INDEX
PART II AMENDED CAPITAL BUDGET 2004 — 2005
MAYOR'S TRANSMITTAL
Project Highlights
Funding Sources
Pending vs. New Projects
Geographic Distribution of Projects
Impact on Operational Budget
Capital Program
Fair Share Contributions
Table 1. List of Projects (Capital Budget)
Table 1A. List of Subpart A Projects (Capital Budget)
Table 1 B. List of Subpart B Projects (Capital Budget)
Table 2. Existing vs. New vs. Replacement Facilities
Table 3. Selection Criteria
Table 4. Functional Classification
Table 5. Proposed Funding Sources
Table 6. Lapse Report
Table 7. Geographic Distribution
Table 8. Capital Program for FY 03-04 to 08-09
Table 9. Fair Share Contributions
Figure 1. Functional Classification (after Table 4)
Figure 2. Geographic Distribution (after Table 7)
CAPITAL BUDGET ORDINANCE
CAPITAL IMPROVEMENTS PROGRAM BY DEPARTMENTS
Department of Environmental Management
Fire Department
Department of Parks and Recreation
Police Department
Department of Public Works
Mass Transit Agency
May 5, 2004
The Honorable James Y. Arakaki, Chair and Members of the County Council
Hawaii County Council
Hilo, HI 96720
Dear Chairman Arakaki and Council Members:
Transmitted herewith is the Capital Budget for FY 2004-05 submitted for your review and approval, and the Capital Program for the next
six years from FY 2004-05 to 2009-10 for your information. The Capital Budget includes 60 projects requiring a total appropriation of
$91,339,000, of which $2,650,000 is Federal Grants Receivable and $88,689,000 is County -financed through State Revolving Fund loans,
bonds, or other sources (see Table 1). This year's CIP budget is extraordinarily high because it includes additional appropriations totaling
$40 million for a special bond dedicated to high-priority transportation projects as requested by Council. To facilitate review and
discussion, we have classified the projects into two subparts: Subpart A includes the projects listed in our March 1 submittal (43 projects
totaling $48,689,000) (see Table IA),' and Subpart B includes the special transportation bond projects (17 projects totaling $40,000,000)
(see Table 113).
Project Highlights
Every year, we strive to present a budget that is fiscally constrained (in terms of prudent debt service planning) and selective based on
rational criteria. The guideline we have used for a prudent debt service limit is 15% of general expenditures. According to the latest
annual financial report, current debt service comprises approximately 9.9% of general expenditures. Although the $48,689,00 for the
Subpart A projects is higher than last year, the budgeted amount would still be within the prudent limits assuming the entire amount is
funded by debt. The special bond for Subpart B transportation projects for $40,000,000, together with the Subpart A amount, would raise
the debt service to approximately 10.5% of general expenditures for FY 04-05.
Mon
co 0_ O
In selecting the projects, funding requests from the agencies were initially screened to ensure that the agency had the capacity to o
implement the project during the fiscal year (i.e., whether to defer or phase the project), that current requests were reconciled with u ° Z
previous appropriations (i.e., unused amounts from previous appropriations were sufficient to carry the project through the coming fiscal
year), that the projects were not more appropriately funded through the operational budget (e.g., minor repairs), and that the projects werH
as equitably distributed geographically as possible while meeting the selection criteria discussed below. The exception is Kona and Puna
where more of the transportation improvements were directed in response to the traffic problems from rapid growth. N
'Three DPW projects funded by the Highway Fund ($1,850,000) and the Waikoloa Runaway Truck Ramp project ($250,000) were added, thereby increasing the
March 1 total ($46,589,000) by $2,100,000.
-8,11 X35,0. �
Hawaii County Council
Page 2
May 5, 2004
The selected projects met at least one of the following criteria (see Table 3):
1) Legal mandate—approximately $14.25M relates to unfunded mandates such as ADA, EPA gang cesspool prohibitions, EPA
landfill restrictions, and legal settlements such as with the union representing the lifeguards;
2) Critical for public safety or health—approximately $8.86M relates to protection of public safety (e.g., emergency response, flood
control) or public health (sanitation);
3) Priority objectives—approximately $52.41M relates to targeted objectives that include ameliorating Kona, Waimea, and Puna
traffic (including all of the Subpart B projects), managing solid waste, maintaining/improving public parks, increasing public
access to the shoreline, and encouraging affordable housing;Z
4) Major deficiency approximately $13.18M relates to meeting basic level of service goals and maintenance standards.
Of the 60 Capital Budget Subpart A and B projects, 35 are new facilities or miscellaneous improvements ($57.46M), 4 are replacement of
existing facilities ($6.57M), and 21 are improvements to existing facilities ($24.66M) (see Table 2). Approximately 54% of the budget is
for transportation projects, followed by public health and safety projects (28%), culture/recreation (9%), and general government facilities
(9%) (see Table 4 and Figure 1).
Funding Sources
Capital projects are typically funded by debt (bonds, State Revolving Fund loans), revenue sources (fuel tax, other special revenues, fair
share contributions), State CII' grants, and various federal grant or loan sources. The projects funded by fuel tax are approved in a
separate ordinance. The Capital Budget presented herein includes those capital projects intended to be funded in whole or part by bonds
or special revenues and State Revolving Fund loans. The Highway Fund projects are the only proposed Capital Budget projects intended
to be funded from current revenues.
The State Revolving Fund, which is a low interest loan program for wastewater projects, is the proposed source for five projects totaling
$13.55M—three of the projects are to replace large -capacity cesspools in areas with County sewer systems (Komohana Heights, Queen
Liliuokalani subdivision) or at County facilities, one is to extend the sewer system in a high priority coastal area (Kalanianaole collector
sewer in Keaukaha), and the fifth is a followup phase of the Kealakehe effluent reuse project. There are no projects requiring County
matching for federal highway funding since all matching requirements for County projects on the State Transportation Improvements
Program (STIP) for this coming fiscal year are covered by existing appropriations. Two federal Special Purpose Grants require
s More specific rationale for the Subpart B Kona projects are provided in the Department of Public Works' summary project list.
Hawaii County Council
Page 3
May 5, 2004
appropriation to partially fund Reed's Bay improvements ($250,000 federal portion) and to provide additional transit facilities (buses and
park/ride areas) ($2,400,000 federal portion). Federal CDBG funding, which is appropriated separately, is anticipated to supplement
capital appropriations for ADA Facilities Improvements for park projects ($1M). Table 5 lists the proposed funding source for each
project.
Pending vs. New Projects
Of the 60 Subpart A and B projects in the Capital Budget, 6 are pending projects that require reappropriation. There are several projects
that will lapse since they were completed, completed with other funding, rebudgeted to operations, or reprioritized (i.e., either dropped or
will be resubmitted for appropriation at a future date) (see Table 6). Any lapsing project that requires an appropriation that differs from
the unencumbered balance is considered a new project rather than a reappropriation. The net increase of this year's projects is
approximately $85M (total less reappropriated amount).
Geographic Distribution of Projects
As a result of the Subpart B projects, Council Districts 7 and 8 that encompass North Kona have the greatest portion of the Capital Budget
at $38.7M (44% of the total budget). District 9 ranks next at $11.8M, followed by District 4 at $8.3M, District 2 at $5.35, District 6 at
$4.97M, District 5 at $3.6M, District 1 at $1.2M, and District 3 at $0.5M (see Table 7 and Figure 2). Approximately $13.51M are
projects that have locations throughout the island and would have varying benefits on each Council District.
Impact on Operational Budget
Generally, new facilities have the greatest impact on the operational budget. These facilities may increase the operational budget by
adding new staff, incurring new utility/maintenance expenses, and/or require new equipment or furnishings (i.e., Equipment Maintenance
Facility (DEM), Ocean View Transfer Station (DEM), Regional Sort Station (DEM), Kona Scrap Metal Salvage Facility (DEM), Kailua-
Kona Senior Center (P&R), and Naalehu Fire Station (FIRE)). However, it is possible that these new facilities could result in net savings
by consolidating operations that were previously scattered (i.e., West Hawaii County Building). The new Puna Police Station and
Honokaa Fire Station will replace existing facilities and therefore not require additional staff.
Hawaii County Council
Page 4
May 5, 2004
Capital Program
Table 8 lists the projects by agency for the next six fiscal years. These projects are subject to ongoing evaluation in terms of priority,
more definitive cost estimates, and availability of alternate or supplementary funding to reduce the County burden. The capital program
still needs work—the excessive amount of projects programmed for next fiscal year must be spread over the next several years. Also, the
Subpart B road projects that were budgeted only for planning and design need to be programmed for construction when more definitive
cost information is available. Over the next six years, the major projects that we need to be sure to reserve bond capacity include:
• ADA Compliance for park facilities ($36M)
• Police 800 (or 700) Mhz Communication System ($21M)
• Alii Highway (County match of $15.8M)
• Closure of the South Hilo Landfill ($12.65M)
• West Hawaii County Building ($12M)
• Regional Sort Station ($11.5M)
• Various road projects construction phase (no cost available yet).
Fair Share Contributions
The Planning Department developed an accounting system to track fair share assessments and used this system to review all rezoning
ordinances. The County Council started assessing fair share contributions from 1992. Assessments for Kaloko Mauka started even before
that date during the mid-1980s as well as a few park dedication fee assessments. The following summarizes the findings (see Table 9):3
Total Assessed. Of the rezonings to date, fair share assessments total $74.3M. More than $50M of this total is for North Kona and
South Kohala. Approximately $34M of the total is for roads and $32M for parks. These figures are based on the proposed
development at the time of rezoning. The actual amount owed will depend on the actual project built.
Total Collected in Cash. Approximately $3.4M has been paid in cash. Only a small portion of this collected amount has been
expended for various road improvements (the exact amount is still being reconciled).
' The numbers are still preliminary in that we are still reconciling with the Department of Finance records.
Hawaii County Council
Page 5
May 5, 2004
Total Credited In -Lieu of Cash. Approximately $15.2 million has been credited in the form of improvements paid by the applicant,
planning or design services paid by the applicant for capital improvement projects, land dedicated to the County or other approved
entity, or cash paid to approved non -County entity.
Balance Due. The total balance due is approximately $55.7M. Some payments are overdue (i.e., project received final subdivision
approval or plan approval without paying in full), which the Planning Department will pursue; others are recent or unbuilt rezonings
where the payment is not yet due.
A detailed report will be submitted under separate cover that will list the fair share contributions by applicant, rezoning ordinance number,
nature and amount of the assessment, and status of collection. Henceforth, expenditures of fair share funds and proposals for in -lieu
credits will be submitted to Council for appropriation similar to any other capital project.
A Better Way
We realize the shortcomings with the past and present CIP to rationally select and prioritize projects. Towards this end, we will work to
improve the CIP in the following ways:
Integration with General Plan. An idea that we will begin researching is to use level of service standards and performance
indicators derived from the General Plan goals and objectives to identify needs and opportunities. An annual "state of the County"
report that analyzes these standards and indicators could then recommend action items for CIP budgeting, operational budgeting,
or other appropriate implementation and provide a framework for the County to effectively concentrate its resources towards a
unified policy direction. This idea is a work in progress and should not forestall the adoption of the General Plan revision
currently before the County Council.
Community Input. A communication network with the community is evolving through the efforts of the Prosecutor's Office and
the Department of Research and Development. This network will hopefully mature into a system for the development and
implementation of community development plans. As part of community planning, this network could be used to solicit input into
the annual CEP and operational budgeting.
Prudent Debt Management. Working with the Finance Department, more rigorous debt service analysis will be attempted in
future CEP submittals.
Asset Management. Deferred maintenance often results in greater expense. A disciplined repair and maintenance program needs
to be developed to optimize the quality and durability of our capital assets.
Hawaii County Council
Page 6
May 5, 2004
Intergovernmental Coordination. State and Department of Water Supply CII' projects should be tracked to avoid duplication, to
better coordinate where resources can be leveraged, to evaluate cumulative impacts, and to assess geographic distribution of
resources.
• GIS and Project Management. A mapping and project management system would provide the tools to carry out the above
objectives as well as monitor the timing and cost status of any project. These capabilities are being examined in conjunction with
the financial and human resources (FRESH) program currently underway.
We ask for your favorable consideration of this Capital Budget and Program.
/ oha
Harry K
Mayor
List of Tables and Figures
Table 1. List of Projects (Capital Budget)
Table IA. List of Subpart A Projects (Capital Budget)
Table 113. List of Subpart B Projects (Capital Budget)
Table 2. Existing vs. New vs. Replacement Facilities
Table 3. Selection Criteria
Table 4.
Functional Classification
Table 5.
Proposed Funding Sources
Table 6.
Lapse Report
Table 7.
Geographic Distribution
Table 8.
Capital Program for FY 03-04 to 08-09
Table 9.
Fair Share Contributions
Figure 1. Functional Classification (after Table 4)
Figure 2. Geographic Distribution (after Table 7) (available in color upon request)
Table 1. List of Projects
Capital Budget FY 04-05
AGENCY "NO SUBPART PROJECT
FUNCTION
FACILITY CRITERIA
SOURCE County
State Federal
OEM
2004001 A
Komohana HNhq is Collector Sewer(SRF)Sanilation
New ;Legal mandate
SRF_ _ _ _
2,000'
DEM
2004002 A
Queen Lilmokelani Collector Sewer ISRFl
Sanitation
New 'Legal mandate
SRF
1 000
DEM
201
- _
Transfer
Ruril
'Sanitation
New issue
'BonNOlher
3.No
DEM
2004004iA
Tr oPrRe(Sodmaalion)
Rural Transfer Station Re cement/Enhan_cement- _ -_
Sanitation
1Priorty
Exta Facility improvements Pnonty, issue
BondlOthe[
900
DEM
2004005 A
Closure Of South Hilo Landfill
San laded
_ 'Ext Facilityimprovements' Leal mandate
Bond/Other
350
OEM
2004006,A
_ _ _ _ _
!Equipment Maintenance Facility
Sanitation
New ,Prion issue
'BondlObter
100
DEM
200400] A
I Kalakehe Effluent Reuse, Ph Ila Reapla 5691 ]3)fSRFj _
Sanilafon
_
New 'Public health
'SRF
2,000
DEM
i 200O081A
I Puamfiko Sewer Improvement Distract
Sanitation
UNew Public health
(Bond/Other
1000
DEM
2004009'A
NOnh Kona Distract
Sanitation
New _ -Public health
Bond/Other
1,000
DEM
2004010'A
wSewer r Improeent D
IOcea na Sewer Improvement Distract
Sanitation
ic
New Public health
1BondMther _
250
DEM
200et012A
Ocean View Transfer Station
Sanitation
New _ Motor deficiency
'BonWOther
1275
DEM
2004012 A
Kona Scrap Metal Salvage Facility
'Sanitation
New _ Prion issue_
'eond/Other
1550
DEM
2004014 A
_
Sew¢r, PH 11 (SRF)
''Sanitation
_ _ -
New
Priany ealth
SRF _
3.ppp '
DPW
2004014A
Likofialatree' tensead
Lako Street Extension
Transportation
_
New Pdodrylssue
BondlOtner-
5,000
DPW
2004015 B
_
Right -Turn Lanes on Hina Carl and Kaimmam
(Transportation
Estg Facrb' im rovements Prion' issue
Trans oration Band,
2,000
DPW
_-
Left -Tum PorJket at Palam junction
(Transportation
Extq Facility-im uoements PnOtry issue
Transportation BOnd�
1,000
DW
.20040168
20040178
Leff -Tum Pocket at Palati to Kanalaeaa
Transportation
Extg FarAiN improvements'. Priority issue
Transportation Bondy
_ __
10001
DW
2004018 8
_ _ —
Connector road at Kali Ahi ahi-Kauhale
(Tranorion
sptat
New 1Pnon ssu
iKali
ns ortation BondJ.
500
—
DPW
2004019 B
_ � � ---
LaVoie Extension to Kuakim
on
New Priority issue _
Transportation
DPW
cer -Ivy ok-
rome
Poorly asue
i11�r0semen
Transportation Ed
DPW_
2004021p�B
- -
Kua�laHghway-t lane outhnofl Huaalle Rd
�TranspOhatluer
Ext9 Fa<IiN Proms sue-
TtansPdatron Bona
1000
DPW
2004022A
Replacement of Large Ca ci Cesspools CSRF)
Sanitation
Replacement 1 Legal mandate
SRF
5.550
OW
2004023iA
1 Wast Hawaii County Building
General Govt_mew
�Majgr deficiency
BonNOlher _
500 _
DPW
2001
Alenaro Stream EastamentAcquiaide
- Public Safety
__— -
New Public safety
BordiOther —
2001 _�—
-'
DPW
.2004025 A-
)antl Acquisition kr PW Facilities
Transportation
'New Priority issue_
'BondiOther
100 _.
DPW -
_
2004026�A
-_ - ___ __ -_
Fast Hawaii Drain elm rovemener
Public Safety
New 'Public safety
BonrLOther_
100`__
;
DPW
201
Weat aii age ements
Public ty
New y
BoncIVOther
too
DPW
120040284A
— _— --- -
Karla Periled Lot Expansion
Transportation
'Fxtq Facility lmprovements.Prxyr s0e _
IBond/Other
200
DPW
260401
Waikoloa Road Truck _Runa>� Ramo_ _
Transportation
Ext, Factlity improvements Public safety _
Boher
250 -
DPW
2004030A
East Hawaii Traffic FaclNes Improvement _--__-_
Transportation
Extq Facility lmprovemenlsl Maior deficiency
'Hwy Fund
300
DPW
2004031 A
N HildHamali Hiahwav Maintenance Buddha
Transportation
New_ _ - Mamr
Hwy Fund
700
DPW
2001A
_
West Hawaii Traffic Buildins,
Transportation
deficiency
New _ _ _ - Mao ajucienoy
,H�ry Fund _
850
DPW
2004033 A-
_
Building Renovation of Countypendingat 25 Aepum Street
'General Doi
New Major deficiency
'Bond/Other
3,000
DPW
2004034 8
Marealaha H-Kawaibae Rd Connector
Transportation
New Priori issue
Transponder Bon
10,000 '
DPW
2004035 B
_
Realignment Of Portions of Highway
Trans op nation_
_atg Facility improvements Priority Issue _,Tra�rtation
Bond
2,000~ '
DPW
_
2004036 B
Puna Emergency Access Road Drainage and Sigel Distance Improvements Transportation
se
Extg Facility Improvements Priority Issue
Trans on Bond
3,500
DPW
200403]8
Poboiki Bypass
Trans Ortation
New Pdonty issue
ITranspo d
2000'
DPW
2004038_6
_ —
to Pkwav
_ Kamenu StreetEden
1 Transportation
New _ Pnonty_lssue _
TTransponaoo�Bonp
3,000
DPW
2004039 8
ionExtension
StudyKealakehe
Hienaloli Fatensmn Cortitlor Study _ -
_Transportation_
New - _ _ _ Priority issue
-
Transparation Bond
1,700
DW
20040408
_
Keehole to bathe Choice, Studio.
Transportation_
New Priorly issue �Transponatlon
Bonb
2,000
DPW
2004641 B
i
(Bke antl Pedestrian Improvements in Kona
'Transportation
_
Extu Facility Improvements Phoney issue
_ Transportation Bond
320
— _
DW
_ _
2004042 8
_ _
INameh Hwy -Alii Dr Connector at Puaa _
Transportation
New _ Priorly Issue
Transportation Bona
1,500
FIRE
2004043
Naalehu Fire Station _ _ _
�Public�
New Major tlefciency
Bo
Bond101her _200
_
T�
FIRE
2004044A
1Honokaa Fire Station
(Public Safety
Replacement Malo deficiency'
BonNOther
200
MSA
2001
!Additional buses and uttered for Kona and Puna (Spec al Pumose Gran_tL'Transarla
tion
New Pnodly issue
L Transporati_on_ Bond
2_
Pi
_
2004046 A
I ADA Compliance CDBG rial fundin - _
__ya funding),_ _
CulturelRecreabou Ext Facility-
tm rovements Local mandate
her
5,250 ]
1.00p
P8R_
Towers Upgrade
. Culture/Reaeation Replacement Leaal mandate
Bond/Other
B:.:n: -
_ 100
P8R
_200404]IA
2004048 A
2064048,
_
Reparert
_ 1Reairs to Facilities
ILLa'ala
-Prionly
COIWfe/Recreati0n Exig FacNryimprovements PnOnly Issue_'"
BonNOther -
600
Pi
20040491A
Bay/Magic Sands Beach Park Improvements _ _
Cultura/Recteation New issue
�BonNO ertherlh __
150
_
Pi
20040501A
IHeac Hale Beach Pack Development _
CulWre/Reaeation Faaliy Improvements Priority issue
'BondlOUter _ _ _
100 400
Pi
2004051A
(Reed's Bay Beach Park Development lSpeaal Purpose Grano _
Neov
"CuIWrelReaea6on New Prioot iLssue _ _
Bontl101her _ __
f-
100
250
PSR
20040521A -
iNae Cernete7 Ex anion Rea ro nation 559163
I CulturseRecreatlon Extg Facility Improvements Major deficiency
Bond101her
25�
PSR
200Q631A
Konawaena Swimming Pool Improvements (Reapproparation 559.85)
ICulture/Recreation Exlg Facility improvements Major deficiency
'BondiOlher
PSR
2004051
IKailua Park Im appropnati0n 559]84)
CulturalRecreatiop Ez�FaciLt my�mvements
BondiOlher _ _ —�
500
POR
2Wp 55A
Senior
'Kala Kona Senior
Culture/ReaeatOn
Prontdeseency
New PriorityIssue
Bmid(Other
100 500
-
POR-_
2004056�A-
esumoc
Pukka Uka Pam Restroom (Range enation 55916])_
Cublic
_
New _ Priority issue
BonNOther _
_
POLICE
200405]IA.Public
_ _ Safety Complex indoor Range
SRfety__or.
Public Safer
_ _--y
mt provemenis, Puble
Ext FaaL tijay
BondrOther
50
150
POLICE
_
200,K581A
Megahertz Conversion_-_ _
Public Safely
isad
Reply
Replacement Public safer
i
Bond/Othet
720
POLICE
2004059'A
Microwave
Micro wave Relocation8) tem Rphation5
'Public Safety_
ExQFacihtyimQrovemenls safely
Bond/Otner
85
POLICE
2004060i,A
iPuna Police Station (newt(mappropnation 5290.33)
'.Public Safely
Major
New Major deficlency_
BondlOther
400
TOTAL 86,689 900
3,69
REAPPROPRIATIONS.
3,710
'
- _+_.
NET INCREASE 84,979.
5/4/2004
Table IA. List of Projects-- SubparA
Capital Budget PY 04-05
EM
2004002 A
Queen Uhuokalani Collector Sewer (SRF)
Santtation New - Legal mandate
SRF
1,000
IEM
2004003 A
Regional Transfer Station (Sort Station)
'Santtation New Priority issue
Bond/Other
_
Y 3 449
EM
2004004 A
_ _ _
-_ Rural Transfer Station Replacement/Enhancement
_ -
,Sanitation Extg Facility improvements Prionty issue
'end 'hr
900
EM
2004005A
Closure Of South Hilo Landfill
Sanitation Extg Facility improvements Legal mandate
Bontl/Other
_
350
EM
2090006 A
Equipment Maintenance Facility
_ _
_,Sanitation New Priority issue
Bontl/Other
100
EM
2004007 A
Kealakehe Efguen[ Reuse, Ph Ila (Reapp 569273) (SRF)
Sanitation New Public health
SRF
2_090 .
