Loading...
HomeMy WebLinkAboutORD 2006-080 2004-2006COUNTY OF HAWAII PART II The Capital Budget and Six Year Capital Improvements Program 2006-2007 j3i11 2 %�� Dr. 4- BILL NO. 236 Draft 4 COUNTY OF HAWAII - STATE OF HAWAII ORDINANCE NO. AN ORDINANCE RELATING TO PUBLIC IMPROVEMENTS AND FINANCING THEREOF FOR THE FISCAL YEAR JULY 1, 2006 TO JUNE 30, 2007. BE IT ORDAINED BY THE COUNCIL OF THE COUNTY OF HAWAI I: SECTION 1. The following amounts to be received from the sale of general obligation bonds, Capital Projects Fund Balance, and other sources are hereby appropriated to the projects and for the purposes designated in Section 2. CAPITAL PROJECTS FUND k 4716 IV Federal Grants Receivable 3,400,000 State Grants Receivable 1,300,000 State Revolving Fund 10,700,000 Fair Share Capital Fund 1,400,000 General Obligation Bonds, Capital Projects Fund Balance, and/or Other Sources 121,812,000 Total $138,612,000 Section 2. The monies to be provided from the sources specified in Section 1 shall be appropriated for the purposes and in the amounts as follows: FYNo PROJECTS APPROPRIATIONS (in $000) FEDERAL GRANTS RECEIVABLE 2006002 N5'alehu and Pahala Large Capacity Cesspool Replacement 400 2006007 East Hawaii Recycling Center 500 2006053 Palai Stream Flood Control Project (ACOE) 100 2006054 Hilo Roads Guardrail & Retaining Walls (FHWA) 2400 Subtotal 3,400 STATE GRANTS RECEIVABLE 2006031 Hilo Bayfront Trails 100 2006088 Kupulau Road Extension 300 2006089 Kapi`olani Street Extension 900 Subtotal 1,300 STATE REVOLVING FUND 2006002 Na`alehu and Pahala Large Capacity Cesspool Replacement 6,300 2006004 Kamanu Street Extension Sewer Line 1,800 2006008 Primary Sludge Pump & DAFT Retrofit 1,500 2006009 Project 19 Sewage Pump Station Renovation LO 0 Subtotal 10,700 FAIR SHARE 2006024 Kailua Park Master Plan & Improvements 700 2006028 Alii Kai Subdivision New Park Development (Reappropriation) 500 2006029 Pualani Playground (Reappropriation) 200 Subtotal 1,400 GENERAL OBLIGATION BONDS, CAPITAL PROJECTS FUND BALANCE, AND/OR OTHER SOURCES 2006001 Honoka`a Large Capacity Cesspool Replacement 600 2006002 Nd'51ehu and Pahala Large Capacity Cesspool Replacement 450 2006005 Rural Transfer Station Replacement/Enhancement 2,000 2006006 East Hawaii Fats, Oil and Grease (FOG) Facility 300 2006009 Project 19 Sewage Pump Station Renovation 100 2006010 Kalaoa Fire Station 2,425 2006011 Fire Admin. Support Complex 6,000 2006012 Pahoa Fire Station (reapprop. 5290.38) 1,491 2006013 Central Fire Station (replacement) 525 2006014 Capt. Cook Fire Station 1,150 2006015 Nd'dlehu Fire Station 300 2006016 Kailua Fire Station Annex 300 2006017 Pa`auilo Fire Station 300 2006018 ADA Compliance 3,500 2006019 Repairs/Improvements to Facilities 1,500 2006020 Hazardous Materials Assessment 1,000 2006021 DWS Water Connection Compliance (P&R) 1,500 2006022 Ahalanui/Pohoiki Bay Beach Parks 500 2006023 Play Equipment Upgrade & Improvements 500 2006024 Kailua Park Master Plan & Improvements 800 2006025 `Alae Cemetery Expansion and Improvements 750 2006026 New Puna Gym & Park Development 500 2006027 Machado Acres Park (Reappropriation) 117 2006030 Waimea Trails & Greenways (Reappropriation) 590 2006031 Hilo Bayfront Trails 50 2006032 Nd'dlehu Park Site Acquisition 1,200 2006033 Reed's Bay Area Parks Restoration & Improvements 1,000 2006034 Park Improvement Projects -Council District 1 100 2006035 Park Improvement Projects -Council District 2 100 2006036 Park Improvement Projects -Council District 3 100 2006037 Park Improvement Projects -Council District 4 100 2006038 Park Improvement Projects -Council District 5 100 2006039 Park Improvement Projects -Council District 6 100 2006040 Park Improvement Projects -Council District 7 100 2006041 Park Improvement Projects -Council District 8 100 2006042 Park Improvement Projects -Council District 9 100 2006043 Waiakea Uka Park Comfort Station (Reappropriation) 60 2006044 Konawaena Swimming Pool Improvements 750 2006045 Kona Evidence Warehouse (reapprop. 5296.64) 130 2006046 District Station Holding Cell Improvements (reapprop. 5299.43) 312 2006047 Captain Cook Police Station Improvements (reapprop. 5296.65) 500 2006048 Public Safety Complex Repainting (reapprop. 5292.28) 125 2006049 Renovation of Police Records Section Receiving Area 35 2006050 Police 700 Megahertz Communication System (reapprop 5299.42) 4,000 2006051 DWS Water Connection Compliance (DPW) 820 2006052 Land Acquisition for PW Facilities 100 2006053 Palai Stream Flood Control Project (ACOE) 100 2006055 Roof Replacement at Public Safety Bldg "A" 1,500 2006056 Lindsey Road Bridge Replacement 650 2006057 Saddle Road Safety Improvements 130 2006058 Napo`opo`o Wall Construction 130 2006059 West Hawaii Drainage Improvements 100 2006060 East Hawaii Drainage Improvements 100 2006061 West Hawaii Traffic Calming Improvements 100 2006062 East Hawaii Traffic Calming Improvements 100 2006063 Hazardous Materials Abatement at County Facilities 800 2006064 Repair and Maintenance of DPW Facilities 690 2006065 Wood Valley Bridge Replacement 300 2006066 Oshiro Peck Road Bridge Replacement 100 2006067 Maekawa Wall Construction 150 2006068 Hawaii County Building Renovations 17,500 2006069 Aupuni Center Parking Lot Renovations 2,500 2006070 Mamalahoa Hwy Rd Improvements, Kamamalu to Mud Lane 200 2006071 La`i`opua Connector Road Project (Portions of Keanalehu & Manawale`a 7,600 2006072 West Hawaii Civic Center, Phase 3 30,000 2006073 Pahoa Facility Off -Site Improvements 2,000 2006074 Mamalahoa Highway Improvements, Honalo to Captain Cook 7,600 2006075 Renovations of DPW Facilities 600 2006076 Palani Road Widening 1,200 2006077 Kea`au Civic Center 200 2006078 Reed's Island Bridge Replacement 300 2006079 Shared Road Bike Signage for Alii Drive 300 2006080 Manono Street Bike & Pedestrian Improvements 300 2006081 Erosion Control Improvements at 680 Haihai Street (reapprop.) 200 2006082 Mamalahoa Highway Improvements, Honalo 750 2006083 Puna Roads Baseyard Storage/Warehouse Building 581 2006084 S. Hilo Roads Baseyard Storage/Warehouse Building 581 2006085 New Street Light Installation — Islandwide 500 2006086 Improvements to West Hawaii County Baseyard (reapprop.) 980 2006087 Signals New and Upgrades 500 2006088 Pahoa Fire Station — Replacement 1,000 2006089 Dirt Bike / ATV Track (reapprop. 5591.71) 100 2006090 Kahuku Community and Senior Center 250 2006091 Na`alehu Park Tennis Court Upgrade 50 2006092 Na alehu Park Gathering Place 115 2006093 Honu`apu Planning 200 2006094 Cooper Center Parking 75 2006095 Public Access, Open Space, & Preservation Acquisition 3,000 2006096 Yano Hall/Greenwell Park Public Parking Lot 500 Subtotal 121,812 Grand Total 138,612 SECTION 3. The Director of Finance shall open appropriate accounts for each project, make monies available, and expend funds for the projects listed herein. SECTION 4. The appropriation and authorization in Section 2 includes land purchase, plans, site preparation, equipment purchase, improvements to land, and construction. SECTION 5. The Mayor shall initiate authorized projects taking into consideration the factors of public need, general financial condition of the general fund, highway fund, sewer fund, parking meter fund, bikeway fund, beautification fund, vehicle disposal fund, solid waste fund, golf course fund, geothermal relocation revolving fund, housing fund, and fair share contributions as well as the County's general economic conditions. SECTION 6. Severability. If any provision of this ordinance or the application thereof is held invalid, such invalidity shall not affect other provisions or applications of the ordinance which can be given effect without the invalid provision or application, and to this end, the provisions of this ordinance are declared to be severable. SECTION 7. As required by Section 10-6(a) of the Hawaii County Charter, the estimated cost of each capital improvement pending or proposed to be undertaken, the estimated operating cost, and the pending or proposed method of financing are set forth in the attached Project Data and/or Financial Impact Statement sheets. SECTION S. This ordinance shall take effect on July 1, 2006. INTRODUCED BY: CO CIL MEMBER, COUNTY OF HAWAII Hawaii Date of Introduction: Date of 1 st Reading: Date of 2nd Reading: Effective Date: REFERENCE: Comm. 718.9 CAPITAL IMPROVEMENTS PROGRAM BY DEPARTMENTS • Department of Environmental Management • Fire Department • Department of Parks and Recreation • Police Department • Department of Public Works DEPARTMENT OF ENVIRONMENTAL MANAGEMENT BARBARA BELL, DIRECTOR SUMMARY OF DEPARTMENTAL REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM Division: VepartmenC PRIORITY tnvvonmenrar rvianagemcui PROJECT FUNDING (in thousands) County State Federal Private ESTIMATED COST BY FISCAL YEARS (in thousands 0 Previous 06-07 07-08 08-09 09-10 10-11 I1-12 wmv�enon TOTAL ESTIMATED COST I Expansion Phase I of South Hilo Sanitary Landfill 1,250 1,250 1,000 1,000 1,000 4,250 2 Honokaa Large Capacity Cesspool Replacement 600 700 600 12,000 13,300 3 Naalehu and Pahala Large Capacity Cesspool 450 6,300 400 3,850 7,150 11,000 4 Replacement Kamanu Street Extension Sewer Line 1,800 1,800 1,800 5 Rural Transfer Station Replacement/Enhancement 2,000 2,150 2,000 2,000 2,000 8,150 6 East Hawaii Fats Oil and Grease (FOG) Facility 300 300 300 7 East Hawai'i Recycling Center 500 500 500 8 Primary Sludge Pump & DAFT Retrofit 1,500 1,500 9 Project 19 Sewage Pump Station Renovation 100 1,100 1,200 1,200 10 Hilo Scrap Metal Salvage Facility 50 2,000 2,050 11 East Hawaii Beverage Redemption Center 760 760 12 Equipment Maintenance Facility 500 8,200 8,700 13 Keanalehu/Manalawea Sewer Extension 2,735 2,735 14 Queen Liliuokalani Village Large Capacity Cesspool 1,800 8,000 9,800 15 Replacement Kilohana Sewer Improvement District 3,250 300 3,550 16 Modify HWWTP Digester 800 5,000 5,800 17 Hilo Scrap Metal Yard Remediation 250 1,800 2,050 18 Kona Scrap Metal Yard Remediation 100 1,500 1,600 19 South Kona/Ocean View Transfer Station/Recycling 1,308 600 1,908 20 Center Waimea Landfill Remediation 2,200 2,200 21 Puueo Collector Sewer (Reapp 5691.31) 100 2,700 2,800 22 Reed's Island Collector Sewer 100 1,000 1,100 23 West Hawai'i Regional Sort Staton 1,550 7,000 8,550 24 Kailua Landfill Remediation 2,150 2,150 25 Upgrade Alii Drive Sewer System 450 3,000 3,450 26 North Kona Sewer Improvement District 1,100 10,000 11,100 27 Honokohau SPS & FM (Reapp 5697.75) 375 2,125 2,500 28 Lono Luna Collector Sewer 300 3,000 3,300 29 Piihonua Collector Sewer 200 2,000 2,200 30 Replace Wailuku & Puueo St. Bridge Lines 300 2,000 2,300 31 Replace Kealakehe WWTP Lagoon Liners 300 3,000 3,300 32 Lunapule Collector Sewer (Repp 5697.74) 420 420 33 Hualalai Interceptor Sewer 200 2,000 2,200 34 Ainako Collector Sewer Ph II 200 2,000 2,200 35 Alii Kai Collector Sewer 300 3,000 3,300 36 Ainako Aina-Nani Collector Sewer (Repp 5691.32) 300 1 3,400 1 3,700 TOTAL 1 4,700 9,200 900 0 16,258 16,300 29,995 28,050 18,875 5,020 11,225 11000 137,723 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT: Environmental Management, Solid Waste Division DATE: January6, 2006 RO✓ECT/PROGRAM NAME: Expansion Phase I of South Hilo Sanitary Landfill LOCATION (attach map): South Hilo Sanitary Landfill TMK. 2-1-13-152 & 156 COUNCIL DISTRICT: 4 AMOUNT REQUESTED: $1,250,000 ROJECTIPROGRAM DESCRIPTION. Design, construct sliver fill, in compliance with the State DOH operating permit and Closure plan. PROJECTIPROGRAM JUSTIFICATION: vur state uepanment Of neann kuvn) permit requires Mat the vounty comply WHO reuerai ttiu t-rtc /Do.ou) anu state iniac t 1-3a. t-1 t) regutauuns governing the closure of the South Hilo Sanitary Landfill. Under the current State DOH Permit, the Landfill is estimated to cease receiving solid waste during the first half of 2006. An amendment to the existing permit, allowing slope change, has been submitted to State DOH. If approved, the outside edge of a sliver fill around the current landfill will be constructed as an ongoing partial closure operation, while in -filling continues. This allows IMPACT ON OPERATIONAL BUDGET: $750,000 / year is the estimate for extra equipment rental, materials and manpower for building of the benches and constructing the key -in at the toe of the landfill. Minimal additional impact on operational budget as long as our submitted application with new operations plan is accepted and Department of Health doesn't add significant new permit requirements. EXPENDITURE (X $1000): rurr Funding is Request FY 07-08 FY 08-09 FY 09-10 FY I0 -II FY 11-11 To completion TOTAL: Planning LandAcquisition Design/survey 250 $150 Construction 1,000 1,000 1,000 1,000 $4,000 Purchase of Equipment epair & Maintenance TOTAL: $1,250 $1,000 $1,000 $1,000 $4,250 O & MCOSTS (x $1000): $750 $750 $750 $750 $3,000 FUND SOURCE (x $1000):'x'_ n =""' - C G. 0. Bond/Other 1,250 1,000 1,000 1,000 $4,250 Cty Special Revenue (e.g., fuel tax) Stage Revolving Fund State CIP Federal Private TOTAL: $1,150 $1,000 $1,000 $1,000 $4,150 Nilo L:auJiill p. County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT:- DeptofEnvironmentalManagement- Wastewater Division DATE: April 11, 2006 ROJECTIPROGRAMNAME: Honokaa Large Capacity Cesspool Replacement LOCATION (attach map): Hamakua See Attachment A for MaD TME. 4-5 COUNCIL DISTRICT: I AMOUNT REQUESTED: 8600.000 ROJECTIPROGRAM DESCRIPTION.• Connect lots in the Honokaa town area currently serviced by large capacity cesspools to a collector system serviced by a wastewater disposal system. ROJECTIPROGRAM JUSTIFICATION: [LegalMandate. The project is required by federal law. The EPA promulgated Underground Injection Control (UIQ regulations on 1217/99 (40 CFR 144-G) which require large capacity cesspools existing before that date must be upgraded or closed by 415/05. Project will involve installation of new ewer mains in Honoka'a Town, purchase of land for a new Wastewater Treatment Plant, and construction of a new Wastewater Treatment Plant to serve the community as the existing facility owned by the State Hospital system has insufficient capacity to service the community. IMPACT ON OPERATIONAL BUDGET: Additional operating costs to be offset by additional wastewater service charge fees. EYPENDITURE(X$1000): Prior Funding This FY Request FY07-08 To FY08-09 FY09-10 FY10-11 FYII-12 completion TOTAL: Planning 100 $100 and Acquisition esign/Survey 600 601) $1,200 Construction 12.000 $12,000 Purchase of Equipment Repair & Maintenance TOTAL: $700 $600 $12,000 $13,300 O& M COSTS (x $1000): 600 0 600 0 0 0 0 $1,200 FUND SOURCE (x $1000): County CIP County non-CIP (eg., fuel tax) 100 State (eg., SRF) 12,000 1 $12,000 Federal Private TOTAL: $700 $600 $12,000 $13,300 rl or�_� _ .:� �,_r•,i County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscat Year 1006 to 2007 DEPARTMENT: Dept of Environmental Management - Wastewater Division DATE: April 1.1. 20011 ROJECTIPROGRAMNAME: Naalehu and Pahala Large Capacity Cesspool Replacement LOCI TION (attach map): Kau See Attachment A or av TMK., 9-5 COUNCIL DISTRICT: 6 AMOUNT REQUESTED: $7,150,000 ROJECTIPROGRAM DESCRIPTION: Connect lots in the Naalehu and Pahala area currently serviced by large capacity cesspools to a collector system serviced by wastewater disposal systems. ROJECTIPROGRAM JUSTIFICATION: egal Mandate. The project is required by federal law. The EPA promulgated Underground Injection Control (UTC) regulations on 1217199 (40 CFR 144-G) which require large capacity cesspools existing be ore that date must be up raded or closed by 4/5105. IMPACT ON OPERATIONAL BUDGET.• Additional operating costs to be offset by additional wastewater service charge fees. ENDITURE(X$1000): nor Funding ,s Request FY07-08 FY08-09 FY09-10 FY10-11 FY 11-11 To completion TOTAL: Planning LandAcquisition esign/Survey 550 450 $1,000 Construction 3,300 6.700 $10,000 [Purchase ofEqu' meet Repair & Maintenance TOTAL: $3,850 $7,150 $11,000 O& M COSTS (x $1000): 0 10 10 0 0 FUND SOURCE (x $1000): County CIP 450 450 77 $900 County non-CIP (&g., fuel 1") State (e.g., SRF) 1,924 6,300,+ $8,224 Federal 1,416 400 $1,876 Private TOTAL: $3,850 $7,150 $11,000 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Dgt oiEnvironmental Mana zement - Wastewater Division DATE: April 10, 2006 ROJECTIPROGRAM NAME: Kamanu Street Extension Sewer Line LOCATION (attach map): Kailua-Kona. Hawaii TMK., 7-3 and 7-4 COUNCIL DISTRICT. 8 AMOUNTREQUESTED: $1,800,000 ROJECTIPROGRAM DESCRIPTION.• Installation of new sewer line in conjunction with Department of Public Works project for extension ofKamanu Street (Kamanu St. Extension to ealakehe Parkway) R OJECTIPR OGRA M JUS TIFICATION• Installation of the sewer line in conjunction with the DPW project will minimize construction costs in addition to minimizing future traffic disruption to install the sewer line. The sewer line will allow diversion offuture sewer flows to anew sewer pump station to be built in the vicinity of Queen aahumanu Highway thereby reducing operating costs. MPACT ON OPERATIONAL BUDGET: dditional operating costs to be offset by additional wastewater service charge fees. EXPENDITURE (X $1000): Prior Funding This FY To Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 somplrnnn TOTAL: fanning Land Acquisition esign/Survey Construction 1,800 $1,800 Purchase of Equipment Repair & Maintenance TOTAL: $1,800 $1,800 O& MCOSTS (x $1000): FUND SOURCE (x $1000): County CIP 0 0 0 0 0 County non-CIP (e.., fuel tax) State (e.g., SRF) 1,800 $1,800 Federal Private TOTAL: $1,800 0 $1,800 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT F:e.nt Yon. 2066 to 2007 DEPARTMENT. Environmental Management, Solid Waste Division DATE: April 12, 2006 ROJECT/PROGRAMNAME: Rural Transfer Station Replacement/Enhancement LOCATION (attach map): TMK., COUNCIL DISTRICT .• All (1-9) AMOUNT REQUESTED: $1,000,000 ROJECTIPROGRAM DESCRIPTION: Repair, replace, improve 20 rural solid waste management facilities. Construct new retaining walls where required, repair transfer station chutes, provide cover over trailers and for the Public. Provide additional services for the up front collection and handling of recyclable materials and household azardous waste divertiruz them from the Landfill. ROJECTIPROGRAM JUSTIFICATION : The first County transfer Mations were originally constructed in the 1970's for collection of household solid waste within the County and to replace open dumps. Most transfer stations are antiquated or have suffered vandalism and are in need of significant repair and in some instances may require expansion in order to accomodate ieceru and projected increases in population. This project is intended to address public health and safety risks and ensure compliance with State MAR -S& 1) regulations as they relate to solid waste transfer systems. MPACT ON OPERATIONAL BUDGET: Minimal impact on operational budgets. EXPENDITURE (X $1000): nor Funding This FY Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY II -12 To complain. TOTAL: Planning 100 $100 and Acquisition esign,Survey 800 $800 Construction 1,250 2,000 2,000 2,000 $7,250 Purchase of Equipment Repair & Maintenance TOTAL: $2,/SO $2,000 $1,000 $2,000 $8,150 0 & M COSTS (x $1000): FUND SOURCE (x $1000): Cy G.O. Bond/Other 1,900 2,000 2,000 2,000 $7,900 Cty Special Revenue (e.., fuel tax) Late Revolving Fund State CIP ederal 250 $250 Private TOTAL: IF $27150 $2,000 $1,000 ,000 $8,150 County of Hawaii PROJECT DATAITINANCL4L IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Environmental Management, Solid Waste Division DATE: April 12.2006 ROJECTIPROGRAMNAME: East Hawai'i Fats Oil and Grease (FOG) Facility OCATION(attach map): South Hilo Sanitary Landfill TMIL 2-1-13-150&167 COUNCIL DISTRICT. • 4 AMOUNT REQUESTED: $300,000 ROJECTIPROGRAM DESCRIPTION: Construction of a Fats Oil and Grease (FOG) facility at the East Hawai'i Regional Sort Station (EHRSS) facility to provide a means for disposal and to allow recycling of the product for use in composting operations as well as manufacture of Biodiesel fuel. ROJECT/PROGRAM JUSTIFICATION Integration of fats, oils, and greases collection, which includes used cooking oil, is in accordance the Update to the Integrated Solid Waste Management Plan for the County of Hawai'i, December 31, 2002. It facilitates a biodiesel industry for the Big Island businesses and residents. ,NPACT ON OPERATIONAL BUDGET: Operating costs expected to be around $60 per ton, which would be more than offset: by the landfill tipping fee ($75 per ton forFY06-07 and $85 per ton for FY07-08), rtor Funding This Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To comptetion TOTAL: EXPENDITURE (X $1000): Planning and Ac uisition esign/Survey Construction 300 $300 urchase of Equipment epair & Maintenance TOTAL: $300 $300 & M COSTS (x $1000): 300 $300 UND SOURCE (x $1000): ty G.O. Bond/Other [(age ty Special Revenue (eg., fuel tax) Revolving Fund State CIP Federal Private TOTAL: $300 1 $300 ri r County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT F: ­r v . 