Laserfiche WebLink
<br /> SORT STATION AND HILO TRANSFER STATION CIP FUNDING <br /> Fundin 04-05 05-Oli 06-07 07-08 <br /> Desi n Construction 4,000,000 4,000,000 3,500,000 3,000,000 <br /> PHASE 12003 Fundin $4M <br /> Site re and utilities 1,623,500 Mobilization; site preparation (clearing and <br /> Structures-public recycling, bottle bill grubbing, excavation, backfill, grading); utilities <br /> redem tion 515,000 (septic, storm sewer, water with fire main); <br /> Mechanical and electrical 50,000 power; roadways and parking; fencing; <br /> SORT PH I SUB-TOTAL 2,188,500 landscaping; and signage for the public <br /> General conditions at 7% 153,195 recycling center (canopy, lighting, retaining <br /> Contin encies at 10% 218,850 `Falls); commercial recycling processing <br /> SORT PH I TOTAL 2,560,545 area; and bottle bill redemption building. <br /> PHASE II 05-06 Re uest $4M <br /> Utilities 170,000 Mobilization; site preparation (clearing and <br /> Site Pre 511,000 grubbing, excavation, backfill, grading); <br /> Internal Roads, sidewalks 125,000 utilities (septic, storm sewer, water with fire <br /> Fencin , landsca in , si na a 20,000 main); power, roadways, parking, sidewalks, <br /> Sort Station FOGS collection ba 10,000 100,000 fencing, landscaping; and signage for the <br /> Re-load buildin 2,153,000 scale house/scales; re-load building; FOGS <br /> Staff facilities 105,000 (fats, oils, greases) collection; scrap metal <br /> Scale House and its 166,000 area remediation (phase A); geenwaste <br /> Scales 210,000 yard remediation; 8r abandoned vehicle <br /> Abandoned vehicle im ound and 25,000" impound yard from vehicle disposal <br /> Scrap metal processing remediation, fund). <br /> site re ,PHA 100,000 <br /> Greenwaste rocessin remediation 60,000 <br /> SORT PH II SUB-TOTAL 3,730,000 <br /> General conditions at 7% 261,100 <br /> Contin encies at 10% 373,000 <br /> SORT PH II TOTAL 4,364,100 <br /> SORT PH I AND PH II TOTALS 6,924,645 <br /> PHASE III 06-07 Re nest $3.5M Establish access road (Ammunition Road) <br /> Ammunition Road & Ri ht of Wa 100,000 1,400,000 subdivision and right-of-way; construct reuse <br /> Reuse and Education Center 50,000 350,000 and education center; household <br /> HHW ermanent collection site 50,000 hazardous waste permanent collection <br /> Construction & Demolition debris site; construction and demolition debris <br /> recove 50,000 1,000,000 recovery yard. <br /> SORT PH III SUB-TOTAL 3,000,000 <br /> General conditions at 7% 210,000 <br /> Contin encies at 10% 300,000 <br /> SORT PH III TOTAL 3,510,000 <br /> PHASE IV 07-08 Re UeSt 3M Remediate scrap metal recycling yard; and <br /> Scra metal rec clin and 50,000 1,500,000 construct scrap metal recycling yard as <br /> Scra metal remediation, Ph B 250,000 1,400,000 mandated by HAR 11-58-1-65 and required by <br /> SORT PH IV SUB-TOTAL 2,900,000 DOH permit. <br /> General conditions at 7% 203,000 <br /> Contin encies at 10% 290,000 <br /> SORT PH IV TOTAL 3,393,000 <br /> Revised 5/17/05 <br /> H iIoTSSiteProjectsDescriptions05051.x1s <br /> <br />