<br /> 8a. What is the status of the AKANDA system (Part I, Volume II, page 232)? <br /> The AKANDA system is a building permit application and processing <br /> system. Where it was previously done manually, we now process in a <br /> computer system the building, electrical and plumbing <br /> applications/information, inspection information and records (in the <br /> AKANDA system in conjunction with the Real Property Tax IAS system. <br /> We are currently upgrading the system to make it more efficient. We <br /> anticipate that by June, 2006, the public will be able to obtain status <br /> information of permits through the Real Property Tax Division CARE <br /> website (permit number issued, date of issuance, and permits that have <br /> been finalized) from 1980 to present. <br /> 8b. Traffic Division, Traffic Signal and Streetlight section, is operating at 60% of <br /> staffing. Why are the three vacant positions so difficult to fill (Departmental <br /> Agencies' Six Month progress report on Program Objectives for FY 2005-06, <br /> Highway Fund, page 2)? <br /> The Traffic Electricians and Traffic Technician !V positions are extremely <br /> difficult to fill for two reasons. One, both classes of work is extremely <br /> specialized and rare throughout the State. Two, the Traffic Electricians <br /> require a journeyman electrician's license which is in great demand <br /> throughout the State in private industry. <br /> The Department has temporarily reallocated downward these positions <br /> and is in the process of interviewing to fill all vacant positions before the <br /> end of FY 05-06. <br /> 9. Capital Budget -West Hawaii Civic Center, Phase 3 has been increasing <br /> annually. A total of $17,000,000 will be appropriated for the $30,000,000 project. <br /> What is its current status? <br /> The consultant Urban Works is actively working on the master plan and <br /> has been through several design schemes. Meeting with the various <br /> agencies for their present and future staff and program requirements, <br /> along with the square footage of various office spaces and common <br /> spaces have increase substantially from the original contract., thus an <br /> increase in cost (estimate now $35 million). Urban Works is reevaluating <br /> the space needs with the various user agencies to bring the project within <br /> budget. We are paying extra attention to the design of the facility, <br /> because we want a facility that is user friendly and inviting to the <br /> surrounding areas. We have a preliminary design that we feel meets <br /> these requirements. Urban Works is presently working on refining the <br /> design before presenting it to the public for their review and comment. <br /> <br />