My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0492.001 1996-1998
ClerkCouncil
>
Council Records
>
Communications
>
1996-1998
>
COM 0492.001 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 1:49:07 PM
Creation date
5/10/2008 7:56:59 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
1996-1998
Communication
0492
Point
001
Author
Virginia Goldstein, Planning Director
Communications - Referred To
COUNCIL
Comments
Council: Close file - 11/13/97
Communications - File Code
FND/OPR
Document Relationships
AGE COUNCIL 11/13/1997 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Council
COM 0492.000 1996-1998
(Related)
Path:
\Council Records\Communications\1996-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> a~ <br /> Maurice A. Richard, Hawaii Regional <br /> Development Manager <br /> October 3, 1989 <br /> Page 3 <br /> resulted in a general policy of support for alternative energy <br /> research and development. The establishment of Geothermal <br /> Resource Subzones, where exploration and development are <br /> allowable activities, acknowledges the potential higher use of <br /> the lands in volcanic rift zones which are generally of marginal <br /> value for agriculture and other cultural uses, Indigenous <br /> geothermal resources will be developed for the general social <br /> and economic well-being of the residents of Hawaii. <br /> 2. The proposed geothermal development activities would not <br /> unreasonably burden public agencies to provide roads and streets, <br /> sewers, water, drainage, school improvements, and police and fire <br /> protection. <br /> There should be negligible impact on public infrastructure <br /> and services. Personnel associated with the drilling and <br /> operations will be small in number. Most of the estimated 23 <br /> construction and 19 operations and maintenance jobs at the <br /> proposed project will be filled by local employees. Peak <br /> construction employment is estimated to be as high as 100. <br /> These people will utilize existing facilities and will not <br /> require additional services that are not already provided by the <br /> County. <br /> Traffic through Pahoa will increase especially during <br /> construction. An estimated 35 vehicle round trips per day aze <br /> expected during wellfield and power plant construction. During <br /> normal power plant operations, the traffic generated will fall <br /> to about 10 to 18 vehicle round trips per day. These added <br /> vehicle trips should not add significantly to the existing <br /> traffic levels of 2000 to 3600 vehicles per day at the <br /> intersection of the Pahoa to Ralapana Road (Hwy 130} and the <br /> Pahoa to Rapoho Road (Hwy 132). <br /> Drilling and power plant operations will require no <br /> provisions from public agencies in the form of roads dr--streets, <br /> sewers, drainage, or school enlargement or improvements, and <br /> only the normally afforded police and fire protection will be <br /> expected. Any necessary access roads will be constructed by the <br /> applicant, and water for drilling will be purchased from the <br /> Department of Water Supply from their existing distribution <br /> system or the applicant will develop its own water supply. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.