit is required for the development of the project.
O. An archaeological inventory survey shall be submitted to the State of Hawaii
Department of Land and Natural Resources -Historic Preservation Division
(DLNR-HPD) for acceptance. The applicant shall obtain approval of a
Preservation and Mitigation Plan, which shall include a Burial Treatment Plan,
from the DLNR-HPD. The applicant shall include all of the DLNR-HPD
mitigation measures and conditions specified in the Preservation and Mitigation
Plan, including the Burial Treatment Plan, into the plans for the project, which
shall be conditions of subdivision approval.
P. The archaeological features on the mauka end of the project site shall be
preserved and made a part of the project's approximately one -half -acre
landscaping/open space buffer from the Kahului to Keauhou Parkway (Alii
Highway). The burial site (16116) consisting of two burial platforms shall be
preserved "as is." A landscaped buffer shall be placed surrounding the burial site,
and the burial site shall incorporated into the project's landscaping/open space
feature. Access to the burial site by descendants shall be allowed, consistent with
the requirements of the Preservation and Mitigation Plan and Burial Treatment
Plan approved by the State of Hawaii Department of Land and Natural Resources -
Historic Preservation Division (DLNR-HPD).
Q. Should any undiscovered remains of historic sites, such as rock walls, terraces,
platforms, marine shell concentrations or human burials be encountered, work in
the immediate area shall cease and the Department of Land and Natural
Resources -Historic Preservation Division (DLNR-HPD) shall be immediately
notified. Subsequent work shall proceed upon an archaeological clearance from
the DLNR-HPD when it finds that sufficient mitigation measures have been
taken.
R. The applicant, its successors or assigns, shall be responsible for ensuring that the
proposed passive park site is preserved, maintained, and cared for in perpetuity.
The applicant shall purchase and install an Emergency Outdoor Warning Siren,
acceptable to the Hawaii County Civil Defense Agency. An Emergency
Response Plan shall also be submitted to the Hawaii County Civil Defense
Agency for review and approval prior to receipt of final subdivision approval.
T. The applicant shall comply with the County of Hawaii's Affordable Housing
Policy pursuant to Chapter 11, Article 1, Hawaii County Code.
U. The applicant shall contribute to the development, funding, and/or construction of
school facilities, on a fair share basis, as determined by and to the satisfaction of
the State Department of Education. Terms of the contribution shall be agreed
upon in writing by the applicant and the Department of Education prior to
obtaining building permits. A copy of this agreement shall be filed with the
Planning Department.
V. The Applicant shall make its fair share contribution to mitigate the potential
regional impacts of the project with respect to parks, fire, police, solid waste
disposal facilities and roads. The fair share contribution shall be initially based on
representations contained within the change of zone application and may be
increased or reduced proportionally if the lot counts are adjusted. The fair share
contribution shall become due and payable prior to final subdivision approval for
any portion of the property or its increments. The fair share contribution in a form
of cash, land, facilities or any combination thereof shall be determined by the
County Council. The fair share contribution may be adjusted annually beginning
three years after the effective date of the change of zone ordinance, based on the
percentage change in the Honolulu Consumer Price Index (HCPI). In lieu of
paying the fair share contribution for other facility impacts, the applicant may
construct such facilities related to roadway, park, fire, police, and solid waste
disposal facilities with the approval of the appropriate agency(ies).
W. Should the Council adopt a Unified Impact Fees Ordinance setting forth criteria
for imposition of exactions or the assessment of impact fees, conditions included
herein shall be credited towards the requirements of the Unified Impact Fee
Ordinance.
X. Comply with all applicable laws, rules, regulations and requirements of other
affected agencies, including the Department of Water Supply.
Y. An annual progress report shall be submitted to the Planning Director prior to the
anniversary date of this change of zone ordinance. The report shall include, but
not be limited to, the status of the development and compliance with the
conditions of approval. This condition shall remain in effect until all of the
4
conditions of approval have been satisfied and the Planning Director
acknowledges that further reports are not required.
Z. An initial extension of time for the performance of conditions within this
ordinance may be granted by the Planning Director upon the following
circumstances:
1. The non-performance is the result of conditions that could not have been
foreseen or are beyond the control of the applicant, successors or assigns,
and that are not the result of their fault or negligence.
2. Granting of the time extension would not be contrary to the General Plan
or Zoning Code.
3. Granting of the time extension would not be contrary to the original
reasons for the granting of the change of zone.
4. The time extension granted shall be for a period not to exceed the period
originally granted for performance (i.e., a condition to be performed
within one year may be extended for up to one additional year).
AA. Should any of the conditions not be met or substantially complied with in a timely
fashion, the Planning Director may initiate rezoning of the property to its original
or more appropriate designation.
