Laserfiche WebLink
plat. One copy shall be returned to the subdivider and the other retained by the director. At such <br /> time the director shall stamp the above two preliminary plats: <br /> "Subdivider authorized to prepare detailed drawings on plat as submitted <br /> including corrections noted." <br /> "Recordation with the Bureau of Conveyances, State of Hawaii, not authorized until <br /> approved for record at a later date." <br /> (b) If no action (approval, disapproval, modification, or deferral) is taken by the director <br /> within forty-five days after submission of the preliminary plat, or such longer period as may have <br /> been agreed upon in writing, the preliminary plat shall be deemed approved[, <br /> °~a~~~oi <br /> ..w.,n e.,a,....e .r,e ,.i ,.r.wo .._°i:...:..,......i.,... ,we c «x.,,.e,. The approval shall be <br /> on condition that the subdivider construct roads to the standards required by this chapter, a water <br /> system to the standards of the department of water supply. drainage meeting with the approval of <br /> the department of public works under section 23-92, that sewage disposal shall conform with <br /> section 23-85, if applicable, and the requirements of the department of health, and that the lot <br /> sizes and dimensions must be adjusted to conform to the zoning code on the final plat. The <br /> subdivider shall comply with the provisions of this chapter in order to receive final subdivision <br /> approval. <br /> (c) The director shall disapprove a preliminary plat or a subdivision map where the <br /> subdivider has failed to comply with the provisions of chapter 25, [wni`~rr~co¢c] zonine code. <br /> (d) The subdivider shall complete all requirements specified as conditions for approval <br /> of the preliminary plat (tentative approval) within three years of said approval. An extension of <br /> <br /> not more than two years may be granted by the director upon timely written request of the <br /> subdivider. At the end of said three year period or its approved extension, unless all said <br /> conditions are completed, the approval of the preliminary plat shall expire and shall be of no <br /> further force or effect, or shall be subject to the technical review of the applicable agencies for <br /> <br /> compliance with current Code and rule requirements. This subsection shall be applied to all <br /> <br /> subdivision applications which have received tentative subdivision approval and which have not <br /> completed subdivision improvements, provided the three year period, and extension, if <br /> <br /> applicable, shall be taken from December 4, 1992 and not from the date of preliminary plat <br /> <br /> (tentative) approval. <br /> 5 <br /> <br />