74nR .n mai DEPARTMENT: Environmental Management, Solid Waste Division DATE: April t I; 2006 R OJECTIPR OGRAM NAME: East Hawaii Recycling Center OCATION(anach map): South Hilo Sanitm Landfill TMK: 2-1-13-150&167 COUNCIL DISTRICT: 4 AMOUNTREQUESTED: $500.000 ROJECT/PROGRAM DESCRIPTION LConstruction of a basic Recycling Center which can be expanded as use warrants. This would be located at the Re -load Facility near the existing Hilo ansfer Station and would provide a ecntvenient area for disposal ofbasic materials to be recyclod. OJECT/PROGRAM JUSTIFICATION Integration of the recyling program with the Reload Facilitly is in accordance with the Update to the Integrated Solid Waste Management Plan for the County of Hawai'i, December 31, 2002. Existing unpaved site can be hazardous when raining and is difficult for some citizens to use, due to the need to lift recyclables into roll -off containers, rather than drop them into the containers. Improved public safety would be significant. IMPACT ONOPERATIONAL BUDGET: Minimal impact on operational budget. Recycleable commodities and collection services will be funded with existing funding. rwr XPENDTTURE (X$1000): Funding tannin and Ac uisition esigr✓Survey Construction urchase o E u' ment epair & Maintenance TOTAL: �I O & M COSTS (x $1000): FUND SOURCE (x $1000): Cty G.O. Bond/Other Cty S ecial Revenue (eg., uel tax) State Revolving Fund State CIP Federal Private TOTAL: to L a 1 1 d f I I ! County of Hawaii PROJECT DATAITINANCIAL IMPACT STATEMENT Fiscal Vear 2006 to 2007 DEPARTMENT: Dept of Environmental Management - Wastewater Division DATE: April 12, 2006 ROJECTIPROGRAMNAME: Primary Sludge Pump & DAFT Retrofit LOCATION (attach map): Hilo Wastewater Treatment Plant TMK: 2-1-013:002 COUNCIL DISTRICT: 4 AMOUNT REQUESTED: $1,S00 ROJECTIPROGRAM DESCRIPTION.• Renovate and convert existing Dissolved Air Floation Thickener (DAFT) to a Gravity Thickener (GT) andprovide redundance for existing Primary Sludge Pumps. ROJECTIPROGRAM JUSTIFICATION: The existing DAFT is deteriorated and in need of renovation. The DAFT is currently being utilized as a gravity thickener but is not efficient when used in that manner. Conversion of the DAFT to a true gravity thickener will improve efficiency of the equipment and would address the existing deterioration. No redundancy is currently provided for the Primary Sludge pumps which requires that the Primary Clarifier be taken out ofservice in the event ofpump failure. Redundancy would ensure that the Primary Clarifiers can be kept in service in the event ofpump failure. MPACT ON OPERATIONAL BUDGET: No significant impact to operational costs. XPENDITURE(X$1000): Prior This FY Tv Funding Request FY07--08 FY 08-09 FY 09-10 FY10-11 FYII-12 completion TOTAL. Tanning and Acquisition esign/Survey Construction 1,500 $1,500 Purchase of Equipment Repair & Maintenance TOTAL: 1 1 $1,500 $1,500 0 & M COSTS (x $1000): UND SOURCE (x $1000): County CIP County non-CIP (e g., fuel tas) State (e.g., SRF) 1,500 $1,500 Federal Private TOTAL: $1,500 $1,500 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Dept o(Environmental Management - Wastewater Division DATE: April 10, 2006 ROJECTIPROGRAMNAME: Proiect 19 Sewage Pump Station Renovation LOCATION (attach map): Kailua-Kona Hawaii TMRi 7-5-005.091 COUNCIL DISTRICT: 8 AMOUNTREQUESTED: $1,100,000 ROJECTIPROGRAM DESCRIPTION. Renovation of existing Project 19 Sewage Pump Station ROJECT/PROGRAM JUSTIFICATION: Complete re -build of the existing Project 19 Sewage Pump Station. The existing station is an underground canned station built in 1980 which has concrete deterioration of the wet well, leaks in the steel underground station due to exposure from seawater, and a failed pump which is beyond repair. The station is currently being serviced with temporary pumps. Re -build of the pump station will eliminate the underground canned station which creates a hazard due to the requirement for work being performed within confined spaces. MPA CT ON OPERATIONAL BUDGET. No significant impact. XPENDITURE (X $1000). Prior Funding This FY To Request FY07-08 FY08-09 FY09-10 FY 10-11 FYII-11 comptefian TOTAL: Planning and Acquisition esigmSurvey 100 $100 Construction 1,100 $1,100 Purchase of Equipment Repair & Maintenance TOTAL: $1,200 $1,100 0 & M COSTS (x $1000): 100 $100 FUND SOURCE (x $1000): County CIP County non-CIP (e.g., fuel tax) State (e.g., SRF) 1,100 $1,100 Federal Private TOTAL: $1,200 $1,200 FIRE DEPARTMENT DARRYL J. OLIVEIRA, FIRE CHIEF SUMMARY OF DEPARTMENTAL REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM Division: FUNDING ESTIMATED COST BY FISCAL YEARS TOTAL PRIORITY PROJECT (in thousands) (in thousands) ESTIMATED County State Federal Private revtous 06-07 07-08 08-09 1 09-10 10-11 11-12 0 <nmPiainn COST 1 Kalaoa Fire Station 2,425 2,400 2,425 4,825 2 Fire Admin. Support Complex 6,000 2,500 6,000 8,500 3 Pahoa Fire Station (reapprop. 1,491 2,809 1,491 4,300 5290.38) 4 Central Fire Station (replacement) 525 525 4,300 4,825 5 Capt Cook Fire Station 1,150 1,150 1,150 6 Naalehu Fire Station 300 300 4,300 4,600 7 Kailua Fire Station Annex 300 300 2,000 2,300 8 Paauilo Fire Station 300 300 1,500 1,800 9 Keaau Fire Station 250 4,350 4,600 10 Honokaa Fire Station 300 4,300 4,600 11 Fire Fighter Training Facility 6,000 6,000 12 Kaloko - Honokohau Area Fire 300 4,300 4,600 Station 13 Kawailani Fire Station 300 4,300 4,600 14 Volcano Fire Station 300 4,300 4,600 15 Kona Makai Fire Station 300 4,300 4,600 16 Pahoa Fire Station -Replacement 1,000 1,000 1,000 TOTAL _13,4911 01 0 1 0 1 7,959 13,491 16,750 1 5,500 1 23,200 1 0 0 01 66,900 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 RTMENT. FIRE DATE: January6, 2006 ECTIPROGRAMNAME: KALAOA FIRE STATION TION (attach map): North Kona, Hawaii _ TMK: TE AMOUNT JI ROJECTIPROGRAMDESCRIPTION: 0 The establishment of a new fire station to provide emergency response capabilities in a area that is presently without a reasonable level of service. This .._a ....,...e,...e..« .. ..,aa fl,,t ;n a rrctaccifinnfinn of the Hawaii Insurance Bureau's Public Protection Rating Schedule. ROJECTIPROGRAM JUSTIFICATION: The establishment of emergency services in an area that is presently without a reasonable level. IMPACT ON OPERATIONAL BUDGET: O&M cost has been included in the department's budget since FY 04-05. XPENDITURE (X$1000): Prior-ThLsFY Funding Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To completion TOTAL: Planning and Acquisition esign/Survey 500 $500 Construction 2,400 1,925 $4,325 Purchase ojEquipment ¢pair & Maintenance TOTAL: $2,400 $2,425 $4,825 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cty G.O. Bond/Other 1,150 2,425 $4,575 Cty Special Revenue (fair share) 250 $250 State Revolving Fund State CIP ederal r. ate TOTAL: $2,400$2,425 $4,825 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 NAME: FIRE ADMINISTRATION AND SUPPORT COMPLEX DATE. January 6, 2006 TMIL (3) 2-4-001: por 168 COUNCIL DISTRICT: Serves islandwide AMOUNT REQUESTED: $6,000,000 ROJECTIPROGRAM DESCRIPTION: ROJECTIPROGRAM JUSTIFICATION: Design and construction of a multi -function administration and support complex to provide essential infrastructure to support effective operations, public service, and departmental training programs. This project would also provide for the relocation of the many components of the support services division to a site that will not be impacted by natural disaster and support uninterrupted service delivery. OPERATIONAL BUDGET., O&M costs would be transferred from existing infrastructure and operations. XPENDITURE(X$1000): Prior L Funding This Request FY0708 FY 08-09 FY09-10 FY10-11 FYII-12 To conrpWw. TOTAL: Planning and Ac uisition esign,Survey 2,500 $2,500 Construction 6,000 $6,000 Purchase ofEqutpment epair & Maintenance TOTAL: $2,500 $6,000 $8,500 O & M COSTS (x $1000): FUND SOURCE (x $7000): Cty G. O. Bond/Other 2,500 6,000 $8,500 Cty Special Revenue (cg., fuel tax) 7 7 State Revolving Fund tate CIP ederal twat. TOTAL: $1,500 $6,000 1$8,500 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT F:u,n/V.-7006 moral DEPARTMENT. Fire DATE: January 6, 2006 ROJECTIPROGRAMNAME. Pahoa Fire Station Planning LOCATION (attach map): Pahoa, Hawaii TMK 1-5-007:017 COUNCIL DISTRICT: 5 AMOUNT REQUESTED: $1,491,000 ROJECT/PROGRAM DESCRIPTION esign/Survey The design and construction of a replacement fire station and emergency operations support complex. The present facility was constructed in 1969 and does not meet hurricane or high wind structural standards. In addition, the current facility does not pr 2,809 ROJECTIPROGRAM JUSTIFICATION: Purchase of Equipment Replacement of antiquated facility that does not comply with strutural integrity standards and subject to significant impact from natural disaster as well provide adequate space to support operational and financial effectiveness. Repair & Maintenance IMPACT ON OPERATIONAL BUDGET: $0 No anticipated impact since this new facility will be a replacement of an existing facility. $3,009 XPENDITURE (X $1000): Prior Funding u Request FY07-08 FY 08-09 FY 09-10 FY10-II FYII-12 To completion TO7AL: Planning 20 $20 and Acquisition $0 esign/Survey 180 $180 Construction 2,809 1,491 $4,300 Purchase of Equipment $0 Repair & Maintenance $0 TOTAL: $3,009 $1,491 $0 $0 $0 $0 $0 $0 $4,500 0 & M COSTS (x $1000): $0 1,491 $1,491 FUND SOURCE (x $1000): Civ G.O. Bond/Other 2,809 Cty Special Revenue (eg., fuel tax) State Revolving Fund $0 State CLP Federal 200 $200 Private $0 TOTAL: $3,009 $1,491 $0 $0 $0 $0 $0 $0 $4,500 County of Hawaii PROJECT DATAIFINANCL4L IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT: FIRE DATE: January 6, 2006 ROJECTIPROGRAMNAME: CENTRAL FIRE STATION LOCATION (attach map): TMK. 3) 2-4-28: par. 12-16 COUNCIL DISTRICT., 2 AMOUNTREQUESTED: $525,000 ROJEC"ROGRAM DESCRIPTION: The establishment of a replacement fire station and emergency operations facility. ROJECT/PROGRAM JUSTIFICATION: Replacement of an antiquated facility that is located in the tsunami inundation zone, and does not meet ADA standards; to provide dedicated and uninterrupted emergency service delive . IMPACT ON OPERATIONAL BUDGET. O&M cost would be transferred from existing facility and operations. XPENOITURE(X$1000): Prioris Funding Request FY07-08 FY08-09 FY09-10 FY10-11 FY1142 To compteann TOTAL: Planning and Acquisition esi rt Survey 525 $525 Construction 4,300 $4,300 urchase o E ui ment epair & Maintenance TOTAL: $525 $4,300 1 $4,825 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cly G.O. Bond/Other 525 $525 Cty Special Revenue (eg., fuel tax) State Revolving Fund 4,300 $4,300 State CIP ederal Private TOTAL: $525 $4,300 $4,825 County of Hawaii PROJECT DATAIFINANCL9L IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. FIRE DATE: January6, 2006 ROJECT/PROGRAMNAME: CAPT. COOK FIRE STATION Planning LOCATION (attach map): Ca t. Cook Kona, Hawaii TMX: (3) 8-2-001-084 COUNCIL DISTRICT: 7 AMOUNT REQUESTED: $1,150,000 Design/Survey rCCROJECTIPROGRAMDESCRIPTIONnstruct an additional apparatus bay at Capt. Cook Fire Station. $150 ROJECT/PROGRAM JUSTIFICATION: 1,000 The current apparatus doorways are 9'-9 1/2" in height, new fire apparatus exceed this by 2 feet. The doorways cannot be renovated to increase the hei ht clearance, since the station is functionble in all other res ects; this addition will increse service to the community and extend the overall station Repair & Maintenance MPACT ONOPERATIONAL BUDGET: O&M will be part of misting facility and operations. $1,150 XPENDITURE (X $1000): Prior I hul, Funding Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To eompletion TOTAL: Planning and Acquisition Design/Survey 150 $150 Construction 1,000 $1,000 Purchase ofEquipment Repair & Maintenance TOTAL: $1,150 $1,150 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cly G.O. Bond/Other 1,150 $1,150 Cry Special Revenue (e.., fuel tax) State Revolving Fund tate CIP ederal rivate TOTAL: $1,150 $1,150 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 EPARTMENT: FIRE DATE: January 6, 2006 ROJECTIPROGRAMNAME: NAALEHU FIRE STATION LOCATION (attach map): Naalehu , Hawaii TMIL TBD COUNCIL DISTRICT: 6 AMOUNTREQUESTED: $300,000 ROJECT/PROGRAM DESCRIPTION: The establishment of a new fire station to provide emergency response capabilities in an area that is presently without a reasonable level of service. This facility and subsequent sevice provision would reflect in a reclassification of the Hawaii Insurance Bureau's Public Protection Rating Schedule. ROJECTIPROGRAM JUSTIFICATION: The establishment of emergency services in an area that is presently without a reasonable level. IMPACT ON OPERATIONAL BUDGET. IT (X$1000): Prior Funding u Request FY07-08 FY 08-09 FY09-10 FY 10-11 FY 11-12 To completion TOTAL: Tanning and Acquisition esign/Survey 300 $300 Construction 4,300 $4,300 Purchase of Equipment Repair & Maintenance TOTAL: $300 $4,300 $4,600 O & M COSTS (x $1000): FUND SOURCE (x $1000): 4,300 $4,300 Cty G.O. Bond/Other Cty Special Revenue (e.g.,fuel tax) State Revolving Fund State CIP ederal (CDBG)300 $300 rivate TOTAL: $300 $4,300 $4,600 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. FIRE DATE. January6, 2006 ROJECTITROGRAMNAME: KAILUA STATION ANNEX LOCATION (attach map): TMR: 7-4-08-:27 COUNCIL DISTRICT. 8 AMOUNT REQUESTED: S300,000_ ROJECTIPROGRAM DESCRIPTION: Construction of a support annex at the Kailua Fire Station, to house a Battalion Chief, provide warehouse space for supply distribution, and establish a apparatus maintenance facility for the Kona area. ROJECTIPROGRAM JUSTIFICATION: This project will substantially imporve the operating efficiency of the department, in supervision and service delivery, with a reginal supply distribution center and maintenance facility those functions will no longer require units to go to Hilo. MPACT ON OPERATIONAL BUDGET: ENDITURE (X $100 0): norThisFy Funding Request FY07-08 FY 08-09 FY09-10 FY10-11 FYII-11 To completion TOTAL: Planning LatuiAcquisition Design/Survey 300 $300 Construction 2,000 $2,000 urchase of Equipment . .I Maintenance TOTAL: $300 $2,000 $2,300 O & M COSTS (x $1000): 300 $300 UND SOURCE (x $1000): Cty G.O. Bond/Other Cty Special Revenue (e.., fuel tax) tate Revolving Fund 2,000 $2,000 tate CIP ederal rivate TOTAL: $300 $2,000 $2,300 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT.- FIRE DATE: January 6, 2006 ROJECTIPROGRAMNAME: PAAUILO VOLUNTEER FIRE STATION OCATION (attach map): TMK: TBD COUNCIL DISTRICT: 1 AMOUNTREQUESTED: $300,000 ROJECTIPROGRAM DESCRIPTION: To establish a garage to house a new apparatus obtained through Federal CDBG funding for the volunteer fire company. ROJECTIPROGRAM JUSTIFICATION: The project provides the needed facility to protect the apparatus from the elements, and be the central point for expansion of services to an expanding o ulation. IMPACT ON OPERATIONAL BUDGET. Once constructed, the expected increase to the operating budget will be in the utilities of electicity, water and phone service. Estimated at $ er year. XPENDITURE (X $10 0 0): Funding ThisFy Request FY07-08 I FY08-09 FY09-10 FY10-11 FY 11-12 To completion TOTAL: Planning and Acquisition esigwSurvey 300 $300 Construction Purchase o Equ' ment 1,500 $1,500 Repair & Maintenance TOTAL: $300 $1,500 $1,800 0 & M COSTS (x $1000): FUND SOURCE (x $1000): Cly G.O. Bond/Other Cty Special Revenue (eg., fuel tax) State Revolving Fund 1,500 $1,500 State CIP Federal (CDBG Funding) 300 $300 Private TOTAL: $300 $1,500 $1,800 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiernl Vnnr 761M t. 71107 DEPARTMENT: FIRE DATE: May 17, 2006 PROJECT/PROGRAM NAME: Pahoa Fire Station - Replacement LOCATION (attach map): Pahoa, Hawaii TMK: 1-5-07:017 COUNCIL DISTRICT: 5 AMOUNTREQUESTED: $1,000,000 PROJECT/PROGRAM DESCRIPTION.- The ESCRIPTION:The establishment of a replacent fite station and emergency operations complex. Present facility does not meet ADA standards, does not comply with high wind or hurricane structural standards, and is subject to impact from natural disasters. In addition, the present facility does not provide adequate space or infrastructure to house and store all equipment and personnel. Design/planning phase completed through CDBG funding. PROJECTIPROGRAM JUSTIFICATION: Replacement of an antiquated and structurally non-compliant facility to provide dedicated and uninterrupted emergency service delivery. IMPACT ON OPERATIONAL BUDGET. O&M cost would be transferred from existing facility and operations. EXPENDITURE (X $1000): F_rF10_r_1is Funding Request FY 07-08 FY 08-09 FY 09-10 FY 10-I1 FY I1-12 To completion TOTAL: Planning 20 $20 Land Acquisition Design/Survey 180 $180 Construction 4,300 1,000 $5,300 Purch ase of Equipment Repair & Maintenance TOTAL: $4,500 $1,000 $5,500 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cty G.O. Bond/Other ba e;�.., 4,500 1,000 $5,500 Cty Special Revenue (e.g., fuel tax) State Revolving Fund State CIP Federal Private 11 TOTAL: $4,5001 $1,000 $5,500 ^jEo �\®' i DEPARTMENT OF PARKS & RECREATION PATRICIA ENGLEHARD, DIRECTOR SUMMARY OF DEPARTMENTAL REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM Department: Parks & Recreation Division: PRIORITY PROJECT FUNDING (in thousands) ESTIMATED COST BY FISCAL YEARS (in thousands) 7'07AL ESTIMATED COST County State Federal Private Previou 06-07 07-08 08-09 09-10 10-11 11-12 -pletim 1 2 3 4 5 6 7 8 9 _ 10 _ 11 _ 12 13 14 is _ I6 ADA Compliance Repairs/Improvements to Facilities Hazardous Materials Assessment DWS Water Connection Compliance Ahalanui/Pohoiki Bay Beach Parks Play Equipment Upgrade & Improvements Kailua Park Master Plan & Improvements Alae Cemetery Expansion and Improvements New Puna Gym & Park Development Machado Acres Park (Reappropriation) Alii Kai Subdivision New Park Development (Reappropriation) Pualani Playground (Reappropriation) Waimea Trails & Greenways (Reappropriation) Naalehu Park Site Acquisition Reed's Bay Area Parks Restoration &Improvement -_ _ - Discretionary Projects - Council District 1 Discretionary Projects - Council District 2 Discretionary Projects - Council District 3 Discretionary Projects - Council District 4 Discretionary Projects - Council District 5 Discretionary Projects - Council District 6 Discretionary Projects - Council District 7 3,500 1,500 1,000 1,500 500 _ 1,000 _ _ _ _ _ _ 200 _ _ 20,419 4,747 150 4,500 1,500 _- _ 1,000 1,500 500 4,000 4,000 1,500 4,000 1,500 _ 3,000 1,500 _ 3,000 3,000 on-gom 45,919 13,747 _- 3,000 1,650 1,500 1,500 - 2,000 _- 4,329 4,000 8,829 4,000 4,500 500 1,500 750 1,500 1,087 250 255 500 500 1,000 500 2,000 500 _ 500 _ _ 1,500 750 500 _ 1,200 1,837 1,950 372 560 117 500 200 _ 590 1,200 _ _--_ _ 117 500 _ _1,322 100 1,117 _ _ 1,822 300 3,607 1,200 1,999 --_--- 100 100 100 100 _ 100 100 100 100 100 130 _ 2,000 200 590_ 1,200 1,000 100 100 100 100 100 100 _____- 1,900 999 - _. _ - 1,000 _000 _ 100 100 100 100 100 _100 100 _. ._-- 17 18 19 20 _ 21 _ 22 _ _ _ _ 100 _ 23 24 25 26 Discretionary Projects - Council District 8 Discretionary Projects - Council District 9 Waiakea Uka Park Comfort Station (Reappropriation) Konawaena Swimming Pool Improvements 100 100 too - - 100 60 _ 70 60 750 1,250 750 .: 27 Lattpahoehoe Po41 Inipirovoirrarb .. 100 _ m250 350 28 Kohala,Puol kn " :" ergs 100 "" z5o ,=29 Puria[0'u Beach ?ark kn rouenitents ..'.. ,-ASO ' Soo ..;- .. 650. :-30 Uku:parklmwovements too I".'Soo 600 .. 31 West Hawai9 R ::"°'onal Ca .. z C3e+tel "crit : -.: 190€1...:2;500 2,5(x:. 2,500 6,500- " 15,0041" 32 6 ""ahaehoePoWPadst rds`:.. :". :: to ":750 "' 854 . .:33 twiStrach.Park fm rOveriiie>rds e� ""' :It* ; $00' 600 ". 34 Paria'ewaRaktfp(eafZo " rnerda "> .jam SOO, =600 35 MaMukonaBeach #arkim rivemants "..