My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0492.007 1996-1998
ClerkCouncil
>
Council Records
>
Communications
>
1996-1998
>
COM 0492.007 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2008 3:00:17 PM
Creation date
5/10/2008 7:56:55 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
1996-1998
Communication
0492
Point
007
Author
Jerry Y. Haruno, Environmental Health Program Manager Noise, Radiation and Indoor Air Quality Branch, State Dept. of Health
Communications - Referred To
COUNCIL
Comments
Presented: Council - 12/3/97
Communications - File Code
FND/OPR
Document Relationships
AGE COUNCIL 12/03/1997 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Council
COM 0492.000 1996-1998
(Related)
Path:
\Council Records\Communications\1996-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.,02:97 1J:51 F_~S 80858858ll _dSPF.STVS OFFICE <br /> 00.1 <br /> tKaurice A. Richard, sawaii Regional <br /> Development Hanager <br /> octobet 3, 1989 <br /> Page 13 <br /> 23. The permittee shall notify the Planning Department and <br /> any resident within 3500 feet of the permittee's project <br /> boundarp who bas previously requested such notice, at least <br /> twenty-four (241 hours in advance of the open venting of <br /> each geothermal well and pipeline cleanout and 14 days <br /> before Commencement of drilling. Initial notification to <br /> residents shall be made in writing, offering the <br /> opportunity to be placed on the notification list. Any <br /> other person may request to be on the list. The permittee <br /> shall notify the Planning Department immediately prior to <br /> the opea venting of any geothermal well and pipeline <br /> cleanout. The permittee shall notify the Planning <br /> Department following completion of each geothermal well, <br /> prior to the demobilization of the drilling rig. <br /> 24. - until such time as noise regulations are adopted by <br /> the State or County, the permittee shall comply with the <br /> following guidelines which shall be enforced by the <br /> Planning Department: <br /> a. During power plant and wellfield operations, the <br /> permittee shall not exceed a general noise level of 55 <br /> dSA during daytime and ~S dBA at night at the current <br /> nearest residence. Fa` the purposes of these <br /> guidelines, 'night` is defined as the hours between <br /> 7:00 p.m. and 7:00 a.m.; <br /> b. The allowable noise levels may be exceeded by a <br /> maximum of 10 dBA; however, in any event, the <br /> generally allowed noise level should not be exceeded <br /> more than 10 percene of the time within any 20-minute <br /> period, and the permittee shall conduct all operations <br /> so as to minimize the occurrence, frequency, and <br /> duration of this impac~. noise; <br /> c. The noise level guidelines specified above shall be <br /> <br /> - waived only for the specified duration of authorized <br /> open geothermal well venting from all wells, steam <br /> pipeline cleanout periods, and the drilling and <br /> testing of wells fLOm well pads E and P. During these <br /> authorized periods, BACT shall be applied. In <br /> addition, during the drilling and testing of wells <br /> from well pads a and F, the permittee shall meet a <br /> general noise level ~~f 55 dBA during the day and 50 <br /> daA during the night ar- the current nearest residence; <br /> and <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.