My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0492.001 1996-1998
ClerkCouncil
>
Council Records
>
Communications
>
1996-1998
>
COM 0492.001 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 1:49:07 PM
Creation date
5/10/2008 7:56:59 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
1996-1998
Communication
0492
Point
001
Author
Virginia Goldstein, Planning Director
Communications - Referred To
COUNCIL
Comments
Council: Close file - 11/13/97
Communications - File Code
FND/OPR
Document Relationships
AGE COUNCIL 11/13/1997 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Council
COM 0492.000 1996-1998
(Related)
Path:
\Council Records\Communications\1996-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bernard K Akana <br /> pp. J~ \ Planiung Comnussion ~,,,m <br /> ai' •l i5 Aapant sweet. Rm.109 • silo, Fiaenii %~zo • (808) %1-area <br /> ear <br /> ~ « <br /> CERTIFIED MAIL <br /> October 3, 1989 <br /> Maurice A. Richard, Hawaii Regional <br /> Development Manager <br /> Puna Geothermal Venture <br /> 101 Aupuni Street, Suite, 1014-H <br /> Hilo, HI 96720 <br /> Dear Mr. Richard: <br /> Geothermal Resource Permit Application (GRP 87-1) <br /> Puna Geothermal Venture - 25 MW (net) Development <br /> Rapoho, Hawaii TMR: 1-4-01: por. 2, 3, por. 19, b 58 <br /> The Planning Commission at its duly held meeting on <br /> September 19, 1989, considered this Geothermal~Resource Permit <br /> Application and based on the following findings, approved the <br /> project consisting of 10 integrated back-pressure steam turbine and <br /> air-cooled binary cycle turbine power generating modules; up to 30 <br /> geothermal wells drilled from 6 well pads; brine and steam <br /> pipelines, pollution control equipment; a brine surge tank and <br /> holding pond; a switchyard; an office, warehouse,, workshop, and <br /> control buildings; access roads; and auxiliary facilities such as <br /> air compressors, fire protection equipment, etc.: <br /> 1. The proposed geothermal development activities would not <br /> have unreasonable adverse health, environmental, or socio-economic <br /> effects on residents or surrounding property. <br /> The project will occupy approximately 25 acres of surface <br /> area within a dedicated 500-acre project area located within the <br /> Rapoho Section of the Kilauea Lower East Rift Geothermal <br /> Resource Subzone. Approximately 2.75 acres of land will be <br /> cleared and leveled for each of 6 drill pads, Each drill site- <br /> will be engineered to support the drilling equipment and to keep <br /> <br /> _ drilling effluent contained onsite and separate from any natural <br /> drainage. Each well pad will have drilling mud pits; sumps with <br /> gently sloped walls used to temporarily store drilling wastes <br /> which typically consist of rock cuttings, waste drilling mud, <br /> EXHIBIT <br /> --.-----T-- <br /> nc7 0 ~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.