• too Svo. 600 36 _ 37 38 39 40 41 Dirt Bike /ATV Track Kahuku Community and Senior Center 50 250 50 115 _ 50 100 3,000 _ __ _ 150 3,250 50 250 Naalehu Park Tennis Court Upgrade 50 115 200 Na'alehu Park Gathering Place Honu'apu Planning _ lCooper Center Parking Area 1 115 200 75 _ 1 200 175 75 1 42 1Hilo Bay Trails 50 100 150 500 500 500 1 1,650 43 Public Access, Op Spam, & Preservation Acquisition 1 3,000 3,000 3,000 44 IYanc, Hall/Greenwell Park Public Parking Lot 500 500 500 TOTAL 1 1 20,857 100 1,000 2001 37,645 1 22,007 19,6001 10,050 14,050 1 12,250 9,750 13,0001 138,352 Countyof Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiera/ Year 2006 to 2007 DEPARTMENT. Parks & Recreation DATE: January 6, 2006 ROJECTITROGRAMNAME. ADA Compliance LOCATION (attach map): Various Sites Island wide TMK COUNCIL DISTRICT: Island wide AMOUNTREOUESTED: $4,500,000 ROJECT/PROGRAM DESCRIPTION: Removal of architectural barriers and related accessibility improvements at various recreational sites/facilities as set forth in the County of Hawai'i's Self Evaluation and Transition Plan. ROJECTIPROGRAM JUSTIFICATION: Legal Mandate and Inadequate Facilities: The project is required by federal law under the Americans with Disabilities Act (1990), Title 28, Code of Federal Regulations 35.150 and the Consent Decree filed in Russell et al v. County of Hawaii in United States District Court Civil No. 97-01102SPK - June 4, 1998. The purpose is to provide all disabled persons equal access to all public recreational facilities and programs. CTON OPERATIONAL BUDGET. one. EXPENDITURE (X $1000): nor Funding cs Request FY 07-08 FY 08-09 FY 09-10 FY 10-17 FY 11-12 To--plelion TOTAL: Planning and Acquisition Design/Survey 3,198 $3,198 Construction 17,221 4,500 4,000 4,000 4,000 3,000 3,000 3,000 $42,721 Purchase of Equipment epair & Maintenance TOTAL: $20,419 $4,500 $4,000 $4,000 $4,000 $3,000 $3,000 $3,000 $45,919 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cty G.O. Bond/Other 12,907 3,500 3,000 3,000 3,000 2,000 2,000 2,000 $31,407 Cty Special Revenue (e.g., fuel tax) State Revolving Fund State CIP Federal 7,512 1,000 1,000 1,000 1,000 1,000 1,000 1,000 $14,512 Private TOTAL: $20,419 $4,500 $4,000 $4,000 $4,000 $3,000 $3,000 1 $3,000 $45,919 County of Hawaii PROJECT DATAIFINANCL4L IMPACT STATEMENT Fivral Year 2006 to 2007 DEPARTMENT.- Parks & Recreation DATE: April 17, 2006 ROJECTIPROGRAMNAME: Repairs/Improvements to Facilities LOCATION (attach map): Various Sites Islandwide TMK COUNCIL DISTRICT. Islandwide AMOUNT REQUESTED: $1,500,000 R OJECTIPR OGRAM DESCRIPTION: Repair of, renovation to and general improvements at park facilities, amenities, infrastructure and utilities and the services necessary to institute and )implement the use of public facilities. R OJECTIPR 0 GRAM JUSTIFICATION: Public health & safety and Repair/Maintenance: To provide for safe and effective use of park facilities by providing for repair or replacement of safe, deteriorated and damaged conditions (due to abuse, exposure, infestation, normal use, wear & tear, etc.); to address conditions that do not satisfy current public health and safety regulations; and general improvements necessary to enhance park usage, efficiency and administration. MPACT ON OPERATIONAL BUDGET: Will have a positive but unquantifiable impact as less interim/temporary measures will need to be implemented after the appropriate corrective actions are implemented. XPENDITURE (X $100 0): rwr Funding u Request FY07-08 FY 08-09 FY09-10 FY10-11 FYlI-12 To wmptaion TOTAL: Tannin and Acquisition esignaurvey 166 $166 Construction 4,581 1,500 1,500 1,500 1,500 1,500 1,500 on-going $13,581 Purchase of Equipment Repair & Maintenance TOTAL: $4,747 $1,500 $1,500 $1,500 $1,500 $1,500 $1,500 $13,747 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cty G.O. Bond/Other 4,747 1,500 1,500 1,500 1,500 1,500 1,500 on-going $13,747 Cty Special Revenue (e.g., fuel tax) State Revolving Fund State CIP Federal Private TOTAL: $4747 $1,500 $I 500 $1,500 $1,500 $1,500 $1,500 $13,747 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 1007 DEPARTMENT. • Parks & Recreation DATE. January 6, 2006 ROJECTITROGRAMNAME: Hazardous Materials Assessment - Islandwide LOCATION (attach map): Various Sites Islandwide TMIL COUNCIL DISTRICT Islandwide AMOUNT REQUESTED: $1,000,000 ROJECT/PROGRAM DESCRIPTION: Survey and assessment of all park facilities for the presence of hazardous substances (asbestos, lead, mercury, PCB's, arsenic, etc.) used in the construction of or contained in/on the building components/materials, includes subsequent planning for remediation, abatement, encapsulation or other appropriate response. ROJECTIPROGRAM JUSTIFICATION : Public health & safety and Repair/Maintenance: To provide for safe and effective use of park facilities by investigating and addressing the presence o hazardous materials in the facilities and at the sites in a comprehensive and appropriate manner. The majority of P&R's facilities are over 20 years old an host numerous youth and senior activities, the two demographic groups most susceptible to the harmful effects of the targeted substances. Federal law mandates that all construction projects involving existing facilities require a hazardous materials investigation and disclosure prior to commencing construction activities. In-house maintenance staff will become informed on what activities are safe and appropriate relative to hazardous materials. MPACT ON OPERATIONAL BUDGET Will have a positive but unquantifiable impact as facilities can be more safely and fully utilized by our staff and the public. EXPENDITURE (X$1000): rtor Funding Ykispy Request FY 07-08 FY 08-09 FY 09-10 FY10-11 FYII-12 Tncompteana TOTAL: Planning and Acquisition esign/Survey 1,000 $1,000 Construction 1,000 $1,000 Purchase of Equipment ¢pair & Maintenance TOTAL: $1,000 $1,000 $2,000 O & M COSTS (x $1000): FUND SOURCE It $1000): Cy G.O. Bond/Other 1,000 1,000 $2,000 Cry Special Revenue (e.g., fuel tax) State Revolving Fund State CIP ederal rivate TOTAL: $1,000 $1,000 $2,000 County of Hawaii PROJECT DATAIFINANCLIL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. • Parks & Recreation DATE: April l7, 2006 ROJECTIPROGRAMNAME. DWS Water Connection Compliance LOCATION (attach map): Various Sites Islandwide TME., COUNCIL DISTRICT: Islandwide AMOUNTREQUESTED: $1,500,000 ROJECTIPROGRAM DESCRIPTION: Installation of new backflow prevention devices on domestic water supply lines to all public facilities to comply with Department of Water Supply standards. Upgrade existing water services that do no meet current Department of Water Supply standards and replace/upgrade existing water lines as needed. ROJECTIPROGRAM JUSTIFICATION: Legal Mandate and Public Health and Safety: The Department of Water Supply has mandated that all facilities connected to municipal water systems install approved backflow prevention devices to prevent the possibility of the reverse flow of water from a facility into the domestic water system and contaminating it, thus causing a serious public safety risk. DWS has issued a deadline of July 2006 for compliance. MPACT ON OPERATIONAL BUDGET. None. XPENDITURE(X$1000): Prior Funding u Request FY07-08 FY 08-09 FY09-10 FY10-11 FYII-12 To completion TOTAL: Planning andAc uisition esigwSurvey 150 100 $250 Construction 1,400 $1,400 Purchase of Equipment Repair & Maintenance TOTAL: $150 $1,500 $1,650 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cly G.O. Bond/Other 150 1,500 $1,650 Cly Special Revenue (eg., fuel tax) State Revolving Fund State CIP ederal rivate TOTAL: $I50 $1,500 $1,650 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Flsca! Vear 2006 to 2007 DEPARTMENT- Parks & Recreation DATE: January 6, 2006 ROJECTIPROGRAMNAME: Ahalanui/Isaac Hale Beach Parks 1-3-08:014,016&021, LOCATION (attach map): Keahialaka & Oneloa, Pohoiki, Puna TME: 1-0-02:005,006,008 & 061 COUNCIL DISTRICT. 5 AMOUNTREQUESTED: $500,000 ROJECTIPROGRAMDESCRIPTION.• Construction of new park facilities, recreational amenities, infrastructure and support services, landscaping and site improvements to augment the public benefit and usa a at the two Eark sites. RO✓ECT/PROGRAM JUSTIFICATION: Replacement of destroyed facilities: Development of these beach parks are intended to replace the county park facilities and amenities lost due to lava flows in the Kaimu-Kalapana area. This phase will continue prior improvements in creating a park environment that is safe for all users, will provide a wide array of amenities and maximize the intensity of its use. The development will also enhance the beauty of the shoreline and promote the use of the County's only public beach parks in the district of Puna. MPACT ON OPERATIONAL BUDGET.- Development UDGET:Development of the new/additional park areas and facilities, and the increased public usage that will follow, will result in increased utilities costs, maintenance costs and in the longer term increased repair and maintenance costs. (X $1000): Prior Funding This Request FY07-08 FY08-09 FY 09-10 FY10-11 FYII-12 To completion TOTAL: Planning andAc uisition 176 $176 est n,Survey 185 500 $685 Construction 3,968 4,000 $7,968 Purchase of Equipment Repair & Maintenance TOTAL: $4,329 $500 $4,000 $8,829 O & MCOSTS (x $1000): $25 $25 $25 $25 $25 on-going $125 FUND SOURCE (x $7000): Cty G.O. Bond/Other sm 3,808 500 4,000 $8,308 Cly Special Revenue (e.g., fuel tax) State Revolving Fund 7 State CIP ederal 521 $521 rimte 11 TOTAL:IL $4,329 $500 $4,000 $8,829 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Parks & Recreation DATE: January 6, 2006 ROJECTIPROGRAMNAME: Playground Equipment Upgrades and Improvements LOCATION (attach map): Various Sites Islandwide TMX: COUNCIL DISTRICT: Islandwide AMOUNTREQUESTED: $500,000 ROJECTIPROGRAM DESCRIPTION: Upgrading of playground equipment, structures and accessories to include wholesale replacement, modifications, removal & disposal, repairs, alterations etc. and the design and construction of 22pErtenant site amenities walks, parking, accessibility requirements, etc.) ROJECTIPROGRAM JUSTIFICATION: Legal mandate, public health & safety, inadequate facility, replacement of deteriorated facilities and Quality of Life: As part of the Consent Decree filed in Russell et al v. County of Hawaii, we are obligated to replace and make accessible all children's playgrounds islandwide. Additionally, many pre-existing playground structures were removed for safety reasons but not replaced and many existing playground structures require safety and accessibility modifications to meet current requirements and industry standards. MPACT ON OPERATIONAL BUDGET: The project will have a positive impact on operations as it will eliminate older, more repair -intensive equipment and accessories with new equipment and Accessories that require less daily maintenance. 6ENDITURE(X$1000): Prior Funding This FY Request FY07-08 FY 08-09 FY09-10 FY10-11 FYII-12 To comp[eaon TOTAL: Tanning and Acquisition esign/Survey Construction 1,500 500 500 500 500 500 $4,000 Purchase of Equipment Repair & Maintenance TOTAL: $1,500 $500 $500 $500 1 $500 $500 $4,000 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cry G.O.Bond/Other 1,500 500 500 500 500 t500 $4,000 Cty Special Revenue (e.., fuel tax) State Revolving Fund State CIP Federal ivate TOTAL: $1,500 J1 $500 $500 $500 $500 $500 $4,000 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 1006 to 1007 D EPARTMENT Parks & Recreation DATE: January 6, 2006 O✓ECT,PROGRAMNAME. Kailua Park Improvements CATION (attach map): Kailua Park, Kailua-Kona, North Kona TMK• 7-5-05:007 & 083 UNCIL DISTRICT: 8 AMOUNTREQUESTED: $1,500,000 OJECTIPROGRAM DESCRIPTION: aster planning of the Kona "Old Airport" Park site that will be transferred to the County in Fiscal 2006-07 to identify higher and maximized uses forth underutilized recreational area to compliment the County's Kailua Park and the recreational resources existing thereat. The project also seeks to prove and upgrade the existing facilities, amenities and site to preserve the integrity and life of the facilities and to promote safe, attractive and highest intensity use of the existing amenities. The existing facilities are in very poor condition and require structural, architectural and aesthetic im rovements. ROJECTIPROGRAM JUSTIFICATION : Inadequate Service/Facility, Repair/Maintenance and Quality of Life: The Kailua-Kona community has minimal recreational resources for a large and growing populace, master planning the available lands at Kailua Park to identify and later implement the addition of compatible, needed facilities ar amenities would allow highest and best use of the recreational space at hand. The State's current facilities are in varied advanced states of disrepair; re- roofing, re -painting, structural upgrades and renovations, replacing doors, windows, cabinetry, etc. are required to ensure safe and continued use. Enhancing the entire site would attract greater use from, and enhance the guality of life for, the community and park users. IMPACT ON OPERATIONAL BUDGET. The project will have a positive impact as major and minor repairs and modifications will be accomplished that would otherwise require in-house staffs time and funds for materials, tools and equipment. Additional development would necessitate additional staffing to ensure minimum services are provided. ENDITURE(X$1000): Prior Funding 11uspy Request FY07-08 FY08-09 FY09-10 FY10-11 I FYII-12 To TOTAL: Planning 100 $100 and Acquisition esign,Survey 400 $400 Construction 1,000 1,000 2,000 $4,000 Purchase of Equipment Repair & Maintenance TOTAL: $1,500 SI,000 $1000 $4,500 O k MCOSTS (x $1000): FUND SOURCE (x $1000): Cty G.O. Bond/Other 1,000 1,5001,000 $25 $50 S75 $75 $75 on-going 2,000 $300 $5,500 Cly Special Revenue (e.g., fuel tax) State Revolving Fund State CIP Federal d ate TOTAL: $1,000 $7500 SI,000 $1,000 $5,500 LOCATION MAP N 2006-2007 CIP W- E S 0 1,300 2,600 5,200 7,89P 10,400 Feet County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Parks & Recreation DATE: April 17, 2006 ROJECTIPROGRAMNAME: Alae Cemetery Expansion and Improvements LOCATION (attach map): TMK 2-6-12:010, 043 & 048 COUNCIL DISTRICT: 1 AMOUNTREQUESTED: $250,000 ROJECT/PROGRAM DESCRIPTION: Additional funding for construction of the expansion of Alae Cemetery to cover paving, grading, grassing and erosion control measures as well as other cemetery related amentities that are required to support its use. ROJECTIPROGRAM JUSTIFICATION: Inadequate Facility: Alae cemetery is nearing (burial) capacity for its currently developed area. The county acquired additional lands mauka of the existing cemetery for expansion of burial plots. The entire expansion area will be graded and grassed, an extension to the access road will be installed, the water line will be extended and cemetery amenities will be constructed to support the expansion of the burial sites. IMPACT ON OPERATIONAL BUDGET. Additional developed area would result in increased maintenance demands and responsibilities for which one additional position would be required. XPEN0ITURE(X$1000): Prior Funding This Request FY07-08 FY 08-09 FY 09-10 FY 1041 FY I1-12 Ta compknon TOTAL: Planning and Acquisition esign/Survey 87 $87 Construction 1,000 750 $1,750' urchase ofE u' men/ epair & Maintenance TOTAL: fO $1,087 1 $750 $1,837 & M COSTS (x $1000): $30 $45 $45 $45 $45 on-going $210 FUND SOURCE (x $1000): Cly G.0.Bond/Other 1,087 750 $1,837 Cty Special Revenue (e.g., fuel lax) State Revolving Fund State CIP Federal tate TOTAL: E $1,087 $750 1 $1,837 County of Hawaii PROJECT DATA/FINANClAL IMPACT STATEMENT Fiscal Year 2005 to 2006 DEPARTMENT: Parks & Recreation DATE: April 17, 2006 ROJECTIPROGRAMNAME: New Puna Gymnasium & Park Development LOCATION (attach map): Keone oko Homesteads, Puna TMK 1-5-07:017, 062-066 COUNCIL DISTRICT .• 5 AMOUNT REQUESTED: $500,000 ROJECTIPROGRAM DESCRIPTION: Additional funding for development of a new District Park in the Puna district near Pahoa to include a gymnasium, ballfields, comfort stations, pavilions, azkin , landscaping and all necessary improvements associated with a new park and related facilities. ROJECTIPROGRAM JUSTIFICATION: Inadequate Service and Facility: The Puna district is the fastest growing population in the County and is under -served with respect to park facilities. Existing park facilities are antiquated, sub -standard, or insufficient to adequately service the current public need/demand. The development of the new gym and park will be accomplished on the same site as the proposed new fire and police stations and will be a tremendous benefit to the population of Puna as well as serve as a possible training area for the Fire Department's fire recruit training ro am. MPACT ON OPERATIONAL BUDGET. Park development will require additional staffing for recreation and maintenance operations as well as increase costs attributable to utilities, maintenance and long-term repair and maintenance efforts. XPENDITURE (X$1000): PPY nor Funding This Request FY07-08 FY 08-09 FY09-10 FY 10-I1 FYII-12 To completion TOTAL: Planning and Acquisition esign/Survey 500 $750 Construction ]250 11,000 $12,000 Purchase of Equipment Repair & Maintenance TOTAL: $250 $500 $12,000 $12,750 O & MCOSTS (x $1000): $200 $200 $200 $200 $200 on-going $1,000 FUND SOURCE (x $1000): Cly G.O. Bond/Other 250 250 $500 Cty Special Revenue (eg., fuel tax) State Revolving Fund State CIP 8,000 $8,000 ederal ivate TOTAL: $250 $150 $8,000 $8,500 Is 0 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to2007 DEPARTMENT- Parks and Recreation DATE: January6, 2006 ROJECTITROGRAMNAME: Machado Acres Park LOCATION (attach map): TMX: 2-4-60:001 & 29:028 COUNCIL DISTRICT. 3 AMOUNTREQUESTED: $255,000 ROJECT/PROGRAMDESCRIPTION.• To design and construct a neighborhood passive park. The construction cost for the passive park would include the clearing, grubbing, purchase of fill 1co2!2!LnitX. d landscaping materials, and rental of equipment. The communitymembers would assist in the project. OJECTIPROGRAMJUSTIFICATION: dinance 98-105, rezoned the subdivision's residential parcels to RS -10 to reflect the actual density, and condition "B" required Machado Acres sociation to dedicate the subject two parcels to the County for a park use. Resolution 95-03, the County accepted the property. The neighborhood ssive park is needed for the residents of the Machado Acres and surrounding communities. The park would initially be used as a passive park for the Rea ro riation for the remaining balance of Account No. 110-599-5591.72.115 F,q CT ON OPERATIONAL BUDGET. isition and improvement of the property augments the park inventory and increases the demand on manpower and equipment ,although it is cted that the community will be active in the care and upkeep of the park. EXPENDITURE (X $1000): Prior Funding This Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To completion TOTAL: Planning and Acquisition esign/Survey 50 $50 Construction 155 117 $272 Purchase of Equipment Repair & Maintenance TOTAL: $205 $117 $322 O & MCOSTS (x $1000): $5 $5 $5 $5 $5 $5 on-going $30 FUND SOURCE (x $1000): County CIP sm 255 117 $372 County non-CIP (ag., fuel tax) State (e.., SRF) Federal Private TOTAL: $255 $117 $372 County of Hawaii PROJECT DATA/FINANCL9L IMPACT STATEMENT Ficral Year 2006 to 2007 DEPARTMENT. Parks & Recreation DATE: January 6, 2006 ROJECTIPROGRAMNAME: Alii Kai Subdivision New Park Development LOCATION (attach map): Holualoa, North Kona THK., 7-6-19:034 COUNCIL DISTRICT: 7 AMOUNT REQUESTED: $500,000 ROJECT/PROGRAM DESCRIPTION: Development of a new neighborhood park in a residential subdivision in area amongst numerous residential subdivision where there are no public .neijzhborhood parks for fami!X related recreational activites ROJECTIPROGRAM JUSTIFICATION: Quality of Life: The development of this park will have a tremendously positive impact on the families living near the site, and those in the general vicinity, as it will afford them a safe, clean, public recreation area that is family oriented in a neighborhood setting. Childrens' playground equipment, a pavilion with restrooms and grassed open areas with landscaping is envisioned for the site. Reappropriation of Account 110.599.5597.91.115 MPACT ON OPERATIONAL BUDGET: Park development will require additional staffing for maintenance operations as well as increase costs attributable to utilities, maintenance supplies & equipment and long-term Mair and maintenance efforts. Prior tc Funding Request FY07-08 FY08-09 FY09-10 FY10-11 FY 11-12 re comvtetinn TOTAL: XPENDITURE(X$1000): tanning 25 $25 and Ac uisition esign/Survey 50 $50 Construction 1,247 500 $1,747 Purchase of Equipment Repair & Maintenance TOTAL: $1,322 $500 $1,822 O & M COSTS (x $1000): $60 $60 $60 $60 $60 on-going $300 FUND SOURCE (x $1000): 500 $1,000 Cty G.O. Bond/Other 500 C Special Revenue (e.g., fuel tax) 7 State Revolving Fund State CIP Federa! rivate 822 $822 TOTAL: $1,322 11 $500 $1,822 County of Hawaii PROJECT DATAIFINANCLIL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT Parks & Recreation DATE: January 6, 2006 ROJECTIPROGRAMNAME: Liholiho Park (Pualani Estates Subdivision) Playground Development LOCATION (attach map): TMK: 7-5-041:052 COUNCIL DISTRICT • 7 AMOUNTREQUESTED: $100,000 ROJECTIPROGRAM DESCRIPTION: The developer of the Pualani Estates Subdivision (D.R. Horton) is required to turn over to the county the 5+ acre park site which will include on-site parking, baseball/softball field, a soccer field, and various landscaping improvements. This project would install children's playground equipment to compliment the other recureational amentities the developer is required to install. ROJECTIPROGRAM JUSTIFICATION: Quality of Life and Inadequate Facilities: Children's playground equipment is beneficial to the development of children's social skills and physical development and is best located in close proximity to residential areas. The new park site, adjacent to the newly developed subidivision would be ideal to service the neighborhood children of the area as there are no other public parks within a save and reasonable walking distance of the community. lReppropriation of Account No. 110-599.5597.92.115 ($100,000) and additional funding $100 000 . MPACT ON OPERATIONAL BUDGET., o immediate impacts, future impact for repair and maintenance of the playground equpment and its surfacing system. URE (X $1000): Prior Funding This Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To completion TOTAL: Planning ition rLandAcquisition ey 100 200 $300 Equipment aintenance TOTAL: $100 $200 $300 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cty G.O. Rondloiker Co, Special Revenue (e.g., fuel tax) 7 State Revolving Fund tate CIP ederal ..vote 100 200 $300 11 TOTAL: $100 $200 $300 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Parks & Recreation DATE: January 6, 2006 ROJECTIPROGRAMNAME: Waimea Trails & Greenways LOCATION (attach map): Waimea, South Kohala TMX. Vanes COUNCIL DISTRICT: 9 AMO UNTREQ UESTED: $590,000 ROJECTIPROGRAM DESCRIPTION: construct pedestrian/bicycle trail system between Lindsey Road and the Sandalwood Subdivision; design trail system between Sandalwood and Kohala View Estates Subidvision; finalize alignment between Lindsey Road and Waimea Church Row. ROJECTIPROGRAM JUSTIFICATION: Matching Funds and Quality of Life: County funds are required to leverage funding from the Statewide Transportation Improvement Program (STIP). The project would improve the quality of life for the Waimea Community by providing a non -vehicular transporation link, as well as greenway, between several of Waimea's residential, recreational and community service areas. Reappropriation of Account No. 110.599.5594.46.115. 