My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2006-078 2004-2006
ClerkCouncil
>
Council Records
>
Ordinances
>
2006
>
ORD 2006-078 2004-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2008 9:12:29 PM
Creation date
5/8/2008 11:57:57 PM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2004-2006
Year
2006
Ordinance
078
Effective Date
6/1/2006
Document Relationships
BIL 227 Draft 01 2004-2006
(Related To)
Path:
\Council Records\Bills\2004-2006
BIL 227 Draft 02 2004-2006
(Related)
Path:
\Council Records\Bills\2004-2006
BIL 227 Draft 02 2004-2006
(Related To)
Path:
\Council Records\Bills\2004-2006
COM 0690.007 2004-2006
(Related)
Path:
\Council Records\Communications\2004-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> H. If the project is built before the portion of the Kahului to Keauhou Parkway is <br /> built through the property, access shall consist of (1) a main project entrance <br /> located in the right-of--way of the future Parkway, with an intersection on Kuakini <br /> Highway, and (2) at Kuakini Highway north of the Waiaha Drainageway. For the <br /> main project entrance, the applicant shall provide full intersection improvements <br /> at Kuakini Highway consisting of, but not limited to, pavement widening, a <br /> dedicated left turn storage lane, drainage improvements, and any relocation of <br /> utilities meeting with the approval of the Department of Public Works, and shall <br /> dedicate the necessary right-of--way to the County for its Kuakini Highway <br /> widening project at no cost to the County, prior to the issuance of a certificate of <br /> occupancy for any residential structures. Improvements may be constructed in <br /> phases as the project is built out, with the approval of the Department of Public <br /> Works. The driveway from the intersection with Kuakini Highway to the main <br /> project entrance shall be constructed meeting with the approval of the Department <br /> of Public Works and shall, to the extent that it can be done without greatly <br /> increasing the cost to the applicant beyond the access needs of their project, be <br /> built so that it can be converted to be used as a portion of the Parkway when the <br /> Parkway is built. Upon construction of the Parkway, the applicant, its successors, <br /> and assigns, shall be responsible for the cost of constructing a replacement access <br /> from the project to the Parkway, at a location meeting with the approval of the <br /> Department of Public Works. The applicant shall have the right to require the <br /> Department of Public Works to finalize the access point prior to the issuance of <br /> plan approval for the project. The necessary intersection improvements shall be <br /> determined by the Department of Public Works and shall be limited to right-in, <br /> right-out only, unless otherwise determined by the Department of Public Works. <br /> The Department of Public Works may approve a secondary access to the Parkway <br /> as long as it is limited to a right-in only. Access (2) on Kuakini Highway shall be <br /> limited to right-out movements only. <br /> -5- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.