EM
2004008 A
Puainako Sewer Improvement District
Sanitation New Public health
Bond/Other
4,000
HEN
2004009 A
North Kona Sewer Improvement District
_ _ _
Sanitation New Public health
_
Bond/Other
1.000
IEM
2004010 A
Kilohana Sewer Improvement District
Sanitation New Public health
Bond/Other
250
EM
2004011 A
Ocean View Transfer Station
Sanitation New Major deficiency
Bond/Other
1,275
EM
2004012A
Kona Scrap Metal Salvage Facility
Sanitation New Priortly issue
Bond/Other
1 SSO
EM
2004013 A
Kalanianaole Collector Sewer, PH II (SRF)
_ _
Sanitation New Public health
SRF
3 000
IPW2004014
A
Lako Street Extension
Transportation New Priority issue
_
Bond/Other
T 5,000
PW
2006022 A
Replacement of Large Capacity Cesspools (SRF) _ _ _ _ _
-
- Sanitation Replacem_ ent _Legal mandate
-
SRF _
51550
FW
2004023_A
West Hawaii County Building
General GoN New Major deficiency
Band/Other
5,000
FW
2004024 A
Alenaio Stream Easement Acquisition_ _
Public Safety New Public safety
_ _ _
Band/Other
200
PW
2004025 A
Land Acquisition for PW Facilities _
Transportation_ New Priority issue
Band/Other
too-
00
IPW
FW
2004026A
,East Hawaii Drainage Improvements
— _
Public Safes New Public safety
Bond/Other
_ _
_ 100
IPW
2004027 A
_ West Hawaii Drainage Improvements
Public Safety New Public safety
Bond/Other
100
IPW
_ 2004028 A
_
Kailua Parking Lot Expansion
Extg Facility improvements Priority issue
Bond/Other
200
POW
2004029 A
Waikoloa Road Truck Runaway Ramp _
_ _Transportation
Extg Facility improvements Public safety
Bond/Other
250
FW
2004030 A
East Hawaii Traffic Facilities Improvement
,Transportation
Transportation Extg Facility improvements_ _Public
r deficiency
Hwy Fund
300
PW
2004031 A
:.N HiloMamakua Highway Maintenance Building
Transportation New ',Major deficiency
,Hwy Fund
_
700'
IPW
2004032 A
_ _
West Hawaii Traffic Building
Transportation New ,Major deficiency
_Hwy Fund
850 '
IPW
-
2004033 A
Builtling Renovation of County Building at 25 AuQuni Street
_ - - - _—
_
General Govt New Major deficiency
Bontl/Other
3,000 '
IRE
2004043 A
Naalehu Fire Station
_
Public Safety New Major defciency
_
Bontl/Other
200
IRE
_2006044 A
- HovelFire Station
- _
Public Safety Replacement Major deficiency
Bond/Other
200
-&R
2004046 A
_ _ _
ADA
Deadeadial funding) ---- -
_
Extg Facility improvements Legal mandate
_
Bond/Other
5,250 1000
&R
2004047A,lfeguaN
_
Towersl(U
g _- _ _ -_
_ Culture/Recreation'
_ Replacement Legal mandate
Bond/Other
100
'&ft _
2004048_A
Repairs to Facilities
Culture/RecreationExfg Facility improvements Priority issue
'Bond/Other
600
&R
2004049 A _
'La'aloa Bay/Magic Sands Beach Park Improvements
Culture/Recreation New Priority issue-Bond/Other
150
'&R
2004050 A
Isaac Hale Beach Park Development _
Culture/Recreation Extg Facility improvements issue
Bond/Other_
100 400
&R _
2004051 A
Reed's Bay Beach Park Development (Special Purpose Grant)
_Priority
Culture/Recreation New Priority issue
Bond/Other
_
100 25.0_
'&R
2004052 A
Alae Cemetery Expansion (Reappropnation 5591 63)
Culture/Recreation�Extg Facility improvements Major deficiency
Band/Other
_ _
250
'&R
2004053 A
Konawaena Swimming Pool Improvements (Reappropriation 5.597.85)
Culture/Recreation Extg Facility improvements Major tleficiency
Bond/Other
500
'&R
2004054 A
Kailua Park Improvements (Reappropriation 5597.84)
Culture/Recreation Extg Facility improvements Major deficiency
Bond/Other500
'&R
2004055-A
Kailua-Kona Senior Center
Culture/Recreation New Priority issue
Bond/Other
100 500
'&R
2004056 A
Waiakea Uka Park Restroom (Reappropriation 5591.67)
_
Culture/Recreation New Priority issue
Bond/Other
_
60
'OLICE_
2004057_A
_Public Sale Complex Indoor Range
Safety P g
__
Public Safe Ext Facility s �. Public
T ty g Nimprovement
'Bontl/Other
150
'OLICE
2004058 A
Police 700 Megahertz Conversion
_ _ _
Public Safety_ Replacement Public safety
_
Bond/Other
_
720
'OLICE
2004059 A
Microwave Relocation 8 System Renovation
Public Safety Extg Facility improvements ,Public safety
'Bond/Other
_
85
'OLICE
2004060 A
Puna Police Station (new) (reappropriation 5290 33)
_
Public Safety New Malor deficiency
Bond/Other
400
TOTAL
48,689 900 3,650
RE_A_ PPROPRIATIONS
3,710
NET INCREASE
44,979
5/5/2004
2004018 B
-- 2004019'B _
2004020 B
2004021:B
-- 2004034 B
2004035,8
2004036 iB
2004037:B
on
Extension to
tion Comdor
Table I B. List of Projects— Subpart B
Capital Budget FY 04-05
)n _
lakaeha
i-Kauhale) _
Honalo to Capt Cook
uth of Hualalai_R_d
Connector
:ay 137 -
:rainage and Sight Distance Improvements__
akehe Pkway
Y
its in Kona
Puna
r Kona and Puna (Special Purpose Grant)
New
New
New
Exlg Facilky Improv(
New
New
Priority issue
Transportation Bond
500
Pnority issue
Transportation Bond'
600
s Priority issue
jransporatm Bonder
4,400
sPriority issue
_ Transportation Bond'1
1,000
Priority issue
Transportation Bond F
10,000_
s Priority issue
Transportation Bond,
2,000
s Priority issue
Transportation Bond
3 500
Priority issue
.Transportstnro no d
2000
_
Priority issue
Transportation Bondi
_3,000
Priority issue
;Transportation Bond 1
1 700
Priority issue _
_ (Transportation Bond I
2,000
s_ Priority issue
Transportation Bond 1
320
Priority issue
Transportation Bond ~
_
1,500
_
Priority issue
jrensportation Bond
480 2,400
40,000 900 3,650
_
REAPPROPRIATIONSL'�
NET INCREASE
40,000
51512004
Table 2. Existing vs. New vs. Replacement Facilities
Capital Budget FY 04-05
FACILITY
FYNO PROJECT
Total
Extg Facility improvements
2004004 Rural Transfer Station Replacement/Enhancement
900
2004005 Closure Of South Hilo Landfill
350
2004015 Right -Turn Lanes on Hina Lani and Kaiminani
2,000
2004016 Lett -Tum Pocket at Palani Junction
1,000
2004017 Left -Tum Pocket at Palani to Kamakaeha
1,000
2004020 Mamalahoa Hwy Improvements, Honalo to Capt Cook
4,400
2004021 Kuakini Highway - mere lane south of Hualalai Rd
1,000
2004028 Kailua Parking Lot Expansion
200
2004029 Waikoloa Road Truck Runaway Ramp
250
2004030 East Hawaii Traffic Facilities Improvement
300
2004035 Realignment of Portions of Highway 137
2,000
2004036 Puna Emergency Access Road Drainage and Sight Distance Improvements
3,500
2004041 Bike and Pedestrian Improvements in Kona
320
2004046 ADA Compliance CDBG partial funding)
5,250
2004048 Repairs to Facilities
600
2004050 Isaac Hale Beach Park Development
100
2004052 Alae emeter Expansion (Reappropriation 5591.63)
250
2004053 Konawaena Swimming Pool Improvements (Reappropriation 5597.85)
500
2004054 Kailua Park Im rovements (Reappropriation 5597.84)
500
2004057 Public Safety Complex Indoor Ran e
150
2004059 Microwave Relocation & System Renovation
85
Extg Facil ty improvements Total
24,655
New
2004001 Komohana Heights Collector Sewer(SRF)
2,000
2004002 Queen Lilmokalani Collector Sewer(SRF)
1,000
2004003 Regional Transfer Station Sort Station)
3,449
2004006 Equipment Maintenance Facility
100
2004007 Kealakehe Effluent Reuse, Ph Ila (Rcapp 5697.73) (SRF)
2,000
2004008 Puainako Sewer Improvement District
1,000
2004009 North Kona Sewer Improvement District
1,000
20040(0 Kdohana Sewer Improvement District
250
2004011 Ocean View Transfer Station
1,275
2004012 Kona Scrap Metal Salvage Facility
1,550
2004013 Kalanianaole Collector Sewer, PH 11 (SRF)
3,000
2004014 Lake Street Extension
5,000
2004018 Connector road at Kalaoa Ahi'ahi-Kauhale)
500
2004019 La'aloa Extension to Kuakini
3,600
2004023 West Hawaii County Building
5,000
2004024 Alenaio Stream Easement Acquisition
200
2004025 Land Acquisition for PW Facilities
100
2004026 East Hawaii Drainage Improvements
100
2004027 West Hawaii Drainage Improvements
100
2004031 N Hilo/Hamakua Highway Maintenance Building
700
2004032 West Hawaii Traffic Building
850
2004033 Building Renovation of County Building at 25 Au uni Street
3,000
2004034 Mamaloahoa H -Kawaihae Rd Connector
10,000
2004037 Pohoiki Bypass
2,000
2004038 Kamanu Street Extension to Kealakehe Plkway
3,000
2004039 Hienaloli Extension Corridor Study
1,700
2004040 Keahole to Kailas Corridor Studies
2,000
2004042 Kuakini Hwy -Alii Dr Connector at Puaa
1,500
2004043 Naalehu Fire Station
200
2004045 Additional buses and ark/ride for Kona and Puna 5 ecial Purpose Grant
480
2004049 La'aloa Ba /Ma is Sands Beach Park Improvements
150
2004051 Reed's Bay Beach Park Development (Special Purpose Grant
100
2004055 Kailua-Kona Senior Center
100
2004056 Waiakea Uka Park Restroom (Reappropriation 5591.67)
60
2004060 Puna Police Station new (reappropriation 5290.33)
400
New Total
57,464
Replacement
022 ement of Large Capacity Cesspools (SRF)
5,550
044 ;aFaton2004
200
2004047 ILifeguard Towers Upgrade
100
2004058 1 Police 700 Megahertz Conversion
720
Replacement Total
6,570
Grand Total
188,689
5/4/2004
Table 3. Selection Criteria
Capital Budget FY 04-05
CRITERIA
FYNO PROJECT
Total
Legal mandate
2004001 Komohana Heights Collector Sewer SRF
2,000
2004002 Queen Liliuokalani Collector Sewer SRF
1,000
2004005 Closure Of South Hilo Landfill
350
2004022 Replacement ofLarge Capacity Cesspools SRF
5,550
2004046 ADA Compliance CDBG partial funding)
5,250
2004047 Lifeguard Towers Upgrade
100
Legal mandate Total
14,250
Public safety
2004024 Alenado Stream Easement Acquisition
200
2004026 East Hawaii Drainage Improvements
100
2004027 West Hawaii Drainage Improvements
100
2004029 Waikoloa Road Truck Runaway Ramp
250
2004057 Public Safety Complex Indoor Range
150
2004058 Police 700 Megahertz Conversion
720
2004059 Microwave Relocation & System Renovation
85
Public safety Total
1,605
Public health
2004007 Kealakehe Effluent Reuse, Ph Ila (Reapp 5697.73 SRF
2,000
2004008Puainako Sewer Improvement District
1,000
2004009 North Kona Sewer Improvement District
1,000
2004010 Kilohana Sewer Improvement District
250
2004013 Kalanianaole Collector Sewer, PH II (SRF)
3,000
Public health Total
7,250
Priority issue 2004003 Regional Transfer Station Sort Station
3,449
2004004 Rural Transfer Station Replacement/Enhancement
900
2004006 Equipment Maintenance Facility
100
2004012 Kona Scrap Metal Salvage Facility
1,550
2004014 Lako Street Extension
5,000
2004015 Right -Turn Lanes on Hina Land and Kadmdnand
2,000
2004016 Left -Tum Pocket at Palani Junction
1,000
2004017 Left -Tum Pocket at Paland to Kamakaeha
1,000
2004018 Connector road at Kalaoa Ahi'ahi-Kauhale
500
2004019 La'aloa Extension to Kuakini
3,600
2004020 Mamalahoa Hwy Im rovements, Hondo to Cat Cook
4,400
2004021 Kuakini Highway - mere lane south of Hualalai Rd
1,000
2004025 Land Acquisition for PW Facilities
100
2004028 Kailua Parking Lot Expansion
200
2004034 Mamaloahoa H-Kawaihae Rd Connector
10,000
2004035 Realignment of Portions of Highway 137
2,000
2004036 Puna Emergency Access Road Drainage and Sight Distance Improvements
3,500
2004037 Pohoiki Bypass
2,000
2004038 Kamanu Street Extension to Kealakehe Pkway
3,000
2004039 Hienaloli Extension Corridor Study
1,700
2004040 Keahole to Kailua Corridor Studies
2,000
2004041 Bike and Pedestrian Improvements in Kona
320
2004042 Kuakini Hwy -Alii Dr Connector at Puna
1,500
2004045 Additional buses and ark/ride for Kona and Puna (Special Purpose Grant)
480
2004048 Repairs to Facilities
600
2004049 La'aloa Bay/Magic Sands Beach Park Improvements
150
2004050 Isaac Hale Beach Park Development
100
2004051 Reed's Bay Beach Park Development (Special Purpose Grant
100
2004055 Kadlua-Kona Senior Center
100
2004056 1 Waiakea Uka Park Restroom (Reappropriation 5591.67)
60
Priority issue Total
52,409
Major deficiency 2004011 Ocean View Transfer Station
1,275
2004023 West Hawaii County Building
5,000
2004030 East Hawaii Traffic Facilities Improvement
300
2004031 N Hilo/Hamakua Highway Maintenance Building
700
2004032 West Hawaii Traffic Building
850
2004033 Building Renovation of County Building at 25 Au and Street
3,000
2004043 Naalehu Fire Station
200
2004044 Honokaa Fire Station
200
2004052 Alae Cemetery Expansion (Reappropriation 5591.63
250
2004053 onSwimmingPool Improvements Rea ro riation 5597.85
500
adlawaena
2004054!!Kus Park Improvements (Reappropriation 5597.84
500
2004060 Puna Police Station new h-cappropriation 5290.33
400
Mabr deficiency Total
13,175
Grand Total
88,689
5/4/2004
Table 4. Functional Classification
Capital Budget FY 04-05
FUNCTION
FYNO PROJECT
Total
Culture/Recreation
2004046 ADA Compliance CDBG partial funding)
5,250
2004047 Lifeguard Towers Upgrade
100
2004048 Repairs to Facilities
600
2004049 La'aloa Bay/Magic Sands Beach Park Improvements
150
2004050 Isaac Hale Beach Park Development
100
2004051 Reed's Bay Beach Park Development (Special Purpose Grant
100
2004052 Alae Cemetery Expansion (Reappropriation 5591.63
250
2004053 Konawaena Swimming Pool Improvements (Reappropriation 5597.85
500
2004054 Kailua Park Im rovements Rea ro riation 5597.84
500
2004055 Kail.-Kona Senior Center
100
2004056 lWaiakea Uka Park Restroom (Reappropriation 5591.67
60
Culmro/Rcereation
Total
7,710
General Govt
2004023West
Hawaii CountyBuilding5,000
2004033
Buildin Renovation of County Building at 25 Au uni Street
3,000
General Govt Total
8,000
Public Safety
2004024 Alenaio Stream Easement Acquisition
200
2004026 East Hawaii Drainage Improvements
100
2004027 West Hawaii Drainage Improvements
100
2004043 Naalehu Fire Station
200
2004044 Honokaa Fire Station
200
2004057 Public Safety Complex Indoor Range
150
2004058 Police 700 Megahertz Conversion
720
2004059 Microwave Relocation & 5 stem Renovation
85
2004060 Puna Police Station (new) ( eappoprialion 5290 33)
400
Public Safety Total
2,155
Sanitation
2004001 Komohana Heights Collector Sewer (SRF)
2,000
2004002 Queen Lilmokalani Collector Sewer (SRF)
1,000
2004003 Regional Transfer Station Sort Station
3,449
2004004 Rum] Transfer Station Re IacemenuEnhancement
900
2004005 Closure Of South Hilo landfill
350
2004006 Equipment Maintenance Facility
100
2004007 Kealakehe Effluent Reuse, Ph Ila (Reapp 5697.73) (SRF)
2,000
2004008 Puainako Sewer Improvement District
1,000
2004009 North Kona Sewer Improvement District
1,000
2004010 Kilohana Sewer Improvement District
250
200401 I Ocean View Transfer Station
1,275
2004012 Kona ScrapMetal Salvage Facility1,550
2004013 Kalamanaole Collector Sewer, PH 11 SRF
3,000
2004022 IReplacement of Large Cap :ity Cesspools (SRF)
5,550
Sanitation Total
23,424
Transportation
2004014 Lako Street Extension
5,000
2004015 Right -Turn Lanes on Hina Lam and Kamunam
2,000
2004016 Left -Tum Pocket at Palani Junction
1,000
2004017 Left -Turn Pocket at Palani to Kamakaeha
1,000
2004018 Connector road at Kalaoa Ahi ahi-Kauhale
500
2004019 La'a]oa Extension to Kuakini
3,600
2004020 Mamalahoa Hwy Improvements, Honalo to Capt Cook
4,400
2004021 Kuakini Highway - mere lane south of Hualalai Rd
1,000
2004025 Land Acquisition for PW Facilities
100
2004028 1 Kailua Parking Lot Expansion
200
2004029 Waikoloa Road Track Runaway Ramp
250
2004030 East Hawaii Traffic Facilities Improvement
300
2004031 N Hilo/Hamakua Highway Maintenance Building
700
2004032 West Hawaii Traffic Building
850
2004034 Mamaloahoa H -Kawaihae Rd Connector
10,000
2004035 Reali nmeof of Portions of Highway 137
2,000
2004036 Puna Emergency Access Road Drainage and Sight Distance Improvements
3,500
2004037 Pohoiki B pass
2,000
2004038 Kamanu Street Extension to Kealakehe Pkway
3,000
2004039 Hienaloli Extension Corridor Study
1,700
2004040 Keaha a to Kailua Corridor Studies
2,000
2004041 Bike and Pedestrian Improvements in Kona
320
2004042 Kuakini Hwy -Alii Dr Connector at Pass
1,500
2004045 1 Additional buses and ark/ride for Kona and Puna (Special Purpose Gran[
480
Transportation Total
47,400
Grand Total
88,689
5/4/2004
Transportation
54%
Figure 1. Functional Classification
Capital Budget FY 04-05
Culture/Recreation
9%
General Govt
9%
Public Safety
2%
Sanitation
26%
Culture/Recreation
® General Govt
❑Public Safety
Sanitation
■ Transportation
5/4/2004
r�
•
Table 5. Proposed Funding Sources
Capital Budget FY 04-05
SOURCE FYNO PROJECT
Total
Bond/Oths 2004003 Regional Transfer Station Sort Station
3,449
2004004 Rural Transfer Station Replacement/Enhancement
900
2004005 Closure Of South Hilo Landfill
350
2004006 Equipment Maintenance Facility
100
2004008 Puainako Sewer Improvement District
1,000
2004009 North Kona Sewer Improvement District
1,000
2004010 Kilohana Sewer Improvement District
250
2004011 Ocean View Transfer Station
1,275
2004012 Kona Scrap Metal Salvage Facility
1,550
2004014 Lako Street Extension
5,000
2004023 West Hawaii County Building
5,000
2004024 Alenaio Stream Easement Acquisition
200
2004025 Land Acquisition for PW Facilities
100
2004026 East Hawaii Drainage Improvements
100
2004027 West Hawaii Drainage Improvements
100
2004028 Kailua Parking Lot Expansion
200
2004029 Waikoloa Road Truck Runaway Ramp
250
20040331Building Renovation of County Building at 25 Au uni Street
3,000
2004043 Naalehu Fire Station
200
2004044 Honokaa Fire Station
200
2004046 ADA Compliance CDBG partial funding)5,250
2004047 Life uard Towers U rade
100
2004048 Re airs to Facilities
600
2004049 La aloa Bay/Magic Sands Beach Park Improvements
150
2004050 Isaac Hale Beach Park Development
100
2004051 Reed's Ba Beach Park Development (Special Purpose Gran[
100
2004052 Alae Cemetery Expansion Rea ro nation 5591.63)
250
2004053 Konawaena Swimming Pool Improvements (Reappropriation 5597.85)
500
2004054 Kailua Park Improvements (Reappropriation 5597.84)
500
2004055 Kailua-Kona Senior Center
100
2004056 Waiakea Uka Park Restroom Rea xo riation 5591.67)
60
2004057 Public Safety Com lex Indoor Ran c
150
2004058 Police 700 Megahertz Conversion
720
2004059 Microwave Relocation & System Renovation
85
2004060 Puna Police Station new) (reappropriation 5290.33)
400
Bond/Other Total
33,289
SRF
2004001 Komohana Heights Collector Sewer (SRF)
2,000
2004002 ueen Liliuokalani Collector Sewer (SRF
1,000
2004007 Keaiakehe Effluent Reuse, Ph Ila Rea 5697.73 SRP
2,000
2004013 Kalanianaole Collector Sewer, PH II SRF
3,000
20040221 Replacement of Large Ca2acity Cess ools (SRF)
5,550
SRF Total
13,550
Hwy Fun
2004030
East Hawaii Traffic Facilities Improvement
300
2004031
N Hilo/Hamakua Highway Maintenance Building
700
2004032
West Hawaii Traffic Building
850
Hwy Fund Total
1.850
Transporte
2004015 Right -Tum Lanes on Hina Lam and Kaiminani
2.000
2004016 LeR-Tum Pocket at Palani Junction
1,000
2004017 Left -Turn Pocket at Palani to Kamakaeha
1.000
2004018 Connector road at Kalaoa Ahfahi-Kauhale)
500
2004019 La aloa Extension to Kuakini
3,600
2004020 Mamalahoa Hwy Improvements, Honalo to Capt Cook
4A00
2004021 Kuakini Highway - mere lane south of Hualalai Rd
1,000
2004034 Mamaloahoa H -Kawaihae Rd Connector
10.000
2004035 Realignment of Portions of Highway 137
2.000
2004036 Puna Emergency Access Road Drainage and Sight Distance Improvements
3,500
2004037 Pohoiki B ass
2,000
2004038 Kamanu Street Extension to Kealakehe Pkwa
3,000
2004039 Hienaloli Extension Corridor Stud
1,700
2004040 Keahole to Kailua Corridor Studies
2.000
2004041 Bike and Pedestrian Improvements in Kona
320
2004042 Kuakini Hw -Alii Dr Connector at Puaa
1.500
2004045 Additional buses and parkiride for Kona and Puna (Special Purpose Grant
480
Transportation Bond Total
40,000
Grand Total
88,689
5/4/2004
Table 6 Lapse Report
AcctNo_Aoencv
ProiectTitle
Ds sition
Desi
CrdNo LapseDate,
FundSource
AoornAmt Allotment UnexcendAll� Status-
ated/Exoended
Puueo Collector Sewer
Lapse
1 Contact collector sewer
01-56;6/3012004
_
SRF
2,000,000
,69135; DEM
_
5292.30 DPW
Palai Stream Flood Control (ACOE)
In progress_
_Feasibility study ACOE _ _
_ 01-56 613012004
_Any/2001A/2003A
400,000
342,100
- 2,9g01By ACOE, county share paid
5290.36,FIRE
_-
HPP Volunteer Fre Station_Water Main
Complete
Install waterline (Hwy 130 to 21st St)
01-99 613012004
1999A
61,195
61,195
33,595Complete
5296.62'.DPW
Keepu-Hienaloli Flood _Control Project
In progress
Feasibility study- ACOE
01-56 6/3012004
Any12001N2003A
800,000,
613,550
236,3501 By ACOE, county share paid
5591.65 P&R
Kawananakoa Gym
,Complete
Contact new gym
01-56 6/30/2004
Any101A/Pk Ded
500,000
267,335
2,0261 Construction completed
5597.86P&R
Lealoa Bay Beach Park Improvements
Complete
1,000,000
01-122 6/30/2004
CPF
150,000
150,000
0 Construction completed
4llo red. Unencumbered Balance that will loose if not encumbered by 6/30104
_Play Equipment Upgrade
_Lapse
-
01-56 6/30/2004
Any
_500,000
5697.76 DEM
Queen Liliuokalani Collector Sewer
In progress
Design collector
01-56 6/30/2004
2003A
500,000.
500,000
500,0001Design phase
5599.42;DEM
Wastewater Disposal System Upgrade
In progress
Design coni from cesspool to septic tank
01-56 fi13012004
2001A
250,000
250,000
140, 4061 Design phase
5691.33,DEM
Komohana Heights Collector Sewer
In progress- -Design
collector
01-56 613012004
2001A
100,000
100,000
100,0001 Design phase
5391.54=DPW
Kawailani Street Bridge -Replacement
In progress
Replace culvert with new bridge
_
01-56 6/3_012004.
Any/200A
4,500,0001
100,000
100,MDesign phase
5396.29 DPW
Lako Street Extension _
In progress
Extend Lako Street
01-56 6130/2004
Any/99A _
3,000,000 2,720,000
2,719, 8571 Planning phase
5396.27 DPW
Patent Road Safety Improvements-
i!In progress
Reappropriate 5397.98
01-56 6130/2004_1999A
1,8500 00
1,534,100 1 Design phase
5399.91 DPW
ADA Curb Ramp Compliance Program, Phase II
In progress
_InstaNreplace curb ramps
0243 6130/2004
2001A
1,700,000.1,700,000
1,229,2531 Design 75% compete
5393.46 DPW
KaloarMamalahoa Bride Replacement
P 9
do progress
Replace bridge feasibllity study
_
_
01-56 613012004
_
Anyll999A
18_3,000
_
182,285
_182,2371 Ready for construction
5396.33 DPW
Alii Drive Road Improvement - County
In progress
_Along Dow Bay
01-120- 6130/2004,
- BF
80,000'.
