Laserfiche WebLink
amount. The County will provide documents showing that all <br /> actions necessary to ensure reimbursement have been taken prior to <br /> the commencement of substantial construction of Road "4B". <br /> (4) Applicant's obligation will be to design and build Road "4" to <br /> applicable rural road standards (12 foot traveled lands, up to 18 foot <br /> paved shoulders and not including utilities or street lights). Specific <br /> design standards and maximum grade of Road "4" shall be <br /> determined by the Director of Public Works after consultation with <br /> Applicant and the Planning Director. <br /> (5) Substantial construction of Road "4" shall commence within the <br /> later o£ 1) three (3) years of the approval of the Project District <br /> Ordinance or 2) acquisition of the road right-of--way; 3) the date of <br /> final subdivision plat approval for the first residential subdivision <br /> (including multifamily residential) in the project; 4) approval by the <br /> County of all documents and actions necessary to ensure <br /> reimbursement described above. Provided that if substantial <br /> construction of Road "4B" has not commenced within three (3) years <br /> after approval of the Project District Ordinance without fault on the <br /> part of Applicant, then Applicant's obligations for Road "4B" shall <br /> expire. <br /> 5. A road to connect south to the future extension of Holoholo Street -Nana <br /> Street (Road "5" on Exhibit "B"): The applicant shall build Road "5" within <br /> the project area to county-dedicable standards as a minor street, and it shall <br /> intersect with the main project access road (Road "P'). <br /> <br /> 6. The Planning Director may require other local streets within the project to <br /> 11 <br /> <br />