COUNTY OF I IAWAN
ORDINANCE NO.
STATE OF I AWAN
BILL NO.
(PLANNING DEPARTMENT)
AN ORDINANCE AMENDING SECTION 25-8-3 (NORTH KONA ZONE MAP),
ARTICLE 8, CHAPTER 25 (ZONING CODE) OF THE HAWAII COUNTY CODE, BY
CHANGING THE DISTRICT CLASSIFICATION FROM AGRICULTURAL (A -5a) TO
SINGLE FAMILY RESIDENTIAL (RS -7.5) AT PUAPUAA 2nd, NORTH KONA, HAWAII,
COVERED BY TAX MAP KEY 7-5-20:71 and 72.
BE IT ORDAINED BY THE COUNCIL OF THE COUNTY OF HAWAII:
SECTION 1. Section 25-8-3, Article 8, Chapter 25 (Zoning Code) of the Hawaii County
Code, is amended to change the district classification of property described hereinafter as
follows:
The district classification of the following area situated at Puapuaa 2nd, North
Kona, Hawaii shall be Single Family Residential (RS -7.5):
Beginning at a %2 inch pipe (found) the Northwesterly corner of this parcel of land,
being also the Southwesterly corner of Lot 5-A and being a point on the Easterly side of
Alii Drive, the coordinates of said point of beginning referred to Government Survey
Triangulation Station "KAHELO" being 1,953.10 feet South and 1,089.37 feet East and
running by azimuths measured clockwise from True South:
Thence, for the next six (6) courses following along the remainder of Royal Patent
7819, Land Commission Award 8559-13, Apana 8 to William C. Lunalilo:
2400
41'
688.11
feet along Lot 5-A to a spike (found);
3300
34' 30"
48.96
feet to a spike (found);
2400
08'
50.00
feet to a Y2 inch pipe (found);
Thence, following along Parcel B-1 on a curve to the left with a radius of 5,050.00
feet, the chord azimuth and distance being:
4. 3290 08' 176.27 feet to a'h inch pipe (found);
5. 3280 08' 57.30 feet along Parcel B-1 to a % inch pipe
(found);
6. 570 52' 35" 739.70 feet along Lot 3-A to a V2 inch pipe (found);
Thence, following along the Easterly side of Alii Drive on a curve to the right with a
radius of 5,704.70 feet, the chord azimuth
and distance being:
7. 1490 28' 31.5" 318.21 feet to the point of beginning and containing
an area of 5.036 Acres.
PARCEL`B"
Beginning at a Yz inch pipe (found) the Southwesterly comer of this parcel of land,
being also the Northwesterly corner of Lot 5-A and being a point on the Easterly side of
Alii Drive, the coordinates of said point of beginning referred to Government Survey
Triangulation Station "KAHELO" being 1,953.10 feet South and 1,089.37 feet East and
running by azimuths measured clockwise from True South:
1
2
3.
4.
5.
Thence, following along the Easterly side of Alii Drive on a curve to the right
with a radius of 5,704.70 feet, the chord
azimuth and distance being:
1520 43' 06" 327.47 feet to a spike (set);
Thence, for the next five (5) courses following along the remainder of Royal
Patent 7819, Land Commission Award 8559-B, Apana 8 to William C. Lunalilo;
2440 21' 50" 735.63 feet along Lot B-1 to a spike (found);
Thence, following along Parcel B -I on a curve to the left with a radius of 5,050.00
feet, the chord azimuth and distance being:
3320
26' 22"
250.78
feet to a spike (found);
610
01'
50.00
feet along Parcel B-1 to a spike (found);
3300
34' 30"
29.67
feet along Parcel B-1 to a spike (found);
-2-
6. 600 41' 688.11 feet along Lot 4-A to the point of beginning
and containing an area of 5.106 Acres.
All as shown on the map attached hereto, marked Exhibit "A" and by reference
made a part hereof.
SECTION 2. In accordance with Section 25-2-44, Hawaii County Code, the County
Council finds the following conditions are:
(1) Necessary to prevent circumstances which may be adverse to the public
health, safety and welfare; or
(2) Reasonably conceived to fulfill needs directly emanating from the land use
proposed with respect to:
(A) Protection of the public from the potentially deleterious effects of
the proposed use, or
(B) Fulfillment of the need for public service demands created by the
proposed use.
SEE ATTACHED CONDITIONS
SECTION 3. In the event that any portion of this ordinance is declared invalid, such
invalidity shall not affect the other parts of this ordinance.
SECTION 4. This ordinance shall take effect upon its approval.
Hawaii
Date of Introduction:
Date of 1st Reading:
Date of 2nd Reading:
Effective Date:
INTRODUCED BY:
COUNCIL MEMBER, COUNTY OF HAWAII
-3-