80,000.
12,704'1 Design phase
5296.61 FIRE
Kalaoa Fire Station
In progress
Construct new fires station
01-56 6130/2004
1999A
1,691,000
1,691,000
1,691,0001In progress
5599.39 P&R
ADA Compliance
In progress
Accessibility improvements at rec facilities
01-56 6/30/2004
2001A
2,000,000' 2,000,000
212,6121 Transition plan implementation
5590.31 P&R
AhalanuJPohoikY i Ba Park Improvements
-
In ro9ress
-
- -
62-M6/3012004
36
Ani
Y
_ _.-
1.071,235
230,800
-.__. ,
2,6131 Design phase
5599.40 PI
Repairs to Facilities
in progress -
Repair/upgrade Parks & rec facilities
01-56 6130/2_ON
500,000
500,000
1,0891 Construction in progress
5590.30 P&R
Volcano Park Multi -Purpose Playcourt
In progress
Reappropriate 5590.25
_
01-93 6/30/2004
_CPF1GF199A/OIA
1999A
81,800
81,800
24,738'Conslruction completed/Phase 2 design
5597,87 P&R
Mholu Beanh Park Improvements
In progress
Reappropnate 5597 78 _ _
02-18.613012004
1999A
66,846
66,846 _ _
66,457 Redesign phase
5594.44_P&R
Waimea Senior Center Renovations
In progress
Repairs and renovations
02-19 6/3012004
1999A
16,055
16,055,
16,055 Design phase
,691.32iDEM
Ainako-Aina Nani Subdivision Sewer
Lapse
Contruct collector sewer
01 - 56 6/3012004
SRF
3,400,000
1691.31 DEM
Puueo Collector Sewer
Lapse
1 Contact collector sewer
01-56;6/3012004
_
SRF
2,000,000
,69135; DEM
Hilo Landfill Closure
Lapse
Plans and designs
01-56 6/3012004
Any
900,000_
,691.34 DEM
Hilo WWTP Warehouse Fasifity
_ _ Lapse
_ Construct facility _
--Or 5_6_6/3012004
Any
350,000
169774DEM
Lunapule Collector Sewer
Lapse
Construct collector sewer
01-56 613012004
SRF
350,000
697.75 DEM
Honokohau SPS & FM
Lapse
Reappropnate 5697.64
01 56 613012004
Any
200,000
396.28 DPW
Mamalahoa Hwy Improvements (Honalo to Capt
Cooke Lapse
Resurfacing
01-56 6130/2004
Any
7,000,000
.299.37 DPW
FEMA Flood Studies for County of Hawaii
Lapse
Develop Flood Insurance Rate Maps
01-56 6/30/2004
Any
1,000,000
Design completed - on hold _
Design 95% complete - on hold
_ Need allotment
Design complete- need allotment
_ 1 Need allotment_ _-
5391.51 DPW
Pauah, Street Resurfacing (Kam Ave. to Kilauea Ave.):Lapse
Resurfacing project
01-56 6/30/2004
Any
1,000,000
5391.50 DPW
Mohouli-Kumukoa Traffic Signal System - _- -
Lapse
Install signal system
01-56 6130/2004
Any
_
5391.53 DPW
Ami Drive Curve Improvements _.o._
Lapse
Widen/resurface-Waiakea Uka Gym vicinih 01-56 6/30/2004
__.
Any
_1_,000,000
300,000
5390.24 DPW
,Puna Maki Alternate Route -Study Council District 5
Lapse
02-79 ', 6/30/2004
Any
250,000
5396.30 DPW
Resurface Mamalahoa Hwy Kainaliu-Kealakekua
Lapse
Resurfacing
01-56 6/30/2004
Any
190,000
5391.52 DPW
East Hawaii Drainage Improvements
Lapse
Council Districts 1,2,3,4,5
01-56 6/30/2004
Any
150,000
5399.87, DPW
Land Acquisition for Public Works FacilitiesLapse
Righ-opway acquisitions
01-56 6/3012004.
Any
100,000
5396,31 -DPW
Roundabout at Nam Kailua Df and Kakalina_Str_ee_t__'Lapse
Install roundabout
01-566/30/2004_
Any
100,000
53934A DPW
OpealMamalahoa Bridge Replacement
Lapse
-Design bridge replacement_ _01_56
6/30/2004
Any _
44000. _ -Design phase
5599.44 P&R
_Play Equipment Upgrade
_Lapse
_Upgrade to safety/accessibility standards
01-56 6/30/2004
Any
_500,000
5593.87 P&R
Honokaa Pool Improvements
Lapse
Reconstruction/repair
01-56 6/30/2004
Any
250,000
5/4/2004
Table 6. Lapse Report
AcetNO Agency Proms
Disposition Description
OrdNo- LapseDate
Fund Source
AoomAmt Allotment UnexpendAllotment
Status
5597.88 P&R Hookena Beach Park Improvements
(Lapse Reappropriate 5597.79
02-17 6/30/2004
Any
125,000
5599.41 P&R Pool Chlorination System Conversion
lapse _ _ Con¢ from chlorine gas to tablet system
01-56 6/30/2004
Any
50,000
5599.43'. P&R Field Lighting System Survey
'Lapse Evaluation of field lighting systems
01-56 6/30/2004
Any
50,000
5591.64iP&R Kamana Senior Center Improvements
,Lapse Upgrade electrical
01-56 6130/2004,
Any
50,000.
5290.341POLICE Puna Police Station Repainting
Lapse Repainting
01 566130/2004
Any
40,000
569&.021DEM Ocean View Transfer/Recycling Center
Lapse, New Construct facility
_ 01-56 6/3012004
1999A
300,000 300,000
300,000 I Consultant selected to do EA
5292.29. DPW Alenaio Seeam Flood Control
Lapse, New 'Reappropriate 5292.14
01-56 6/30/2004
Any/1999A
150,000 125,950
125,950, In progress
5293.05 FIRE Honokaa Fire Station
_ _ _
Lapse, New Construct new fire/EMS station
01-56 613012004
Any
_
1,691,000
_
5290.35; FIRE Naalehu Fire Station
Lapse, New Construct new fire/EMS station
_
01-56 fi13012004
Any
1,691,000
-
Requested for Reaoorocriation
5697.73DEM Kealakehe Sewage Effluent
Reappropriate Sewage effluent system
01-56 6/3012004
SRF
2,000,000
'Design phase
5591.63 i,P&R Alae Cemetery Expansion _ _ _ _
Reappropriate i Land acquisition/construction
r-- _
01-56 613012004
_
Any _
500,000
5597.851P&R Konawaena Pool Improvements
Reappropriate', Pool improvements
01-56 6/3012004
Any
500,000
5597.84P8R Kailua Park lm rovements
D
Rea ro nate'Repairs/renovations to former terminal bldg 01-56 613012004.
Dp D
Any
501
5591.671P&R 'Waiakea-Oka Park Restroom
ReappropriateConstruct restroom
02-50 613012004
Any
60,000
5290.33'. POLICE Puna Police Station (New)
Reappropriate', New, station
01-56 6130/2004
Any
3,685,000'
;omplete=Added to fixed assets inventory
in progress Expected encumbrance of balance prior to end of fiscal year
-apse= Unencumbered balance will lapse
-apse, New= Unencumbered balance will lapse, new appropropnation requested
for more or less than unencumbered balance
5/4/2004
Table 7. Geographic Distribution
Capital Budget FY 04-05
District
1EYNOPROJECT
Total
I
2004031 N Hilo/Hamakua Hi hwa Maintenance Buildin
700
2004044 Honokaa Fire Station
200
2004052 Alae Cemetery Expansion (Reappropriation 5591.63
250
t Total
1,150
2
1 2004001 Komohana Heights Collector Sewer SRF
2,000
2004013 Ki -da inana , SRF
3,000
20040241 Alenaio Stream Easement Acquisition
200
20040571 Public Safety Complex Indoor Range
150
2 Total
5,350
3
2004056 Waiakea Uka Park Restroom Rea roriation 5591.67
60
1 2004060 Puna Police Station new) (reappropriation 5290.33
400
3 Total
460
4
2004003 Regional Transfer Station Sort Station
3,449
2004005 Closure Of South Hilo Landfill
350
2004006 Eui ment Maintenance Facility
100
2004008 Puainako Sewer Improvement District
1,000
2004030 East Hawaii Traffic Facilities Improvement
300
2004033 Building Renovation of County Building at 25 Au uni Street
3,000
2004051 Reed's Bay Beach Park Devclo ment Special Purpose Grant
100
4 Total
8,299
5
1 20040351 Realignment of Portions of Highway 137
2,000
2004037 Pohoiki Bypass
2,000
2004050 Isaac Hale Beach Park Development
100
5 Total
4,100
6
2004011 !Ocean View Transfer Station
1,275
2004036 Puna Emergency Access Road Drainage and Sight Distance Improvements
3,500
2004043 Naalehu Fire Station
200
6 Total
4,975
7
2004010 Kilohana Sewer Improvement District
250
2004014 Lako Street Extension
5,000
2004019 La'aloa Extension to Kuakini
3,600
2004020 Mamalahoa Hwy Improvements, Honalo to Capt Cook
4,400
2004021 Kuakini High a - mere lane south of Hualalai Rd
1,000
2004053 Konawaena Swimming Pool Improvements (Reapproptiation 5597.85)
500
2004055 Kailua-Kona Senior Center
100
7 Total
14,850
8
2004002 Queen Liliuokalani Collector Sewer (SRF)
1,000
2004007 Kealakehe Effluent Reuse, Ph Ila (Reapp 5697.73) (SRF)
2,000
2004009 North Kona Sewer Improvement District
1,000
2004015 Right -Tum Lanes on Hina Lani and Kaiminani
2,000
2004016 Lefi-Tum Pocket at Palani Junction
1,000
2004017 Lefi-Turn Pocket at Palani to Kamakaeha
1,000
2004018 Connector road at Kalaoa Ahi ahi-Kauhale
500
2004023 West Hawaii County Building
5,000
2004028 Kailua Parking Lot Expansion
200
2004032 West Hawaii'fmffic Building
850
2004038 Kamanu Street Extension to Kealakehe Pkway
3,000
2004039 Hienaloli Extension Corridor Study
1,700
2004040 Keahole to Kailua Corridor Studies
2,000
2004041 Bike and Pedestrian Improvements in Kona
320
2004042 Kuakini Hwy -Alii Dr Connector at Puaa
1,500
2004045 Additional buses and ark/ride for Kona and Puna (Special Purpose Grant)
480
2004049 La'aloa Bay/ ais Sands Beach Park Improvements
150
2004054 Kailua Park Improvements (Reappropriation 5597.84)
500
8 Total
24,200
9
2004012 Kona Scrap Metal Salvage Facility
1,550
2004029 Waikoloa Road Track Runaway Ramp
250
2004034 Mamaloahoa Hw-Kawaihae Rd Connector
10,000
9 Total
11,800
Islandwide
13,505
Grand Total
88,689
5/4/2004
yi Hamakua
A
North Hilo
District w_ m
South Hilo
S
Legend
Q District Boundary
NAME
t»,» Dstrict 1
District 2
District 3
District 4
District 5
E District 6
District 7
4=<
District 8
District 9
25,000
20.000
15,000
10,000
5,000
0
1 2
Total
I
i
i
1
`3
7 8 9 Islandmde
Fig. 2. Geographic Distibution of Appropriations
C I P FY 04-05 1*
3 4
5 6
District
I
i
i
1
`3
7 8 9 Islandmde
Fig. 2. Geographic Distibution of Appropriations
C I P FY 04-05 1*
_ South Hilo Sanitary Landfill Closure_
Equipment Maintenance Facility _
Kealakehe Effluent Reuse, PH Ila (Reapp 5697.73_)
Puain_ako Sewer Improvement District
North Kona Sewer Improvement District
Kilohana Sewer Improvement District
!Ocean View Transfer Station
Kona Scrap Metal Salvage Facility
Kalanianaole Collector Sewer, PH II
Table 8. 6 -Year Capital Program
FY 04-05 to 09- 10
tunas and JKv loan Only; excmdes Med tunas)
Previous 04-05 05-06 06-07 07-08 08-09 _ _09-10 Completion's Total
-- - - 200 2,000 --- - _ -- -- - 2,200
800 1,000 1,800
5,000 3,449 3,000 - - Y 11,449
900 1,000 1,000 1,000 3,900
350 12,250 12,600
-_-_.
100 7,675 7,775
2,000_ _ 2,000
11000 14,000 15,000
200 1,000 10,000 _ _ _ 11,200 _
250 3,000 _ 3,250
_25 1,275 - _ _ 1,300
__.
1,550, 1,550
3,000 3,000
--
Hilo Scrap Metal Salvage Facility - - _ 1,5.50
Hilo Scrap Metal Yard Remediation
Kona Scrap Metal Yard Remediation__ _
Kailua Landfill Remediation
Waimea Landfill Remediation
West Hawai I Regional Sort Station
Waikoloa Transfer Station
Kaumana Gardens Sewer (Reapp 5691.89)
Puueo Collector Sewer (Reapp 5691.31)
Hilo WTP Warehouse Facil�(Reapp 5691.34)
�Lunapule Collector Sewer (Reapp 5697.74)
Honokohau Spa & Fm (Reapp 5697.75)
Wailoa Force Main Replacement
Lono Kona Collector Sewer
Ainako Collector Sewer PH II
Hualalai Interceptor Sewer
Alii Kai Collector Sewer
___._____
Piihonua Collector Sewer
Kona Hillcrest Collector Sewer
Aloha Kona Collector Sewer
_ Hawaiian Homes Collector Sewer
Honolii Interceptor Sewer
1,650 1,650
1,100
2.150 2.150
_Replacement of Large Capacity Cesspools
1,220
5,550
West Hawaiti County Building
2,000
5,000
Building Renovation of County Building at 25 Aupuni Street
_ _ 2,200
3,000
Lako Street Extension
280
5,000
Alenaio Stream Easement Acquisition
25 T
200
Land Acquisition for PW Facilities
200
100
East Hawaii Drainage Improvements
300
100
West Hawaii Drainage Improvements
100
300 _ _ 3,000
200 2,000
200 2,000
300 _ 3,000 _
_200_ _ _ __ 2,000
300 3,000.
8-CIP (2) 5/5/2004
200 ---
_ 2,000
2,200
200
_ 2,000
_ _ 2,200
6,770
5,000
12,000
3,000
5,280
-
225
100
100 50
50 50
on-going 650
100
100 100
100 100
on-going 900
100
100 100
100 100
on-going 600
8-CIP (2) 5/5/2004
Table 8. 6 -Year Capital Program
FY 04-05 to 09-10
(Includes County funds and SRF loan only; excludes Fed funds)
AGENCY
PROJECT
Previous 04-05
05-06
06-07 07.08 _ 08-09
09.10 Completion Total
DPW
Kailua Parking Lot Expansion
200
600
(FHWA)
800
DPW
ADA Curb Ramp Compliance Phase V
28 500
3,300
Mohouli Street Improvement- Komohana to Kilauea (FHWA)
3,300
DPW
Bridge Inspection & Appraisals of County of Hawai'i Bridges
65
20
20
20 125
DPW
Palani Road Safety Improvements (FHWA)
42500
1,000
4,750
5,500
DPW
Hilo Roads Guardrail & Retaining Walls (FHWA)
0
600
600
P&R
Kamehameha Avenue Resurfacing from Wailoa Bridge to Ponahawai Street
2,650
600
750
750 750
DPW
,(FHWA1__ _.
1,828
100
1,000
_ _
1,100
DPW
Kuakini Highway Improvements from Hualalai Road to AN Highway (FHWA)
0
60
100 1,000
1,160
DPW
Alii Drive Improvements Along Oneo Bay (FHWA)
200
100
600
800
DPW
Kahului-Keauhou Parkway (FHWA)
9,830
_
2,375 3,625
15,630
DPW
Keopu-Hienaloli Flood Control Project (ACOE)
800
500
3,115
3,915
DPW
Palai Stream Flood Control Project (ACOE)
400 2,485
DPW
Upper Waiakea Stream Flood Control Project (ACOE)
600 4,200
FIRE
Kawailani/Pohakulani/Ainaola & Kawailani/lwalani Intersection Improvement
2,886 2,000
DPW
(FHWA)
DPW
Mamalahoa Highway Improvements Hualalai North (FHWA)
28 500
DPW
Mohouli Street Improvement- Komohana to Kilauea (FHWA)
175 1,400
FIRE
Naalehu Fire Station
200
2,093
FIRE
Honokaa Fire Station
200
1,491
FIRE
Central Fire Station
200
1,491
FIRE
Volcano Fire Station
200
2,093
P&R
ADA Compliance
14,620
5,250
4,750
3,000 3,000
P&R
Lifeguard Towers/Stands Upgrade
0
100
P&R
Repairs to Facilities
2,650
600
750
750 750
P&R
La'aloa Bay/Magic Sands Beach Park Improvements
1,828
150
100
P&R
Isaac Hale Beach Park Development
0
100
400
P&R
Reed's Bay Beach Park Development
0
100
250
P&R
Alae Cemetery Expansion
250
250
P&R
iKonawaena Swimming Pool Improvements
250
500
P&R
Kailua Park Improvements
0
500
P&R
_
Kailua-Kana Senior Center
100
3,000
P&R
Waiakea-Uka Park Comfort Station
60
60
P&R
_Play Equipment Upgrade
1,500
500
500_ 500
P&R
Pana'ewa Equestrian Center Improvements
0
350
P&R
Hilo -Puna Trail System
0
100
P&R
Leleiwi Beach Park Improvements
500
P&R
_
Pana'ewa Rainforest Zoo Improvements
_
500.
P&R
Mahukona Beach Park Improvements
_
500
3,000 3,000,
_ 4,800
4,886
-528
1,575
2,293
1,691
1,691
t
2,293
100
750 750 on-going 7,000
2,078
500
350
500
750
500
3,100
120
500 T 3,500
350
100
500
500
-500
8-CIP (2) 5/5/2004
Table 8. 6 -Year Capital Program
FY 04-05 to 09-10
(Includes County funds and SRF loan only; excludes Fed funds)
8-CIP (2) 5/5/2004
To
AGENCY'
PROJECT
_ Previous 04-05
05-06
06-07
07-08
0"9
09.10
Completion;
Total
P&R
Laupahoehoe Pool Improvements
150
150
P&R
Kohala Pool Improvements
100
-100
-
P&R
Kahalu'u Beach Park Improvements
500
500
P&R
Waimea Regional Park Development
1,000
2,500
2,500
2,500
2,500
1,000
12,000
P&R
Spencer Beach Park Improvements
500
500
P&R
Lehia Beach Park Development
500
1,000
1,000
1,000
1,500
5,000
P&R
Punalu'u Beach Park Improvements
500
500
P&R
Kahuku Park Improvements
500
500
P&R
West Hawaii Regional Complex Development
1,000
2,500
2,500
2,500
3,500
12,000
P&R
Lau_pahoehoe Point Park Imrprovements
500
500
P&R
Keaau Community Park Development
500
500
_
500
500
2,000
P&R
South Kona Community Park Development
500
1,000'
1,000
1,500'
4,000
P&R
Waiakea-Uka CommunityCenter Development
500
500
500
500.
2,000
P&R
Kailua Park Improvements
500'
500
P&R
Greenwell Park Improvements
500,
500
P&R
Keokea Beach Park Improvements
250
250
500
P&R
Honokaa Community Center Development
500
500
1,000
2,000
P&R
West Hawai'i Senior Center Development
500
1,500'
2,000
P&R
Hilo Municipal Golf Course Improvements
500
1,500;
2,000
P&R
Kaumana Park Development
_
500.
2,500'
3,000
POLICE
Puna Police Station (New) (reapprop. 5290.3.3_)_
400
2,650_
635
3,685
POLICE
Public Safety Complex Indoor Range
150
_ _
_ _ _ _
_
150
POLICE
Police 700 Megahertz Conversion
_
720
2,400
18,720
1,200
23,040
POLICE
Microwave Relocation & System Renovation
15,680 85
15,765
POLICE
Police 700 Megahertz Communication System
4,000
4,000
4_,000
4,000
5,000
21,000
POLICE
Kealakehe Refueling Station Upgrade
300
300_
POLICE
Public Safety Complex Evidence Warehouse/Radio Shop Completion
1,300
1,300
POLICE
Kona Evidence Warehouse
130
130
POLICE
Renovation of Police Records Section Receiving Area
35
35
POLICE
South Kohala Police Station Parking Lot Expansion
25
25
POLICE
District Station Holding Cell Improvements
312
312
POLICE
Police Substation at Fire Department Kalaoa Site
50
50
POLICE _
Public Safety Complex Chainlink Fence & Security Gates
125
125
POLICE
South Kohala Police Station Central Heating & Cooling System
68
68
POLICE
Captain Cook Police Station Improvements
500
500
TOTAL
_
66,872 46,589
110,324
_ _ _ _
45,062
_
52,257
26,050
31,670
15,000 393,824
DPW
East Hawaii Traffic Facilities Improvement _
300
DPW
N Hilo/Hamakua Highway Maintenance Building
700
8-CIP (2) 5/5/2004
Table 8. 6 -Year Capital Program
FY 04-05 to 09-10
(Includes County funds and SRF loan only; excludes Fed funds)
To
\GENCY PROJECT _ _ Previous 04-05 05-06 06.07 07-08 0-"9 09.10 Completion Total
)PW West Hawaii Traffic Building 850
)PW Waikoloa Road Truck Runaway Ramp_ _ _ _ _ _ 250
)PW Subpart B Projects 40,000
88,689
8-CIP(2) 5/5/2004
Table 9. Fair Share Contributions
5142004
Hamakua
North 8 South Kona
North Hilo
North Kohala
North Kona
Puna
South Hilo
South Kohala
South Kona
TOTAL
In lieu credits
Fire
000
000
000
000
500,000 00
000
000
000
0.00
500,000 00
Parks
0.00
1,175,00000
0.00
9770000
2,824,65049
000
000
000
0.00
4,097,350.49
Roads
0.00
9,698.800 00
000
000
624,538 78
000
4,28800
246,557.20
0.00
10,574,18396
Total In lieu credits
000
10,873,80000
0.00
97,70000
3,949,18927
000
4,28800
24655720
000
15,171,534.47
Undeposited Funds
Fire
1.99566
119,40699
000
2,50389
220,75193
0.00
8,775.66
25,659.10
5,887.20
384960.43
Kaloko Mauka
0.00
000
000
000
303,95340
000
000
000
000
303,953.40
Parks
20,945.10
78,215.15
0.00
128.579.09
1,017,56209
6,500.00
55,75000
9132615
6178806
1,460,885.84
Police
101040
60,45560
000
1,26772
103,27279
000
4,44311
12,99135
2,98068
186,421.65
Roads
0.00
0.00
0.00
23,34946
657.37468
000
85,54764
15,50840
54,89976
836,679.94
sold Waste
873.72
52,277.58
0.00
1,096.20
112,39052
000
3,84210
11,23390
2,57748
184,291.50
Total Undeposited Funds
24,82488
310,35532
000
156,796.36
2,415,305.41
6,500.00
158,358.51
156.718.90
128,133.18
3,358.992.58
Assessment
Fire
-7,82052
-266,08800
-72376
-595,38651
-1,542573.12
-11,64135
-86,27432
-984.357.04
-172,554.08
3,667,41870
Kaloko Macke
0.00
0-00
000
000
486,52786
906
000
000
0.00
486,527.86
Parks
-126,438.20
-2792,680.00
-7,596.08
-1,019,51049
-16.301052.62
-133.67975
-517,40776
-9,514,87635
-1,812,011.10
32,225.25235
Police
-2,020.80
-134,720.00
-366.44
-290,431.88
E83,794,38
-5,894.00
41,662.17
415,405.32
47,36390
-1,661,658.09
Roads
-293.64656
-2481344.00
-6,74926
-6,214,03050
-14,093,80907
-108,55880
-806,63346
-8,957,727.30
-1,609,114.39
-34,571,613.34
Sewer
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-22,559.84
-22,55964
Solid Waste
-3,619.44
-116,496.00
-316.86
-268,089.84
-679,591.00
-5,096.70
-37,859.74
43,587.39
-75,545.91
-1,621,202.88
Total Assessment
433,%552
-5,791,32800
-15,752.40
-8,387,44922
-33,787,348.05
-264,870.60
-1,489,83745
-20,306,953.40
-3,779,149.02
-74,256,23366
TOTAL
408,720.64
5,392,827.12
45,75240
4,112,952.86
-27,422,853.17
-258,370.60
-1,127,190.94
-19,901,877.10
-3,851,015.84
45,727,706.63
5142004
Department of Environmental Management
Fire Department
r
Department of Public orks'
Mass Transit Agency
SUMMARY OF DEPARTMENTAL REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Environmental
CURRENT YEAR FUNDING ESTIMATED COST BYFISCAL YEARS
RIORITY PROJECT I (in thousands) (in thousands)
Division:
AL
ATF.I)
County
tate(SRF
Federal
Private Previous
04-05
05-06
06-07
07-08
08-09
09-10
To
completion COST
I KOMOHANA HEIGHTS LCC REPLACEMENT
2,000
200
2,000
2,200
2 QUEEN LILIUOKALANI LCC REPLACEMENT
1,000
800
1,000
1,800
3 EAST HAWAII REGIONAL SORT STATION 3,449
5,000
3,449
3,000
11,449
4 RURAL TRANSFER STATION 900
900
1,000
1,000
1,000
3,900
REPLACEMENT/ENHANCEMENT
5 SOUTH HILO SANITARY LANDFILL CLOSURE 350
400
350
12,250
13,000
6 EQUIPMENT MAINTENANCE FACILITY 100
100
7,675
7,775
7 KEALAKEHE EFFLUENT REUSE, PH IIA (Reapp 5697.73)
2,000
2,000
2,000
8 PUAINAKO SEWER IMPROVEMENT DISTRICT 1,000
1,000
14,000
15,000
9 NO_R0Vr-.k4ENLDI
10 KILOHANA SEWER IMPROVEMENT DISTRICT 250
250
3,000
3,250
11 OCEAN VIEW TRANSFER STATION 1,275
25
1,275
1,300
12 KONA SCRAP METAL SALVAGE FACILITY 1,550
1,550
1,550
13 KALANIANAOLE COLLECTOR SEWER, PH II
3,000
3,000
3,000
14 HILO SCRAP METAL SALVAGE FACILITY
1,550
1,550
15 HILO SCRAP METAL YARD RCMENATION
1,650
1,650
16 KONA SCRAP METAL YARD REMEDIATION
1,100
1,100
17 KAILUA LANDFILL REMEDIATION
2,150
2,150
18 WAIMEA LANDFILL REMEDIATION
2,200
2,200
19 WEST HAWAII REGIONAL SORT STATION
1,550
7,000
8,550
20 WAIKOLOA TRANSFER STATION
300
1,000
1,300
21 KAUMANA GARDI: W SEWER (Reapp 5691.89) 1
300
3,500
3,800
22 A1NAKO AfNA-NANI COLLECTOR SEWER (Reapp 5691.32)
3,400
3,400
23 PUUEO COLLECTOR SEWER (Reapp 5691.31)
2,700
2,700
24 HILO WTP WAREHOUSE FACILITY (Reapp 5691.34)
350
350
25 LUNAPULE COLLECTOR SEWER (Reapp 5697.74)
350
350
26 HONOKOHAU SPS & FM (Reapp 5697.75)
2,500
2,500
27 WAILOA FORCE MAIN REPLACEMENT
2,000
2,000
28 LONG KONA COLLECTOR SEWER
300
3,000
3,300
29 AINAKO COLLECTOR SEWER PH II
200
2,000
2,200
30 HUALALAI INTERCEPTOR SEWER
200
2,000
2,200
31 'XUER
300
J'-iUU
32 PIIHONUA COLLECTOR SEWER
200
2,000
2,200
33 KONA HILLCREST COLLECTOR SEWER
300
3,000
3,300
34 ALOHA KONA COLLECTOR SEWER
300
3,000
3,300
35 HAWAIIAN HOMES COLLECTOR SEWER
200
2,000
2,200
36 HONOLII INTERCEPTOR SEWER
200
2,000
2,200
TOTAL
9,874
8,000
0
0 6,725
17,874
70,725
5,200
18,200
5,300
11,000
0 135,024
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
Dept of Environmental Management - Wastewater Division DATE: January 2, 2004
NAME: Komohana Heights Large Capacity Cesspool Replacement
ITION (attach map): South Hilo (See Attachment A or Map) TMK: 2-3
VCIL DISTRICT. 2 AMOUNT REQUESTED: $2,000,000
►ECTIPROGRAM DESCRIPTION:
inate large capacity cesspools in the Komohana Heights subdivision, eliminate the sewage pump station at Sunrise Ridge subdivision, and connect
tonal properties to the public sewer system.