'IMPACT ON OPERATIONAL BUDGET: Increased development would require additional maintenance efforts and, in the future, additional repair and maintenance efforts. EXPENDITURE (X $1000): nor Funding is Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-11 To compteaon TOTAL: Tanning andAcquisition esign/Smwey 527 150 F1 $677 Construction 590 590 1,750 $2.930 Purchase of Equipment Repair & Maintenance TOTAL: $1,117ll $590 $1,900 $3,682 O & MCOSTS (x $1000): $5 $10 $15 $20 $25 on-going $75 FUND SOURCE (x $1000): 590 650 $2,043 Cly G.O. Bond/Other 803 Cty Special Revenue (e.g., fuel tax) State Revolving Fund State CIP Federal 314 1,250 $1,564 rimte TOTAL: $1,117 $590 I $1,900 $3,607 County of Hawaii PROJECT DATAIFINANCL4L IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Parks & Recreation DATE. January 6, 2006 ROJECDFROGRAMNAME.- Hilo Bay Trails LOCATION (attach map): Hilo, South Hilo TMK.• Vanes COUNCIL DISTRICT. 4 AMOUNT REQUESTED: $50,000 ROJECTIPROGRAM DESCRIPTION: Construct pedestrian/bicycle trail system from the cruise ship terminal at Hilo Harbor to downtown Hilo via Banyan Drive, Hilo Bayfront, and Wailoa Park. ROJECT/PROGRAM JUSTIFICATION: Matching Funds and Quality of Life: County funds are required to leverage funding from the Hawaii Tourism Authority. The project would provide a recreational asset for the residents and cruise ship visitors, and economic stimulus for local businesses. MPACT ON OPERATIONAL BUDGET. Increased development would require additional maintenance efforts and, in the future, additional repair and maintenance efforts. EXPENDITURE (X $1000): Prior Funding This FY Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-11 To compfefian TOTAL: Tannin 150 $150 and Acquisition esigwSurvey 300 $300 Construction 200 500 500 $1,200 Purchase of Equipment _ Repair & Maintenance TOTAL:$150 $500 $500 $500 $1,650 O & MCOSTS (x $1000): FUND SOURCE (x $1000): Cty G. 0. Bond/Other 50 $5 500 $10 500 $15 $20 $25 on-going 500 $75 $1,550 Cty Special Revenue (e.., fuel tax) tl; State Revolving Fund State Grant 100 $100 Federal Private TOTAL: 01 $150 1 $500 $500 I $500 1 1 1 $1,6501 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2005 to 2006 DEPARTMENT. Parks & Recreation DATE: January 24, 2006 ROJECT/PROGRAMNAME: Na'alehu Park Site Acquisition LOCATION (attach map): 95-5635 Mamalahoa Highway TMK.- (3)9-5-21:023 COUNCIL DISTRICT. -6 AMOUNT REQUESTED: $1,200,000: ROJECTIPROGRAM DESCRIPTION: Acquisition of Na'alehu Park site and all of the improvements thereat as County -owned property. ROJECTIPROGRAM JUSTIFICATION: Inadequate Facilities: Na'alehu Park is the primary recreational site in the town of Na'alehu containing ballftelds, tennis and basketball courts, a comfort station, a community center and several smaller structures. The site is fully developed and centrally located within the town and hosts numerous recreational and elderly programs and functions of the department. This purchase is necessary to ensure the park site is held in public ownership for public use due to the pending dissolution of the former C. Brewer company, from which the County has leased this site for numerous years. MPACT ON OPERATIONAL BUDGET.• There is no anticipated impact on the operating budget as the County has manned, maintained and operated the site under lease for numerous years. XPENDITURE (X $1000): rtor—Th-5TY Funding Request FY07-08 FY08-09 FY09-10 FY10-11 FYII-12 To completion TOTAL: Tanning LandAcquisition 1,200 $1,200 Design/Survey Construction Purchase of Equipment Repair & Maintenance TOTAL: $1,200 $1,200 O & M COSTS (x $1000): 1,200 $1,200 FUND SOURCE (x $1000): Cly G. 0. Bond/Other Cly Special Revenue (e.g., fuel tax) State Revolving Fund State CIP ederal rivate TOTAL: L $1,200 $1,200 _�---- -- l._ _-._._.__._. _. 8� _ r'3i . i'S: `� .31 SI County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Ficral Year 2005.to 2006 DEPARTMENT. • Parks & Recreation DATE: April 17, 2006 ROJECTIPROGRAMNAME: Reed's Bay Area Parks Restoration & Improvement LOCATION (attach map): Reed's BM, Waiakea, South Hilo TMK.• 2-1-05:001,2-1-06:013 & 015 COUNCIL DISTRICT: 4 AMOUNTREQUESTED: $1,000,000 ROJECTIPROGRAM DESCRIPTION: Development of Reed's Bay Beach Park and adjoining County park sites to include replacement of the comfort station, separating vehicular and pedestrian access, providint picnickingamenities, accessible routes, landscaping and overall beautification of the site. ROJECTIPROGRAM JUSTIFICATION: Quality of Life: Reed's Bay Beach Park and Kuhio Kalanianaole Park are located at the juncture of Banyan Drive and Kalanianaole Street and are adjacent to the major tourist accommodations in Hilo as well as on the direct route that cruise ship passengers take from the pier to all of Hilo. The project will enhance the beauty of Hilo's shoreline and facilitate more intensive use for East Hawaii's limited public beach space as well as provide areas for small watercraft enthusiasts to launch and retrieve their craft and educate the ublic about boating and water safer . ACT ONOPERATIONAL BUDGET. clue. ;PENDITURE (X $1000): rwr Funding u Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY11-12 To comp/Kion TOTAL: Planning and Acquisition esigmsurvey 100 $100 Construction 899 1,000 $1,899 Purchase ofE uipment Repair & Maintenance TOTAL: $999 $1,000 1 $1,999 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cty G.O. Bond/Other 750 1,000 $1,750 City Special Revenue (e.g., fuel tax) State Revolving Fund State CIP ederal 249 $249 rivate TOTAL: $999 $1,000 $1,999 County ofHawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2005 to 2006 DEPARTMENT- Parks & Recreation DATE: April 17, 2006 ROJECTIPROGRAMNAME. Park Improvement Projects - Council District 1 LOCATION (attack map): Various TMK N/A COUNCIL DISTRICT., I AMOUNT REQUESTED: $100,000 ROJECTIPROGRAM DESCRIPTION: Council discretionary fund projects directed through our department are used to fund new improvements, repairs, upgrades, and modifications at various parks utilizing community volunteers in combination with County resources. Projects, although smaller in scale, require extended timeframes and flexibility in funding due to the volunteer component and typically weekend -only availability for implementation. ROJECT/PROGRAM JUSTIFICATION: Quality of Life, Public health & safety and Repair/Maintenance: The department relies on volunteer efforts to accomplish many smaller, front line projects that are supported by the local communities they are intended for in conjunction with support from the sitting councilmember of the district. These projects, whether repairs or new work, have an immediate impact in the community and develop a positive relationship between taxpayers and their government and benefit the entire community. Projects enhance the safety, usability and aesthetics of park sites and facilities. .MPACT ON OPERATIONAL BUDGET. None. :1 [EXPENDITURE (X $1000): F -Tr -for Funding ThISFY Request FY07--08 FY 08-09 FY09-10 FY10-11 FYII-12 Tocompledon TOTAL: Planning and Acquisition esign/Survey Construction 100 $100 Purchase o E u' ment Repair & Maintenance TOTAL: $100 $100 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cty G.O. Bond/Other 100 $100 Cty Special Revenue (e.g., fuel tax) State RevolvingFund State CIP Federal ivate TOTAL: $100 $100 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2005 to 2006 DEPARTMENT. Parks & Recreation DATE. April 17, 2006 ROJECT/PROGRAM NAME: Park Improvement Projects - Council District 2 LOCA TION (attach map): Various TMK: NIA COUNCIL DISTRICT: 2 AMOUNTREQUESTED: $100,000 PRO .IECT/PROGR.4M DESCRIPTION: Council discretionary fund projects directed through our department are used to fund new improvements, repairs, upgrades, and modifications at various parks utilizing community volunteers in combination with County resources. Projects, although smaller in scale, require extended timeframes and flexibility in funding due to the volunteer component and typically weekend -only availability for implementation. ROJECTIPROGRAM JUSTIFICATION: Quality of Life, Public health & safety and Repair/Maintenance: The department relies on volunteer efforts to accomplish many smaller, front line projects that are supported by the local communities they are intended for in conjunction with support from the sitting councilmember of the district. These projects, whether repairs or new work, have an immediate impact in the community and develop a positive relationship between taxpayers and their government and benefit the entire community. Projects enhance the safety,usability and aesthetics of park sites and facilities. IMPACT ONOPERATIONAL BUDGET: None. ENDITURE (X $1000). Prior Funding lhUPY Request FY07-08 FY08-09 FY09-10 FY 10-11 FYIl-12 Tow-PIMan TOTAL: Planning and Acquisition esign/Survey Construction 100 $100 ofE uipment Furchase ,pair & Maintenance TOTAL: $100 $100 O & M COSTS (x $1000): FUND SOURCE (x $1000): Ciy G.O. Bond/Other mom 100 $100 Cty Special Revenue (e.., fuel tax) State Revolving Fund State CIP Federal Private TOTAL: I $100 $100 County of Hawaii PROJECT DATAIFINANCL9L IMPACT STATEMENT Ffernl Vonr 2005 to 2006 DEPARTMENT. Parks & Recreation DATE: April 17, 2006 ROJECTIPROGRAMNAME: Park Improvement Projects - Council District 3 LOCATION (attach map): Various TMK: NIA COUNCIL DISTRICT: 3 AMOUNTREQUESTED: $100,000 ROJECTIPROGRAM DESCRIPTION: Council discretionary fund projects directed through our department are used to fund new improvements, repairs, upgrades, and modifications at various parks utilizing community volunteers in combination with County resources. Projects, although smaller in scale, require extended timeframes and flexibility in funding due to the volunteer component and typically weekend -only availability for implementation. ROJECTIPROGRAM JUSTIFICATION: Quality of Life, Public health & safety and Repair/Maintenance: The department relies on volunteer efforts to accomplish many smaller, front line projects that are supported by the local communities they are intended for in conjunction with support from the sitting councilmember of the district. These projects, whether repairs or new work, have an immediate impact in the community and develop a positive relationship between taxpayers and their government and benefit the entire community. Projects enhance the safety, usability and aesthetics of ark sites and facilities. MPACT ON OPERATIONAL BUDGET. Lone. [EXPENDITURE (X $1000): r�orThis Funding Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To rompledm TOTAL: Tanning and Acquisition esigwSurvey Construction 100 $100 Purchase ofE uipment Repair & Maintenance TOTAL: $100 $100 O & M COSTS (x $1000): FUND SOURCE (x $1000): City G.O. Bond/Other 100 $100 Cty Special Revenue (e.g., fuel tax) State Revolving Fund State CIP Federal rivate TOTAL: $100 $100 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal Year 2005 to 2006 DEPARTMENT: Parks & Recreation DATE: April 17, 2006 ROJECTIPROGRAMNAME: Park Improvement Projects - Council District 4 OCATION(attach map): Various TMK• N/A COUNCIL DISTRICT .• 4 AMOUNTREQUESTED: $100,000 ROJECTIPROGRAM DESCRIPTION: Council discretionary fund projects directed through our department are used to fund new improvements, repairs, upgrades, and modifications at various parks utilizing community volunteers in combination with County resources. the sitting councilmember of the district. Projects, although smaller in scale, require extended timeframes and flexibility in funding due to the volunteer component and typically weekend -only availability for implementation. ROJECTIPROGRAM JUSTIFICATION: Quality of Life, Public health & safety and Repair/Maintenance: The department relies on volunteer efforts to accomplish many smaller, front line projects that are supported by the local communities they are intended for in conjunction with support from the sitting councilmember of the district. These projects, whether repairs or new work, have an immediate impact in the community and develop a positive relationship between taxpayers and their government and benefit the entire community. Projects enhance the safety,usabiljtyand aesthetics of ark sites and facilities. MPACT ON OPERATIONAL B UD GET.- None. ET:None. XPENDITURE (X $1000): Prior Funding This Request FY07-08 FY 08-09 FY 09-10 FY 10-11 FYI1-12 Tocomptetion TOTAL: Planning and Acquisition esignlNurvey_ Construction 100 $100 Purchase of Equipment Repair & Maintenance TOTAL: $100 $100 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cty G.O. Bond/Other 100 $100 Cty Special Revenue (e.g., fuel tax) State Revolving Fund tate CIP Federal Private TOTAL: $100 E $100 County of Hawaii PROJECT DATAIFINANCiAL IMPACT STATEMENT Fiera! Year 2005 to 2006 DEPARTMENT. Parks & Recreation DATE: April 17, 2006 ROJECTIPROCRAMNAME. Park Improvement Projects - Council District 5 LOCATION (attach map): Various TMK: N1 COUNCIL DISTRICT: 5 AMOUNT REQUESTED: $100,000 ROJECT/PROGRAM DESCRIPTION.• Council discretionary fund projects directed through our department are used to fund new improvements, repairs, upgrades, and modifications at various parks utilizing community volunteers in combination with County resources. Projects, although smaller in scale, require extended timeframes and flexibility in funding due to the volunteer component and typically weekend -only availability for implementation. ROJECTIPROGRAM JUSTIFICATION: Quality of Life, Public health & safety and Repair/Maintenance: The department relies on volunteer efforts to accomplish many smaller, front line projects that are supported by the local communities they are intended for in conjunction with support from the sitting councilmember of the district. These projects, whether repairs or new work, have an immediate impact in the community and develop a positive relationship between taxpayers and their government and benefit the entire community. Projects enhance the safety,usability and aesthetics of park sites and facilities. MPACT ON OPERATIONAL BUDGET. None. XPENDTTURE(X$1000): norThisFY Funding Request FY07-08 FY08-09 FY09-10 FY 10-11 FYII-12 To eompleaan TOTAL: Planning and Acquisition esign/Survey Construction 100 $100 Purchase of Equipment ,pair & Maintenance TOTAL: $100 $100 0 & M COSTS (x $1000): FUND SOURCE (x $1000): Cty C.O. Bond/Other 100 $100 Cty Special Revenue (e.., fuel tax) State Revolving Fund State CIP edera! rival, TOTAL: $100 $100 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2005 to 2006 DEPARTMENT. Parks & Recreation DATE: April 17, 2006 ROJECTIPROGRAMNAME: Park Improvement Projects - Council District 6 LOCATION (attach map): Various TMK: N/A COUNCIL DISTRICT. 6 AMOUNT REQUESTED: $100,000 ROJECT/PROGRAM DESCRIPTION: Council discretionary fund projects directed through our department are used to fund new improvements, repairs, upgrades, and modifications at various parks utilizing community volunteers in combination with County resources. Projects, although smaller in scale, require extended timeframes and flexibility in funding due to the volunteer component and typically weekend -only availability for implementation. [ROJECTIPROGRAM JUSTIFICATION: uality of Life, Public health & safety and Repair/Maintenance: The department relies on volunteer efforts to accomplish many smaller, front line ojects that are supported by the local communities they are intended for in conjunction with support from the sitting councilmember of the district. ese projects, whether repairs or new work, have an immediate impact in the community and develop a positive relationship between taxpayers and ir overnment and benefit the entire communi . Projects enhance the safe usabili and aesthetics of ark sites and facilities. PACT ON OPERATIONAL BUDGET: ne. EXPENDITURE (X $1000): Prior Funding Ihispy Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To co®plefion TOTAL: Planning and Acquisition esigmSurvey Construction 100 $100 Purchase of Equipment Repair & Maintenance TOTAL: O $100 $100 O & MCOSTS (x $1000): 100 $100 FUND SOURCE (x $1000): Cty G.O. Bond/Other Special Revenue (e.g., fuel tax) State Revolving Fund State CIP Federal Private TOTAL: $100 $100 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiernl Year 20051. 2006 DEPARTMENT: Parks & Recreation DATE: April 17, 2006 ROJECTIPROGRAMNAME. Park Improvement Projects - Council District 7 LOCATION (attach map): Various TMK: N/A COUNCIL DISTRICT: 7 AMOUNTREQUESTED: $100,000 ROJECTIPROGRAM DESCRIPTION: Council discretionary fund projects directed through our department are used to fund new improvements, repairs, upgrades, and modifications at various parks utilizing community volunteers in combination with County resources. Projects, although smaller in scale, require extended timeframes and flexibility in funding due to the volunteer component and typically weekend -only availability for implementation. ROJECTIPROGRAM JUSTIFICATION: Quality of Life, Public health & safety and Repair/Maintenance: The department relies on volunteer efforts to accomplish many smaller, front line projects that are supported by the local communities they are intended for in conjunction with support from the sitting councilmember of the district. These projects, whether repairs or new work, have an immediate impact in the community and develop a positive relationship between taxpayers and their government and benefit the entire communily. Projects enhance the safety,usability and aesthetics of park sites and facilities. BIPACT ON OPERATIONAL BUDGET: None. EXPENDITURE (X $1000): for Funding This FY Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To completion TOTAL: /arming and Acquisition Design/Survey Construction 100 $100 urchase ofEqu' ment epair & Maintenance TOTAL: $100 1 1 $100 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cty G.D. Bond/Other 100 $100 CtyS ecial Revenue (e.., uetax) State Revolving Fund State CIP Federal Private TOTAL: $100 $100 County of Hawaii PROJECT DATAITINANCZAL IMPACT STATEMENT Ficral Year 2005 to 2006 DEPARTMENT. Parks & Recreation DATE: April 17, 2006 ROJECTIPROGRAMNAME: Park Improvement Projects - Council District 8 OCA TION (attach map): Various TMK. N/A' COUNCIL DISTRICT. 