Laserfiche WebLink
9 <br /> P <br /> 1 <br /> l.3 Pmiect n ecri to ion <br /> Except far the connector lot mentioned above ;a distance of approximately (,500 Ceet), <br /> the road already exists. The project would widen, pave and otherwise improve the road as <br /> appropriate to meet the following standards: <br /> o Two paved 8-foot travel lanes, with center stripe; <br /> o Two paved 2-foot shoulders, striped for separation from travel lanes; <br /> 0 2-inch AC pavement; <br /> o Sight distance appropriate to 25 MPH road. <br /> Alt surfacing on the existing roads would be done over compacted base course that •.vas <br /> installed about 30 years ago and has become overgrown from lack of maintenance. Tfre <br /> <br /> ' new section on the connector lot would require grading and a base course in addition to <br /> paving. Because this section is an entirely new road, slightly higher standards requiring 20 <br /> feet of paved lanes, 6-foot shoulders, and Z-inch AC pavement over 4 inches of base <br /> course with 6 inches of sub-base (if necessary) will be applied. <br /> Most road work would take place in Hawaiian Acres and in the connector lot, because <br /> Ainaloa Blvd. currently meets the above standards in most places and requires only minor <br /> widening and striping. Ainaloa Blvd and much of Road 8 (approximately 60 percent of <br /> the total route) are already paved. <br /> Several sections of the road require safety modifications in order to meet minimum sight <br /> distance safety requirements. Because the roads are all straight, no adjustment of <br /> horizontal alignment is necessary. Blind hills impair sight distance in several locations, <br /> which will be improved mostly through placement of fill. Avery limited area of cutting is <br /> required. <br /> The road would have a posted speed limit of 25 MPH. <br /> A County Capital Improvement Fund of $1,000,000 has been authorized to bring the <br /> route up to County emergency standards. These funds can only be applied after the <br /> County acquires ownership of the road. <br /> <br />