Laserfiche WebLink
<br /> Environmental Management Budget Review <br /> March 3Q, 2005 <br /> Page 7 of 8 <br /> Large Capacity Cesspool Replacement Projects: <br /> • Ka'u (Na alehu/Pahala) - Includes plantation camps from C. Brewer, State housing <br /> and ILWU elderly housing, a few churches and some small commercial buildings. C. <br /> Brewer funding established to cover cost of connecting each resident already connected <br /> to new sewer system. County to cover design and new sewer construction. M&E <br /> reported to EPA a design completion date of 3/1/06. <br /> • Kea au - 9-1/2 mile camp will utilize existing lines, installing a septic tank to be <br /> maintained by COH. Project to be tied with the Ka'u and Honoka'a projects and will <br /> be a supplement to existing Building Division Contract. No design completion date yet. <br /> • Honoka' a - COH to assume operation of hospital system while connecting County park <br /> and others in proximity. No design completion date. <br /> • Queen Li1? uokalani Village Sewer System -Includes County owned/operated Village, <br /> two public schools, a State housing project and other smaller properties will ultimately <br /> connect to existing County sewer. Wastewater contracting with Belt Collins for a study <br /> (as reported to EPA, complete design by 9/01/06). State Revolving Fund Application: <br /> Approx. $SM for construction requested. GO bonds appropriation of $300k (Ordinance <br /> No. 03-90). Requesting additional $SOOk via Council action 3/15/05. Total of $800k <br /> required for study and design. <br /> • Komohana Heights Sewer Extension (Cesspool conversion project) -County <br /> owned/operated. M&E in progress on design. State Revolving Fund Application: <br /> Appropriated amount: $2M (Ordinance No. 03-155). <br /> • Banyan, Kolea, and Onekahakaha Sewage PUmping Station Injection Wells - <br /> abandonment of large capacity cesspools used as overflow pits. Wastewater will do <br /> design work in house. <br /> Improvement District Projects: <br /> • Puainako - KTA and Puainako Town Center own large capacity cesspools. Akinaka <br /> doing implementation study. Assessing limits of Improvement District. Provides <br /> potential to reach capacity at Hilo Wastewater Treatment Plant. <br /> • Kilohana -Private subdivision within reasonable distance of sewer lines. Wastewater <br /> looking to connect Kilohana, by extending sewer along Ahi Drive. Wastewater <br /> contracting for Implementation Study with Engineering Concepts. <br /> • North Kona - Costco has the only large capacity cesspool in this area. This <br /> Improvement District has been discussed for some years. It is a key improvement for <br /> protecting our near shore waters as well as ongoing commercial development in West <br /> Hawaii. Implementation Study being executed with SSFM. <br /> 13. What is the status of account receivables? <br /> The accounts receivable over 90 days currently makes up 54% of the total accounts <br /> receivable for the Wastewater Division. Concentrated efforts are continuing to improve <br /> the collection of outstanding Wastewater charges. The efforts include conversion to new <br /> Hawaii County is an equal opportunity provider and employer. <br /> <br />