My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0521.013 2002-2004
ClerkCouncil
>
Council Records
>
Communications
>
2002-2004
>
COM 0521.013 2002-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2008 6:06:05 PM
Creation date
5/10/2008 12:40:53 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2002-2004
Communication
0521
Point
013
Author
Bruce McClure, Public Works Director
Communications - Referred To
FC
Comments
FC: Close file - 4/19/04
Document Relationships
AGE FC 04/19/2004 2002-2004
(Related)
Path:
\Council Records\Agendas\2002-2004\Finance Committee (FC)
BIL 237 Draft 01 2002-2004
(Related)
Path:
\Council Records\Bills\2002-2004
COM 0521.000 2002-2004
(Related)
Path:
\Council Records\Communications\2002-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
months and years have been spending a lot of time in the shop for repairs. In the <br /> <br /> West Side sometimes as many as four (4) vehicles are in the shop at one time. <br /> <br /> This hinders the inspectors' ability to perform their work. Inspectors need the <br /> <br /> vehicles to do their inspections. They travel an average of 100 miles per day. <br /> EXPENDITURES PUBLIC WORKS -ENGINEERING <br /> Item 38 There are 3 vacant engineering positions and we are presently <br /> interviewing for all 3 vacant positions. <br /> The fourth is a Drafting Tech position. We had conducted interviews but the <br /> selected applicant declined. We will be calling for a new list. It is difficult to find <br /> qualified applicants with engineering background. Considering a downward <br /> reallocation and placing emphasis on engineering. However, this may reduce <br /> the pool of qualified applicants. <br /> Item 39 Had 2 existing unfunded positions, a CE IV and a CE III. The CE III <br /> replaced a former Right-of-way Agent position (both positions have the same <br /> salary rating). The positions were defunded to meet past budgetary constraints. <br /> Because we had increased the shortage differential for engineers in 12!03, we <br /> are now in better position to fill these vacancies and have now funded the <br /> positions. <br /> Item 40 It is already "built-in" and is part of our funding request to the State DOH <br /> for Federal Highway Funds as a percentage of project's budget. There is no "line <br /> item" for this but we must submit a report of time spent to get reimbursed. This is <br /> a standard practice for all of our Federal Highway projects. Reimbursements <br /> are deposited a revenue account (3401.51 ENG DIV SVC CHG TO PROJ) <br /> Item 41 In light of lawsuits that had arisen out of the 2000 flood, we see a need <br /> to promote/educate the public of the principles outlined in the Chapter 27, <br /> Section 27-3 of the Hawaii County Code which has its basis in the U.S. National <br /> Flood Insurance Act of 1968 and the U.S. Flood Disaster Protection Act of 1973. <br /> EXPENDITURES PUBLIC WORKS -HIGHWAY FUND <br /> Item #42. Please show justification for all positions funded by fuel tax <br /> increase. <br /> TRAFFIC <br /> Civil Engineer V <br /> Will be part of the newly formed Traffic Engineering Design Team, and will <br /> be proactive in addressing traffic roadway issues and traffic safety <br /> concerns. This will include, but not be limited to the following. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.