rECTIPROGRAM JUSTIFICATION :
l Mandate. The project is required by federal law. The EPA promulgated Underground Injection Control (U(C) regulations on 12/7/99 (40 CFR
G) which require large capacity cesspools existing before that date must be upgraded or closed by 4/5/05.
!CT ON OPERATIONAL BUDGET.
inating the sewage pump station at Sunrise Ridge will save approximately $20, 000 per year in operating costs. In addition, the conversion of
oximately 27 lots from gang -cesspools and the addition of approximately 40 new customers will provide approximately $23,000 in additional
x1000): 11 Funding 11 Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To completion I TOTAL:
TOTAL: 11 $200 11 $2,000
LOCATION MAP
CNP 2004-05
0 112.225 450 675 900
lillillilFeet
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
Dept o Environmental Management - Wastewater Division DATE: January 2, 2004
'ROJECTIPROGRAMNAME: Queen Liliuokalani Large Capacity Cesspool Replacement
OCATION (attach map): North Kona (See Attachment A or Maps TMK: 7-6
'OUNCILDISTRICT. 8 AMOUNTREQUESTED: $1,000,000
ROJECTIPROGRAM DESCRIPTION:
,onvert large capacity cesspools in the Queen Liliuokalani subdivision to secondary seepage pits, and install septic tanks in easements to be created.
ROJECTIPROGRAM JUSTIFICATION:
,egal Mandate. The project is required by federal law. The EPA promulgated Underground Injection Control (UIC) regulations on 12/7/99 (40 CFR
44-G) which require large capacity cesspools existing before that date must be upgraded or closed by 4/5/05.
MPA CT ON OPERATIONAL BUDGET.
dditional cost to pump the septic tanks peiodically would be offset by improvements to the sewer system which will reduce cleaning and repair costs.
$1000): 11 Funding 11 Request I FY 05-06 g FY 06-07 I FY 07-08 I FY 08-09 I FY Os -10 I €o compledon I TOTAL:
esignIsurvey 800 $800
Construction IL I1, 000 I I I 1 1$1, 000
TOTAL: 1 $800 1 $1,000 1 1 1 1 1 1 1 $1,800
U
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Ficral Yvar 2004 to 200i
EPARTMENT: Environmental Management, Solid Waste Division DATE: January 9, 2004
ROJECT/PROGRAM NAME: East Hawaii Regional Sort Station
LOCATION (attach map): South Nilo Sanitary Landfill TMK: 2-1-13:150 & 167
COUNCIL DISTRICT: 4 AMOUNT REQUESTED: $3,449,000
ROJECT/PROGRAM DESCRIPTION:
Construction of a solid waste management facility to receive, segregate, process, and recycle municipal solid waste generated from areas throughout East
Hawai'i County.
ROJECT/PROGRAM JUSTIFICATION:
The South Milo Sanitary Landfill is estimated to cease receiving solid waste during the first half of 2006. In order for the County to comply with State
(HAIL 11-58.1) regulations governing the transfer of solid waste, all waste previously accepted at the South Hilo Sanitary Landfill must be transported to
the West Hawai'i Sanitary Landfill in Pu'uanahulu. The sort station facility is being constructed in order to increase diversion of recycable materials from
as ofssposalan as a means° o`f re cmg waseranspoi a ion ncosts two uu uana u u.
IMPACT ON OPERATIONAL BUDGET:
Additional County staff and equipment will be required in order to operate the facility concurrently with normal operations at the South Filo Sanitary
Landfill. It is anticipated that once the facility has achieved operational status, the existing Hilo Transfer Station can be abandoned and existing transfer
station personnel will be available to support facility activities. Given the expanded capabilities of the facility, additional resources will be necessary.
VENDITURE (X $1000): 11 Funding I Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To completion I TOTAL:
anning 100 $100
rnd Acquisition
nign/Survey 899 $899
instruction 4,001 3,449 3,000 $10,450
trchase of Equipment
pair & Maintenance E� i
TOTAL: $5,000 $3,449 $3,000 $11,449
& M COSTS (x $1000): $325 $900 $900 $900 $900 $900 $4,825
..
.IND SOURCE C
SOUR E
x 1000
Bun& er 11,000 3,449 3,0019 $10,449
y Special Revenue (e.g., fuel tax)
ate Revolving Fund 1,000 $1,000
ate CIP
11 TOTAL: 11 $5,000 1 $3,449 1 $3,000 1 1 1 1 1 1 $11,44911
•
C
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Environmental Management, Solid Waste Division DATE: January 9, 2004
ROJECT/PROGRAM NAME: Rural Transfer Station Replacement/Enhancement
LOCATION (attach map): TMK.
COUNCIL DISTRICT: Various AMOUNT REQUESTED: $900,000
ROJECTIPROGRAM DESCRIPTION.
Design and rehabilitation construction of various rural solid waste management facilities. Enhancement of rural transfer stations will include increasing
collection and handling of recycable materials and household hazardous waste.
PROJECT/PROGRAM JUSTIFICATION:
County transfer stations were originally constructed as a short-term solution for collection of solid waste within the County. Most transfer stations are
antiquated or have sufferred vandalism and are in need of significant repair and in some instances may require expansion in order to accomodate recent
and projected increases in population. This project is intended to address public health and safety risks and ensure compliance with State (HAR-58.1)
egu a iof ns as they rel e to solid -waste transfer systems.
IMPACT ON OPERATIONAL BUDGET.
No impact on operational budget for this fiscal year. However, upon completion of the project, additional personnel will be required to manage the
facilities during operating hours in order to monitor waste dispsosal activities, encourage recycling, and to provide education to the public regarding
appropriate solid waste management habits.
(X $1000): Funding I Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 To completioe
100
800
1,000 1,000 1,000
& Maintenance
TOTAL:
& M COSTS (x $1000):
IND SOURCE (x $1000):
y G.Or Bon&Mer
y Special Revenue (e.g., fuel tax)
zte Revolving Fund
zte CIP
$900 1 $1,000 1 $1,000 1 $1
TOTAL:
$100
$800
$3,000
$3,900
11 TOTAL: 11 i1_ $900 1 $1,000 1 $1,000 1 $1,000 1 1 1 1 $3,90011
County of Hawaii
PROJECT DATAIFINANCIAL LVPACT STATEMENT
Fi.Qral Voor zona to znns
DEPARTMENT. Environmental Management, Solid Waste Division DATE: January9, 2004
PROJECTIPROGRAMNAME: Closure of South filo Sanitary Landfill
LOCA TION (at#ach map): South Hilo Sanitary Landfill TMR: 2-1-13:152 & 156
COUNCIL DISTRICT: 4 AMOUNT REQUESTED: $350,000
PROJECTIPROGRAM DESCRIPTION:
Design and closure construction at South Hilo Sanitary Landfill in anticipation of the project closure date.
PROJECTIPROGRAM JUSTIFICATION:
The South Hilo Sanitary Landfill is estimated to cease receiving solid waste during the first half of 2006. In order for the County to comply with Federal
(40 CFR 258.60) and State (HAR 11-58.1-17) regulations governing the closure of solid waste management facilities, closure construction must be
initiated within thirty (30) daXs from the day..the landfill ceases to receive solid waste.
IMPACT ON OPERATIONAL BUDGET: µ No impact on operational budget for this fiscal year, however subsequent to landfill closure construction, estimated annual operating expenditure of
$500,000 for post closure maintenance and monitoring until that time in which the County is able to demonstrate that the landfill no longer poses a threat
to human health and the environment.
��. — --,�
Funding 11 Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To completion I TOTAL:
Oesigty:Suavey 400 11 350 1 1 1 1 1 1 1$7501
Construction 12,250 1 1 1 1 1 1 $12,25011
& Maintenance
({-.-- _ TOTAL: 11 $400 1 $3501 $12,250 1 1 1 I 1 1 $13,00011
& M COSTS (x $1000):
JND SOURCE (x $1000):
Revenue (�
vine Fund
CIP
11 TOTAL: 11 $4001 $3501 $12,2501 1 1 1 1 1 $13,00011
4111
................. i r ................. i .................. r .............. .. ..........
............. .... i
...................
................. i 1 i :
.............. ; 4 :
. ..... ...................
................ . . . ....... . ..............
.... . ..............
I =Wkuea
. ........ ............
.............................................
legi"l Transfer Station (Sort Stdtiqn)
I a ..'Ini I -k I u I a St
t
ala SVE Makaalla St 1
-1 . ...... . . .. ...... ............................ ---- - ---------
. . .............................................
;c:
r-/PiminakoSt
Closure Of South Hilo Landfill
01
LOCATION MAP
N
'CIP 2004-05
c'
W E
e
T
t
§t o
0 312.5625 1,250 1,875S
2,500
Feet
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Environmental Management, Solid Waste Division DATE: January9, 2004
R OJI,,C TIPR 0 GRA M NA ME: Equipment Maintenance Facility
LOCATION (attach map): South Hilo Sanitary Landfill TMK. 2-1-13:150 & 167
COUNCIL DISTRICT: 4 AMOUNT REQUESTED: $1001000
PROJECT/PROGRAM DESCRIPTION:
Design and construction of an equipment maintenance facility to perform repairs and preventative maintenance on County Department of
Environmental Management equipment.
PROJECTIPROGRAM JUSTIFICATION:
The Department of Environmental Management is responsible for complying with State and Federal regulations pertaining to solid waste and waste
water. The department has specialized equipment unique in performing day to day operations. The timely repair and maintenance of all department
equipment is a critical element in maintaining compliance with applicable State and Federal regulations. The County Automotive Division lacks
sufficient resources toropersrreepare equipment for repairs and perform preventative maintenance on existing department equipment and will be
further strained as the department acquires additional equipment necessary to support department objectives. The construction of this facility will
improve the operating efficiency of the department in terms of reducing equipment down time, replacement equipment rental costs, and violations for
ermit non-compliance.
MPACT ON OPERATIONAL BUDGET.
Additional County staff and equipment will be required in order to operate tl-.tis facility.
pair & Maintenance
&M COSTS (x $101
>ND SOURCE (x $I
y G.O. Bond/Other
y Special Revenue (e
ate Revolving Fund
ate CIP
tax)
Funding II Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To compkdon I TOTAL:
TOTAL: 11 11 $100 I $7,675
$600 1 $600 1 $600 1 $600
$100
$7,375
$300
$7,775
$2,800
$7,775
$7,775
ula St
E
St
St
.- ....... ..... � ................ .. ......... _.
...._.....
. f
>_...............: : I
kc rt 11,b6
.................. ........
___....._..
,fes NN
iol ;qI Transfer Station (Sort St4fign)
t
Equipment Maintenance
1 � �
1
1 j
I
� I
Closure Of South Hilo Landfill
s_--._...._..._.._...___.... .......... r h,
rr 1. •✓ . '' f� �1 , '' , "..-^..F„
,%10
LOCATION MAP
CIP 2004-05
,l
��.�
o e S, — — --- Y "' - 5-� ' i
''
1
�
� Kam � .�
i1
0 312.5625 1,250 1,875 24(
N
•
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 20 04 to 20 05
DEPARTMENT.- Dept of Environmental Management - Wastewater Division DATE: January 2, 2004
PROJECTIPROGRAMNAME: Kealakehe E went Reuse, PhIIA
LOCATION (attach map): North Kona (See Attachment A for Map) TMK. 7-4-8
COUNCILDIST'RICT. 8 AMOUNTREQUESTED: $2,000,000
ROJECTITROGRAM DESCRIPTION:
Sewage effluent storage reservoir and distribution system.
PROJECTIPROGRAM JUSTIFICATION :
[Legal Mandate. Requirement to comply with EPA grant conditions for the Kealakehe Wastewater Treatment Plant and consent order with Department
of Health.
MPACT ON OPERATIONAL BUDGET:
Sale of recycled water to Honokohau Harbor should generate approximately $20, 000 per year for water that is currently discharged to a seepage pit.
11 Funding 11 Request I FY 05-06 I FY 06-07 I FY 07 08 I FY 08.09 I FY 09-10 I Te c'mWeaws I TOTAL:
esign/Survey � 200 $200
Construction 1,800 $1,800
& Maintenance
11 TOTAL: II II $2,000 1 1 1 1 1 1 1 $2,00011
&M COSTS (x $10
YND SOURCE (x $1
runty CIP
runty non-CIP (e.g.,,
2,000
llt
11 TOTAL: 11 1'1 $2,000 1 1 1 1 1 1 1 $2,00011
�..
,�... .�................ _.......-.
u 1 '' 1 '�✓
ti..
.....,
"i
\, ✓�� •.� ..�....�--• � � �� _ ale �, � . \ / ;
dA.
_
r =I
Kealakehe EffluentRe a
Nell
•�...-.r� \ i�' I y-.L:Z.�`1� i ✓" 1 moi'
"I •4 al-'"' 111 :,��': .. s!C . r, f,..}x? � J .l.J,�....�
��. LOCATION MAP N
g,.
W E
C I P 2004-05
S
0 0.3 0.6 1.2 1.8 2.4
Miles
•
•
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Dept of Environmental Management - Wastewater Division DATE: January 9, 2004
PROJECT/PROGRAM NAME: Puainako Sewer Improvement District
LOCATION (attach map): South Hilo See Attachment A or Map TMK. 2-2
COUNCIL DISTRICT. 4 AMOUNT REQUESTED: $1,000,000
ROJECT/PROGRAM DESCRIPTION:
Extend sewer system to Railroad Avenue and up Puainako Street to serve KTA, Puainako Town Center, and planned UHH expansion mauka of
Komohana St.
ROJECTIPROGRAM JUSTIFICATION
Inadequate service or facility. The project provides needed facilities to an underserved area. Currently the area has no public sewer system. In additio
KTA and Puainako Town Center are required to eliminate use of it's large capacity cesspools, and UHH must develop a new method of sewering the
IMPACT ON OPERATIONAL BUDGET.
Additional cost to operate an additional sewage pump station would be offset by additional user fees.
$1000): 11 Funding 11 Request I FY 05-06 1 FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To completion I TOTAL:
TOTAL: 11 11 $1,000 1 $14,000 1 1 1 1 1 1 $15,000
a 411..
,.h anianaole Coll
Ilk
ronr
......... �a ......
..•.``�_\ 1 _!. nV \ ...1-•, `� > 0.............._..to.
._..._._.__...__J '
i (Hilo Air fj
............i
'V ✓ .a._.
l
� 1
uain PSewer
-'" ai�o Se I D
� f
r
� 42711,
-
kmr
J orifi _L —Am- VMS W
N Y
11.1 ` .6 , O< i't �'' pn •Yrs � L"
MIX
,i
_
-
a
• ..
Imr-• _ �-..-� ;,•:•�. LOCATION MAP
!7i.c' •-i _. 1�+s". V .i ,l. T ^'=F �� L-.-1• ,''- ./ `,
C I P 2004-05 N
r
4-�'�G� ` �.•—„ , 1 .:i%s�yws`-- %4i'�i"' ' ,
10 4s
F 70
•
C�
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Dept of Environmental Management - Wastewater Division DATE: January 9, 2004
PROJECT/PROGRAM NAME: North Kona Sewer Improvement District
LOCATION (attach map): North Kona (See Attachment A or Ma TIMI. 7-6
COUNCIL DISTRICT: 8 AMOUNT REQUESTED: $1,000,000
PROJECT/PROGRAM DESCRIPTION.
Extend sewer system to developing area north of Kealakehe Wastewater Treatment Plant
PROJECT/PROGRAM JUSTIFICATION :
Inadequate service or facility. The project provides needed facilities to an underserved area. Currently the area has no public sewer system. In
addition, the Costco store is required to eliminate use of it's large capacity cesspool.
IMPACT ON OPERATIONAL BUDGET.
Additional cost to operate an additional sewage pump station would be offset by additional user fees.
$1000): 11 Funding CI Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To complerion I TOTAL:
TOTAL: 1 $1,000 1 $10,000 1 1 1 1 1 1 $11,000
North Kona Sewer I. D.
0
• • .:0..a ._
i t
t
t
x.. , . Keal�►�
Na
Ke \
I f; ,itF f
_. 1
Q4 Qtiimp C
J.~
1,950 3,900 7,800
c_
LOCATION MAP N
C I P 2004-05
W-(E
S
11,700 15, 00
Fe
is
•
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Dept of Environmental Management - Wastewater Division
DATE: January 9, 2004
PROJECT/PROGRAM NAME: Kilohana Sewer Improvement District
LOCATION (attach map): North Kona (See Attachment A or MaTMK.
7-6
COUNCIL DISTRICT: 7
AMOUNT REQUESTED: $250,000
ROJECT/PROGRAM DESCRIPTION:
Extend sewer system to private subdivision.
PROJECTIPROGRAM JUSTIFICATION :
Legal Mandate. The project is required by federal law. The EPA promulgated Underground Injection Control
(UIC) regulations on 12/7/99 (40 CFR
144-G) which require large capacity cesspools existing before that date must be upgraded or closed by 4/5/05.
Mayor Kim has indicated a desire to
assist this private subdivision conzp!y with the new regulations.
IMPACT ON OPERATIONAL BUDGET.
Additional operational costs would be more than offset by additional user fees.
Funding II Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To completion I TOTAL:
esign/Survey 250 1 $250
Construction 3,000 $3,000
& Maintenance
11 TOTAL: 11 11 $250 ! $3,000 1 1 1 1 9 1 $3,25011
& M COSTS (x $1000):
)ND SOURCE (x $1000):
runty CIP
runty non-CIP (e.g., fuel t
250
$250
11 TOTAL: 11 11 $250 1 $3,000 1 1 1 1 1 1 $3,25011
1
•
00
Feet
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT.- Environmental Management, Solid Waste Division DATE: January 9, 2004
PROJECT/PROGRAM NAME: Ocean View Transfer Station/Recycling Center
LOCATION (attach map): TMK:
COUNCIL DISTRICT. 6 AMOUNT REQUESTED: $1,275,000
PROJECTIPROGRAM DESCRIPTION:
Design and construction of a solid waste management facility.
ROJECT/PROGRAM JUSTIFICATION:
Identification and construction of a transfer station in the vicinity of Ocean View Estates is included in the General Elan update.
IMPACT ON OPERATIONAL BUDGET.•
Additional County staff and equipment will be required in order to operate this facility.
EXPENDITURE (X $1000):
Funding
I Request FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 To completion TOTAL: '
lanning (Re -Appropriation)
25
25 � $50
Land Acquisition (Re -Appropriation)
50 $50
esignISurvey (Re -Appropriation)
200 $200
Construction
1,000 $1,000
[Purchase of Equipment
[Iiep,ir & Maintenance
TOTAL:
$25
$1,275 $1,300
O & M COSTS (x $1000):
$25 11 $130 $130 $130 $130 $130 $675
FUND SOURCE (x $1000):
Cry G.O. Bond/Other
25
.......:::.:.>
1,275 $1,300
Cly Special Revenue (e.g., fuel tax)
State Revolving Fund
Federal
rivate
TOTAL:
$25
$1,275 $1,300
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Environmental Management, Solid Waste Division DATE: January 9, 2004
PROJECTITROGRAMNAME: Kona Scrap .Metal Salvage facility
LOCATION (attach map): West Hawaii Sanitary Landfill TMK. 7-1-03:01
COUNCIL DISTRICT: 8,9 AMOUNTREQUESTED: $1,550,000
ROJECTIPROGRAM DESCRIPTION:
Design and construction of a permanent salvage facility for the collection, storage, and processing of automobiles, appliances, and miscellaneous scrap
metal and tires. In addition, a permanent abandoned vehicle holding area will be constructed for temporary storage of impounded vehicles which are
designated for recycling,
ROJECTIPROGRAM JUSTIFICATION:
The Department of Environmental Management, through the County's Abandoned Vehicle Disposal Program, is responsible for managing the collection
and handling of abandoned automobiles and scrap metal generated within the County. In an effort to divert solid waste from land disposal, these
facilities are constructed to store and process all vehicles collected for recycling.
"IMPACT ON OPERATIONAL BUDGET:
Additional County staff and equipment or a local vendor will be required in order to operate these facilities.
$1000): II Funding II Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08t-09 I FY 09-10 I To completion I TOTAL:
Design✓SurvPy f� 50 $50
Construction —fj 1,500 $1,500
& Maintenance
11 TOTAL: 11 11 $1,550 1 1 1 1 1 1 f $1,55011
& M COSTS (x $1i
7ND SOURCE (x $
P G.O. Bond/Other
y Special Revenue (
ite Revolving Fund
xte CIP
1,550
$1,550
11 TOTAL: 11 11 $1,550 1 1 1 1 1 1 1 $1,55011
P
v _
Queen U
'9 sqj
r�waihae Rdft�15
i
j
2l `^
aiko914 ' fi
: MetaVSaNage
\ `` I /
/
y _
n•.