8 AMOUNT REQUESTED: $100,000 ROJECT/PROGRAM DESCRIPTION Council discretionary fund projects directed through our department are used to fund new improvements, repairs, upgrades, and modifications at various parks utilizing community volunteers in combination with County resources. Projects, although smaller in scale, require extended timeframes and flexibility in funding due to the volunteer component and typically weekend -only availability for implementation. ROJECT/PROGRAM JUSTIFICATION: Quality of Life, Public health & safety and Repair/Maintenance: The department relies on volunteer efforts to accomplish many smaller, front line projects that are supported by the local communities they are intended for in conjunction with support from the sitting councilmember of the district. These projects, whether repairs or new work, have an immediate impact in the community and develop a positive relationship between taxpayers and their government and benefit the entire community. Projects enhance the safety,usability and aesthetics of park sites and facilities. IMPACT ON OPERATIONAL BUDGET: None. XPENDII'URE(X$1000): Prior Funding is Request FY07-08 FY 08-09 FY09-10 FY10-11 FYII-12 To completion TOTAL: Planning and Acquisition Design/Survey Construction 100 $100 Purchase ofE ui ment Repair & Maintenance TOTAL: $100 $100 & M COSTS (x $1000): 100 $100 UND SOURCE (x $1000): Cty G.O. Bond/Other 1O Cty Special Revenue (e.., fuel tax) State Revolving Fund State CIP ederal rivate TOTAL: $100 $100 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT FReal Year 2005 to 2006 DEPARTMENT., Parks & Recreation DATE: April 17, 2006 ROJECTIPROGRAMNAME: Park Improvement Projects - Council District 9 LOCATION (attach map): Various THK N/A COUNCIL DISTRICT: 9 AMOUNT REQUESTED: $100,000 ROJECTIPROGRAM DESCRIPTION: Council discretionary fund projects directed through our department are used to fund new improvements, repairs, upgrades, and modifications at various parks utilizing community volunteers in combination with County resources. Projects, although smaller in scale, require extended timeframes and flexibility in funding due to the volunteer component and typically weekend -only availability for implementation. ROJECTIPROGRAM JUSTIFICATION: Quality of Life, Public health & safety and Repair/Maintenance: The department relies on volunteer efforts to accomplish many smaller, front line projects that are supported by the local communities they are intended for in conjunction with support from the sitting councilmember of the district. These projects, whether repairs or new work, have an immediate impact in the community and develop a positive relationship between taxpayers and their government and benefit the entire communit . Projects enhance the safety,usability and aesthetics of park sites and facilities. MPACT ON OPERATIONAL BUDGET: None. XPENDITURE (X $1000): norFIFE= Funding Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To comptenon TOTAL: Planning and Acquisition Design/Survey Construction 100 $100 Purchase o Equ' ment Repair & Maintenance TOTAL: $100 $100 O & M COSTS (x $1000): 100 $100 FUND SOURCE (x $1000): Cty G.O. Bond/Other Cty Special Revenue (e.., fuel tax) State Revolving Fund State CIP Federal liorivate TOTAL: $100 $100 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2004 to 2005 DEPARTMENT. Parks & Recreation DATE: April 17, 2006 ROJECTIPROGRAM NAME: Waiakea Uka Park Comfort Station LOCATION (attach map): Waiakea Uka Park, South Hilo TMX: 2-4-35:002, 004 COUNCIL DISTRICT: 3 AMOUNT REQUESTED: $60,000 ROJECT/PROGRAM DESCRIPTION: Construction of a new comfort station to service the existing baseball fields. ROJECTIPROGRAM JUSTIFICATION: Inadequate Facility: Baseball fields and the children's playground equipment area do not have restroom facilities to support their use (outside gym hours). The fields are heavily used for numerous baseball and softball leagues' activities and the children's playground is also well -used. Construction of the comfort station will involve volunteer construction efforts and this request represents the costs for materials as well as construction expertise beyond the volunteer's capabilities as required to complete the groject. Reappropriation of balance of Account No. 110-599-5591.70.115 IMPACT ON OPERATIONAL BUDGET: None. t = - -------- i : On _-------_ z i ;; +ri3w $ :: as it r r�, `5,'47 ' County of Hawaii PROJECT DATAIFINANCL4L IMPACT STATEMENT Fiscal Year 2004 to 2005 DEPARTMENT. Parks & Recreation DATE: April 17, 2006 ROJECTITROGRAMNAME: Konawaena Swimming Pool Improvements LOCATION (attach map): Konawaena School Cam us, South Kona TMK. 8-1-05:013 COUNCIL DISTRICT: 7 AMOUNT REQUESTED: $750,000 ROJECTIPROGRAM DESCRIPTION: Improvements to the swimming pool circulation system, pool basin, lighting system, solar heating system, re -roofing of the facility and other related or similar repairs or upEades necess2a to ensure pro2er and safe o eration of the 2ool facility. ROJECT/PROGRAM JUSTIFICATION: Repair/Maintenance: Existing pool circulation system is antiquated and in constant need of repairs reulting in poor water quality and complaints by users, solar heating system is deteriorated beyond repair, existing roofing is in poor condition resluting in leaks damaging buiding interiors, electrical system is antiquated and in constant need of repairs and other damage due to termite, rot, wear, abuse and other factors contribute to the rundown condition of the facility and its need of repairs. Pool is contantly and heavily used by the public and Konawaena School. MPACT ON OPERATIONAL BUDGET: Positive impact as project will obviate constant in-house repairs, circulation and electrical system will be more energy efficient. m Request FY07-08 FY 08-09 FY09-10 FY10-11 FY11-11 Tocmpletion TOTAL: XPENDITURE (X $1000): rwr Funding Planning nd Ac uisition esign/Survey Construction 1,250 750 $2,000 Purchase of Equi ment Repair & Maintenance TOTAL: $1,250 $750 $2,000 O & M COSTS (x $1000): FUND SOURCE (x $1000): 750 $2,000 Cty G.O. Bond/Other 1,250 Cty Special Revenue (e.g., fuel tax) 7 State Revolving Fund State CIP r edera! iv TOTAL: $1,250 $750 $2,000 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to2007 DEPARTMENT. Parks and Recreation DATE: May 8, 2006 R OJE CTIPR 0 GRA M NA ME: Dirt Bike / ATV Track LOCATION (attach map): TUX 2-1-13:002 Portio COUNCIL DISTRICT. 4 AMOUNTREQUESTED: $100,000 ROJECTITROGRAMDESCRIPTION: To facilitate improvements necessary to create a safe riding environment for ATV and MotoCross vehicles. R OJECTIPR 0 GRAM JUSTIFICATION: The popularity of offload recreational vehicles and the legitimacy of such riding/racing as a bona fide sport continues to increase amongst youth and adults alike while the opportunities for safe, legal operation is far outweighed by the increasing demand. The creation of a track for ATV racing and trails for recreational riding are consistent with the purpose of the department and provides alternative recreational pursuits for both adults and youth of the big island. Reappropriation for the remaining balance in Account No. 110-599-5591.71.115 of $29,552.53 and increases the appropriation for additional improvements to be funded. MPACT ON OPERATIONAL BUDGET. • The proposed improvements are projected to have no impact on the operational budget as operation and maintenance will be the responsibility of the volunteer group and/or non-profit entity the County partners with tooperate the ATV/MX tracks, trails and related improvements. XPENDITURE (X $1000): JF —WI—or Funding u Request FY 07-08 FY 08-09 FY 09 -IO FY 10-I ] FY II -12 7o completion TOTAL: Planning and Acquisition esign/Survey Construction 50 100 $150 Purchase of Equipment Repair & Maintenance TOTAL: $50 $100 $150 O & M COSTS (x $1000): FUND SOURCE (x $1000): 50 100 $150 County CIP County non-CIP (eg., fuel tax) State (e.g., SRF) Federal Private 111711 TOTAL. $50 $100 $150 County ofHawai `i PROJECT DATAIFINANCIAL IMPACT STATEMENT C-....1 V--- IaA6 m 7aa7 DEPARTMENT: Parks and Recreation DATE: May 11, 2006 PROJECTIPROGRAMNAME: Kahuku Community and Senior Center OCA TION (attach map): 92-8598 Paradise Circle Makai TMK. 9-2-94:3 COUNCIL DISTRICT. 6 AMOUNT REQUESTED: $250,000 PROJECT/PROGRAM DESCRIPTION., Appropriation provides partial funding for the design, planning and construction of a facility with restrooms, to accommodate seniors programs and other group activities; and office space for P&R and aging programs. Building hardened to specifications to allow its use as a civil defense shelter. PROJECTIPROGRAM JUSTIFICATION: The center will provide a safe facility, with restrooms, in which park users can have group gatherings. Office space will allow program staff to be on site and more effective. IMPACT ON OPERATIONAL BUDGET: Increased maintenance will be provided in-kind from the Friends of Kahuku Park (a community group). The community, through Friends of Kahuku Park, has demonstrated the ability to provide in-kind resources, including labor, for improvements and maintenance at Kahuku Park. EXPENDITURE (X $1000): rtar Funding us Request FY 07-08 FY 01-09 FY 09-/0 FY IO -1 / FYI /-12 Tocompletion TOTAL: Planning 50 $50 Land Acquisition Design/Survey 200 $200 Construction 3,000 S3,000 Purchase of Equipment Repair & Maintenance TOTAL: $250 $3,000 $3,250 O & M COSTS (x $1000): FUND SOURCE (x $1000): CtyG.O.Bond/Other 250 3,000 $3,250 Cry Special Revenue (e.g., fuel tax) State Revolving Fund State CIP Federal [private TOTAL: � $250 $3,000 $3,250 O V0 •e• .,, 1. ..... �. �" <O ..O ,1,...O p� ,� . <_.-. O e ..ly ./ • � ., O � ,.,..- O• �" _...... r. ..K Q' a Q ..� ; •..OR �.':��;., / �� r;"" 10,31 0W•'•� •.!•�• ' F ,23 of �` •B ,B3 — 1/ � � 4ae c� � a ` ..,` O••a y�, Y �• rs, _L... O DI. �Q °y.;.':,.1'_•.iw �h9t � "� o. /' O ? of � y,1' ,6B 1 n v .ria RLY J e - •1S, t a 0 i= _ �' k � ,_...,n � 9 , r ..,.a, N O •'r�:A.ls`,.'Mf,...01'Y .._.,_ _ _ . _� i 1 ne., c..... Ci a''B •a: 62 B3 �6 _ C _ _. _ _ 2�2 •23 aeel .nr.l a..e•.laea s•Y l /r Ov _ -•i e.,x ,r �'r Inla`- rr'{ O �26'ln..a/✓'e.n%YfrnJlh' O� vz • y.Qr•.. `....v.::._..• • .� 33 v>.esaF 'x� 2 4 O • O� x •55 ..... O• • O �� i2° e! .• j Sd ,v..1.• /aJ'L v r 0 3P(ly oyO cones O }e 0 !10 ei Y 4 1.11 \ 43 2Q•_ .f Y Y 4 Y� Y 5.3ry •f s`s 2 ,! ;i ri er e tP 47 4B +} QR c[nr ae oe.er �/ �'•"e..r.- ,eXATMN r P eu u AX 9 o.2 94 s°um >o�olnxo, rB Yer Nq Wq//qN OCEAN VIEW ESrq IES, GF })9 /. Np NUk V, XIU, N<Wd// E V M? /Fwmar/r g-I-O/-OBl _ _ _ _ Counq, of Halvai `i PROJECT DATA/FINANCIAL IMPACT STATEMENT Fi<rnl Yon, 2006 to 7007 DEPARTMENT: Parks and Recreation DATE: May 5, 2006 PROJECT/PROGRAM NAME: Naalehu Park Tennis Court Upgrade Planning LOCATION (attach map): Naalehu Park, 95-5635 Mamalahoa Highway TMK: 9-5-21:023 COUNCIL DISTRICT: 6 AMOUNT REQUESTED: $50,000 PROJECT/PROGRAM DESCRIPTION: Design/Survey Upgrading of tennis courts: these funds will be used to purchase materials intended for tennis court surfaces to be applied to the two tennis courts and to purchase windbreaks for along the sides of the courts. PROJECT/PROGRAM JUSTIFICATION: Purchase of Equipment The community is developing a tennis program that utilizes these tennis courts. Improved surfaces and protection from the high wind will help realize the potential for recreation opportunities in this rural area. IMPACT ON OPERATIONAL BUDGET.• TOTAL: Increased maintenance will be minimal, and will be provided in-kind from the community. $50 I $50 EXPENDITURE (X $7000): rtorus Funding Request FY 07-08 FY 08-09 FY 09-70 FY 10-11 FY II -I2 ro completion TOTAL: Planning Land Acquisition Design/Survey Construction 50 $50 W Purchase of Equipment Repair &Maintenance TOTAL: $50 I $50 O & M COSTS (s $7000): FUND SOURCE (x $1000): Cry G.O. Bond/Other 50 $50 CO3 Special Revenue (e.g., fuel tax) State Revolving Fund State CIP Federal Privale TOTAL: [—= $50 $50 ------ ---- yo uP v� `�1 �\ w �\ G H WP -y MPMP ONOP 30 L2 IIIA e lo a \ 1y F o I n 21 1. P A . . ....... 17 unMPsw POP �LA, KAU, HAWA�(�­,,, 0) County of Hmvai`i PROJECT DATA/FINANCIAL IMPACT STATEMENT F,scnt Yo„r 2006 !02007 DEPARTMENT., Parks and Recreation DATE: May 5, 2006 PROJECTIPROGRAMNAME: Naalehu Park Gathering Place LOCATION (attach map): Naalehu Park, 95-5635 Mamalahoa Highway TMX: 9-5-21:023 COUNCIL DISTRICT: 6 AMOUNT REQUESTED: $115,000 PROJECT/PROGRAM DESCRIPTION: A roofed shelter, on a concrete Pad, with one unisex toilet will be constructed. PROJECT/PROGRAM JUSTIFICATION: Space at the one community center at the Naalehu Park is insufficient to accommodate families and community groups using or wanting to use the Park. IMPACT ON OPERATIONAL BUDGET. - The new facility will require regular maintenace. EXPENDITURE (X $1000): F—TrFor– Funding us Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To complain. TOTAL: Planning Land Acquisition Design/Survey 15 $15 Construction 100 $100 Purchase of Equipment Repair & Maintenance TOTAL: $IIS $115 O & M COSTS (,$1000): FUND SOURCE (x $1000): Cq, G.O. Bond/Other 115 $115 Cry Special Revenue (e.g., fuel tax) State Revolving Fund State CIP Federal Private TOTAL: $115 $115 - 21 3Mp. piv \ R \\�L w-. GJ � OPVFER SiRF/T _ yjl I �tL;X;-,m ._, ..... �A....., A 17' IBMPMAOY -O; XOR^•-%%�'..'0�,+�--CJ. r. V'9ii�, 1 �ar�e/ ••• i f lu,eas 3o a3. �NelNs.r _ :�.2 •' 2~� � \ `/"Q'J �-J.eZ.O ..... •y[✓, �. r ll �,2 ., .- �^u'n. o ' P e.a... ..i 12 n ... _ 22 22 .23 1 4 to A Y � loX P...r o7 _.1__ / eA' VM.r. x b1=11F o .u,..o.,r tmnory vX..o ,_2fOFFAWALR.YAU XAWR//(Fo.me. /YVo. 9-5�0)B/O/ \ wUin CMwN4[ .. Count); of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT F;scc! Year 9006 m 9007 DEPARTMENT: Parks and Recreation DATE: May 5, 2006 PROJECTIPROGRAMNAME: Honu`apo Planning LOCATION (attach map): Whittington Beach Park, Honu`apo TMX: 9-5-014:049 COUNCIL DISTRICT: 6 AMOUNT REQUESTED: 8200,000 PROJECT/PROGRAM DESCRIPTION: The favids will be used to survey and map the 225 acres and shoreline, conduct an arachaeological assessment, and prepare a master plan for preservation !Ell: PROJECT/PROGRAM JUSTIFICATION: This land and coastline have in 2006 been established as part of the county parks system. This work is necessary as a starting point to ensure fulfillment of the county's responsibility for land management and open space preservation. IMPACT ON OPERATIONAL BUDGET.- There UDGET:There is no direct impact on the operational budget. Future implementation of the master plan will require operational expenditures. EXPENDITURE (X SI 000): F—PiTo—r Funding lls Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To cmnplenon TOTAL: Planning 75 875 Land Acquisition Design/Survey 125 $125 Construction Purchase of Equipment Repair & Maintenance TOTAL: $200 5200 O & M COSTS (x S1000): FUND SOURCE (x $1000): Cq, G.O. Bond/Other 200 5200 Cry Special Revenue (e.g., fuel tax) State Revolving Fuad Slate CIP Federai Private TOTAL:E==l S200 9700 9 5 14 Or x I • a 1y '�Ii . II f bs.�c { xu.aa/ % , N 1 II ILI 11 .�....,, ...,g{yrN::.: ,>'.'_:,..-. /� p �- f.N 1, l.,..� 3 ��J• Jj .' ^ __ "." ow :.Sri:•=� 4. t7 L fTHIRD olvi>lom IL I14 COSCx LL' In • 500 ff Count), of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Ficrnt Vnar 200A fn MD7 DEPARTMENT: Parks and Recreation DATE: May 11; 2006 PROJECT/PROGRAM NAME: Paving Cooper Center Parking Area Planning LOCATION (attach map): 19-4030 Wright Road TMX: 1-9-03:017 COUNCIL DISTRICT: AMOUNTREQUESTED: $75,000 PROJECT/PROGRAM DESCRIPTION: Design/Sun,el, Paving of parking area at the Cooper Center. JUSTIFICATION: FPROJECTIP,ROGRAM rently, he Cooper Center parking area is bare dirt and gravel, resulting in access to the facility being unsafe and not clean. Purchase of Equipment ONOPERATIONAL BUDGET:ng will not result in an increase in operating costs, and, with the reduction of dust and mud in the parking area near the access, F cleaning will be ier and there can be a small reduction in operating costs. TOTAL: EXPENDITURE (X $1000): F-PFIO-rires Funding Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY ]I-12 Ta emry7letian TOTAL: Planning 10— 510 Land Acquisition Design/Sun,el, Construction 65 $65 Purchase of Equipment Repair & Maintenance TOTAL: � $75 575 11 O & Af COSTS (x 81000): FUND SOURCE (x 81000): Ch, G.O. Bond/Other 75 $75 CN Special Revenue (e.g., fuel tax) Stare Revohing Fund State CIP Federal Private TOTAL: 375 575 K/LAU A QOAG 4 I 0 zppoo{ s.eou` i 5 ,QOA� SUMMER LOTi, PUHA, HAWAII AOVANCA SHEET IIc—a—iuuwix_vnncu er.(-I If IHen'I9. E oGlE rn=wan MIMIEO County of Hawaii PROJECT DATAIFINANCL4L IMPACT STATEMENT Ficrnl Yen, 7006 fn 7007 DEPARTMENT: Parks and Recreation DATE: May 24, 2006 PROJECTIPROGRAM NAME- Public Access, Open Space, & Preservation Acquisition LOCA TION(anach map): Island Wide TMK: COUNCIL DISTRICT.. i through 9 AMOUNT REQUESTED: $3.000,000 PROJECTIPROGRAM DESCRIPTION: To provide funding for the Public Access, Open Space, and Preservation Fund for the acquisition of land based on chapter 2, article 42, Hawaii County Code, Public Access, Open Space, and Natural Resources Preservation Fund. PROJECT/PROGRAM JUSTIFICATION: This is to support the Public Access, Open Space, and Preservation Fund for the acquisition of land based on the following: (1) Public outdoor recreation and education, including access to beaches and mountains; (2) Preservation of historic or culturally important land areas and sites; (3) Protection of natural resources, including buffer zones; (4) Preservation of forests, beaches, coastal areas, natural beauty and agricultural lands; and (5) Protection of watershed lands to preserve water quality and water supply. IMPACT ON OPERATIONAL BUDGET: Unknown at this time. TURE (X $1000): rtor Funding s Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY I1-12 ru cnmpk&. TOTAL: Planning isition rrD 3.000 $3.000 vey on f Equipment Repair A Maintenance TOTAL: $3,000 $3,000 O A M COSTS (x S1006): FUND SOURCE (x S1000): - -nn no Cry G.O. Bond/Other 3,000 S3,000 Cty Special Revenue (eg., fuel tax) State Revolving Fund State CIP Federal Private TOTAL: $3.000 53,000 .11, < Wo 1—1 onlrPj "KONA C4) I ',v I LJTFS If ALA CT) ME it Z)) 49 IVA, I I t. rpAv�.T ON XD3 05 T 3 T , ?00 County of Hawai'i PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT: Parks and Recreation DATE: May 24, 2006 PROJECT/PROGRAM NAME: Yano Hall/Greenwell Park Public Parking Lot LOCATION (attach map): Kealakekua, South Kona TMK: 8-2-13:0 COUNCIL DISTRICT: 7 AMOUNT REQUESTED: $500,000 PROJECT/PROGRAM DESCRIPTION: The funds will be used to build a parking area for the Yana Hall, Greenwell Park and surrounding businesses. PROJECTIPROGRAM JUSTIFICATION: The additional appropriation is for the construction of a new parking lot adjacent to Yano Hall and Greenwell Park. The new parking lot would contain approximately fifty parking stalls. IMPACTON OPERATIONAL BUDGET: The proposed improvements is a project to have no impact on the operational budget. EXPENDITURE (X SI000): rlar Funding llus Request FY07-08 FY08-09 FY09-10 FY10-I1 FYII-11 T C.Wlnio. TOTAL: Planning Land Acquisition esigmSurvey Construction 500 $500 Purchase of Equipment Repair & Maintenance TOTAL: $500 $500 Oa M COSTS (x 51000): O FUND SOURCE (x 81000):7,4 City G.O. Bon&Other 500 $500 Cry Special Revenue (eg., fuel tax) State Revolving Fund State CIP Federal rtvate TOTAL: 5500 I5500 POLICE DEPARTMENT LAWRENCE MAHUNA, POLICE CHIEF SUMMARY OF DEPARTMENTAL REQUESTS SLY YEAR CAPITAL IMPROVEMENTS PROGRAM Division: ue arrment route CURRENT YEAR FUNDING ESTIMATED COST BYFJSCAL YEARS TOTAL PRIORITY PROJECT in thousands) thousands ESTIMATED County State ---in Federal Private revious 06-07 07-08 08-09 09-10 1 10-11 1 11-12 COST 1 Police 700 Megahertz Communication System (reapprop 5299.42) 4,000 4,000 4,000 4,000 4,000 5,000 21,000 2 Kona Evidence Warehouse (reapprop. 5296.64) 130 130 1,275 1 1,405 3 Captain Cook Police Station Improvements (reapprop. 5296.65) 500 500 500 4 Public Safety Complex Repainting (reapprop. 5292.28) 125 125 125 5 Renovation of Police Records Section Receiving Area 35 35 I 35 6 District Station Holding Cell Improvements (reapprop. 5299.43) 312 312 312 7 Microwave Relocation & System Renovation 0 13,100 13,100 2,685 8 Pahoa Police Substation (New) 0 300 1,750 635 850 9 Public Safety Complex Indoor Range 0 150 700 4,085 10 Puna Police Station (New) 0 400 3,685 23,040 11 Police 700 Megahertz Conversion 0 720 2,400 18,720 1,200 0 TOTAL 5,102 0 0 0 14,670 1 5,1021 13,810 23,355 1 5,200 5,000 0 67,137 Overall Rev 06-07.xls 5/3/2006 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT F;.rnt Von. 20 n v to 20 0d AMOUNTREQUESTED: $4,000,000 ROJECTIPROGRAM DESCRIPTION: Convert existing analog microwave loop system to 700 Mhz (previously 800 mhz) digital microwave through new and existing relay sites throughout the Island of Hawaii for all County, Federal and State agencies. ROJECTIPROGRAM JUSTIFICATION: Current analog system has been purchased by private industries forcing affected agencies to migrate to 700 megahertz(MHz) or compatible system. The proposed 700 MHz will serve all government agencies. System enables greater automatic backup frequencies should individual components fail. The system would provide higher and clearer resolution and reliability on data transmission; greater security in radio transmissions with built-in system configuration to prevent unauthorized access, greater cost effectiveness in future improvements which are accomplished through software and input/output hardware changes and eliminates dead spots, crossovers, or interferences in radio transmissions. XPENDITURE (X $1000): Prior Funding 1hispy Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY II -12 TOTAL: Planning 124 $124 and Acquisition $0 esign/Survey 1 $1 Construction 3,875 4,000 4,000 4,000 5,000 $20,875 Purchase of Equipment $01 Operations & Maintenance $0 TOTAL: $0 $4,000 $4,000 1 $4,000 $4,000 $5,000 $0 1 $21,000 O & MCOSTS (x $1000): 4,000 4,000 $8 4,000 $8 4,000 $8 5,000 $8 $32 $21,000 FUND SOURCE (x $1000): County State (SRF) $0 Federal $0 [Private $0 TOTAL: $0 $4,000 $41900 $4,000 $4,000 $5,000 $0 $21,000 County of Hawaii PROJECT DATA1FINANCIAL IMPACT STATEMENT Fiscal Year 20 03 to 10 04 DEPARTMENT. Police Department DATE: January 17, 2006 PROJECTIPROGRAMNAME: Kona Police Evidence Warehouse (Re Appropriation) LOCATION (attach map): Kealakehe, North Kona TMK.