My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 224 Draft 03 2004-2006
ClerkCouncil
>
Council Records
>
Bills
>
2004-2006
>
BIL 224 Draft 03 2004-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2008 9:00:44 PM
Creation date
5/8/2008 11:58:39 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2004-2006
Bill/Resolution
224
Draft
03
Introducer
Stacy K. Higa, Council Chair
Referred To
COUNCIL
Action 1
Presented: Council - 6/5/06
Action 2
Council: Bill 224, Draft 3 postponed to 6/21/06 meeting - 6/05/06
Action 3
Council: Bill 224, Draft 3 amended to Draft 4 - 6/21/06
Document Relationships
AGE COUNCIL 06/05/2006 2004-2006
(Related)
Path:
\Council Records\Agendas\2004-2006\Council
AGE COUNCIL 06/21/2006 2004-2006
(Related)
Path:
\Council Records\Agendas\2004-2006\Council
COM 0687.079 2004-2006
(Related To)
Path:
\Council Records\Communications\2004-2006
COM 0687.079 2004-2006
(Related)
Path:
\Council Records\Communications\2004-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amount. The County will provide documents showing that all <br /> actions necessary to ensure reimbursement have been taken prior to <br /> the commencement of substantial construction of Road "4B". <br /> (4) Applicant's obligation will be to design and build Road "4" to <br /> applicable rural road standards (12 foot traveled lands, up to 18 foot <br /> paved shoulders and not including utilities or street lights). Specific <br /> design standards and maximum grade of Road "4" shall be <br /> determined by the Director of Public Works after consultation with <br /> Applicant and the Planning Director. <br /> (5) Substantial construction of Road "4" shall commence within the <br /> later o£ 1) three (3) years of the approval of the Project District <br /> Ordinance or 2) acquisition of the road right-of--way; 3) the date of <br /> final subdivision plat approval for the first residential subdivision <br /> (including multifamily residential) in the project; 4) approval by the <br /> County of all documents and actions necessary to ensure <br /> reimbursement described above. Provided that if substantial <br /> construction of Road "4B" has not commenced within three (3) years <br /> after approval of the Project District Ordinance without fault on the <br /> part of Applicant, then Applicant's obligations for Road "4B" shall <br /> expire. <br /> 5. A road to connect south to the future extension of Holoholo Street -Nana <br /> Street (Road "5" on Exhibit "B"): The applicant shall build Road "5" within <br /> the project area to county-dedicable standards as a minor street, and it shall <br /> intersect with the main project access road (Road "P'). <br /> <br /> 6. The Planning Director may require other local streets within the project to <br /> 11 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.