.ti r v
LOCATION MAP
CMP 2004-05
N
00 22,000 33,000 ...4441
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Ki -I V."r lfifie t" ,fins
DEPARTMENT. Dept of Environmental Manggement - Wastewater Division DATE: January 2, 2004
PROJECTIPROGRAMNAME: Kalanianaole Collector Setiver, Phff
LOCATION (attach map): South Hilo (See Attachment A for Map) TME: 2-3
COUNCIL DISTRICT: 2 AMOUNT REQUESTED: $3,000,000
ROJECTIPROGRAM DESCRIPTION:
Extend sewer system to unsevered areas in Keaukaha.
R OJECTIPR OGRAM JUSTIFICATION:
Legal Mandate. Requirement to comply with EPA grant conditions for the Hilo Wastewater Treatment Plant.
IMPACT ON OPERATIONAL BUDGET.
Addition of approximately 100 new residences will increase revenues by approximately $35, 000 per year.
& Maintenance
& M COSTS (x $1000):
7ND SOURCE (x $1000):
runty CIP
non-CIP (e.g., fuel tax)
Funding Request uest FY 05-06 I FY 06-07 I FY 07 08 I FY 08-09 FY 09-10 I To completion TOTAL:
3,
TOTAL: 11 11 $3,000 1 1 1 1 1 1 1 $3,000
3,000 1 1 1 1 1 1 1 $3,000
TOTAL: 11 11 $3,000 1 1 1 1 1 1 1 $3,000
co
I CD
t
re
Ir
a' ianaole Collector Sewer Ph II
PJe
LOCATION MAP N
CIP 2004-05 WE
s
�, ;✓ 0 1,500 3,000 6,000 9,000 12,000
Feet
•
•
MMM4442119
SUMMARY OF DEPARTMENTAL REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Division:
CURRENT YR FUNDING ESTIMATED COST BYFISCAL YEARS TOTAL
PROJECT I (in thousands) I (in thousands) I ESTIMATED
County
State
Federal
Private Previous
04-05
05-06
06-07
07-08
08-09
09-10
To
completion COST
1 Naaleha Fire Station 200
200
2,093
2,293
2 Honokaa Fire Station 200
200
1,491
1,691
3 Central Fire Station
200
1,491
1,691
4 Volcano Fire Station
200
2,093
2,293
5
6
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Ficral Yoor 21) n4 to 2n ns
DEPARTMENT. Fire DATE: January 8, 2004
ROJECT/PROGRAMNAME: Naalehu Fire Station
LOCATION ('attach ,nap): Naalehu, Hawaii TMK. 9-5-006:002
COUNCIL DISTRICT: 6 AMOUNT REQUESTED: $2,293
ROJECT/PROGRAM DESCRIPTION:
:Design and construction of a new fire station facility for the Naalehu community and adjacent areas. This area and district presently relies on the
response of services from Pahala, approximately 13 miles away which reflects a substantial impact on adequate service delivery. This project would
also result in a reclassification of the Hawaii Insurance Bureau's Public Protection hating Schedule. Proposed site is County owned. Reappropriation o
529.5.
ROJECT/PROGRAM JUSTIFICATION:
To establish dedicated fire protection and support the delivery of other emergency services in an area that is presently inadequately served.
IMPACT ON OPERATIONAL BUDGET:
New station will .require hiring additional staff.
$1000): II Funding II Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To completion I TOTAL:
I
•
00
Feet
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Ficrn/ Vonr ?.n ne to 2n ns
DEPARTMENT. Fire DATE: January 8, 2004
PROJECTITROGRAMNAME: Honokaa Fire Station
LOCATION (attach map): Honokaa, Hawaii TMK. 4-5-006:003
COUNCILDISTRICT. 1 AMOUNT REQUESTED: $1,691,000
PROJECT%PROGRAM DESCRIPTION:
The establishment of a replacement fire station and emergency operations complex. Present facility does not comply with high wind or hurricane
structural standards and is subject to impact from natural disasters. In addition the present facility does not provide adequate space or infrastructure to
house and store all a ui ment and personnel. Reappropriation of 5293.05.
PROJECT/PROGRAM JUSTIFICATION :
Replacement of an antiquated and structurally non-compliant facility to provide dedicated and uninterrupted emergency service delivery.
-� ......._.... x� _ .- ----
IMPACT ON OPERATIONfAL BUDGET:
O&M costs would be transferred from exisitng facility and operations.
$1000): 11 Funding 11 Request I FY 05-06 i FY 06-07 I FY 07 08 I FY 08-09 ! FY 09-10 I To m -pleb-- I TOTAL:
IlDesignISurvey g 200 I S I -I I I I $200 �
(amtruction 1 1.491 1 1 1 1 1 1 $1,491
& Maintenance
II TOTAL: II II $200 1 $1,491 1 1 1 1 1 1 $1,69111
&M COSTS (x$1000):
7ND SOURCE (x $1000):
y G. 0. Bond/Other
v Special Revenue (e z, A
CIP
200 1 1,491 1 1 1 1 1 1 $1,691
11 TOTAL: 11 11 $200 1 $1,491 1 1 1 1 1 1 $1,69111
LL
l(D
'77--
!(n
. . ... . ...... . ......
Marnalah
19f
LOCATION MAP
CIP 2004-05 N
w � 1
1.300 1.950s
Feet
-1!1111111 lllllmlvq� lllllq� 1111 Rl iiiii III
Did
SUMMARY OF DEPARTMENTAL REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Parks & Recreation
FUNDING ESTIMATED COST BY FISCAL YEARS
ITY PROJECT (in thousands) I (in thousands)
Division:
County
State
Federal
Private
Previous
04-05
05-06
06-07
07-08
08-09
09-10
0
completion COST
I ADA Compliance 5,250
1,000
14,620
5,250
4,750
3,000
3,000
3,000
3,000
0 36,620
2 Lifeguard Towers/Stands Upgrade 100
0
100
100
3 Repairs to Facilities 600
2,650
600
750
750
750
750
750
on-goin 7,000
4 La'aloa Bay/Magic Sands Beach Park ImprovementE 150
1,828
150
100
2,078
5 Isaac Hale 'Death Park Development 100
0
100
400
500
6 Reed's Bay Beach Park Development 100
250
0
100
250
350
7 Alae Cemetery Expansion 250
250
250
500
8 Konawaena Swimming Pool Improvements 500
250
500
750
9 Kailua Park Improvements 500
0
500
500
1�1rmMV] t QtC11,1011 6U
60
60
120
11 Kailua-Kona Senior Center 100
500
100
3,000
3,100
12 Play Equipment Upgrade
1,500
500
500
500
500
3,500
13 Pana'ewa Equestrian Center Improvements
0
350
350
14 Hilo -Puna Trail System
0
100
100
15 Leleiwi Beach Park Improvements
500
500
16 Pana'ewa Rainforest Zoo Improvements
500
500
17 Mahukona Beach Park Improvements
500
500
18 Laupahoehoe Pool Improvements
150
150
19 Kohala Pool Improvements
100
100
20 Kahalu'u Beach Park Improvements
500
500
21 Wairnea Regional Park Development
1,000
2,500
2,500
2,500
2,500
1,000 12,000
22 Spencer Beach Park Improvements
500
500
23 Lehia Beach Park Development
500
1,000
1,000
1,000
1,500 5,000
24 Punalu'u Beach Park Improvements
500
500
25 Kahuku Park Improvements
500
500
26 West Hawaii Regional Complex Development
1,000
2,500
2,500
2,500
3,500 12,000
27 Laupahoehoe Point Park Imrprovements
500
500
28 Keaau Community Park Development
500
500
500
500 2,000
29 South Kona Community Park Development
500
1,000
1,000
1,500 4,000
30 Waiakea-Uka Community Center Development
500
500
500
500 2,000
31 Kailua Park Improvements
500
500
32 Greenwell Park Improvements
500
500
33 Keokea Beach Park Improvements
250
250
500
34 Honokaa Community Center Development
500
500
1,000 2,000
35 West Hawaii Senior Center Development
500
1,500 2,000
36 Hilo Municipal Golf Course Improvements
500
1,500 2,000
37 Kaumana Park Development
500
2,500 3,000
TOTAL 1 7,7101
500 1
1,250
0 121,158
1
7,710
13,950
9,750
11,750
14,000 114,000
1
15,000 107,318
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Parks & Recreation DATE: February 19, 2004
ROJECT/PROGRAMNAME: ADA Compliance
LOCATION (attach map): TMK.
COUNCIL DISTRICT. Islandwide AMOUNT REQUESTED: $5,250,000
PROJECTIT ROGRAM DESCRIPTION:
Accessibility improvements at recreational sites/facilities as set forth in the County of Hawai`i's Self -Evaluation and Transition Plan.
PROJECTIPROGRAM JUSTIFICATION:
Legal mandate and inadequate facilities: The project is required by federal law under the Americans with Disabilities Act (1990), Title 28, Code of
Federal Regulations 35.150 and the Consent Decree filed in Russell et al v. County of Hawai `i in United States District Court Civil No. 97-01102SPK -
9
IMPACT ON OPERATIONAL BUDGET.
None. il
$1000): II Funding I'I Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To completion I TOTAL:
County of Hawaii
PROJECT DATAITINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Parks & Recreation DATE. February 19, 2004
ROJECTITROGRAMNAME. Lifeguard Towers/Stands upgrade
LOCATION (attach map): TMK.
COUNCIL DISTRICT: Islandwide AMOUNT REQUESTED: $100,000
PROJECTIT ROGRAM DESCRIPTION:
Upgrading of existing lifeguard towers/stands at beach parks throughout the island to include wholesale replacement or repairs and modifications to
existing facilities.
ROJECT/PROGRAM JUSTIFICATION :
Union grievance, public health & safety and replacement of deteriorated facilities: Lifeguard towers/stands are popular targets for :nighttime
mischief and abuse and must be replaced/modified for security reasons (drug paraphenalia, condoms, human excrement, etc. are commonly found therein
and require lifeguard's time to clean-up taking away from their oversight of beach and swimming activities). Towers need to be modified so they can be
secured after-hours, some need to be replaced due to exposure, deterioration and abuse and new towers are needed to accommodate park use.
IMPACT ON OPERATIONAL BUDGET.
None.
$1000): II Funding II Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To completion I TOTAL:
11(-.Wvvirrgrdon 11 11 100 1 1 1 1 1 1 1 $10011
pair & Maintenance
TOTAL:
$100
$100
& M COSTS (x $1000):
D R x 1000
111 SOURCE C ( )
.... ..... E,..E..,. w .. �w ........... E.., .wE ....tit
V G.O. Bond/Other
100
$100
Y pl?LW Revenue (0-Z' finel tax)
ante Revolving Fund
ate CIP
Weral
ivate
TOTAL:
$100
$100
County of Hawaii
PROJECT DA TAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Parks & Recreation DATE: February 19, 2004
PROJECTIPROGRAMNAME: Repairs to Facilities
LOCA TION (attach map): THK.
1COUNCIL DISTRICT: Islandwide AMOUNT REQUESTED: $600,000
PROJECTTROGRAM DESCRIPTION:
Repair of and renovation to park facilites, amenities, infrastructure and utilities.
PROJECTIPROGRAM JUSTIFICATION:
Public bealtb & safety and Repair/Maintenance: To provide for safe and effective use of park failities by providing for repair or replacement of
unsafe, detiorated and damage conditions (due to abuse, exposure, infestation, normal use, wear & tear, etc.) and to address conditions that do not satisfy
laws.
Y
IMPACT ON OPERATIONAL BUDGET.
Will have a positive but unquantifiable impact as less band-aid measures will need to be applied when the corrective action is implemented.
$1
Funding 11 Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To completion I TOTAL:
11 TOTAL: 11 $2,65011 $6001 $750 1 $750 1 $750 1 $7501 $7501 1 $7,00011
2,650
600 750 750 750 1 750 1 750 Ion -going
$2000
Purchase of Equipment
Repair & Maintenance
L
I
TOTAL:
$2,650
$600 $750 $750 $750 $750 $750
$7,000
10 & M COSTS (X $1000):
.. .. .. . ... .. .. ..... . .. .. ............ ... ... ...........
FUND SOURCE ft $1000):
........ ................
..........................
. ............. .. ........... ........... .......................... ....... ... ..
. ....... ........ ........... ......................... ............................................
........................... ................................
............ ..... ........................
...... ..... .......................... ............... x:
........... .............. ................ ....... .......................... ......................
... ..... ............... ................................
.......................................
........... ................................ .........................................
.... . .. ................ ���Effim ----------------------------- --------------
Cty G. 0. Bond/Other
2,650
600 750 750750 750 750 on-going
$7,000
CJY.SPZLud (e- Z' fiad tax)
State Revolving Fund
IState CIP
11 TOTAL: 11 $2,65011 $6001 $750 1 $750 1 $750 1 $7501 $7501 1 $7,00011
Couno of Hawaii
PROJECT DATAITINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT: Parks & Recreation DATE. February 19, 2004
"ROJECTITROGRAMNAME: La'aloa Bay Beach Park/Magic Sands Beach park Improvements
LOCATION (attach map): La'aloa, North Dona TMK. 7-7-08:017, 035, 106, 107 & 7-7-10:036
COUNCIL DISTRICT. 8 AMOUNT REQUESTED: $150,0001
ROJECT/PROGRAM DESCRIPTION:
Implementation of second phase of improvements at La'aloa Bay Beach Park to include walking paths, interpretive signs, pavilion, landscaping, selective
clearing and other beautification and improvement work to com liment the recently installed parking lot and walkways.
ROJECTITROGRAM JUSTIFICATION:
I
Legal mandate and quality of life: The project is required to satisfy obligations to Department of Land and Natural Resources, State Historic
preservation Division pursuant to §HRS 6E-8 and §6E-43 as a condition of the SMA permit filed for the initial phase of improvements. The project also
eeks to address the preservation and treatment of identified archaeological sites pursuant to a preservation plan and burial plan prepared for the site.
Beneficiaries will include native Hawaiians, residents and tourists and it will en iance t1ie shore rine beau oNe Kona coast.
IMPACT ON OPERATIONAL BUDGET.•
None.
EXPENDITURE (A ,$1000): Funding 11 Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To completion I TOTAL:
Planning 20 $20
and Acquisition 1,580 $1,580
esigolSurvey 50 $50
Construction 178 150 100 $428
11 TOTAL: 11 $1,82811 $150 1 $100 1 1 1 1 1 1 $2,07811
County of Hawaii
PROJECT DATAITINANCIAL IMPACT STATEMENT
V-1 V- ?nnQ f,. MMC
DEPARTMENT. Parks & Recreation DATE. February 19, 2004
ROJECT✓PROGRAMNAME: Isaac Hale Beach Park Improvements
OCA TION (attach map): Pohoiki, Puna TMK. 1-3-08:014, 016 & 021, 1-4-02-008
COUNCIL DISTRICT: 5 AMOUNT REQUESTED: $100,000
PROJECT/PROGRAM DESCRIPTION:
Construction of a new pavilion, outdoor courts, children's playground, walking paths, picnic areas, landscaping, beautification and the related
infrastructure and utilities necessary to support these and compliment previously planned improvinents at the site.
PROJECT/PROGRAM JUSTIFICATION:
Replacement of destroyed facilities: Development of this beach park is intended to replace the county park facilities and amenities lost due to lava
flows in the Kaimu-Kalapana area. This phase will continue prior improvements in creating a park environment that is safe for all users, will provide a
wide array of amenities and maximize the intensity of its use. The development will also enhance the beauty of the shoreline as p�c�rnca��
oun 's o -@ic, open -ocean beach 2ark in the district of Puna.
IMPACT ON OPERATIONAL BUDGET.
None.
EXPENDITURE (X $1000): Funding 11 Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 FY 09-10 To completion TOTAL:
Planning
and Acquisition 176 $176
DesignJSurvey 85 100 $185
Construction 783 400 .$1,183
pair & Maintenance
&M COSTS (x$1000):
IND SOURCE (x $1000):
y G.O. Bond/Other
y Special Revenue (e.g.,fI
xte Revolving Fund
xte CIP
TOTAL: 11 $1,04411 $100 1 $400
523
521
TOTAL.IF $1,044
100 1 400
$100 1 $400
$1,544
$1,023
$521
$1,544
isaac Hal
Development
LOCATION MAP
CIP 2004-05
0 1,900 3,800 1 7,600 11
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
DEPARTMENT. parks & Recreation DATE: February 19, 2001
PPROJECTIPROGRAMNAME: Reed's Bay Development
LOCATION (attach map): Reed's Bay, South Hilo TMK: 2-1-05:001, 2-1-06:013 & 015
COUNCIL DISTRICT: 4 AMOUNT REQUESTED: $100,000
PROJECTIPR0GRA ill DESCRIPTION:
Development of heed's Ray Beach park to include replacement of the comfort station, separating vehicular and pedestrian access, providing picnicking
amenities, accessible routes, landscaping and overall beautification of the site.
PROJECTIPROGRAM JUSTIFICATION :
Quality of Life: Reed's Bay Beach Park is located on Banyan Drive adjacent to the major tourist accommodations in filo and is on the direct route froar�
ythe,,,, passenger ship docks to downtown Hilo. The project will enhance the beauty of Hilo's shoreline and facilitate more intensive use for East Hawaii's
TY71'i�tETTAiGZ7GdIE3
IMPACT ON OPERATIONAL BUDGET:
None.
$1000): II Funding !I Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To completion I TOTAL:
0-
D
L •'
L
1 r
r steed's Bay Beach Park `0OVelo went�l e� J�' r ose } r t - r-
;. XX
ihiwai IFPRY; ;l
"
5 \
i" r
I
r, l
\ LY
meh �..._.......1..._L...Kame' arr Av�t
- --------
......
---------- --- --FT
. .............. . . . .........
. ....... ........I ;
r,, !....... ...
0
! p.
\ i
\ ( y
._....._....&Suavta._S.t...............�...._� CD
i
., co
v
T i ;
r
Cp
LOCATION MAPMAP..............
i
____-�.�.......... _.._...._.........: .............. �—...... ,CNI' 2004 05
I
—,– a to �i s
0
860 1,720 2,580 3,440
OWN
i - Feet
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Ficral Voar 21Y)d to 21Y)';
DEPARTMENT. Warks & Recreation DATE: February 19, 2004
ROJECTWOGRAMNAME. Alae Cemetery Expansion
LOCATION (attach map): Alae, South Hilo TMK. 2-6-12:010
COUNCIL DISTRICT. 1 AMOUNT REQUESTED: $250,000
ROJECTIPROGRM f DESCRIPTION:
Development of a portion of the proposed land acquisition for cemetery purposes (i.e., burial plots, access .road, etc.) and necessary related upgrades and
improvements to existing cemetery infrastructure and support facilities.
PROJECTITROGRAM JUSTIFICATION:
Inadequate Facility: Alae cemetery is nearing (burial) capacity for its currently developed area. It is anticipated that the County will acquire an
expansions area mauka of the existing site during this fiscal year. It is anticipated that this additional area will be developed in increments necessary to
satisfy an anticipated burial rate for 10 year periods. This request is to develop the initial increment as required to receive bu_mia hots for the first 10
ears.
IMPACT ON OPERATIONAL BUDGET.
Additional developed area would result in increased maintenance demands and responsibilities for which one additional position would be requested.
[EXPENDITURE (X $1000): Funding Request I FY 05-06 I FY 06-07 + FY 07-08 I FY 08-09 I FY 09-10 To co np[eraon TOTAL:
Planning
and Acquisition 175 $175
esign/Survey
Cons&ucdon 75 250 $325
pair & Maintenance
& M COSTS (x $1000):
1ND SOURCE (x $1000,
p G.O. Bond/Other
Secia�evenue (e.Q..
xte Revolving Fund
zte CIP
TOTAL: 11 $250 !i $250
250 11 250
TOTAL: 11 $25011 $250
$35 1 $35 1 $35 I $35
$500
$175
$500
$500
Alae
Dr
5591.63)
LOCATION MAP
CIP 2004-05 WE
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Parks & Recreation DATE: February 19, 2004
ROJECTIPROGRAMNAME: Konawaena Swimming )Fool Improvements
LOCATION (attach map): Konawaena School Campus, South Kona TMK.• 8-1-05:013
COUNCIL DISTRICT: 7 AMOUNT REQUESTED: $500,000
PROJECT/PROM3 1 iil DESCR!PTION:
Improvements to the swimming pool circulation system, pool basin, lighting system, solar heating system, re -roofing of the facility and other related or
similar repairs or upgrades necessary to ensure proper and safe aeration of the pool facility.
ROJECTIPROGRAMJUSTIFICATION: -^
Repa rMaintenance: Existing pool circulation system is antiquated and in constant need of repairs reulting in poor water quality and complaints by
users, solar heating system is deteriorated beyond repair, existing roofing is in poor condition resluting in leaks damaging buiding interiors, electrical
system is antiquated and in constant need of repairs and oilier damage due to termite, rot, wear, abuse and _other _factors contribute to t o jkdav�r
coition of the facilit andts need of re2airs. fool is contantly and heavily used by the public and Konawaena School.
.IMPACT ON OPERATIONAL BUDGET:
Positive impact as project will obviate constant in-house repairs, circulation and electrical system will be more energy efficient.
$1000): 11 Funding 11 Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I T e completion I TOTAL:
11Construction JL_ 2'5011 5001 1 I I 1 1 1 $75011
?pair & Maintenance
11
11
1 1 1
TOTAL:
$250
$500 $750
& M COSTS (x $'1000):
ND
U SOURCE ft $1000):
)
4 4:4
------------------k
G.O. Bond/Other
250
500 $750
;�Snecial Revenue (kg.. feel tax)
rite Revolving Fund
ate CIP
Weral
•ivate
TOTAL:
$250
$500 $750
Rd
St
Rd
LOCATION MAP
CIP 2004-05
�
w__F
s
Feet
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fkral Voor Irma to Inns
DEPARTMENT. Warks & Recreation DATE: February 19, 2004
PROJECTIPROGRAM NAME: Kailua 'ark Improvements
LOCATION (attach map): Kailua Park, Kailua-Kona, North Kona TALK. 7-5-05:83
COUNCIL DISTRICT: 8 AMOUNT REQUESTED: $500,000
PROJECTIPROGRAM DESCRIPTION:
Improvements to existing park facilities including the Old Airport Terminal Building, Comfort Station, play fields and other existing facilities and
appurtenances.
ROJECTIPROGRAM JUSTIFICATION:
Repair/Maintenance: Old terminal building and comfort station in need of restoration due to damage attributable to termite, rot, abuse, wear & tear, and
the high and intensive usage as well as ages of the buildings. Kailua park is the primary recreational sports complex for West Hawaii and is heavily used.
during all park hours for numerous recreational activities, functions and events. Existing facilities are admittedly insufficient to slipport existing uses,
hilus makm�iE6e a re alis even inor-e vital to continue activities at the cora lex.
roneC
TON OPERATIONAL BUDGET.
$1000): 11 Funding 11 Request 1 FY 05-06 I FY 06-07 I FY 07 08 I FY 08-09 I FY 09-10 I Tocompletion I TOTAL:
esIgHl5'urveV 50 $50
1 11 Ci��sstruction 450 $450
& Maintenance
11 TOTAL: 11 1� $5001 1 1 1 1 1 1 $50011
&M COSTS (x$1000):
1ND SOURCE (x $1000):
P G.O. BondlOther
Fund
CIP
500
$500
11 TOTAL: 11 1 $500 1 1 1 1 1_ 1 1 $50011
r� Il
O \
� <
%r
Kailua Park Imp oveme app' b tion-59 J
Y^
.� i� \.. ` \.vim �� � r,.-• y� y�l:r....; '�
,- K r `V 11ag`e ypa �--�-
1
13.
LOCATION MAP
CIP 2004-05 N
E W E
0 1,375 2,750 5,500 8,250 511,000
Fee
•
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
ARTMENT: Parks & Recreation DATE: February 19, 2004
OJECT/PROGRAMNAME: Waiakea'{Jka Park Comfort Station
CATION (attach map): Waiakea Uka Park, South Hilo TMK. 2-4-35:002, 00z
'UNCIL DISTRICT. 3 AMOUNT REQUESTED: $60,000
OJECTIPROGRAM DESCRIPTION:
,nstruction of a new comfort station to service the existing baseball fields.
OJECTIPROGRAM JUSTIFICATION :
adequate Facility: Baseball fields and the children's playground equipment area do not have restroom facilities to support their use (outside gyro
urs). The fields are heavily used for numerous baseball and softball leagues' activities and the children's playground is also well -used. Construction
the comfort station will involve volunteer constniction efforts and this request represents the costs for materials as well as c_on_struction expolise,
gond the volunteer's capabilities as re2uired to complete the project.