• 7-4-08:17 COUNCILDISTRICT: 8 AMOUNT REQUESTED: $130,000 ROJECTIPROGRAM DESCRIPTION: Construction of a 5,000 square feet warehouse at the Kealakehe Police Station site. R OJECTIPROGRAM JUSTIFICATION: A well -secured evidentiary warehouse is needed due to the rapidly increasing volume of evidence in West Hawaii. The present facility is filled to capacity resulting in evidence being stored at various locations. The centralizing of storage will result in efficient and effective accountability for police and court purposes. Operating costs will decrease as monthly rates at the various locations will no longer be necessary. XPENDITURE (X $1000): Prior Funding This Request FY 07-08 FY 08-09 I FY 09-10 FY 10-11 FY II -12 TOTAL: Planning 130 $130 and Acquisition $0 esign/Survey $0 Construction 1,275 $1,275 Purchase of Equipment $0 Operations & Maintenance $0 TOTAL: $0 $130 $1,275 $0 $0 $0 $0 $1,405 0 & MCOSTS (x $1000): FUND SOURCE (x $1000): 130 1,275 $2 $2 $2 $2 $8 $1,405 County State (SRF) $0 Federal $0 Private $o TOTAL: $0 $130 $11075 $0 $01 $0 I $0 1 $1,405 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 20 03 to 26 04 DEPARTMENT. Police Department DATE: January 17, 2006 ROJECTIPROGRAMNAME: Captain Cook Police Station Improvements(Re-Appropriation) LOCA TION (attach map): Captain Cook, South Kona TM/L COUNCIL DISTRICT. 7 AMOUNT REQUESTED: $500,000 ROJECTIPROGRAM DESCRIPTION: Interior renovation of existing building to conform to the Uniform Building Code as amended by the County of Hawaii, the America With Disabilities Act Accessibility Guidelines and other applicable governmental codes and regulations. ROJECTIPROGRAM JUSTIFICATION: In order to better serve the increasing population of South Kona, the Captain Cook Police Station must become a fully and continuously staffed station independent of the Kealakehe Police Station. The station is presently staffed by two officers per watch XPENDITURE(X$1000): Prior Funding u Request FY07-08 FY 08-09 FY09-10 FY10-11 FYII-12 TOTAL: Planning $0 and Acquisition $0 esigmSurvey $0 Construction 500 $500 Purchase ofEquipment $0 Operations & Maintenance $0 TOTAL: $0 $500 $0 $0 $0 $0 $0 $500 O & M COSTS (x $1000): FUND SOURCE (x $1000): 500 $500 County State (SRF) $0 ederal $0 rivate $0 TOTAL: JIF $500 1 $0 $0 $0 $0 $0 $500 County of Hawaii PROJECT DATAITINANCLU IMPACT STATEMENT Fiscal Year 20 03 to 20 04 EPARTMENT: Police Department DATE: January 17, 2006 ROJECTIPROGRAMNAME: Public Safety Complex -Repainting (Re -Appropriation) OCA TION (attach map): 349 Kapiolani Street, Hilo, Hawaii TMK. 2-4-25:28-33 COUNCIL DISTRICT. • 4 AMOUNT REQUESTED: $125,000 ROJECTIPROGRAM DESCRIPTION: Public Safety Complex - Exterior repainting of Radio Shop/Vehicle Shed and Evidence Warehouse Roof, repainting of covered front entrance, trash enclosure and LPG tank enclosure, exterior repainting of generator/air conditioning cooling tower -chiller build ROJECT/PROGRAM JUSTIFICATION: Repainting of the structures at the Public Safety Building Complex are needed. Due to exposure to the elements, paint has peeled or i flaking and mildew and moss have grown on some surfaces. This is an eyesore epecially at the covered front entrance wh XPENDITURE (X$1000): Prior Funding I his Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 TOTAL: Planning $0 and Acquisition $0 esigalSurvey $0 Construction 125 $125 Purchase of Equipment $0' Operations & Maintenance $0 TOTAL: $125 $0 $0 $0 $0 $0 $125 O & M COSTS (x $1000): $0 FUND SOURCE (x $1000): 125 $125 County State (SRF) $0 Federal $0 Private $0 TOTAL: $0 $125 $0 $0 $0 $0 $0 $125 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiernl Vonr 2n n? in 20W DEPARTMENT. Police Department DATE: January 17, 2006 ROJECT/PROGRAMNAME. District Station Holding Cell lmprovements(Re-Appropriation) LOCATION (attach map): Islandwide TMX. Various COUNCIL DISTRICT: ALL AMOUNT REQUESTED: $312,000 ROJECT/PROGRAM DESCRIPTION: Repair and improve holding cells at Honokaa, South and North Kohala, Kealakehe, Captain Cook and Keaau Police Stations. Repair, replace, paint, suicide proof plumbing, toilet, beds, light fixtures, doors, windows, cell bars and install electronics survei ROJECT/PROGRAM JUSTIFICATION: The district holding cells which are used daily are old and need to be refurbished and brought up to present standards to prevent suicides by detainees. Video surveillance systems with remote monitors must also be installed for suicide watches. Prior IhIsIty XPENDITURE (X $1000): Funding Request FY07-08 FY 08-09 FY09-10 FY10-11 FYII-12 TOTAL: Tanning andAcquisition esigeSurvey 1$3'102 Construction 312 urehase of Equipment Operations & Maintenance $0 TOTAL: $0 $312 $o $0 $0 $0 $o $312 O & M COSTS (x $1000): $0 UND SOURCE (x $1000): 312 $312 t County tate (SRF) 7--- $0 ederal $0 .7SFP rivate $0 TOTAL: $01 $312 $0 $0 $0 $0 $0 $312 DEPARTMENT OF PUBLIC WORKS BRUCE MCCLURE, DIRECTOR SUMMAR Y OF DEPAR TMENTAL REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM Department Public Works CURRENT YEAR FUNDING ESTIMATED COST BY FISCAL YEARS (CO UNTY FUNDING) TOTAL PRIORITY PROJECT (in thousands) (in thousands) ESTIMATED To County State Federal Private Previous 06-07 07-08 08-09 09-10 10-11 11-12 C --Pi"'-" COST 1 Water System Backflow Prevention 820 820 820 Compliance at County Facilities 2 Land Acquisition for PW Facilities 100 100 100 100 100 100 100 100 700 3 Palai Stream Flood Control Project 100 100 339 100 2,485 2,924 ACOE 4 Hilo Roads Guardrail & Retaining Walls 2,400 0 FHWA 5 Roof Replacement at Public Safety Bldg 1 Soo 1,500 1,500 6 Lindsey Road Bride Replacement 650 650 600 8,000 9,250 7 Saddle Road Safety Improvements 130 130 500 630 8 Napoopoo Wall Construction 130 130 50 350 530 9 West Hawaii Drainage Improvements 100 100 100 100 100 100 100 100 700 10 East Hawaii Drainage Improvements 100 100 100 100 100 100 100 100 700 11 West Hawai'i Traffic Calming 100 100 1,000 1,100 Improvements 12 East Hawai'i Traffic Calming 100 100 1,000 1,100 Improvements 13 Hazardous Materials Abatement at 800 800 2,000 3,000 5,800 County Facilities 14 Repair and Maintenance of DPW 690 350 690 920 1,150 1,150 1,380 1,380 7,020 Facilities 15 Wood Valley Bridge Replacement 300 300 800 6,000 6,000 13,100 16 Oshim Peck Road Bride Replacement 100 100 300 4,000 4,400 17 Maekawa Wall Construction 150 - 150 100 1,500 1,750 18 Hawai'i County Building Renovations 17,500 5,750 17,500 23,250 19 Au uni Center Puking Lot Renovations 2,500 2,500 2,500 20 Mamalahoa Hwy Rd Improvements, 200 1,000 200 1,500 6,000 4,000 12,700 Kamamalu to Mud Lane 21 La'i'opua Connector Road Project 7,600 400 7,600 8,000 Portions of Keanalehu & Manawae'a 22 West Hawai'i Civic Center Phase 3 30,000 12,000 30,000 42,000 23 Pahoa Facility Off -Site Improvements 2,000 2,000 2,000 24 Mamamalahoa Highway Improvements, 7,600 4,400 7,600 12,000 Honalo to Captain Cook 25 Renovations of DPW Facilities 600 600 720 840 960 960 1 200 5,280 SUMMARY OF DEPARTMENTAL REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM DeP artment Public Works CURRENT YEAR FUNDING ESTIMATED COST BYFISCAL YEARS (COUNTYFUNDING) TOTAL PRIORITY PROJECT in thousands in thousands ESTIMATED To County State Federal Private Previous 06-07 07-08 1 08-09 09-10 10-11 I1-12 Compktion COST 26 Palani Road Widening 1,200 1,200 500 7,000 8,700 27 Kea'au Civic Center 200 200 800 550 6,000 5,000 5,000 17,550 28 Reed's Island Bridge Replacement 300 1,500 300 700 2,500 29 Shared Road Bike Signage for Alii Drive 300 300 300 30 Manono Street Bike & Pedestrian 300 300 3,000 3,300 Improvements 31 Erosin Control Improvements at 680 200 200 200 Haihai Street 32 Mamalahoa Highway Improvements, 750 750 3,900 7,500 12,150 Honalo 3,600 6,400 33 La'aloa Avenue Extension 10,000 34 ADA Compliance for DPW Facilities 1,900 1,000 1,300 1,900 35 ADA Upgrades for County Puking Lots - 350 1,500 1,850 36 ADA Curb Ramp Compliance - 8,163 500 500 500 9,663 Bridge Inspection & Appraisals of 20 20 40 37 Coun f wai'i Bridges 38 Roof PreventiveMaintenance at Aupuni 1,500 1,500 Center 39 Kahului-Keauhou Parkway (FHWA) - 9,830 6,000 15,830 40 Waianuenue Improvements - 275 400 8,000 8,675 41 Mohouli Street Improvement- Komohana 175 1,400 1,575 to Kilauea FHWA 42 Upper Waiakea Stream Flood Control 600 4,200 4,800 Project ACOS 43 Keopu-Hienaloli Flood Control Project 800 3,115 3,915 ACOE Kamehameha Avenue Resurfacing from 44 Wailoa Bridge to Ponahawai Street - 1,000 1,000 HWA 45 Alii Drive Improvements Along Oneo 200 600 800 Ba HWA 46 Kawailani/Iwalani Intersection - 2,886 2,000 4,886 47 Pma M=ds Storage/Warehouse 581 581 581 Building SUMMARY OF DEPARTMENTAL REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM CURRENT YEAR FUNDING ESTIMATED COST BY FISCAL YEARS (COUNTY FUNDING) TOTAL PRIORITY PROJECT in thousands (in thousands) ESTIMATED To County State Federal I Private Previous 06-07 07-08 08-09 09-10 10-11 I1-12 COST 48 Mamalahoa Highway Improvements 28 500 528 Hualalai North FHWA 49 S Hilo Roads Baseyard 581 581 581 Stora e/Warehouse Building Kuakini Highway Improvements from 1,000 1,000 50 Hualalai Road to Alii Highway HWA 51 New Street Light Installations - 500 500 500 500 500 500 500 500 3,500 Improvements to West Hawai'i County 980 980 980 52 Base and 53 Signals New and Upgrades 500 500 500 500 500 500 500 500 3,500. 54 Ku ulau Road Extension 300 0 55 Ka ., ant Street Extension 900 0 0 TOTAL1 80,262 1 1,200 2,500 - 54,846 80,262 44,425 64,475 21,330 8,640 8,880 1,000 1 283,858 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 EPARTMENT.• Department of Public Works - Building Division DATE: January4, 2006 Water System Backflow Prevention Compliance at County Facilities is Request rROJECTIPROGRAMNAME: OCATION (attach map): Islandwide TMK various COUNCIL DISTRICT: Islandwide AMOUNT REQUESTED: $820,000 ROJECTIPROGRAM DESCRIPTION.• TOTAL: Install water system backflow prevention assembly on all County of Hawaii building facilities islandwide ROJECTITROGRAM JUSTIFICATION: Legal Mandate: The Department of Water Supply promulgated Rules and Regulations effective October 21, 2004 requiring the consumer to install an approved backflow prevention assembly to continue water service. The Department of Public Works currently has 67 facilities islandwide that requires compliance. $0 MPACT ON OPERATIONAL BUDGET: Annual testing and certification of backflow prevention assembly. XPENDITURE (X$1000): rtor Funding I is Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY I1-12 To compaction TOTAL: Tanning $0 and Acquisition $0 esign/Survey 120 $120 Construction 700 $700 Purchase ofE uipment $0 Repair & Maintenance $0 TOTAL: $0 $820 $0 $0 $0 $0 $0 $0 $820 O & M COSTS (x $1000): $15 $15 $16 $16 $17 $79 FUND SOURCE (x $1000): 820 $820 Cty G.O. Bond/Other Cty Special Revenue (eg., fuel tax) 7 $0 State Revolving Fund $0 State CIP Federal $0 rivate $0 TOTAL: $0 $820 $0 $0 $0 $0 $0 $0 $820 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal K-ar 2006 to 2007 DEPARTMENT. Public Works, Engineering DivisionDATE: January 6, 2006 ROJECTIPROGRAMNAME., LAND ACQUISITION FOR PUBLIC WORKS FACILITIES LOCATION (attach map): Island -wide TMR: All COUNCIL DISTRICT: All AMOUNT REQUESTED: $1.00,000 ROJECTIPROGRAM DESCRIPTIOK ands for the acquisition of property to establish a County right-of-way for existing streets, traffic signal systems and other public works facilities. ROJECTIPROGRAM JUSTIFICATION: Legal Mandate: During the year, Public Works receives requests to correct roadway encroachments%obstructions in private lands or discovers that an existing Comity facility such as a traffic signal box is not within the County right-of-way. This program provides funds for appraisals, title searches and payments so we may properly acquire private properties to correct these problems. MPACT ON OPERATIONAL BUDGET: None. Prior EXPENDITURE (X $1000): Funding This FY Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To Completion TOTAL: Planning and Ac uisition too too 100 100 100 100 100 $700 esign/Survey Construction Purchase of Equipment Repair & Maintenance TOTAL: $100 $100 $100 $100 $100 $100 $100 $700 O & M COSTS (x $1000): DND SOURCE (x $1000): County CIP 100 100 100 100 100 100 $700 County non-CIP (e.g., fuel tax) State (cg., SRF) 7$1001 Federal Private TOTAL: 7 $100 $100 $100 1100 $100 $100 $700 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fi.,..t V.. M661., 2007 EPARTMENT. Public Works, Engineering Division DATE: January 19, 2006 ROJECTIFROGRAMNAME: PALAI STREAM FLOOD CONTROL. PROJECT (ARMY CORPS OF ENGINEERS) LOCATION (attach map): Waiakea S. Hilo, Hawaii TMK. 24-013,2-2-043&2-4-002 COUNCIL DISTRICT. 8 AMOUNT REQUESTED: $200,000 ROJECTIPROGRAM DESCRIPTION: Complete the Waiakea Uka Flood Control Project and divert Palai stream into the flood control project. Project is receiving federal aid through the Army Corps of Engineers (ACOS) As the sponsor of the project, the Cotmry is obligated to provide local matching (50/50) funds. All technical servicesrwill be provided by the ACOS through in-house and/or contracted services. Additional funds are needed to complete environmental documentation that now includes Tmk: 2-4-002: 73 owned by the Catholic Church. ROJECTIPROGRAM JUSTIFICATION: Public Safety, Matching funds: The ACOF. Palai Stream Flood Damage Reduction Project will improve public safety by reducing the risk of flood damages along the present aliagnment of Palia Stream from Kinoole Street to Waiakea Pond.. MPACT ON OPERATIONAL BUDGET. Upon completion of the project the County of Hawaii is obligated to maintain all improvements in accordance with the ACOE operations manual for the project. This FY Request FY07-08 FY 08-09 FY09-10 FYI0-Il FY 11-12 To Coo,pletion TOTAL: XPENDITURE (X $1000): Prior Funding Planning 339 200 $539 and Ac uisition esign/Survey Construction 7,100 $7,100 Purchase of Equipment Repair & Maintenance TOTAL: $339 1 $200 $7,100 $7,639 O & M COSTS (x $1000): FUND SOURCE (x $1000): County CIP 339 100 2,485 $2,924 County non-CIP (&g.,fuel tax) State (e.g., SRF) Federal 100 4,615 $4,715 Private i —7 TOTAL: $339 lr�$200 $7,100 $7,639 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 1007 DEPARTMENT Public Works, Engineering Division DATE: January23, 2006 ROJECTIPROGRAMNAME. KILO ROADS GUARDRAIL & RETAINING WALL IMPROVEMENTS LOCATION (attach my): TMK: COUNCIL DISTRICT: AMOUNT REQUESTED: $2,400,000 ROJECTIPROGRAM DESCRIPTION: Installation of guardrails and retaining wall at various locations in Hila County match to be funded by fuel tax, ROJECT/PROGRAM JUSTIFICATION.• Public Safety: The project will provide a wider roadway shoulder and will enhance the safety of the roadway. IMPACT ON OPERATIONAL BUDGET. ccd to maintain new guardrails. [EXPENDITURE (X $1000): Prior Funding This FY Request FY07-08 FY0S-09 FY09-10 FY10-11 FY11-12 T Cnmple6un TOTAL: Planning and Ac uisition esign/Survey Construction 2,400 $2,400 Purchase of Equipment Repair & Maintenance TOTAL: $2,400 1 1 1 $2,400 O & M COSTS (x $1000): FUND SOURCE (x $1000): County CIP County non-CIP (e g., fuel taz) State (e.., SRF) Federal 2,400 $2,400 [Private TOTAL• $2,400 $2,400 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT: Department of Public Works - Building Division DATE. January4, 2006 RO✓ECTIPROGRAMNAME: Public Safety Building "A" Roof and Pistol Range Repair LOCATION (attach map): TMK. (3) 2-2-25:028 COUNCIL DISTRICT. 4 AMOUNTREQUESTED: $1,500,000 ROJECT/PROGRAM DESCRIPTION: Remove and replace leaking existing built-up roof and flashing. ROJECTIPROGRAM JUSTIFICATION: Public Safety, Repair and Maintenance: Deferred maintenance has resulted in roofing failure and leaks. MPACT ON OPERATIONAL BUDGET: Execute higher repair/maintenance cost that is not typically included in the annual operational budget. XPENDITURE (X $1000): Prior Funding Iftispy Request FY 07-08 FY 08-09 FY 09-10 FY 10 -II FY 1I-12 To completion TOTAL: farming $0 and Acquisition $0 esign/Survey 225 $225 Construction 1,275 $1,275 Purchase of Equipment $0 Repair & Maintenance $0 TOTAL: $0 $1,500 $0 $0 $0 $0 $0 $0 $1,500 O & M COSTS (z $7000): $0 FUND SOURCE (z $1000): 1,500 $1,500 Cty G.O. Bond/Other Cly Special Revenue (e.g., fuel tax) $0 State Revolving Fund $0 State CIP Federal 1 $0 rivate 1 $0 TOTAL: r $0 $1,500 $0 $0 $0 $0 $0 $0 1 $1,500 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT.- Public Works DATE: January 17, 2006 ROJECT/PROGRAMNAME: Lindsey Road Bridge Replacement LOCATION (attach map): Waimea TMK: 6 - COUNCIL DISTRICT: 9 AMOUNTREQUESTED: $650,000 ROJECTIPROGRAM DESCRIPTION.• Replace the existing Lindsey Road bridge which is currently limited to 16 tons gross vehicle weight with a new bridge designed to carry HS20 loading. Major components of the project will include: 1) demolition of existing structurally substandard concrete bridge; 2) construct new four -lane reinforced concrete bridge; 3) construct approach taper, tie-ins and other appurtenances; 4) construct other associated components such as utility lines, center line and edge of pavement striping, raised pavement markers and traffic signs; 5) if detour road (including temporary culvert) is needed, construction of same and demolition thereafter; 6) environmental assessment, planning, design, construction management, including securing all Federal, State and County ¢units. ROJECT/PROGRAM JUSTIFICATION: Public Health or Safety. Inadequate Service or Facility. Existing reinforced concrete bridge is structurally substandard and is limited to 16 tons gross vehicle weight. Also, additional lane is needed to meet the current traffic volume at very busy intersection. MPACT ON OPERATIONAL BUDGET: Minimal operational expense associated with completed concrete bridge. XPENDITURE(X$1000): nor Funding This Request FY07-08 FY08-09 FY09-10 FY10-11 FY11-12 To completion TOTAL: Planning 150 $150 and Acquisition 500 $500 esign/Survey 600 $600 Construction 8,000 $8,000 Purchase of Equipment Repair & Maintenance TOTAL: $650 $600 $8,000 $9,250 O & MCOSTS (x $1000): FUND SOURCE (x $1000): City G.O. Bond/Other 650 600 8,000 $9,250 Cty Special Revenue (e.., fuel tax) State Revolving Fund tate C!P Federal Private TOTAL: $650 1 $600 $8,000 $9,250 County of Hawaii PROJECT DATA/FINANCML IMPACT STATEMENT F«cal Year 2006 to 2707 DEPARTMENT. Public Works DATE: January17, 2006 ROJECT/PROGRAMNAME: Saddle Road Safety Improvements LOCA TION (attach map): Saddle Road TMK. COUNCIL DISTRICT. AMOUNT REQUESTED: $130,000 ROJECTIPROGRAM DESCRIPTION Construct various safety improvements to Saddle Road at mile posts 8, 13 and 14. Improvements will vary based on conditions (limited vertical sight distance and sharp curves) but will likely include the following: 1) widen shoulder width to provide recovery zones enabling motorists to remain on roadway; 2) install additional warning signs; 3) if site conditions will allow, reconstruct roadway to provide greater vertical sight distance; 4) reconstruct road to increase super elevation for increase safety; 5) install thermoplastic striping and raised pavement markers from mile posts 23 to 53 (excluding portion under construction near Pohakuloa Training Area). ROJECTIPROGRAM JUSTIFICATION: Public Safety: Improvements to sections of Saddle Road will make the roadways safer to motorist and general public. IMPACT ONOPERATIONAL BUDGET: Road maintenance will be provided under general highway maintenance program. [EXPENDITURE (X $1000): Prior Funding This FY Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-11 To completion TOTAL: Planning 30 $30 and Acquisition 50 $50 esign/Survey 50 $50 Construction 500 $500 Purchase of Equipment Repair & Maintenance TOTAL: $130 $500 1 $630 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cty G.O. Bondlother t130 500 $630 Cty Special Revenue (e.., fuel tax) State Revolving Fund State CIP Federal in:Late TOTAL: $130 $500 $630 County of Hawaii PROJECT DATAIFINANCLIL IMPACT STATEMENT V—r zaaF m 2aa7 DEPARTMENT. Public Works DATE: January 17, 2006 ROJECT/PROGRAMNAME: Napoopoo Wall Construction FY07-08 OCATION (attach map).