Laserfiche WebLink
<br /> Page 11 of 11 <br /> <br /> Bi11224, Draft 3 <br /> <br /> Hiluhilu Development, LLC <br /> contribution for all residential units will be satisfied when Applicant <br /> completes and offers for dedication all of the land facilities for the active <br /> use pazk described in Condition U above. The fair share contribution for <br /> roads will be satisfied upon completion of the Mid-Level Road (Road <br /> " 2") Road " 3", Road "5" and Road "4A". <br /> <br />