PACT ON OPERATIONAL BUDGET:
$1
Funding 11 Request I FY 05-06 I FY 06-07 I FY 07 -OAR i FY Obi -09 I FY 09-10 I To coupler;.. I TOTAL:
OConyrarction $ 60 60 $12011
pair & Maintenance
& M COSTS (x $1000):
!IND SOURCE (x $1000):
y G. 0. Bond/Other
yS ecialRevenue(e.e.,A
ate Revolving Fund
ate CIP
TOTAL: 11 $6011 $60
6011 60
TOTAL: 11 $60 11 $60
$120
$120
$120
C|P2OO4-05
/
'
C|P2OO4-05
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
EPARTMENI. Parks & Recreation DATE: February 19, 2004
ROJECTIPROGRAMNAME. Kailua-Kona Senior Center
LOCATION (attach map): Site Selection Study Needed IMK. TBD
COUNCIL DISTRICT: 7 or 8 AMOUNT REQUESTED: $100,000
ROJE CTIPR OGRA M DESCRIPTION.
Construction of a new facility to provide consolidated social and recreational services to senior citizens living primarily in the Keahole to Keauhou area.
The facility could be an intergenerational community center to serve a range of age groups if properly designed.
ROJECTIPROGRAM JUSTIFICATION:
Inadequate F acuity: Existing senior programs are scattered in multiple facilities shared with other programs. A new facility would substantially
enhance the guality of life for the grwin number of seniors in the area.
IMPACT ON OPERATIONAL BUDGET.
Consolidation of programs would result in elimination of lease rents currently incurred and redundancy of equipment and staffing could be eliminated to
partially offset additional operating expenses of a new facility.
EXPENDITURE (X $1000): Funding I Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 To completion I TOTAL: I
Planning 50 $50
Land Acquisition
esign/SSurvey 250 $250
4
Construction 300 3,000 $3,300
& Maintenance
TOTAL: 11 E1 $600 1 $3,000
7 & M COSTS (x $1000):
FUND SOURCE( x $1000):
)
^ty G.O. Bond/Other 100
7ty Special Revenue (e.g., fuel tax)
(tate Revolving Fund
►tate CIP 500
$50 1 $50 1 $50 1 $50
$3,600
$200
$500
TOTAL: 1 1 $600 1 $3,000 1 1 1 1 1 1 $3,600
. ... .. ....
-EF
PULI
Police
SUMMARY OF DEPARTMENTAL REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Division:
IFUNDING I ESTIMATED COSTBYFISCAL YEARS TOTAL
PROJECT (in thousands) (in thousands) FSTIMAT,
Overall0405rev 5/4/2004
County
State
Federal
Private Previous
04-05
05-06
06-07
07-08
08-09
09-10 COST
I Puna Police Station (New) (reapprop. 5290.33)
400
400
2,650
635
3,685
2 Public Safety Complex Indoor Range
150
150
150
3 Police 700 Megahertz Conversion
720
720
2,400
18,720
1,200
23,040
4 Police 700 Megahertz Communication System
0
4,000
4,000
4,000
4,000
5,000 21,000
5 Microwave Relocation & System Renovation
85
15,680
85
15,765
6 Kealakehe Refueling Station Upgrade
0
300
300
7 Public Safety Complex Evidence Warehouse/Radio Shop Completioi
Kona irl�rehu0
0
1,300
Vin
1,300
-E,
9 Renovation of Police Records Section Receiving Area
0
35
35
10 South Kohala Police Station Parking Lot Expansion
0
25
25
11 District Station bolding Cell Improvements
0
312
312
12 Police Substation at Fire Department Kalaoa Site
0
50
50
13 Public Safety Complex Chainlink Fence & Security Gates
0
125
125
14 South Kohala Police Station Central Heating & Cooling System
0
68
68
15 Captain Cook Police Station improvements
0
500
500
TOTAL
1,355
0
0
0 15,680
1,355
10,685
23,753
6,012
4,000
5,000 66,485
Overall0405rev 5/4/2004
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 20 04 to 20 05
DEPARTMENT: Police Department DATE: January7, 2004
PROJECTIPROGRAM NAME. Puna Police Station (New)
LOCATION (attach map): Keaau, Puna, Hawaii TMK- TBD
COUNCIL DISTRICT. 3 AMOUNT REQUESTED: $3,685,000
ROJECTIPROGRAM DESCRIPTION.
Planning, design and construction of a new Puna Police Station including a refueling station and a radio tower. Site selection pending.
ROJECTIPROGRAM JUSTIFICATION:
The present station is located in a rented structure with the lease due to expire in 2006. The structure is in adequate in size, lacks
adequate power to accommodate resent anti future electrical needs and does not afford security_& eM lol gees.
maintenance repair costs are also increasing due to the age of the structure.
(X $1000): 11 Funding 11 Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I TOTAL:
IlConstruction 11 1 1 2,6501 6351 L 1 1 $3,28511
& Maintenance
SOURCE (x $1
TOTAL: 11 11 $40011 $2,6501 $635
400 1 2,650 1 635
TOTAL:I 1�__ $4001 $2,6501 $6351 1 1 1 $
County of Hawaii
PROJECT DATAITINANCIAL IMPACT STATEMENT
Fiscal Year 20 04 to 20 05
DEPARTMENT. Police Departnsent DATE: February 19, 2004
PROJECTIPROGRAM NAME: Repair roof for indoor firing range
LOCATION (attach map): 349 Kapiolani Street, Hilo, Hawaii TMK. 2-4-25:28
COUNCIL DISTRICT: 2 AMOUNT REQUESTED: $150,000
ROJECTIPROGRAM DESCRIPTION:
Repair roof for to -door Firing Range at the Public Safety Complex
ROJECTIPROGRAM JUSTIFICATION:
Although our department has the use of the firing range located at the Kilauea Military Reservation (KMR), this is restrictive and
priority is given to our training police recruits and annual firearrns qualifications for in-service personnel. By not having the in -door
i=afige avairAbre,%ae ddomta ie if�v i� e a e d caiat viae to pibcess a i cat oils` of Pe Y aafs o C2i y` 7racciig ealei ire s
submitted by the various security companies. As part of the permitting process, applicants must demonstrate their proficiency and.
safe handling of their issued firearm, which is done at the indoor range. to addition, our department's armorers need to perforin
periodic maintenance on our issued firearms, which need to be test fired prior to being reissued. The water damage that has resulted
fiom the leaking roof covering the departi-rent's indoor firing range has been significant and if allowed to continue will eventually
TENDITURE (X $1000): __Jj Funding I Request FY 05-06 FY 06-07 FY 07-08 FY 08-09 I FY 09-10 I TOTAL:
r --�
IlConstruction II II 1501 1 1 1 1 1 $15011
& :Maintenance
TOTAL: 11 II $15011 1 1 1 1 1 $15
& M COSTS (x $1000):
)ND SOURCE (x $1000,
11County 11 it 1501 1 1 1 1 1 $15011
(SRF)
11 TOTAL: 11 11 $150 1 1 1 1 1 1 $15011
z
'41
C)
Lo
0 LO
C)
00
\<
CD
xN 0\7,1
....... . ......
>-,ae
.... ..... . ... - . ... .. ... . . .
...... ...... .
, <
cu/
... . ...... ....
....... . ......
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 20 04 to 20 OS
!ENT. Police Department DATE: February 19,
PROGRAM NAME. Police 700 MHz Communication System (Re Appropriation)
V (attach map): Island Nide
DISTRICT: All TMK Vs _ AMOUNT REQUESTED: $720,000
PROGRAM DESCRIPTION:
Consultant fees and project planning
ECTIPROGRAM JUSTIFICATION :
Current analog system has been purchased by private industries forcing affected agencies to migrate to 800 Megahertz (MHZ) or
compatible systems such as the 700 Megahertz (MHZ). This new system would serve all government agencies. The system would
raa r ter-automtaty�ba =t fiMgrf(8 is 5tt #diY l�iS i e is paal ig iex ari earea i'esolu ion aric elia ila y
on data transmission; 3) greater security in radio transmissions with built-in system configuration to prevent unauthorized access; 4)
greater cost effectiveness in future improvements which are accomplished through software and input/output hardware changes; 5)
Although previous C1P submittals made reference to an 800 mhz system, the current plan is to go with a 700 mhz system for the following reasons: 1) the State
of Hawaii has committed to the 700 nyh:r, radio basad in eSpe se to i fa dc:ral iiiiti ttz s' to p:,,ovidc the 700 mhz s13c.ctnim t3pE cilically for laL.fl)lic cafe#;y enabling
shared interoperability among federal, State, and local public safety users; 2) the 700 mhz band provides for high speed, wideband data transmission with
greater penetration than the 800 mhz band in commercial establishments and other large structures; 3) 800 mhz system requires more tower sites for the same
coverage; and 4) the 800 mhz band is more susceptible than the 700 mhz to cellular phone systems, particularly the PCS systems that overpower the 800 mhz
trunked radio system.
$1000): Futding 11_ IieOut°sl I FY 05-06 F3706-07 FY 07-0� FY 0ii-09- L F1' 09-1 0 j..TOTAL
720
& Maintenance
& M COSTS (x $1
SOURCE (x $1000):
18,720 1 1
720 2,400 18,720 1 2J0 $23,
TOTAL: L_ 1 $720 1 $2,400 $18,720 $1,200
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 20 04 to 20 05
DEPARTMENT: Police Department DATE: Yebnzary 19, 2004
PROJECT/PROGRAM NAME: Microwave Relocation and System Renovation (Re -Appropriation)
LOCATION (attach map): Island Wide TMIi: Various
COUNCIL DISTRICT. All _ AMOUNT REQUESTED: $85,000
ROJECTIPROGRAM DESCRIPTION:
Replace existing analog 2 GHz microwave system to a modem 6 GHz digital system that will support an 700 MHz trunking systema.
ROJECT/PROGRADI JUSTIFICATION:
The County requires replacement of the existing microwave systema utilized to transport emergency and public safety circuits on an
island -wide basis. The exi .fin UY ten. has outlived its useful lifeat d is not
communications system to a federally mandated 800 MHz trunked system. This project involves construction of new towers and
facilities, engineering supply and installation of new equipment and cut -over of the existing circuits to the new systema. Replacement
of the microwave system is absolutely necessary for the County's long term objectives of providing reliable public safety services.
(X$1000): II Funding II Request I FY 05-06 1 FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 1 TOTAL:
II Construction I[__ 15,680 11 85 1 1 1 I 1 1 $15,76511
& Maintenance
SOURCE (x $1000):
TOTAL:. 11____$15,68011_ $8511 1 1 1 1 1 $15,765
15,68011 851 1 1 1 1 1 $15
11 TOTAL: 11 $15,6801 $851 1 1_ 1 1 1 $15,76511
m !q
SUMMARY OF DEPARTMENTAL REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Department: Public Works (Suboart A Proiects)
CURRENT YEAR FUNDING ESTIMATED COST BY FISCAL YEA RS (COUNTYFUNDING) TOTAL
PRIORITY
PROJECTin thousands in thousands ESTIMATED
To
State Federal Private Previous 04 -OS OS -06 06 07 07-08 08-09 09-00 ^��
County � ��n COST
Cep acement o ge capacity 5,550 1,220 5,550 1,220
1
2
West Hawaii County Building 5,000 2,000 5,000 5,000 12,000
3
Building Renovation of County Buildin?.
3,000
at 25 Au uni Street
3,000
3,000
4
Lako Street Extension 5,000
1 280
5,000
1
5,280
5
rllenaio Stream Easement Acquisition 200
1
25
200
1
225
6
Land Acquisition for PW Facilities 100
200
100
100
100
50
50 50
50 700
7
East Hawaii Drainage Improvements 100
300
100
100
100
100
100 100
100 1,000
8
West Hawaii Drainage Improvements 100
1 100
100
100
100
100 100
100 700
9
Kailua Parking Lot Expansion 200
200
600
800
10
A_.DA, Curb Ram Cot , liance Phase V -
3,300
3,300
-
11pi,>'
County of Hawaii Biid es
65
20
20
20
125
12
Palani Road Safety Improvements
FIIWA
4,500
1,000
5,500
13
Hilo Roads Guardrail & Retaining Walls
(FIIWA
600
600
K.smeltanteha Avenue Resurfacing from
14
Vr,'ailoa Bridge to Ponahw ai Street
100
11000
1,100
FHWA
15
Kuakini Highway Improvements from
Hualalai Road to Alii Highway FHWA
60
100
1,000
1,160
16
Alii Drive Improvements Along Oneo
200
600
800
17
Kahului-Keauhou Parkway 'FHWA)
9,830
2,375
3,625
15„830
18
Keopn-Hienaloli Flood Control Project
ACOS
800
3,115
3,915
19
Palai Stream Flood Control Project
A.COE
400
2,485
2,883
20
Upper Waiakea Stream Flood Control
Project ACOS
600
4,200
4,800
Kawailani/Pohakulani/Ainaola &
21
Kawailani/lwalani Intersection
2,886
2,000
4,886
Improvement FIIWA
22
Mamalahoa Highway Improvements
Hualalai North. FHWA
28
500
528
23
lvlohouli Street Improvement- Komohan
to Kilauea FHWA
175
1,400
1,575
948
24
West Hawaii Traffic 850
98
850
25
North Hilo/Hamakua Highway 700
700
Maintenance Building Construction
700
26
East Hawaii Traffic Facilities 300
38
300
Im rovement
338
27
Waikoloa Runaway Truck Ramps 250
250
250 79,715
TOTAL
15,800
5,550
23,645
21,350
10,980
2,775
16,295
2,750 1 1,670
SUMMARY OF DEPARTMENTAL REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Department: Public Works (Suu"art B Projects)
PRIORITY
CURRENT YEAR FUNDING
PROJECT in thousands)
County State Federal Private
ESTIMATED COST BY FISCAL YEARS (COUNTY FUNDING)
(in thousands)
To
Previous 04-05 05-06 06-07 07-08 08-09 09-00 complaton
TOTAL
ESTIMATED
COST
North Kona:
Add Mauka-Makai Connectors, Kailua to Keauhou
1,220
1
La'aloa Extension to Kuakini 3,600
3,600
12,000
1
Lako Street Extension to Alii Drive see Subpart A
3,000
1
Kuakini Hwy -Alii Dr Connector at Puaa 1,500
1,500
1,500
Relieve Mamalahoa Peak Hour
_
I
I
Construction of rt turfy lanes- Mina,
Left turn pocket on Rt. 190 into Rt. 180 �- 1,000
1,000
1,000
1
falani Road,Ieft tum ocket at Kamakaeha 1,000
1,000
1,000
1
Connector road at Kalaoa Ahi°ahi-Kauhale 500
500
500
1
Relieve Alamalahoa Highway, Honalo to Capt Co 4,400
4,400
4,400
Mauka alternative to Kuakini corridor
_
1
Iia >31<ali: E�te,astrsta tssTadc � ttaci ' _ _ 1,700
1,700
1,700
Keahole to Kadua internal network to relieve ueen K
_
I
Kamanu St Extensti.on to Kealakehe Pkwy 3,000
3,000
3,000
1
Keahole to Kailua corridor studies: 2,000
2,000
2,000
Pal:ani Road to KeanaJohu Corridor Stud
_
Kealakehe Parkway to Kealakaa. Extension PIn
_
Ke 3l rkaa Ext. to Kealakehe Parkway Study
Kealakaa Extension, Hiiva I_aGni to lloloholo Stud
_
Improve Kuakini
_
I
_Kuakini Highway - mere lane south of Hualalai 1 1,000
1,000
1,000
Alternative trans ortation modes
_
1
Additional transit facilities see Mass Transit Agency)
_
1
Pedestrian and bike improvements 320 1
320
320
Waimea:
_
Bypass Lindse -Mamalahoa intersection
_
1
Mamaloahoa H -Kawaihae Rd Connector 10,000
10,000
10,000
-PU=
-
1
_Realignment of portions of Hwy 137 2,000
390
390 2,000 1
2,390
1
Puna Emergency Access Rd- Drainage Hawn Ac 2,0001
2,000
2,000
1
PunaEmer enc Access Rd- Si ht distance Ainal 1,500
1,500
1,500
1
Pohoiki Park BXEass 2,0001
2,000
2;000
TOTAL
1 39,520
_ - i 390 -
390 39,520 - - - - - -
39.910
County of Hawaii
PROJECT DATAIFINANCIAL L IPACT STATEMENT
EPARTHENT. Public Works - Building Division IRATE. January9, 2004
ROJE°CT/PROGRAMNAME. Replacement of Large Capacity Cesspools
LOCATION (attach map): TMK. Various
COUNCIL DISTRICT: AMOUNTREQUESTED• $5,550,000
PROJECT (PROGRAM DESCRIPTION:
*rhe Department of Public Works has taken the lead for the EPA mandate of large capacity cesspool replacement for County Facilities. Previously
appropriated under Department of Parks & Recreation under "Wastewater Disposal Upgrade" (5599.42, 5599.47, 5599.31). Previous appropriation for
Public Works (5699.21)
PROJECTIPROGRAM JUSTIFICATION :
" The U.S. Environmental Protection (EPA) promulgated Underground Injection Control (UIC).r,.e..gdulations on December 7, 1999 which prohibited the
Sstructkm of no lar-goGL;q) Git i a �+i-f,'tt�i.�i_ ei AADYTn ri(�� 'i�.t�isl L6.. t-LSii 4.i����.i V aJJ6.�i7y
April 5, 2005.
MPACT ON OPERATIONAL BUDGET.
Annual maintenance of replacement septic tanks.
(x
Funding 11 Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I Ta completion
TOTAL:
esignlNarvey 1,167
$1,167
Construction
5311 5,550 1 $S, 603
pair & Maintenance
& M COSTS (x $1000):
7ND SOURCE (x $1000):
r-G�O,Ba ^theft
p Special Revenue (e.g., fh
xte Revolving Fund
zte CIP
tax)
TOTAL: II $1,22011 $5,550
2,450 jI 5,550
TOTAL: !l $3,670 IJ $5,550
$60 I $60 1 $60 1 $60 I $60
5,770
$300
$8,000
$9,220
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Ypar 261M to Inns
DEPARTMENT. Public Works - Building Division DATE: January2, 2004
ROJECTITROGRAMNAME: West llawai'i County Building
LOCATION (attach map): Kealakehe, North Kona TMK. (3) 7-4-020:025
COUNCIL DISTRICT. 8 AMOUNT REQUESTED: $10,000,000
PROJECT/PROGRAM DESCRIPTION:
Continuation of existing project to provide a new 60,000 square foot office complex in North Kona to house a majority of the existing County Agencies
Currently renting or leasing office space at various scattered locations.
ROJECT/PROGRAM JUSTIFICATION :
This project will consolidate into a central location a majority of County Agencies currently serving West Hawaii residents from various locations
scattered throughout North Kona. By consolidating the agencies into one location, the County will be able to eliminate most of the rental fees currently
being paid to private owners and will offer the residents of West Hav_vai'i a centralized fa.cilw e" gy carj-a= s govern_an=t,.al wnL cea—lhis-pr*
will provide West Hawaii with an office facility in parity with those in East Hawai'i.
IMPACT ON OPERATIONAL BUDGET.
Annual operations and maintenance (A/C, grounds, utilities).
rt0r lS
XPENDITURE (X $1000): Funding Request FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 To completion TOTAL:
1 -
Planning 40 $40
Land Acquisition
esigi;VSurvey 1,060 750 750 $2,560
Construction 900 4,250 4,250 $9,400
tepair & Maintenance
& M COSTS (x $1000):
7 UND SOURCE (x $1000):
G.O. BondlOther
;tv Special Revenue (e.g., fuel tax)
tate Revolving Fund
tate CIP
TOTAL: 11 $2,000 11 $5,000 1 $5,000
TOTAL: 11 $2,000 11 $5,000 J $5,000
$250 1 $250 1 $250 1 $250
$12,000
$12,000
)00
FeE
County of Hawaii
PROJECT DATAITINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Public Works - Building Division DATE: January2, 2004
ROJECTiPROGRAMNAME: Building Renovation of County Building at 25 AYHpuni Street
LOCATION (attach map): TMK. (3) 2-2-012:004
COUNCIL DISTRICT: 4 AMOUNT REQUESTED: $3,000,000
PRO IECT/PROGRAM DESCRIPTION:
Replace old air handler units along with ductwork and replace existing ceiling tiles with new as required for all offices; Replace existing single and double storefront doors and frame
with new Americans with Disability Act Standard (ADA) accessible doors; Replace existing elevator with new ADA accessible elevator with 8,000 pound capacity; Existing toilets t
be ADA accessible; Upgrade existing electrical systems. Distinguish from Emt/West ;-i1 Office Renovations 11 (5199.09) which is for renovations due to moving offices, whereas this
project is for structural upgrades and maintenance specific to this aged building.
ROJECTIPROGRAM JUSTIFICATION:
The project will bring an existing building which has been in use for over 37 years with little maintenance with its infrastructure upgraded to meet the demands of today and future
assers`�xrs"l3rig'�ir Cr�di'dBifOr�ln` g (i�"C'.j equxpiiiiin�`cii�lfG� r-cj`alaceifiu'll�ifc�w �iieagy caf�'ici'ci9iii�iiiliiis: S1iii�;'i'ieirz`l"dai.�rs v.•iipf,�e �=islilaczd�`o`irieet�"�i�tiilxiiudti r�uiri4�ses�fs`T'uitlf
will be made ADA Accessible. Existing elevator will be both functional and ADA accessible. Electrical System shall be upgraded to meet electrical demands of computers and other
uipment.
IMPACT ON OPERATIONAL BUDGET:
There will be no additional impact on the operational budget. Actually it will enhance our existing budget by allowing us to operate within our budget.
$1000): 11 Funding II Request I FY 05-06 i FY 06-07 ! FY 07-08 ! FY 08-09 I FY 09-10 I To completion I TOTAL:
1 esign/Survey 11 350 $3501
Construction 2, 650 $2, 650
& Maintenance
II TOTAL: II II $3,000 1 1 1 1 1 1 1 $3,00011
& M COSTS (x $1
Cty G.O. Bond/Other y 3,000 $3,000
Cty Special Revenue (e g., fuel tax)
State Revolving Fund
State CIP
11 TOTAL: 11 11 $3,000 1 1 1 1 1 1 1 $3,00011
ng Reng/vati(i
4-
I........ . ..
co
ing at 25 Aupuni
LOCATION MAP
CIP 2004-05 N
w
0 140 280 560 840 ........... I.,1205
OFeet
Counly of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Ficrai V.-ar 9000 to NMI
DEPARTMENT: public Works, Engineering Division DATE: January 5, 2004
ROJECT/PROGRAMNAME. LAKO STREET EXTENSION
LOCATION (attach map): Holualoa 3rd & 4th, north Kona, Hawaii TMK. 7-7-04: 43 & 56
COUNCIL DISTRICT: 7 AMOUNT REQUESTED: $5,000,000
PROJECTITROGRA.H DESCRIPTION:
Extend Lako Street from its makai terminus to Alii Drive. Additional funds needed in lieu of reappropriating of 5396.29.
PROJECT/PROGRAM JUSTIFICATION:
I A r ,ve traffc circyylak on by 1aroviz� more direct mauka-makai connector between Kuakini Highway and Alii Drive.
IMPACT ON OPERATIONAL BUDGET:
Additional one-third to one-half mile of road to maintain.
Prior This FY
EXPENDITURE (X $1000): Funding 11 Request I FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 1 To Completion TOTAL:
Planning 280 $2.80
and Acquisition 200 $200'
Design/Survey 220 $220
Construction 4,580 $4,580
pair & Maintenance 11 11
TOTAL: $280 $5,000
& M COSTS (x $1000):
runty CIP 2805,000
runty non-CIP (e-zl fuel tax)
TOTAL: 11 $280
WO FEET
0 STRE .Y�
KINI IfIGHWAY
I d
«4'Y13K '
' 09 :_:t 1-:.Y.
t x
X04UA OA IAT
-'r PR ED LAKO STREET
PR ALN DRIVE
(ALTERNATE A)
A
(ALTERNATE Q PROPOSED LAKO STREET
S ALII DRIVE
(ALTERNATE 8) o
a
ioaPrepared BySHOWING
ENGINEERING.
Eoa984 KalankStreet, Hilo, INC.
96720 TF4FFIC COUNT INTERSECTIONS
Telephone- (bas) 961-3706 PROPOSED LAKO STREET I EXTENSION
GRWHIC SCALE: DEPARTMENT OF PUBLIC IIWOM
ii iii;NMR-- COUNTY OF HAW'"
0 too 1200 HOLVALOA MW k 4TH. NT?ff3 KONA
i3LAN79 OF HAWAU. iiAA9lll�ppee
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Ficriil V. -or 2004 t., 21765
DEPARTMENT. Public Works, Engineering Division DATE: .lanuary5, 2004
ROlECTIPROGRAMNAME: AL NAIO STREAM EASEMENT ACQUISITION
LOCATION (attach map): Ponahawai, South Hilo, Hawaii TMK: 2-3-19,36&41
COUNCIL DISTRICT: AMOUNT REQUESTED: $200,000
ROJECEPROGRAM DESCRIPTION:
Acquisition of flowage easements along Alenaio Stream from Kapiolani Street to Flood Wall "A" of the Alenaio Flood Control System. Additional funds needed in lieu of
reappropriatiiig 5292.29.