- Kona TMK 8-1-08 COUNCIL DISTRICT: 6 AMOUNTREQUESTED: $130,000 ROJECT/PROGRAM DESCRIPTION: Construct concrete rubble masonry wall to retain unstable embankment. Work will also include paving, striping and signage within the affected areas. ROJECTIPROGRAM JUSTIFICATION: - Public Safety, Repair / Maintenance: Large boulders in the existing embanlanent are ready to fall and could create hazard to motorists. Improvements will stabilize unstable slope and will make roadway safer to motorist and general 2ublic $100 MPACT ON OPERATIONAL BUDGET: Road maintenance will be provided under general highway maintenance program. 50 XPENDITURE (X $1000): Prior Funding a Request FY07-08 FY 08-09 FY09-10 FY10-11 FY11-12 To completion TOTAL: Tanning 30 $30 and Acquisition 100 $100 esigmSurvey 50 $50 Construction 350 $350 Purchase ojEqu' hent Repair & Maintenance TOTAL:----- — $130 $50 $350 $530 O & M COSTS (x $1000): FUND SOURCE (x $1000): 50 350 $530 Cry G.O. Bond/Other Cly Special Revenue (eg., juel tax) r130 7 State Revolving Fund State CIP edera[ Private TOTAL: $130 $50 1 $350 3530 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Ficral Ypar 2006 to 2007 DEPARTMENT., Public Works, Engineering Division DATE: January 6, 2006 ROJECTITROGRAMNAME: WEST HAWAII DRAINAGE IMPROVEMENTS LOCATION (attach map): Various locations in best Hawaii TMK: 5, 6, 7, 8 &. 9 COUNCIL DISTRICT: 6, 7, 8 & 9 AMOUNT REQUESTED: $1.00,000 ROJECTIPROGRAM DESCRIPTION: Construction of various drainage improvements such as drywclls, culverts, chanmcls, swales, etc. to provide a 10 -year level of protection at various locations. Work may also include the upgrading and''or repair of existing drainage facilities. ROJECT/PROGRAM JUSTIFICATION.• Public Safety: Project will address localized flooding/drainage problems in West Hawaii that cannot be economically addressed by a flood control system. Improvements will not provide area wide flood control protection, nor will it address flooding caused by major storm events. MPACT ON OPERATIONAL BUDGET: Projects will reduce maintenance and repairs costs associated with localized flooding.. XPENDITURE(X$1000): L Prior Funding ThisFY Request FY07-08 FY 08-09 FY09-10 FYI0-ll FY1I-11 To Completion TOTAL. Tanning and Acquisition esign/Survey Construction 100 100 100 100 100 loo 100 $700 urehase of Equipment epair &Maintenance TOTAL: $100 $100 $100 $100 $100 $100 $100 $7001 0 & M COSTS (x $1000): FUND SOURCE (x $1000): County CIP too 100 100 100 100 100 100 $700 County non-CIP (e.g., fuel tax) State (,eg., SRF) [Federal [Private TOTAL: $100 $100 $100 $100 $100 $100 5100 $700 County of Hawaii PROJECT DATA/FINANCL9L IMPACT STATEMENT Ficnnl V.-70/161. mn7 DEPARTMENT. Public Works, Engineering Division DATE: January6, 2006 ROJECTIPROGRAMNAME: EAST HAWAII DRAINAGE IMPROVEMENTS LOCATION (attach map): Various locations in East Hawaii TMS: 1,2,3A COUNCIL DISTRICT. • 1,2,3,4&5 - AMOUNT REQUESTED: $1.00,000 ROJECTIPROGRAM DESCRIPTION., Construction of various drainage improvements such as drywclls, culverts, cbatmels, swales, etc. to provide a l0 -year level of protection at various locations. Work may also include the upgrading and%or repair of existing drainage facilities. ROJECTITROGRAM JUSTIFICATION.• Publie Safety: Project will address localized flooding/drainage problems in Past Hawaii that cannot be economically addressed by a flood control system. Improvements will not rovide area wide flood control protection, nor will it address flooding caused by major storm events. IMPACT ON OPERATIONAL BUDGET. Projects wilt reduce maintenance and repairs costs associated with localized flooding.. Prior XPENDITURE (X $1000): Funding This FY Request FY07-08 FY 08-09 FY 09-10 FY10-11 FY11-12 To Completion TOTAL: Planning and Ac uisition esign/Survey Construction 100 100 too 100 loo 100 100 $700 Purchase of Equipment Repair & Maintenance TOTAL: $100 $100 $100 $100 $100 $100 $100 $700 O & M COSTS (x $1000): FUND SOURCE (x $1000): County CIP 100 loo loo 100 100 100 too $700 County non- CIP (eg., fuel tax) State (e.., SRF) Federal Private TOTAL: $100 1 $100 1 $100 1 $100 $100 1 $100 1 $100 $700 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Public Works, Administration DATE: January 19, 2006 RO✓ECTIPROGRAMNAME: WEST HAWAII TRAFFIC CALMING IMPROVEMENTS LOCATION (attach map): Various Locations in East Hawaii TMK.• West Hawaii COUNCIL DISTRICT: 6, 7, 8 & 9 AMOUNT REQUESTED: $100,000 ROJEC77PROGRAM DESCRIPTION. Construction of various Traffic Calming imrpovements such as speed humps and roundabouts, etc. to provide a means to slow down traffic in residential areas at various locations. Work may also include u radin and/or repairing existing road components such as shoulders and drainage ROJECTIPROGRAM JUSTIFICATION: Public Safety: Project will serve to slow traffic and reduce the danger of motorists that speed through residential neighborhoods. Project will also provide for a more efficient flow of traffic through an intersection. This improved flow through the intersection would reduce the number of motorists IMPACT ON OPERATIONAL BUDGET. Project will reduce pedestrian and vehicle accidents due to speeding and risky driver behavior. This reduction in accidents will reduce operational costs associated with a Police and EMS response, as well as costs associated with potential law suits against the County. EXPENDITURE (X$1000): rtor Funding u— Request FY07-08 FY08-09 FY 09-10 FYI0-11 FYII-12 To comptedion TOTAL: Planning and Acquisition esign7Survey 100 $100 Construction 1,000 $1,000 urchase of Equipment ¢pair & Maintenance TOTAL: $100 $1,000 $1,100 O & M COSTS (x $7000): FUND SOURCE (x $1000): City G.O. Bond7Other OEM 100 $100 Cty Special Revenue (e.g., fuel tar) State Revolving Fund 1,000 $1,000 tate CIP ederal Aust¢ TOTAL: $100 $1,000 $1,100 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT: Public Works, Administration DATE: January19, 2006 RO✓ECTIPROGRAMNAME: EAST HAWAII TRAFFIC CALMING IMPROVEMENTS LOCATION(attach map): Various Locations in East Hawaii TMK• East Hawaii COUNCIL DISTRICT. • 1, 2,3_4 ,4 & 5 AMOUNT REQUESTED: $100,000 ROJECTIPROGRAM DESCRIPTION: Construction of various Traffic Calming imrpovements such as speed humps and roundabouts, etc. to provide a means to slow down traffic in residential areas at various locations. Work may also include upgrading and/or repairing existing road components such as shoulders and draina e ROJECTIPROGRAM JUSTIFICATION: Public Safety: Project will serve to slow traffic and reduce the danger of motorists that speed through residential neighborhoods. Project will also provide for a more efficient flow of traffic through an intersection. This improved flow through the intersection would reduce the number of motorists MPACT ON OPERATIONAL BUDGET: Project will reduce pedestrian and vehicle accidents due to speeding and risky driver behavior. This reduction in accidents will reduce operational costs associated with a Police and EMS response, as well as costs associated with potential law suits against the County. ENDITURE (X $1000): rtor Funding 7his py Request FY07-08 FY 08-09 FY09-10 FY10-11 FY 11-12 To completion TOTAL: Tanning and Acquisition esign/Survey 100 $100 Construction 1,000 $1,000 Purchase of Equipment Repair & Maintenance TOTAL: $100 $1,000 $1,100 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cty G.O. Bond/Other 100 $100 Cty Special Revenue (e.g., fuel tax) State Revolving Fund 1,000 $1,000 State CIP Federal Private TOTAL: $100 $1,000 $1,100 County of Hawaii PROJECT DATAIFINANCL4L IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Department of Public Works - Building Division DATE: January4, 2006 ROJECTIPROGRAMNAME: Hazardous Materials Abatement at County Facilities LOCATION (aaach map): Islandwide TMK• various COUNCIL DISTRICT: Islandwide AMOUNT REQUESTED: $800,000 ROJECTIPROGRAM DESCRIPTION* Perform investigative reconnaissance for hazardous material content of all building components for County facilities islandwide. ROJECTIPROGRAM JUSTIFICATION: Public Safety, Repair/Maintenance: The National Emissions Standards Hazardous Air Pollutants (NESHAP) 1973 Act obligates the County to perform investigative reconnaissance for hazardous material content of all buildings components prior to any planned demolition or repair/maintenance work. Samples must be taken by a certified technician licensed by the State and analyzed by an accredited laboratory. NESHAP also requires hazardous material demolition and repair/maintenance work to be properly performed by trained and certified worker(s), and a minimum 10 day notification to the EPA of an hazardous material abatement work. A hazardous material inventory for County facilities shall be established and maintained for administration of re uirement. MPACT ON OPERATIONAL BUDGET.• Building demolition or repair/maintenance work involving hazardous materials will require special work contracts. Prior XPENDITURE (X $1000): Funding This FY Request FY 07-08 FY 08-09 FY 09-10 I FY 10-11 FY 11-12 To completion TOTAL: Planning $0 and Ac uisition $0 esigmSurvey 800 $800 Construction 2,000 3,000 $5,000 Purchase of Equipment $0 Repair & Maintenance $0 TOTAL: $0 $800 $2,000 1 $3,000 $0 $0 $0 $0 $5,800 O & M COSTS (x $1000): $0 FUND SOURCE (x $1000): Cty G.O. Bond/Other 800 $800 Cty Special Revenue (e.g., fuel tax) $0 State Revolving Fund $0 State CIP Federal $0 rival¢ $0 TOTAL: $0 1 $800 1 $0 1AAA$0 $0 $0 $0 $0 $800 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 1007 EPARTMENT Department of Public Works - Building Division DATE: January 4, 2006 ROJECTIPROGRAMNAME: Repair & Maintenance of DPW Facilities Islandwide OCATION (attach map): Islandwide TMX: various COUNCIL DISTRICT: Islandwide AMOUNT REQUESTED: $690,000 ROJECT/PROGRAM DESCRIPTION.• Repair & Maintenance of DPW Facilities Islandwide ROJECTIPROGRAM JUSTIFICATION: Public Safety, Repair and Maintenance: Scheduled R&M on DPW Facilities were deferred in past years resulting in higher repair costs. IMPACT ON OPERATIONAL BUDGET.• Annual budgets for scheduled repair and maintenance were proposed. However, when funds for emergencies or budget cuts were required, traditionally this was the first account sourced. The repair and maintenance schedule is currently 20 years plus behind schedule. ATENDITURE (X $1000): nor Funding 7 lus Request FY 07-08 FY 08-09 FY 09-10 FY IO -II FY 11-12 To compleaon TOTAL: Planning $0 and Acquisition $0 esign/Survey 52 90 120 150 150 180 180 $922 Construction 298 600 800 1,000 1,000 1,200 1,200 $6,098 urchase ofEquipment $o ¢Pair &Maintenance $o TOTAL: $350 $690 $920 $1,150 $1,150 $1,380 $1,380 $0 $7,020 O A M COSTS (x $1000): FUND SOURCE (x $1000): Cly G.O.Bon&Other 350 690 920 1,150 1,150 1,380 1,380 $0 $7,020 Cly Special Revenue (e.g., fuel tax) $O State Revolving Fund $0 State CIP Ldi Federal $0 [Private i $0 TOTAL: $350 $690 $920 $1,150 $1,150 $1,380 1 $1,380 $0 $7,020 County of Hawaii PROJECT DATA/FINANCL4L IMPACT STATEMENT Fiero/ Yen, 2006 to 2007 DEPARTMENT., Public Works DATE: January 17, 2006 ROJECT/PROGRAMNAME. Wood Valley Bridge Replacement LOCATION (attach map): Wood Valley TMK. 9-6 COUNCIL DISTRICT. 6 AMOUNT REQUESTED: $300,000 ROJECTITROGRAM DESCRIPTION: Replace existing four (4) wooden bridges with reinforced concrete bridges. Work will include demolition of the exisiting bridges; construction, maintenance and removal of detour road if needed; construction of new brid a with associated appurtenances. ROJECTIPROGRAM JUSTIFICATION: Inadequate Infrastructure, Repair / Maintenance: Existing wooden bridges are old and structurally substandard. Repairing and maintaining the bridges require ma or work Failure of any of the four (4) bridges will cut off access to the residences of Wood Valley because there is no other road serving the MPACT ON OPERATIONAL BUDGET: Minimal operational expense associated with completed concrete bridge. EXPENDITURE (X $1000): Prior Funding Is Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY II -12 To completion TOTAL: Planning 300 $300 and Acquisition esign/Survey 800 $800 Construction 6,000 6,000 $12,000 Purchase of Equipment Repair & Maintenance TOTAL: I IF $300 T $800 1 $6,000 $6,000 $13,100 O & M COSTS (x $1000): FUND SOURCE (x $1000): CtyG.O.Bond/Other 300 800 6,000 6,000 $13,100 Cly Special Revenue (e.., uet tax) State Revolving Fund State CIP Federal Private TOTAL: $300 $800 $6,000 $6,000 $13,100 y 8� Ma 1 Pa 'fes L t 7,yy k a Yo alley 0 e. Rp acement Qo-d Val It a'geme, nt ' xr m a: Vatley e Rep eemsRt. .,"""W......___ao.d � �eF ��' �, •a- e� gm�++ r� sJ Y�(o�t Vliet' € a ellre t 41 4 AlG' Q a q `, sffi A. c - r�a.ra.x e * 0 LOCATION MAP 2006-2007 CIP 0 1,250 2,500 5,000 7,500 10,000 FN ocG ll°fir a, a-ta .e1 f� p Feet County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fuca[ Year 2006 to 2007 DEPARTMENT. Public Works DATE: January 17, 2006 ROJECTIPROGRAMNAME: OshiIo Peck Road BIidge Replacement LOCATION (attach map): Puna TMK 1-8-005 COUNCIL DISTRICT: 3 AMOUNT REQUESTED: $700,000 ROJECTIPROGRAM DESCRIPTION: Replace existing two (2) wooden bridges with reinforced concrete bridges. Work will include demolition of the exisiting bridges; construction, maintenance and removal of detour road if needed; construction of new brid a with associated appurtenances. ROJECTIPROGRAM JUSTIFICATION: Inadequate Infrastructure, Repair / Maintenance: Existing wooden bridges are old and structurally substandard. Community is growing and the number of vehicles usin the bridges are increasing. Increased vehicle traffic re uires major and frequent repair and maintainance of the existin bridges. IMPACT ON OPERATIONAL BUDGET.- Minimal UDGET:Minimal operational expense associated with completed concrete bridge. r rrr �_ r r: r: r� r• r �_®_�_to � WN� .wA , r • I LOCATION MAP w N 2006-2007 CIP E 6 0 280 560 1,120 1,680 2,240 Feet County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Public Works DATE: January 17, 2006 ROJECTIPROGRAMNAME. Maekawa Wall Construction LOCATION (attach map): Kohala TMK. 5-5-01' COUNCIL DISTRICT. 9 AMOUNT REQUESTED: $150,000 ROJECT/PROGRAM DESCRIPTION: Construct concrete rubble masonry wall to retain vertical embankment. Work will also include paving, striping and signage within the affected areas. ROJECTIPROGRAM JUSTIFICATION: Public Safety, Repair / Maintenance: The existing embankment is vertical (with large trees at top of embankment) and starting to erode creating hazard to motorists. Improvements will stabilize slope and will make roadway safer to motorist and general Eublic. MPACT ON OPERATIONAL BUDGET.• Road maintenance will be provided under general highway maintenance program. XPENDITURE(X$1000): Prior Funding is FY Request FY07-08 FY O8-09 FY09-10 FY 10-11 FY 11-12 Tocompkiion TOTAL: Planning 50 $50 and Acquisition 100 $100 ¢sigmSurvey 100 $100 Construction 1,500 $1,500 Purchase of Equipment Repair & Maintenance TOTAL: $150 $100 $1,500 $1,750 O & M COSTS (x $1000): 150 100 mom 1,500 $1,750 FUND SOURCE (x $1000): Cty G.O. Bond/Other Cty Special Revenue (e.., fuel tax) State Revolving Fund tate CIP ederal ivate TOTAL: $150 $100 $1,500 $1,750 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Department of Public Works - Building Division DATE: March 10, 2006 ROJECTITROGRAMNAME: Hawaii County Building Renovation LOCATION (attach mal); TMX: (3) 2-2-12:004 COUNCIL DISTRICT: 4 AMOUNT REQUESTED: $17,500,000 ROJECT/PROGRAM DESCRIPTION: This project will combine previously multi -phased repair and renovation work into a single project. Work to include but not limited to: asbestos abatement, roof repair, air conditioning system replacement, data/electrical/lighting upgrade, fire alami/suppression system; hurricane/seismic improvements; office space programming and renovation, interior/exterior painting, pavement and sidewalk repairs, and miscellaneous improvements. ROJECTIPROGRAM JUSTIFICATION: Legal Mandate, Public Health and Safety, Improve Operating Efficiency; Repair/Maintenance: This project is necessary for the continue use of the building. Accessibility improvements are required as settlement to Alexa Russell, et al. vs. COH. The removal of asbestos material was determined to be the most effective abatement option. Roof replacement is required to address leaks. Roof deck repairs was determined necessary after a partial collapse of roof sections occurred. Aging air conditioning system components require efficient replacements. Communication and electrical system upgrades are required to address technological changes. Fire alarm/suppression systems are necessary for building code fire resistance requirements and protection of life and property. Hurricane and seismic resistance upgrades will be investigated and incorporated where possible. Office renovation are required to lefficiently accommodalg the te�oraanizatirm of &12artments and increase in staff MPACT ON OPERATIONAL BUDGET: Reduce annual operational budget by lowering AC electrical power demand and maintenance costs. E (X $1000): Prior Funding u Request FY 07-08 FY 08-09 FY 09-10 FY IO -Il FY II -12 Jo comptraon TOTAL: $0 randAcquisition ion $0 550 1,750 $2,300 5,200 15,750 520,950 quipment $o Repair & Maintenance $0 TOTAL: $5,750 $17,500 $0 $0 $0 $0 s0 $0 $23,250 O & MCOSTS (x $1000): $0 17,500 0 $17,500 FUND SOURCE (x $1000): Cy G.O. Bond/Other Cy Special Revenue (e.g., fuel tax) $0 State Revolvin Fund $o State CIP Federal $0 Private $0 TOTAL: 1 $0 $17,500 $0 s0 $0 s0 50 $O $17,500 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fi<rn/ Year 2006 to 2007 EPARTMENT: Department of Public Works - Building Division DATE., are 27, 2006 ROJECTIPROGRAMNAME: Aupuni Center Parking Lot Improvements OCA TION (attach map): 101 Pauahi Street TMX: 2-2-15:033 COUNCIL DISTRICT: 4 AMOUNT REQUESTED: $2,500,000 ROJECTIPROGRAM DESCRIPTION: This project will reconstruct the parking to increase the number of parking stalls, provide covered delivery/loading zone and sidewalk, exterior lighting, improve drainage control, landscaping, and repair of sidewalks. ROJECTIT ROGRAM JUSTIFICATION: Inadequate Facility, Quality of Life, Public Health and Safety: This project is needed to increase the number of employee and public parking stalls in preparation for the move of the Office of the Prosecuting Attorney to Aupuni Center. This project is also needed to provide an accessible route, covered loading zone and sidewalk, building exterior and parking lot lighting, flood control measures, landscaping required by Chapter 25 of the Hawaii County Code, and repair of uneven and broken sidewalks surrounding Aupuni Center. MPACT ON OPERATIONAL BUDGET. Project will result in an increase in the building electrical consumption, landscape maintenance, and future repair/maintenance requirements XPENDITURE (X $1000): rear Funding This FY Request FY07-08 FY08-09 FY09-10 FY 10-11 FY11-12 To--Pluinn TOTAL: Planning and Ac uisition esign/Survey 250 $250 Construction 2,250 $2,250 Purchase of Equipment Repair & Maintenance TOTAL: $2,500 $2,500 O & M COSTS (x $1000): FUND SOURCE (x $1000): 2,500 $2,500 Cty C.O. Bond/Other Cly Special Revenue (mg., fuel tax) State Revolving Fund State CIP Federal Private TOTAL: $2,500 $2,500 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 1007 DEPARTMENT: Public Works DATE: April 12, 2006 RO✓ECTIPROGRAMNAME: Mamalahoa Highway Road Improvements, Kamamalu Street to Mud Lane LOCATION (attach map): Waimea TMX: 6-4-1 thru 6-4-30 COUNCIL DISTRICT: 9 AMOUNTREQUESTED: $200,000 ROJECT/PROGRAM DESCRIPTION The road improvements of Mamalahoa Highway between Kamamalu and Mud Lane (approximately 4 miles) will include drainage and road Improvements. Drainage improvements will include construction of french drains along shoulders (where feasible) with perforated piping to connect french drains to drywells. 