ROJECTIPROGRAM JUSTIFICATION:
Easements are being acquired to compensate property owners who were adversely affected by the Alenaio Flood Control Project. The easements will also preserve the integrity of the
ed inel—e erlca1 kt1�t2fl�a
MPACT ON OPERATIONAL BUDGET:
None.
Prior This FY
()f $1000): Funding 11 Request
2511 200
pair & Maintenance 9f (�
TOTAL: $25 $200
& M COSTS (x $1000):
Inn
RCE —11
�7N73 SOL r
$
runty CIP 25 µ 2O0
runty non-CIP (e.g., fuel tax)
ute (e.g., SRF)
TOTAL: 11 $2511 $200
FY OS -06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To Completion I TOTAL:
County of Hawaii
PROJECT DATAIFINANCIAL LVPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT: Public Works, Engineering Division DATE: January 5, 2004
PROJECTITROGRAMNAME: LAND ACQUISITION FOR PUBLIC WORKS FACILITIES
LOCATION (attach map): Island -wide TMK: All
COUNCIL DISTRICT: All AMOUNT REQUESTED: $100,000
PROJECTITROGRAM DESCRIPTION:
Funds for the acquisition of property to establish a County right-of-way for existing streets, traffic signal systems and other public works facilities.
PROJECTIPROGRAM JUSTIFICATION:
During the year, Public Works receives requests to correct roadway encroachments/obstructions in private lands or discovers that an existing County facility such as a. traffic signal bo
r�utwrtltin the Cotity aig#rta�r']r15lsrtyrrrtdit�rti ft]r;�sr4:ttixxl=, ttlt>tratrt h� �t�sd;�t �ts�arctttsstr<tsatrSa}r5rt5pei°tft tcl#`eli'v'b113
IMPACT ON OPERATIONAL BUDGET:
None.
EXPENDITURE (X $1000):
1
Funding 11
Request
I FY 05-06 I
FY 06-07
I FY 07-08 1
FY 08-09 i
FY 09-10 I
To Completion TOTAL:
Planning
anslAcquisition
100
100
100
50
50
50
50 $500
esign/Survey
Construction
Purchase of Equipment
Repair & Maintenance
TOTAL:
E�
$100
$100
$100
$50
$50 1
$50
$50 1 $500
O & M COSTS (x $1000):
100
100
100
50
50
50
:Y. '.vvv• ...............................
50 $500
County CIP
...........
County non-CIP (e.g., fuel tax)
State (e.g., SRF)
TOTAL: 11 11 $100 1 $100 1 $100 1 $50 1 $50 1 $50 1 $50
County of Hawaii
PROJECT DATAITINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT.- Public Works, Engineering Division DATE: January 5, 2004
ROJECTIPROGRAMNAME: EAST HAWAII DRAINAGE IMPROVEMENTS
LOCATION (attach map): Various locations in East Hawaii IMK. 1,2,3,4
COUNCIL DISTRICT. 1, 2, 3, 4 & 5 AMOUNT REQUESTED: $100,000
ROJECTIPROGRAM DESCRIPTION:
Construction of various drainage improvements such as drywells, culverts, channels, swales, etc. to provide a 10 -year level of protection at various locations. Work may also include
the upgrading and/or repair of existing drainage facilities.
ROJECT/PROGRAM JUSTIFICATION.
Project will address localized flooding/drainage problems in East Hawaii that cannot be economically addressed by a flood control system. Improvements will not provide area wide
, ii it a-d-d.ts°�sffin Yng-caused by maj r-stam .
IMPACT ON OPERATIONAL BUDGET.
Projects will reduce maintenance and repairs costs associated with localized flooding..
$1
epair & Maintenance
TOTAL:
& M COSTS (x $1000):
UlYDLS0EZRCE it .1000
aunty CIP
ountV non-CIP (em., fuel tax)
Prior This FY
Funding 11 Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To Completion TOTAL:
100
100
100
100
100
100
$100
$100
$100
$100
$1001
$100
100
$100
1.00 1 100 1 100 1 100 j 100 1 100 1 100
11 _ TOTAL: 11 11 $1001 $1001 $1001 $1001 $1001 $1001 $1001 $70011
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT: Public Works, Engineering Division DATE: January 5, 2004
PROJECTITROGRAMNAME: WEST HAWAII DRAINAGE IMPROVEMENTS
LOCATION (attach map): Various locations in West Hawaii TMK: 5, 6, 7, 8 & 9
COUNCIL DISTRICT: 6, 7, 8 & 9 AMOUNT REQUESTED: $100,000
PROJECTIT ROGRAMDESCRIPTION:
Construction of various drainage improvements such as drywells, culverts, channels, swales, etc. to provide a 10 -year level of protection at various locations. Work may also include
the upgrading and/or repair of existing drainage facilities.
ROJECTITROGRAM JUSTIFICATION:
Project will address localized flooding/drainage problems in West Hawaii that cannot be economically addressed by a flood control system. Improvements will not provide area wide
floe' eontrol proteetien, nor will ii if ad dress flooding eausedd by major storm events.
MPACT ON OPERATIONAL BUDGET:
Projects will reduce maintenance and repairs costs associated with localized flooding..
$1000): II Funding II Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To Completion I TOTAL:
11 TOTAL: 11 11 $1001 $1001 $1001 $1001 $1001 $1001 $1001 $70011
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
>c;—t a Inne 0- Mnc
DEPARTMENT. Public Works, Engineering Division DATE: January 5, 2004
ROJECTIPROGRAMNAME: KAILUA PARKING LOT EXPANSION
LOCATION (attach map): Kaiiva Village, North Kona, ]Hawaii TMK: 7-5-6:02,36 & 37
COUNCIL DISTRICT. 8 AMOUNT REQUESTED: $200,000
PROJECT/PROGRAM DESCRIPTION:
Expand existing parking lot.
ROJECT/PROGRAM JUSTIFICATION:
Provide more free public parkinin Kailua Village.
IMPACT ON OPERATIONAL BUDGET.-
Increase
UDGET:Increase operational costs associated with the maintenance of the parking lot.
Prior This FY
$1000): Funding Request I FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 To Completion
200
TOTAL:
jkesl:gn/Su"ey 1001 I 1 1 ! $1003
! anctrurtinn 1 1-1 500 1 1 1 1 1 $50011
TOTAL: 11 11 $200 1 $600
r�
I
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
Public Works - Building Division DATE: March 29, 2004
OJECTIPROGRAMNAME: West Hawai'i Traffic Building Construction
'CATION (attach map): Kailua-Kona TMK: 7-04-08 2'
►UNCIL DISTRICT: 7 AMOUNT REQUESTED: $850,000
OJECTITROGRAM DESCRIPTION:
x100' metal building for Traffic Division offices, vehicle storage, materials storage and containment area.
OJECTIPROGRAM JUSTIFICATION:
provide a West Hawai'i location for Traffic Division field crew and materials to enable the County to more conveniently and efficiently respond to and resolve West
wai'i service calls.
PACT ON OPERATIONAL BUDGET:
nual operations and maintenance (A/C, grounds, utilities)
iEEXPENDITURE (X $1000): Funding Request ! FY 05-06 FY 06-07 FY 07-08 FY 08-09 I FY 09-10 I To completion TOTAL:
Planning
and Acquisition
DesigalSurvey 98 $98
Construction 850 $850
urchase of Equipment
epair & Maintenance
TOTAL: $98 $850 $948
O & M COSTS (x $1000): $25 $25 $25 $25 $25 $125
N ... ,.
FUND
SOURCE x
$1000):
Cty G.O. BondlOther
CI Revenue aLitx Fund) 850
State Revolving Fund
tate CIP
11 TOTAL: $98JI $850 1 1 1 1 1 1 1 $94811
\ / r'�
Kamakaeha Ave
J
Wes�arwatt �ffic Building f-
1 '
Qvee� 1 /Jrrr
rj � � ,\ ( \� 'V" `•,vim, /�y ..f 'f/�]/.,.
LOCATION MAP N
'\`�°' C I P 2004-05 W-
0
0 110220 440 660 880
,-
`� Feet
CI
�J
County of llawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
F"-1 V.— Anne M Anne
DEPARTMENT: Public Works - Building Division DATE. March 16, 2004
ROJECTITROGRAMNAME: North faioffla akua I ighway Mitintenance Building Construction
LOCATION (attach map): Harnakua _ TMK. 4-2-05-01
COUNCIL DISTRICT: 1 AMOUNT REQUESTED: $700,000
PROJECTIPROGRAIb.,t DESCRIPTION:
North Hilo/Hamakua Road (Highways) Baseyard Facility
ROJECTITROGRAM JUSTIFICATION:
Construction of a new baseyard facility is requested due to the condition of the present facility. The existing metal quonset .hut is old, electrical lines do not meet safety
standards and the building needs major repairs to its metal structure. We have outgrown the current storage area for our equipment and supplies. The present facility is
of on County property. A site (on County property) has been located in the Paauilo area. This would centralize operations for the North l iilo/Harnakua districts and
MPACT ON OPERATIONAL BUDGET.
Annual operations and maintenance (A/C, grounds, utilities)
$1
& Maintenance
& M COSTS (x $10
)ND SOURCE (x $1
Y G-0. Bond/Other
Fund
CIP
TOTAL:
Funding it Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-10 I To completion I TOTAL:
11 --�—
11 —��!-
$'700
$700
$35
TOTAL: $700 1 1 1 1 1 1 1 $700
County of Hawaii
PROJECT D.ATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
!ENT: Public Works - Building Division DATE. March t6, 2004
PROGRAM NAME: East 14nwaN Traffic Facilities Improvement
V (attach map): South Hilo TMK. 2-02-58-1
DISTRICT: 4 AMOUNTREQUESTED: $300,000
!OJECTIPROGRAM DESCRIPTION:
roof extension connecting the two existing metal buildings used for signs and markings storage, and for signal storage, and county vehicle parking. This project will
Ovide additional covered storage space for materials and vehicles.
eOJECTIPROGRAM JUSTIFICATION :
o enable the Traffic Division to store more vehicles, supplies, and expensive and sensitive equipment and materials in covered/secured conditions.
ACTON OPERATIONAL BUDGET.
operations and maintenance (A/C, grounds, utilities).
XPENDITURE (X $1000):
Planning
and Acquisition
Desika"Survey
Construction
Purchase of Equipment
epair & Maintenance
TOTAL:
E
O & M COSTS (x $1000):
FUND SOURCE (x $1000):
Cty G.O. Bond/Other
State Revolving Fund
State CIP
Federal
Private
TOTAL:
E
. . . . . . . . . . .
1--N
. . ....... ... ---
.. --------------
...... ...... ......
L.... I .................... .......
............ ...
. . . . . . . . . . . . . . . . . . . . . . . . .
..... .......
j ._..._............ . ...
I . . .......
m....................
...... . . ...... ......
........ ..... ...........
. .. . ....... .. ....... . . . ........
.......... . ............ . . ..........
.......... : -.1 i
...... . ...
CD\
.. . .. ............
iL
...........
.........
. ..... . . .......
..... .......
EQ.... . ........ 3 i- - - -------- ------- - - -- -
- — -- - --- ------------ - ---
L
...... .... . .......... ......... . ...
.... ... ....... .... . ... ... . ......
6
................ ...... I ..... ......... . ......
..........
... ........ . .............. ... ......... ....... ................ ......... ..... . .......
..............
. ...............
................ ........ ....... . .............. ......... ..........
......... . . ..
T",-, Regional T
La
J 4 i 8 S"t I .............. . ................
..n z ......................
............
A 1
ANA.Pww"A i Traffic F..:, s- I.M.Pro-vement .......... - . . ................................. .........................
.... . ....... . ..
...... . . . ......
A�
.
H41ea
....... . ....
i St
.. . .... ........
.... .........
qla St
V
........ . ..........
r.... . ..... ,
......... 2i
............Ist
IL
X_,.__
- -----
..........
�\i IPI T'-
............ Do( r-7-
... . . ... .. ..........
,4
.................
........... . . . .
;CON ro.
IJ
E Ma�6' LOCATION MAP
1. iSt ..................... . . ... ..........
......................
. ............ . ....... . ....................
CIP 2004-05
vv E
II[1MME==M
08570340510680 Feet s
0
0
County of Hawaii
PROJECT DATAITINANCIAL IMPACT STATEMENT
Fiscal Vear 20174 to 21)111
DEPARTMENT. Public Works, Engineering Division DATE: May 5, 2004
ROJECT/PROGRA M NAME: WAIICOLOA RUNAWAY TRUCK RAMP
LOCATION (attach map): Waikoloa, South Kohala, Hawaii TMK.
COUNCIL DISTRICT: 9 AMOUNT REQUESTED: $250,000
ROJECT/PROGRAM DESCRIPTION.
Study emergency ramps for runaway trucks going downhill on Waikoloa Road.
ROJECTITROGRAM JUSTIFICATION:
Public safety to prevent more accidents/deaths resulting from brake failure of trucks due to the long incline of Waikoloa Road.
IMPACT ON OPERATIONAL BUDGET.
None.
Prior This FY
$1000): 11 Funding IL Request FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10 I To Completion TOTAL:
250
& Maintenance
& M COSTS (x $1000):
7ND SOURCE (x $100?2:
Putrly CIP
runty non-CIP (e.g., fuel d
xte (e.g., SRF)
TOTAL: 1:1 Il $250
250
TOTAL: 11 11 $250
v
d
M,
mp
Waikoloa Rd
Mm
m
O
LOCATION MAP
C I P 2004-05
I*
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fi_eeal Year 2004 to 2005
EPARTMENT. public Works, Engineering Division DATE: 04/28/04
PROJECT/PROGRAM NAME: LA'ALOA EXTENSION '1O KUA1KIN1 HIGHWAY
OCA TION (attach map): Pahoehoe, North Kona, Hawaii TMIG 7-7-008: 030
COUNCIL DISTRICT: 7 AMOUNT REQUESTED: $1,050,000
PROJECTIT ROGRAM DESCRIPTION:
Design, acquire right-of-way and construct approximately 1,400 -feet of new 60 -feet wide road to extend the La'aloa Street from its present terminus to the Kuakini Highway,
approximately. Design/survey to be provode by a private consultant. Work will
ROJECTIPROGRAM JUSTIFICATION:
Provide a new mauka to maki connector from Alii Drive to Kuakini Highway to improve traffic circulation in this area of Kona.
IMPACT ON OPERATIONAL BUDGET.
Maintain and operate additional 1,400 feet of new roadway.
$1
Prior This FY
Funding 11 Request
FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-00 I To Completion I TOTAL:
and Acquisition 7501 1 1 1$750
esign/Survey 300 . on
& M COSTS (x $I
'IND SOURCE (x $
runty CIP
runty non-CIP (e.g.
zte (e.g., SRF)
TOTAL: 19 11 $1,050
TOTAL: 11 11 $1,050
l�JJ
J
•
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT.- Public Works, Engineering Division DATE: 04/28/04
KUAKIN1 HIGHWAY - AMI DRIVE CONNECTOR AT PUHA
LOCATION (attach map): Puaa 1 st, North Kona TMK: 7-5-009: 021 & 023
COUNCIL DISTRICT: 8 AMOUNT REQUESTED: $700,000
PROJECTIPROGRAM DESCRIPTION:
Design, acquire right-of-way and construct approximately 600 -feet of new 60 -feet wide road to establish a new collector road between Alii Drive in the vicinity of Oneo Bay to the
County owned portion of the Kuakini Highway. Work will include curbs, gutters and sidewalks, roadside drainage improvements, street lights and necessary intersection
improvements at both Alii drive and the Kuakini Highway.
ROJECT/PROGRAM JUSTIFICATION:
Provide a new mauka to maki connector from Alii :Drive to Kuakini Highway to improve traffic circulation in this area of Kona.
IMPACT ON OPERATIONAL BUDGET:
Maintain and operate additional 600 feet of new roadway.
Prior This FY
�APENDITURE (X $1000): 1 Funding IL Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-00 I To CoMpkaon TOTAL:
Planning 100 $100
and Acquisition 500 $500
Design/Survey 100 $100
Construction 800 "00
TOTAL: 11 11 $7001 $8001 1 1 1 1 1 $1
'e,!Ihakaeha Ave �
)ate```\ r'i�" t �-' ��l �`\ /��, /�1�� ''���...�.•.''� ��",J ��. �"!Q\ �.-L' ,�
lit
co
41,
•� cv � f � t •. fC` -., -1y • �..... �-� Vic' '�' I
��'` `>^� ,/ • !
•y � � �-.�•lr• r -f t ` +j ,,((�_ J �,Q*�-yYY , .-' "' \ 11 r
~``. 1' /(~'' ,, Y�.•. �' \ ; .J �� �`�`'f `C\ /s 'Y`e`er,(01,�'" `r?` j-'_ ;W-.� •� _..�^—'�-`'.__ ,�,.,J'`•, �� \ �'.-, .�•-. ��
ePla
1� (� ; � .r•�/ t ` tt %•y�4 _f. , �.,fa7 �^c " C � ;..� � y % - 15�.`''`i \� ,,,...�-•^. �._•^•^^'" �....--•w .....r'"} ...7 .. 'A,
Ip
A L C� ti �� llci W
?:7i � �/ �.� � ,,, �, ,�, 'tom �__•'�-' _-_- • � �-�--'..� �.� '��� ,:•��:�..g;-;� .�-� 1 �"
�; �J 4l Ar.�\`(�...h y.-?1.��3`—�.... �....J- `y`l�..,f �`�/''yYf/,/�}/♦��_ ��: ('{{''i"��� :- -11[' �..�` -•i!
(1 r/ j I�,,;l,
♦ "+ r �s�_.. �""= " n•\ C �` r+�i-.T^S7'i._1�-z. � / � i � ♦ , 1;` �� �... },-. •C.' �Z,'�.,1��.
inL_'Yt,* E3
�/•-.. „' ^ f �� , \..'..::%"-`S1, \`i�.._'1 \ f��.�, t f�,,7L y t y �' ,
r'
t ;
`` .'::J �-•�""- y._.._ .__.�........� ._ __.. �;.
h
•!` �`Z..."`� tis ♦� r�,....�-...__.._....._.....,_._..._..---- ...�..�, �� 1 � 1'�� �, f,� ----}
-� LOCATION MAP N
C I P 2004-05
625 1,250 2,500 3,750 5,00
et
ti r'''te � L '�Yi� �•...._SY..y
a
1
C7
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. public Works, Engineering Division DATE: 04/28/04
PROJECTIPROGRAMNAME: CONSTRUCTION OF RIGHT TURN LANES ON HINA LANI AND KAIMIN, TMK- 7-3-009:017,7-3-008:023,
LOCATION (attach map): Kaloko and Kalaoa, North Kona, Hawaii 7-3-029: 001, 7-3-049 : 001
COUNCIL DISTRICT: 8 AMOUNT REQUESTED: $2,000,000
PROJECTIPROGRAM DESCRIPTION.
Install right turn lanes at four different locations: 1) on Hina Lani St turning onto :Viamalahoa Highway, 2) on Hina Lani St turning onto Queen Kaahumanu, 3) on Kaiminani St
turning onto Queen Kaahumanu, and 4) on Kaiminani St turning onto Mamalahoa Highway. The lanes will be contained within the existing County right-of-way. The project include
design and construction of right turn lanes including grading, pavement widening, traffic signs and markings.
ROJECTITROGRAM JUSTIFICATION:
Add right turn lanes to increase the traffic capacity at Hina Lani and Kaiminani intersections at Queen Kaahumanu and Mamalahoa.. This will improve the overall flow of traffic in
IMPACT ON OPERATIONAL BUDGET:
Maintain and operate wider roadway and more roadway appurtenances.
IL Priori This FY
XPENDITURE (X $1000): Funding Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-00 I To C.mpka.- TOTAL:
esign/Survey 200 1 $200
Construction 1,800 $1,800
TOTAL: 11 11 $2,000
• Keahole St
a
_.. -......... _....::::.... ...
aal0le
AM
J 1, .. f y ZTT 'Q f
-. Z
j rr 1' r ; ___........_..................
far _ r
i ' ' : P. (TT ..
T . ` ..._—.
r J 1 ! !
t � ... W����r:.���.}�'. ._
!� J+ `. `! !`f i ? M� I i f _ . tµT` f' ; •tip�a~! ml 1f .
J T1ivl!co
j
'^yj,��.. tlTjTyka, J•,,� ' !.�(y1.. a.
14
{ � LU:-�, •:—:.s.:,i..i9
' co i 1 JJJ j i i .moi. /
_.,_; �...__ ! : - �_;x�.:. �;�.�_:.•.-c . .. �. -.;.L_-..rte=.:�_.. �-.�- � _,_,..._._.^.-.•-__
t -•..... , � „'=-1f.��t� '� �r •��1�� Z�. �. s. _ -?L` 5 C-r�+'•"S >.:r•'`�'`
1 (Q ^`�• � 1;:.• ��Zt��: rpt' �Ylir:. �! � ��y�v rS>}�[�.,,T-nV_.•� •'''� .. '
__ xij ' • O , G`�i.1j77�r:1t?7jF � j. a�'yt.. _ .� � "'�,� ; .. M 7.rri. :.a._" -7- ! `.._..._� .• 1,
fiEf...�:�.. ... .. ..::: i �1..• f>< � .. _yam-�-- .__..............
N'A
7
. t .
:
�....
. W.
Q ;
p..,ji
Right-< urn Lanes on Hina Lan' and Kaiminani '
Huliko a D•--
iLU.
LOCATION MAP
C I P 2004-05
i �t� 1..�----'' � �,....•--- 0 7001,400 2,800 4,200
t e
s
•
r�
L
County of Hawaii
PROJECT DATAITINANCIAL IMPACT STATEMENT
Fivral ` oor anoa t., arms
DEPARTMENT. Public Works, Engineering Division DATE: 04/28/04
ROJECTIPROGRAMNAME: LEFT TURN POCKET ON ROUTE 190 INTO ROUTE 181) (N'1ANIALABOA 111G"N%'AV)
LOCATION (attach map): North Kona, Hawaii TAIK . 7-4-06
COUNCIL DISTRICT. 8 AMOUNT REQUESTED: $1,000,000
PROJECT✓PROGRAM DESCRIPTION:
Design and construct a left turn pocket on Route 190 to channel traffic turning into Route 180. State DOT design requirements will be followed for improvements within the State
DOT jurisdiction. Work will include roadway widening, asphalt concrete paving, roadside drainage improvements, retaining walls, guardrails and pavement signing and striping.
ROJECT/PROGRAM JUSTIFICATION:
To improve the movement of traffic through the Route 190 / Route 180 (Mamalahoa Highway) intersection.
IMPACT ON OPERATIONAL BUDGET.
Maintain and operate wider roadway and more roadway appurtenances.
1��ENDITURE (X)Prior II This FYI � $1000: Funding Request FY OS -06 FY 06-07 FY 07-08 FY OS -09 FY 09-00 To can tenon TOTAL:
esignISurvey 1 11 200 1 1 1 1 1 1 1$200
Construction 800 $800
& Maintenance
11 TOTAL: 11 11 $1;0001 1 1 1 1 1 1 $1,00011
& M COSTS (x $I
CIP
non-CIP
g., SRF)
E
$1
11 TOTAL: 11 11 $1,0001 1 1 1 1 1 1 $1,00011
j} ti
_, � , � � �.`��*•` 4 ��... ;{ LED T
` �..' � I ,
T_
. ..... . .....
x,
ICU! ON
�tAl
co ! -44,...........
��9�
it
..! r,
r '
kk
1p
1 t r; C�,y�`���� ...j ...—..w�–• tti �"."�^�,l i ,r`i�,.,.�1 i,h �.�1 � i��l�.•,"%'`'.�
` .. .�---' left-Tu`rn Poeket at Palani Junction
kk
Nt
y.
�,/`� %j \�.j `� ,-•--�.✓ J � ',-,^''-'ter'
r , t
�•,_ tom. �..-•--.�—�'•^'_,• r i,. `y`� ✓�✓�..� �^�r,�,.� .'�'. �� y�
itr•=-' '- 1 t 1 ✓� i y `; s"'i'-ter
.%, .,.,� tiS ti <. � � . �..5_�.--.r • T '_t r.Y'� ` � � tt � Y >..,--^"'...--t'.'�' � `r.- 1 �,,.--� t t
.. ...../`�........._.f"i- �� /1 � �..t---tL..a.-io*:_�4r�. Lam...._.. -k-''.., f _ i �„".�-'l„�•.,,,"„`^ �l \ ` - }t! .
.r>7f�Qa�af` LOCATION MAP N
r\ -: .
n �u .sem r t l C I P 2004-05 W E
'( r
�'�,.� �`,•. r.'t may' ! ��� �� !`
f �✓ t i < i ry
t �
550 1,100 2,200 3,300 4,400
tion Ow- t
Ll
County of Hawaii
PROJECT DATAITINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Public Works, Engineering Division DATE: 04/28/04
ROJECTIPROGRAMNAME: LEFT TURN POCKET ON PAi,ANI ROAD INTO KAMAKAEHA STREET
LOCATION (attach map): Keahuolu, North Kona, Hawaii TMK. 7-4-008
COUNCIL DISTRICT: 8 AMOUNT REQUESTED: $1,000,000
PROJECTIPROGRAM DESCRIPTION:
Design and construct a left turn pocket on Palani Road to channel traffic turning into Kamakaeha Street. Work will include roadway widening, asphalt concrete paving, roadside
drainage improvements, retaining walls, guardrails and pavement signing and striping.
ROJECTIPROGRAM JUSTIFICATION:
To improve the movement of traffic through the Palani Road / Kamakaeha Street intersection.
IMPACT ON OPERATIONAL BUDGET:
Maintain and operate wider roadway and more roadway appurtenances.
$1000: Prior g 1I Req FY
Request Re uest FY OS -06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-00 I To Completion TOTAL:
DesignISurvey 200 1 1 1 1 1 1 1 $LUu
construction 800 $800
& Maintenance
11 TOTAL: 11 11 $1,0001 1 1 1 1 1 1 $1,00011
& M COSTS (x $1
County CIP 11000 $1,000
County non-CIP (e.g., fuel tax)
State (e.g., SRF)
11 TOTAL: 11 11 $1,0001 1 1 1 1 1 1 $1,00011
� `1' rte,,.-' ,r•'" � ,�
�\ Left-Turn Pocket; =P�Iani to Kamakaeha
t .
r " /
tir LOCATION MAP
C I P 2004-05 "
200 400 800 1,200 'x,600
Feft
•
C�
County of Hawaii
PROJECT DATAITINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Public Works, Engineering Division DATE: 04/28/04
ROJECTIPROGRAMNAME: AHIAHI-ll{AURALE STREET CONNECTOR
LOCA TION (attach map): Honokohau, North Kona, Hawaii TALK. 7-3-010: 036
COUNCIL DISTRICT: 8 AMOUNT REQUESTED: $500,000
PROJECTIPROGRAM DESCRIPTION:
Design, acquire right-of-way and construct approximately 300 -feet of new 50 -feet wide road to establish anew connection between Ahiahi Street and Kauhale Street.
JUSTIFICATION.
a new road connection to improve traffic circulation in this area of Kona.
ON OPERATIONAL BUDGET.
and operate additional 300 feet of new roadway.
Prior This FY
[VXPENDITURE (X $1000): Funding Request FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-00 To Completion TOTAL:
Planning 30 $30
and Ac uisition 110 $110
esign/Survey 50 1 $50
!'anwrurtion 310 1 $310
pair & Maintenance
TOTAL: � $500
& M COSTS (x $1000):
_Ir
ND 2R
0):
�_CEx100
?Unty CIP 500
?untp non-CIP (e.z., fuel tax)
TOTAL: 11 11 $500
.. ........
V.I-rf F! ;l'_
.... ......
.... ... .... . ...... IF71 T-- 7-1
V7
........ ..
TFT""I
la.St-
I ... .... i j ...........
...
r'S
-- -------- oa
T_
T
57
7
-r-r-r-
43-- -)--L - i It.- j I
--I �-A (-- J 1 .rt -../I
cu�!
90'
Mat
P I
T
A,
7-1
LOCATION MAP
CIP 2004-05
......... 1-
20 =I
5 410 820 1,230'-(5—T, 34 F
0
'eet
I
County of Hawaii
PROJECT DATAITINANCIAL LVPACT STATEMENT
Fiscal Year 2004 to 20/15
DEPARTMENT: Public Works, Engineering Division DATE. 04/28/04
PROJECT/PROGRAM NAME: MAMALABOA 1 GHWAY IMPROVEMENTS AT 14ONAL,O, KAINALIU, KEALAKEKUA & CAVI'. COOK
LOCATION (attach map): North & South Kona TMK: 7-9 & 8-1
COUNCIL DISTRICT: 7 AMOUNT REQUESTED: $900,000
PROJECE PROGRAM DESCRIPTION:
Provide a turning lane at various locations at Honalo, Kainaliu, Kealakekua and Captain Cook Villages by removing on -street parking. Work to include ADA upgrades, removal of
barriers, eradication of parking stalls, driveway and utility adjustments. Land acquisition may be required at various locations where there is insufficient right-of-way.
ROJECT/PROGRAM JUSTIFICATION:
Turn lane willl improve traffic circulation in this area of Kona.
IMPACT ON OPERATIONAL BUDGET:
Operate and maintain additional lane of traffic.
EXPENDITURE (X $1000): Funding Request I FY 05-06 1 FY 06-07 I FY 07-08 I FY 08-09 I FY 09-00 I To Completion I TOTAL:
Tanning 100 $100
Land Acquisition 500 $500
Design/Survey 300 $300
Construction 3,500 $3,500
•
1
County of llawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004to 2005
DEPARTMENT. Public Works, Engineering Division DATE: 04/26/04
ROJECT/PROGRAM NAME: IIIENALOL,I EXTENSION CORRIDOR STUDY
LOCATION (attach map): North Kona, Hawaii TMK.
COUNCIL DISTRICT: 8 AMOUNT REQUESTED: $1;700,000
ROJECTIPROGRAM DESCRIPTION:
:Develop alternative alignments for the extension of Hienaloli road to Palani Road. Prepare appropriate environmental documents and prepare a preliminary engineering report.
ROJECT/PROGRAM JUSTIFICATION:
aar les aatall seC -
south direction without having to go onto Kuakini and Queen Kaahumanu.
IMPACT ON OPERATIONAL BUDGET.
[EXPENDITURE (X $1000): Funding I Request i FY 05-06 I FY 06-07 I FY 07-08 FY 08-09 FY 09-00 To Completion I TOTAL:
Planning I : 1 11 1,7001 1 1 $1,700
& Maintenance
11 TOTAL: ]1 11 $1,7001 1 1 1 1 1 1 $1,70011
& M COSTS (x $1
County CIP� 1,700 j $1,70011
County non-CIP (e.Q.. fuel tax)
TOTAL: 11 11 $1,700
•
00
Feet
County of Hawaii
PROJECT DATAITINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Public Works, Engineering Division DATE: 04/28/04
PROJECTIPROGRAMNAME: KAMAN[ STREET EXTENSION TO 1KEALAIKEHE PARKWAY
LOCATION (attach map): Honokohau, North Kona, Hawaii TiVK. 7-4-051: 060, 7-4-008: 013 & 026
COUNCIL DISTRICT. 8 AMOUNT REQUESTED: $800,000
PROJECTIPROGRAM DESCRIPTION:
Design, acquire right-of-way and construct approximately 2,700 -feet of new 60 -feet wide road to establish anew major collector road between Hina Lani and Kealakehe Parkway
parallel to the Queen K Highway. Work will include paved shoulders and swales, roadside drainage improvements, street lights.
ROJECTIPROGRAM JUSTIFICATION:
Provide a new road between Hina Lam and Kealakehe Parkway parallel to Queen K highway to improve traffic circulation in this area of Kona.
IMPACT ON OPERATIONAL BUDGET.
Maintain and operate additional 2,700 feet of new roadway.
EXPENDITURE (X $1000): Funding I Request FY 05-06 I FY 06-07 I FY 07-08 4 FY 08-09 I FY 09-00 I To Completion TOTAL:
Planning 250 $250
and Acquisition 2501 $250
Desien/Survev 300 $300
& Maintenance
11 TOTAL: II II $8001 $2,2001 1 1 1 1 1 $3,00011
10 & M COSTS (x $1000):�
FUND SOURCE x 1000
County CIP 800 2,200 $3,000
County non-CIP (e.Q., fuel tax)
11 TOTAL: 11 11 $8001 $2,2001 1 1 1 1 1 $3,00011
Right -Turn Lanes on Hina Lan' i and Kaiminru
..
KamanLf Stre$t `xtens on to Keahakehe Pkway
old
Left -Tu,.,.- 'ok at Pala
..........
t—
f 1 t� Lili 'ni Collector
1 �
LOCATION MAP N
C I P 2004-05
W E
S
0 950 1,900 3,800 5,700 7,61
County of Hawaii
PROJECT DATAITINANCIAL IMPACT STATEMENT
Fiscal Year 2004to 2005
DEPARTMENT: Public Works, Engineering Division DATE: 04/26/04
KEAIIOLY TO KAILUA PLANNING STUDIES: KEANALEHU EXTENSION TO PALANI, KEALAKEHP PARKWAY
PROJECT/PROGRAM NAME: ROAD
LOCATION (attach map): Kealakehe & Keahuolu, North Kona, Hawaii TMK. 7-4-008,7-4-020:010&022
COUNCIL DISTRICT: 8 AMOUNT REQUESTED: $2,000,000
ROJECT/PROGRAM DESCRIPTION:
:Develop alternative alignments for the extension of Keanalehu to Palani road and the extension of Kealakehe Parkway to the extension of Kealakaa Street. :Prepare appropriate
environmental documents and prepare a preliminary engineering report to establish design parameters for the selected alternatives.
PROJECT/PROGRAM JUSTIFICATION:
Detailed planning studies will set a Me. -1.gnmont. Theso 1w;ridom would p;ovidc connecti,on.s that would alleviate some 12-lani Road and Queen Kaahllmanu traffic, -ad
provide emergency bypass options for segments of Palani and Queen Kaahumanu should these segments close for any reason such as accidents.
IMPACT ON OPERATIONAL BUDGET:
$1000): II Funding II Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-00 I To Completion I TOTAL:
& Maintenance
TOTAL:
o & M COSTS (x $1000): 1 �_
xc ••• c::a•--•c w.cccccc• ccc cttc c ccs ccs caccccccxcccr"
4 4 - K-44 m4. ..-4... �v. .4.. .4...
...�......,.,c;s,L.,,.i,..........:.°.....,..., ,{.},°is..:::::::::.::r;.} ;`;4.`i. v..?.i}.;..�::�.���:.:.:,;y..�:::::.•;.�. .�. 22P3..,i...
FUND SOURCE x 1000: _
( )
2 000 .,,,.....�2�000
County CIP $ ,
County non-CIP (e.g., fuel tax)
St'
(e g., SRF) 11 11
TOTAL:
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2004to 2005
DEPARTMENT: Public Works, Engineering Division DATE: 04/26/04
PROJECTITROGRAMNAME: KUAKINI HIGWAY - MERGE LANE SOUTH OF HUAI_.ALAI ROAD
LOCATION (attach map): Hienaloli, North Kona, Hawaii TMK. 7-5-008
COUNCIL DISTRICT: 8 AMOUNT REQUESTED: $1,000,000
PROJECTIPROGRA.M DESCRIPTION.
This project will provide a long southbound merge lane south of Kuakini highway/Hualalai :Road intersection to accommodate the future through and a through -right southbound
lanes north of the intersection. Work will include roadway widening, asphalt concrete paving, roadside drainage improvements, grade adjustment/retaining walls, relocation of utilities
and pavement signing and striping.
PROJECTITROGRAM JUSTIFICATION:
To improve the movement of traffic through the Kuakini Highway / Hualalai Road intersection.
IMPACT ON OPERATIONAL BUDGET.
Maintain and operate wider roadway and more roadway appurtenances.
(X$1000): 11 Funding 11 Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-00 I To Completion I TOTAL:
IV?esignISurvey 200 1 $200
Construction 800 $800
& Maintenance
11 TOTAL: 11 11 $1,0001 1 1 1 1 1 1 $1,00011
O & M COSTS (x $1000):
FUND SOURCE x 1000
County CIP 1,000 $1,000
County non-CIP (ex., fuel tax)
11 TOTAL: 11 11 $1,0001 1 1 1 1 1 1 $1,00011
•
•
Puia Rd
�o
Makalauna PI
tp.
Kuakini Hwy-
Merge Lane Sof Hualalai
o- Qa
St
�. Pume�ara
S
use
�uraP
Go
\-odd "
o
o
.L
.
.....
.._ _.
d c�
'10 PI
Dr
Ka�oW
G
G.
o�
v,.
o
O N
dy
O
St
a
o
o o
, ...
a\Qo\�o
v
Va� N
ea\ora
,� o
S
v
LOCATION MAP
I
�a�a
o
J�
-o
-� wikolia St
�Gid
C I P 2004-05
r
— —
wKalamauka
St
� Cf)
0 5501,100 2,200 3,300
4,400 �
%,�� o
Fee.
a
•
•
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fi.cral Year 2004to 21)05
DEPARTMENT. Public Works, Engineering Division DATE: 04/26/04
ROJECT/PROGRAM NAME: 1KONA DIKE AND PEDESTRIAN IMPROVEMENTS
LOCATION (attach map): North Kona, Hawaii TMK.
COUNCIL .DISTRICT. 7 & 8 AMOUNT REQUESTED: $320,000
PROJECTIPROGRAM DESCRIPTION:
Study, design, and construct improvements to encourage increased bicycle and pedestrian travel within a "bike shed" zone that is topographically suitable for ordinary users.
PROJECT/PROGRAM JUSTIFICATION:
Safe bicyc a an jiedestrian routes wrt irn or separate roan roa 1)'g iso way will ho pe u y avert some ve rcu ar trave to rionve icu ar moes to a ev3ate some a ic.
IMPACT ON OPERATIONAL BUDGET.
EXPENDITURE (X $1000): k Funding g11 Request I FY 05-06 FY 06-07 I FY 07-08 I FY 08-09 I FY 09-00 To Completion I TOTAL:
Plaraniri� I 30 $30.
J�DesigtjlSurvey 11 75 1 1 1 1 1 1 1$75
Construction 1 11 215 1 1 1 1 1 1 1
TOTAL: 11 it $320
& M COSTS (x $1000): �� M
r ---
1jND SOURCE x 1000
( : )
runty CIP 320
runty non-CIP (e.g., fuel tax)
TOTAL: 11 11 $320
Coun(y of Hawaii
PROJECT DATAITINANCIAL IMPACT STATEMENT
Ficral Voar 2004 to 21)05
DEPARTMENT. Public Works, Engineering Division DATE: 04/28/04
PROJECTIPROGRAMNAME: 1VIANIALAHOA HIGHWAY - KAWAIHAE ROAD CONNECTOR
LOCATION (attach neap): South Kohala, Hawaii TMK. 6-6-001:010&038,6-6-005:027
COUNCIL DISTRICT. 9 AMOUNT REQUESTED: $1,500,000
PROJECT,PROGRAM DESCRIPTION:
Construct a connector road between the Mamalahoa Highway by Lalamilo Farm Lots and the Kawaihae Road by the County Baseyard including a bridge at the Waikola Stream
Crossing and channelization improvements at both ends. The entire length of road is approximately 9000 feet long. Due to limited funding, this road will have grassed shoulders,
minimal roadside drainage facilities, and a reduced pavement thickness,
ROJECTIPROGRAM JUSTIFICATION:
The connector road will provide an alternate route from Kawaihae Road to Mamalahoa Highway that will bypass the congested Waimea Town area for north bound traffic.
IMPACT ON OPERATIONAL BUDGET.
Operation and mintenance costs will be much higher than usual as the pavement will not be able to wuthstand heavy truck traffic nor will there be sufficient drainage improvements.
EXPENDITURE
(X$1000): Funding 11 Request FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-00 To Complexion TOTAL:
Planning 250 $250
and Acquisition 500 $SOQ
esien/Survev 750 $750
11 TOTAL: 11 11 $1,5001 $8,5001 1 1 1 1 1 $10,00011
� � r
/�.............................
`"--
t
I ~ r \
r'
lit r`-'
AS
u. T:'� ��R,�"'..T,_,_\-�,....,�.� _i�(.I.L �.i �t �ys(,�� i "`�,t�� �,� \ � ,.� ��l• �.
F �, / l "'r''"• S( }I(.�" ..n"� �i `� r �-� I I 1 i �c "C � �' � '�. 7. ,J:'
J1it r'7 �•A ?' Cr,
Waimea Bypass C n Acfia aKalarr.
71 N -I
a > f
F �
,t
...�\ ;tet � •� � " ,�" J�/ter �.. _---.. F � ...,��� ..1"_.. % �� / / ri
�.J---•"'"!rte `� '` � 1.
4_.•,�-" -- ,/ _ g LOCATION MAP
0
13 CIP 2004-05 W E
S
cu
0 800 1,600 3,200 4,800 6,400Feet
! i
i
•
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Ficral Year 2004 to 2005
DEPARTMENT. Public Works, Engineering Division DATE: 04/28/04
PROJECT/PROGRAM NAME: REALIGNMENT OF POKHONS OF HIGHWAY 137
LOCATION (attach map): Puna, Hawaii TMK. 1-3
COUNCIL DISTRICT: 5 AMOUNT REQUESTED: $2,000,000
PROJECTIPROGRAM DESCRIPTION:
Realignment of two sections of Highway 137. Total length of realigned road is approximately 2,500 lineal feet. The typical section will consist of twenty feet wide pavement with
four feet gravel shoulders on each side.
PROJECTIPROGRAM JUSTIFICATION:
Current sections of roadway are being inundated and damaged during periods of high surf. This project will relocate the existing roadway further inland to provide a safe and passable
.0"tng-these-p Ti.odsofhigh surf
IMPACT ON OPERATIONAL BUDGET:
This project will reduce the operational costs since repair activities for these sections of roadway during periods of high surf will be eliminated.
(X $1000): II Funding 11 Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-00 I To Completim I TOTAL:
and Acquisition 150 $150
Design/Sarvey 390 $390
Construction 1,850 $1,850
Purchase of Equipment
[Repair & Maintenance
TOTAL: $390 $2,000 $2,39011
& M COSTS (x $1000):
YND SOURCE (x $1000):
non-CIP (e g., fuel tax)
390
TOTAL: 11 $39011 $2,000
LOCATION MAP N
CIP 2004-05 W E
\ Z. 0 280560 1,120 1,680 2,240
y Feet
•
•
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiera[ Year 2004 to 2005
DEPARTMENT. Public Works, Engineering Division DATE: 04/28/04
ROJECTIPROGRAMNAME: DRAINAGE IMPROVEMENTS - PUNA EMERGENCY ACCESS ROAD IN HAWAIIAN ACRES
LOCATION (attach map): Kurtistown, Puna, Hawaii TMK. 1-7-007
COUNCIL DISTRICT. 6 PEAR $2,000,000
ROJECTTRROGRAM DESCRIPTION.
Design and construct various drainage improvements, including roadway culverts, along Puna Emergency Access Road. Design/survey to be provide in-house. Work will include a
culverts, headwalls, drainage swales, drop inlets, and other drainage improvements on the Hawaiian Acres side of the Puna Emergency Access Road.
ROJECTIPROGRAM JUSTIFICATION:
The existing road is easily damaged by flood waters due to the lack of drainage systems. This defeats the purpose of the emergency road because it is rendered impassable by flood
lx .}� st xa'ati�ld ri e dsauu impTA�e axa(17IS�t� lxxt9$Ertthe the, m2d and x ithin the mad
IMPACT ON OPERATIONAL BUDGET.
This project will reduce future maintenance costs of repairing a portion of the Puna Emergency Access Road after heavy flooding. The project will greatly decrease the chance of
major roadway damage.
$1000): II Funding !I Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-00 I To Comptedon I TOTAL:
Design/Survey 100100 1 1 1 1 ] 1 1 $1001
Construction 1 11 1.900 1 1 1 1 1 1 1 $1,900
TOTAL: 11 11 $2,000
& M COSTS (x $1000):
County CIP 2,000 $2,000
County non-CIP (e.g., fuel tax)
State (e.g., SRF)
TOTAL: 11 11 $2,000
r-
1
L
•
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fieral Voar 21)1)4 to 2065
DEPARTMENT. Public Works, Engineering Division DATE: 04/28/04
PROJECT/PROGRAMNAME: SIGHT DISTANCE IMPROVEMENTS - PUNA EMERGENCY ROAD ON AINAi,OA DRIVE
LOCATION (attach map): Makuu, Puna, Hawaii TMK. 1-6-099
COUNCIL DISTRICT: 5 AMOUNT REQUESTED: $1,500,000
PROJECTIPROGRAM DESCRIPTION.
Reconstruct sections of the Puna Emergency Access Road (specifically on Ainaloa Drive) to remove stretches with limited sight distance. Work includes removal of existing sections
of roadway, grading, and placing of new base course and pavement. Shoulders and swales may be added where deemed necessary for safety.
ROJECT/PROGRAM JUSTIFICATION.
The existing Ainaloa Drive, which is part of the Puna Emergency Access Road, has several stretches with limited sight distance. This project will cut down hills and even out the dips
sight distam-ar
MPACT ON OPERATIONAL BUDGET.
This project will reduce the required maintenance of the Puna Emergency Access Road by replacing portions of the old pavement with new pavement. Also, the pavement section will
e designed to withstand the anticipated traffic condition, which might not have been the case when the road was originally built.
11EXPENDITURE (X 51000): Prior This FY
Funding Ii Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 I FY 09-00 1 To Completion I TOTAL: �I
esign/Survey 100 1 $100
Construction 1,400 $1,400
& Maintenance
TOTAL: II 11 $1,500
& M COSTS (x $1
County CIP� 1,500 $1,500
County non-CIP (e.g., fuel tax)
TOTAL:
l ` pej
`
\
0 �
•
•
Vs
p QTji
a
5
�
� o
''
% : _
��O r
v ka LOop
o��,
wr
ov
Z
C°
��o d
o.
�.�
O
L
Puna Emergency Access Rd lm;r�rvm`6,n�t°�� IQm
O,.
a
G G/o
�
0
o ..
o^ 'a
•
•
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fiscal Year 2004 to 2005
DEPARTMENT. Public Works, Engineering Division DATE: 04/28/04
ROJECTIPROGRAMNAME: P01101 KI PARK BYPASS
OCA TION (attach map): Puna, Hawaii TMK: 1-3-008 & 1-4-002
COUNCIL DISTRICT: 5 AMOUNT REQUESTED: $2,000,000
PROJECT!PROGRAM DESCRIPTION:
Construct a new road from the Pohoiki Road/Highway 137 intersection heading east (towards Kapoho) to bypass the section of raodway that is currently being inundated during high
tide.
ROJECTIPROGRAM JUSTIFICATION:
This bypass road will provide a new road that will not be affected by the tide or high seas. It will also move the traffic away from the Pohoiki park.
MPACT ON OPERATIONAL BUDGET.
This project will reduce the operational costs since repair activities for this section of roadway since the negative effects of water inundation will be eliminated.
jkX ENDITURE (X $1000): Funding 1I Request I FY 05-06 FY 06-07 I FY 07-08 FY 08-09 FY 09-00 To Completion TOTAL: �I
lannine 150 $150
1�esignlSurvey 300 $300
Construction 1,500 $1,500
.pair & Maintenance
TOTAL:
& M COSTS (x $1000):
'jND SOURCE (x $1000):
runty CIP
runty non-CIP (e.g., fuel tax)
xte (e.g., SRF)
,deral
ivate
TOTAL:
_.. - ......__...__.._ .._..._.._—_.-_......
A
€o
CD
l0,
CL}
Pohoiki Bypass
Isaac �H�:,c Beach Park `Development
LOCATION MAP N
C I P 2004-05
W E
0 5501,100 2,200 3,300 4,400 s
Feet
•
•
TOM BRO =.-.TRATOR
County of Hawaii
PROJECT DATAIFINANCIAL IMPACT STATEMENT
Fi.eral Year MUM 2005
DEPARTMENT. Public Works, Engineering Division DATE: 04/26/04
PROJECTIPROGRAMNAME: WEST HAWAII AND PUNA TRANSIT FACILITIES
LOCATION (attach map): North Kohala, South Kohala, North Kona, South Kona & Puna, Hawaii TMK.
COUNCIL. DISTRICT: various AMOUNT REQUESTED: $480,000
PROJECTIPROGRAM DESCRIPTION.
Purchase buses of various sizes (l8 -passenger, 33 -passenger, 45 -passenger), and develop two park/ride facilities for Kona and one for Puna.
ROJECT/PROGRAM JUSTIFICATION:
County matching funds would leverage $2.4 million committed federal special purpose grant funds to provide additional commuter routes (using the larger buses), to add feeder bus
, hoarrtraffic. fm Rona t1nJrarMride 14WHLY.
would alleviate some traffic along Mamalahoa through Honalo, and a proposed park/ride facility at the Old Kona Airport would alleviate traffic along Queen Kaahumanu between
Ralani and the aimoil.
IMPACT ON OPERATIONAL BUDGET.
The additional operational costs (e.g., repair, maintenance, fuel) will be partially funded by the proposed increase in the vehicular weight tax.
(N Prior � IL
This FY
EXPENDITURE $1000): Funding Request I FY 05-06 I FY 06-07 I FY 07-08 I FY 08-09 FY 09-00 To Completion TOTAL:
Pla44ing 100 $100
11
& Maintenance
& M COSTS (x $10
YNVD SOURCE (x $1
Panty CIP
Panty non-CIP (e.g.,.
rite (e.g., SRF)
TOTAL:
TOTAL:
200
500
480
2,400