22 drywells (60' to 120' in depth) and 22 grated catch basins with connecting reinforced concrete pipes will also be installed. Road improvements will include asphaltic concrete overlay of 5" thick, widening of shoulders where practical for left turn pockets and two-way left tum/center lane. Land acquisition as needed. ROJECTIPROGRAM JUSTIFICATION: Public Safety, Repair/Maintenance: The wearing surface of the asphalt pavement is experiencing premature failure and cracking due to differential settlement caused by the lack of an adequate drainage system to protect the road subbase from water infiltration. Without this project, repeated resurfacing projects will continue to fail to support the amount and type of traffic using Mamalahoa Highway through Waimea. IMPACT ON OPERATIONAL BUDGET: Normal operational expenses are minimal; periodic drywell maintenance (sediment removal) depends on rainfall frequency and vegetative growth of immediate area; as haltic 2avement resurfacing evEa decade Or by C.I.P. funds. II EXPENDITURE 1X SI000): for Funding I his lY Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To completion TOTAL: Planning 200 $200 and Ac uisition 1,000 $1,000 esign/Survey 500 $500 Construction 1,000 6,000 4,000 $11,000 Purchase of Equipment Repair A Maintenance $1,000 $200 $1,500 $6,000 $4,000 $12,7001 TOTAL: O & M COSTS (x $1000): FUND SOURCE (x $1000): 200 1,500 6,0004,000 $11,700 Cty G.O. Bond/Other Cly Special Revenue (e.., fuel t") 1,000 7 $1,000 State Revolving Fund State CIP Federal Private TOTAL: $1,000 $200 $1,500 ,000 $4,000 $12,700 County of Hawaii PROJECT DATA/FINANCL4L IMPACT STATEMENT Ficcal Year 2006 to 2007 DEPARTMENT. Public Works, Engineering Division DATE: January6, 2006 ROJECTIPROGRAMNAME. I.A'I'OPUA CONNECTOR ROAD PROJECT (PORTIONS OF KF,ANALF.ITU DRIN F. & MANAWAE'A STREET) LOCATION (attach map): Kealakehe. North Kona, Hawaii TMK. 7-4-021 COUNCIL DISTRICT: 8 AMOUNT REQUESTED: $7,600,000 ROJECTIPROGRAM DESCRIPTION: Complete a connector road system between Kealakehe Parkway and Kealakaa Street by extending Keanallehu Drive up to the proposed Manawae'a Street intersection and completing anawae'a Street to complete the connection to Kealakaa Street. ROJECTIPROGRAM JUSTIFICATION. Quality of Lire: The connector road will provide an alternate route between Queen K and Palani Road and between the Kealakebe High School and K::atakebe slementarylintermediatc Schools thereby relieving congestion at the PalaniiQueen K intersection. MPACT ON OPERATIONAL BUDGET. Additional roadway and related infrastructure to maintain. XPENDITURE(X$1000): Prior Funding This FY Request FY07-08 FY 08-09 FY09-10 FY10-11 FY 11-12 To Completion TOTAL: Planning and Acquisition Design/survey 400 $400 Construction 7,600 $7,600 Purchase ofEqu' ment Repair & Maintenance TOTAL: $400 $7,600 $8,000 O & M COSTS (x $1000): 400 7,600 $8,000 FUND SOURCE (x $1000): County CIP County non-CIP (e.., fuel tax) State (e.g., SRF) ederal rtvate TOTAL: $400 $7,600 $8,000 County of Hawaii PROJECT DATA/FINANCLAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Department of Public Works - Building Division DATE: April 7, 2006 ROJECT/PR0GRAM NAME: West Hawaii Civic Center, Phase 3 LOCATION (attach map): THX (3) 7-4-20:003 COUNCIL DISTRICT. 8 AMOUNTREQUESTED: $30,000,000 ROJECTITROGRAM DESCRIPTION, Continuation of exist project to provide a new 62,000 square foot office complex in North Kona to house a majority of the existing County Agencies currently renting or leasing office space at various scattered locations. ROJECTIPROGRAM JUSTIFICATION: Replacement of inadequate facility, improve operating efficiency: This project will consolidate into a central location a majority of County Agencies currently serving West Hawaii residence from various locations scattered throughout North Kona. By consolidating the agencies into one location, the County will be able to offer the residents of West Hawaii a centralized complex where they can access governmental services and eliminate most of the office lease/rent fees currently being paid to private owners. This project will provide West Hawaii with an office facility in parity with those in East Hawaii. PACT ON OPERATIONAL BUDGET.• Reduce annual operational budget by eliminating office rental fees paid to private owners. ENDITURE (X $1000): Prior Funding 77iu Request FY07-08 FY 08-09 FY09-10 FY10-11 FY 11-12 To--Pkaon TOTAL: Planning $0 and Acquisition $0 esign/Survey 900 $900 Construction 11,100 30,000 $41,100 urchase of Equipment $0 ¢pair & Maintenance $0 TOTAL: $12,000 $30,000 $0 $0 $0 $0 $0 $0 $42,000 O & M COSTS (x $1000): UND SOURCE (x $1000): 12,000 $0 30,000 $42,000 Cty G.O.Bond/Olher Cty Special Revenue (eg., fuel tax) $0 State Revolving Fund $0 State CIP Federal $0 Private $0 TOTAL: $12,000 $30,000 $0 $0 $0J_$0 $0 $0 $42,000 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Department of Public Works - Building Division DATE: March 10, 2006 ROJECTIPROGRAMNAME: Pahoa Facility Off -Site Improvements LOCATION (attach map): TMK. (3) 1-5-07:017 COUNCIL DISTRICT. 5 AMOUNT REQUESTED: $2,000,000 ROJECTITROGRAM DESCRIPTION.• This project will provide a channelized highway intersection on the Kea'au-Pahoa Road (Route 130) for vehicular and pedestrian access to the new Pahoa Fire Station, Gym, Park and Police Station Facilities. ROJECTIPROGRAM JUSTIFICATION: Inadequate Service or Facilities: The development of the new fire station, gym, park and police station will have a significant positive impact for the fast growing population in the Puna district. Current fire and police facilities are inadequately hardened to resist hurricane and seismic events nor properly sized to accommodate personnel, equipment and public safety sevice requirements. The proposed location along the main thoroughfare of Route 130 will provide the public centralize and highly visible public safety and recreational service facilities. rMPACT ONOPERATIONAL BUDGET: O & M cost would be transferred form existing facilities and operations. XPENDITURE(X$1000): r -or Funding u Request FY07-08 FY08-09 FY09-10 FY10-11 FYII-12 To completion TOTAL: lanning 30 $30 and Acquisition $0 esign/Survey 170 $170 Construction 1,800 $1,800 Purchase of Equipment $0 Repair & Maintenance $0 TOTAL: $0 $2,000 $0 $0 $0 $0 $0 $0 $2,000 O & M COSTS (x $1000): $0 FUND SOURCE (x $1000): 2,000 0 71$0 $2,000 Cty G.O. BondlOther Cty Special Revenue (e.g., fuel tax) $0 State Revolving Fund State CIP Federal $0 Private $0 TOTAL: $0 $2,000 $0 $0 $0 $0 $0 $0 $1,000 a7e-D• i �1 NEUP� AMBULANCE ACCESS ROAD -- �� r� I PUMP HOUSE AND STORAGE SHED Keaau-Pahoa Hwy u+•+e ma NAU r � I I . EXPARE EXPANSION---, 20.000 SF I - I I PUBLIC PARKING PRELIMINARY MASTER SITE PIAN PAHOA FIRE STATION, PLIAAP HAWAII Ioxo County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT: Public Works DATE: April 11, 2006 PROJECT/PROGRAM NAME: AIAMAL,AIIOA HIGiiWAY IMPROVEMENTS, Honato to Captain Cook. LOCATION (attach 8-112 x II map): North Kona, Hawaii TMK: COUNTY COUNCIL DISTRICT: 7 AMOUNTREQUESTED: $7,600,000 PROJECT/PROGRAM DESCRIPTION: Provide turning lanes, two-way left -tum lanes, and intersection and off-street parking lot improvements at various locations in Kainaliu, Kealakekua, and Captain Cook Towns. Work to also include sidewalks, ADA upgrades, and driveway and utility adjustments. PROJECTIPROGRAMJUSTIFICATION (what is the projectlprogram trying to address or solve, arealpopulation served, benefus/beneficiaries, etc.?): Public Safety, Repair Maintenance: The proposed roadway improvements will be: (1) in conformance to the General Plan, (2) continue the State Highway artirial roadway, (3) relieve the present horrendous traffic congestion, (4) provide a two-way left -turn center lane to improve traffic flow, and (5) enhance traffic and pedestrian safety. Funds are needed to allow for the construction of these features. Rev. 1195 CIP Form Prior Funding This FY FY FY Request 2007-1008 2008-2009 FY FY 2009-2010 2010-2011 FY 2011-2012 TOTAL EXPENDITURE x $1,000: Planning 100 100 Land Acquisition 100 100 Destgn/Survey 700 700 Construction 3,500 7,600 11,100 Purchase of Equipment 0 TOTAL 4,400 7,600 0 0 0 0 0 12,000 O&MCOSTS (x$1,000): 0 L 0 0 0 0 0 0 0 FUND SOURCE (x$1,000): County 4,400 7,600 12,000 State (SRF) 0 Federal 0 Private 0 TOTAL 4,400 7,600 0 0 0 0 0 12,000 Rev. 1195 CIP Form County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Ficral Year 2006 to 2007 EPARTMENT: Department of Public Works - Building Division DATE: January 4, 2006 ROJECTIPROGRAMNAME: Renovation of DPW Facilities OCA TION (attach map): Islandwide TMK. various COUNCIL DISTRICT: Islandwide AMOUNT REQUESTED: $600,000 ROJECTIPROGRAM DESCRIPTION.• Renovation of DPW Facilities Islandwide ROJECTIPROGRAM JUSTIFICATION: Renovation of facilities to improve operating efficiency: This project is needed to maintain continued use of existing facilities. Fifty-seven percent (57%) of DPW's sixty-seven (67) facilities were built prior to the 1970's. Facility renovations are needed to address the increasing number of office staff and public served and accommodate new field/office equipment. This project will provide comfortable and efficient work environments to continue services to the increasing number of Big Island residences and visitors. MPA CT ON OPERATIONAL BUDGET: No operational budget impact. XPENDITURE (X $1000): nor Funding 's Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To compteaon TOTAL: Planning $0 Land Acquisition $0 esign/Survey 100 120 140 160 160 200 $880 Construction 500 600 700 800 800 1,000 $4,400 Purchase of Equipment $0 Repair & Maintenance $0 TOTAL: $0 $600 $720 $840 1 $960 $960 1 $1,200 $0 $5,280 O & M COSTS (x $1000): $0 FUND SOURCE (x $1000): Cly G.O. Bond/Other 0 600 720 NONE 840 960 960 1,200 $5,280 Cty Special Revenue (cg.,fuel tax) $0 State Revolving Fund $0 State CIP Federal $0 rivate $0 TOTAL: $0 $600 $720 $840 $960 $960 $1,200 $0 $5,280 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Public Works DATE: January 17, 2006 ROJECTIPROGRAMNAME: Palani Road Widening OCATION(aaach map): Kona TMX: 7-4-00 COUNCIL DISTRICT. 8 AMOUNTREQUESTED: $1,100,000 ROJECTIPROGRAM DESCRIPTION: The proposed project will include: Widen existing roadway to provide 6 -foot wide shared bike/pedestrian lane; Extend the existing truck climbing lane where feasible; 5" asphalt concrete overlay from Queen Kaahumanu Highway to Highway 190 junction; Other work will include striping, markers and signage. Project will require land acquisition where needed. ROJECTIPROGRAM JUSTIFICATION: Public Safety, Repair / Maintenance: Existing roadway currently has inadequate (lacking in some areas) lane for bikers and pedestrian. Providing a shared lane will enhance the safety of bikers and pedestrian using Palani Road. Extending the truck climbing lane will provide a longer lane for slower movin& vehicles and allow faster moving vehicles to pass safely. IMPACT ON OPERATIONAL BUDGET. Road maintenance will be provided under general highway maintenance program. EXPENDITURE (X S1000): Prior Funding This Request FY07-08 FY08-09 FY09-10 FY10-11 FY11-12 To completion TOTAL: Planning 200 5200 and Acquisition 1,000 $1,000 esign/Survey 500 $500 Construction 7,000 $7,000 Purchase ojEquipment Repair & Maintenance TOTAL: $1,200 $500 $7,000 $8,700 O & M COSTS (x $1000): FUND SOURCE (x S1000): 1,200 5007,000 $8,700 Cty G.O. Bond/Other Cty Special Revenue (e.g., fuel tax) State RevolvingFund State CIP Federal Private TOTAL: $1,200 $500 $7,000 $8,700 Hao K ni St M eka Pi Pd St Pa\ac` Ililoa p\d i//y . o °aS �s o1 \ • °dP K W 4� 5 t V' E cO�m m oc dN eatakaha m y_ o m, m N La lap.ua neetor <E;4 Kona -"v" arallse v o} O m m� Palanl R Eclan`tng 3d a s i m a ,a m m m `One amakaeha Ave LOCATION MAP N y s/ 2006-2007 CIP w�}E it _ F" . to nrtaX 6 0 1,250 2,500 5,000 7,500 10,000 trn:p v m n t s Feet aWa, County of Hawaii PROJECT DATAIFINANCLIL IMPACT STATEMENT Fiera! Year 2006 to 2007 DEPARTMENT: Public Works DATE: January 17, 2006 ROJECTIPROGRAMNAME: Keaau Civic Center LOCATION (attach map): Keaau TMK. 1-6-3 COUNCIL DISTRICT: 3 AMOUNT REQUESTED: $200,000 ROJECTIPR O GRAM DESCRIPTION: The proposed project includes the construction of civic center consisting of satellite county/state offices, fire station, police station, helipad and parking facilities. ROJECTIPROGRAM JUSTIFICATION: Replacement of inadequate facility, improve operating efficiency: District of Puna is the fastest growing region in the State, with Keaau located in the hub of Puna. Current government facilities are undersized and inadequate. Larger infrastructure is necessary to provide adequate health, safety and other services commensurate with the continued rapid l2ol2ulationyrowth. MPACT ON OPERATIONAL BUDGET. Normal building maintenance expenses (utility bills, repairs, etc..) will need to be budgeted once the architectural design is completed. Larger expenses such as painting of buildings, roof re lacement, etc. will need to be budgeted through future C.I.P. funding as the need arises. E (X $1000): Prior Funding 1harr Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To completion TOTAL: 200 $100 rPlanning n 550 $550 800 $800 6,000 5,000 5,000 $16,000 uipment Repair & Maintenance TOTAL: $100 $800 $550 $6,000 $5,000 $5,000 $17,550 O & M COSTS (x $1000): UND SOURCE (x $1000): Cly G.O. Bond/Other 200 800 550 6,000 5,000 5,000 $17,550 Cty Special Revenue (e.g., fuel tax) State Revolving Fund State CIP Federal Private TOTAL: $200 $800 $550 $6,000 $5,000 1 $5,000 $17,550 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 1007 DEPARTMENT. Public Works DATE. April 12, 2006 ROJECTIPROGRAMNAME: Reed's Island Bridge Replacement LOCATION (attach map): Hilo TMIL 2-3-015 COUNCIL DISTRICT: 1 AMOUNT REQUESTED: $300,000 ROJECTITROGRAM DESCRIPTION: Replace structurally substandard wooden bridge with a new reinforced concrete bridge with H 20 load bearing capacity to accommodate emergency response vehicles to Reeds Island access. ROJECTITROGRAM JUSTIFICATION: Inadequate Infrastructure, Repair/Maintenance: Heavy Hawaii County Fire Department trucks, among other heavy service vehicles, are not permitted to drive on the weight restricted (6 Tons) wooden bridge. IMPACT ON OPERATIONAL BUDGET. Normal road maintenance program operational expenses. [EXPENDITURE rmr Funding u FY Request FY 07-08 FY 08-09 FY 09-10 FYIO-11 FY 11-12 To..plaw. TOTAL: Planning and Acquisition esign/Survey $300 Construction 1,500 [E300 3,500 $5,000 Purchase of Equipment Repair & Maintenance TOTAL: $1,500 $300 $3,500 $5,300 O & M COSTS (x $1000): OEM 300 700 $1,000 FUND SOURCE (x $1000): Cty G.O. Bond/Other Cty Special Revenue (eg., fuel tax) State Revolving Fund State CIP Federal 1,500 2,800 $4,300 Private �— TOTAL: 11 $1,500 $300 1 $3,500 $5,300 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT: Public Works, Engineering Division DATE: January 1A, 2006 ROJECTIPROGRAMNAME: SHARED ROAD BIKE. SIGNAGE FOR ALIT DRIVE LOCATION (attach map). Kailna to Kcauhou, North Kona, Hawaii TMK. 7-5,6,7&8 COUNCIL DISTRICT: 7&8 AMOUNT REQUESTED: $300,000 ROJECTIPROGRAM DESCRIPTION, Provide appropriate bike signs for a Alii Drive making it a shared road. ROJECTIPROGRAM JUSTIFICATION.• Quality of Life: Enhances/promotes use of bicycles. IMPACT ON OPERATIONAL BUDGET: Will increase maintenance activities for the DPW Traffic Division due to additional signs. XPENDITURE(X$1000): Prior Funding This FY Request FY07-08 FY08-09 FY09-10 FY10-11 FYII-11 To Completion TOTAL: Planning andAcquisition esign/Survey 300 $300 Construction Purchase of Equipment Repair & Maintenance TOTAL: $300 1 $300 O & M COSTS (x $1000): FUND SOURCE (x $1000): County CIP 300 $300 County non-CIP (e.g., juel tax) State (e.g., SRF) redera' rivate TOTAL: $300 $300 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT., Public Works, Engineering Division DATE: January 14, 2006 ROJECTIPROGRAMNAME: MANONO STREET BIKE AND PEDESTRIAN IMPROVEMENTS LOCATION (attach map): Waiakea Houselots, South Hilo, Hawaii TMK: 2-2 COUNCIL DISTRICT: 4 AMOUNT REQUESTED: $300,000 ROJECT/PROGRAM DESCRIPTION: Provide bicycle and pedesrian facilities on Manono Street from Bay$ont Highway tro Kawili Street. ROJECTIPROGRAM JUSTIFICATION: Quality of Life: Enhances/promotes use of bicycles. IMPACT ON OPERATIONAL BUDGET: itl increase highway maintenance activities due to added drainage and roadway facilities. XPENDITURE (X $1000): Prior Funding This FY Request FY07-08 FY 08-09 FY09-10 FY10-I1 FYII-12 To Completion TOTAL: Tanning and Acquisition esignJurvey 300 $300 Construction 3,000 $3,000 Purchase ofEquipment Repair & Maintenance TOTAL: $300 1 $3,000 $3,300 O & M COSTS (x $1000): FUND SOURCE (x $1000): County CIP 300 3,000 $3,300 County non-CIP (e g., ji el tax) State (eg., SRF) Federal rivate TOTAL: $300 $3,000 $3,300 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Public Works, Engineering Division DATE: January 6.2006 ROJECTIPROGRAMNAME: EROSION CONTROL IMPROVEMENTS AT 680 HAIHAI STREET LOCI TION (attach map): Waiakea. South Hilo. Hawaii TMR: 24-29: 013; 022 & 023 COUNCIL DISTRICT: 3 - AMOUNT REQUESTED: $200,000 ROJECTITROGRAM DESCRIPTION: Construct CRM wall for the western channel bank adjacent to Tmk: 2-4-29:013 and stabilize existing rock: walls along western channel bank adjacent toTmk: 2-4-29: 022 & 023 with unite. ROJECTIPROGRAM JUSTIFICATION. Repair/Maintenance: The new CRM will replace eroded banks and the 6vnite will stabilize existing walls along the western bank of the existing flood control charnel from further mage cause by drainage flows MPACT ON OPERATIONAL BUDGET: Projects will reduce maintenance and repairs costs associated with localized flooding.. URE(X$1000); Prior Funding This FY Request FY07-08 FY08-09 FY09-10 FY10-11 FYII-12 To Cumpietiun TOTAL: ition ey r 60 $60 140 $140 Equipment epair & Maintenance TOTAL: $200 1 $200 O & M COSTS (x $1000): FUND SOURCE (x $1000): 200 $200 County CIP County non-CIP (e.g., fuel tax) State (e.g., SRF) Federal Private TOTAL: $200 $200 County of Hawaii PROJECT DATAIFINANCL4L IMPACT STATEMENT Fisrol Year 2006 to 2007 DEPARTMENT. Public Works, Engineering Division DATE: January l9, 2006 ROJECTIFROGRAMNAME: MAMALAHOA HIGHWAY- IMPROVEMENTS, HONALO LOCATION (attach map): North Kona, Hawaii TMK. COUNCIL DISTRICT: 7 AMOUNT REQUESTED: $750,000 ROJECTIPROGRAM DESCRIPTION: Widen roadway, providing a two-way left -tum center lane thru town. Work includes, but not limited to, concrete sidewalks, landscaping, road widening, crosswalks, driveway and utility adjustments, and possible roundabout. Land acquisition will be necessary to widen right-of-way from approximately 30-11. to 60!80 -ft. (General Plan). Note: This project is mutually exclusive from the Matnalahoa Highway Improvements (I-Ionalo to Captain Cook) CIP. ROJECTIPROGRAM JUSTIFICATION: Public Safety: The proposed right-of-way widening will be; (1) in conformance to the General Plan, (2) continue the State Highway artirial roadway, (3) relieve the present horrendous traffic congestion, (4) provide a two-way left -tum center lane to improve traffic flow, (5) remove the "bottleneck" at the Honalo Junction, (6) enhance traffic and pedestrian safety, and (7) provide better service and improve operating efficiency. MPACT ON OPERATIONAL BUDGET.• EXPENDITURE (X $1000): Prior Funding This FY Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To Completion TOTAL: Planning 750 $750 and Acquisition 3,000 $3,000 esign/Survey 900 $900 Construction 7.500 $7,500 Purchase of Equipment Repair & Maintenance TOTAL: $750 $3,900 $7,500 - $12,150 O & M COSTS (x $1000): 750 3,900 7,500 $12,150 FUND SOURCE (x $1000): County CIP County non-CIP (eg., fuel tax) State (eg., SRF) Federal rtvate TOTAL: $750 $3,900 $7,500 S12,150 County of Hawaii PROJECT DATA1FINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT: Public Works - Building Division DATE: March 9, 2006 ROJECT/PROGRAMNAME: Puna Road Baseyard Warehouse TOTAL: LOCATION (attach map): TMK. 1-7-003:019 COUNCIL DISTRICT. 3 AMOUNTREQUESTED: $581,207 ROJECT/PROGRAMDESCRIPTION: Construction of a replacement warehouse with approximate 40'x80' footprint. It will be used for storage space and for current equipment and supplies. ECTIPROGRAMJUSTIFICATION: acement of inadequate facility. Improve operating efficiency. Existing structure no longer used (a new baseyard office was built and staff relocated w location). F 551.207 $551.207 CT ON OPERATIONAL BUDGET: EXPENDITURE (X $1000): rwr Funding u Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY II -12 To complenun TOTAL: Tanning LandAcquisition esign,Survey 30.000 $30.000 Construction 551.207 $551.207 urchase ojEguipment ¢pair & Maintenance TOTAL: 581.207 $581.207 O & M COSTS (x $1000): FUND SOURCE (x $1000): Cly G.O. Bond/Other Cty Special Revenue (eg., fuel tax) 581.207 $581.207 State Revolving Fund State C7P Federal Private TOTAL, 581.207 $581.207 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT oa...., I v..... Irma .,. 141417 DEPARTMENT., Public Works - Building Division ^ DATE: March 9, 2006 ROJECTIPROGRAMNAME: South Hilo Road Baseyard Warehouse LOCATION (attach map): TMK. 2-2-058:018 COUNCIL DISTRICT: 4 AMOUNT REQUESTED: $581,208 ROJECTIPROGRAM DESCRIPTION: Construction of a replacement warehouse with approximate 40'x80' footprint. The warehouse will replace existing structure that was demolished. It will be used for r e space and for current equipment and supplies. Reference: Ord. No. 03-90 (5395.04, $300,000) and Ord. No. 05-87 (5191.34, $100,000). ECTIPROGRAM JUSTIFICATION: acement of inadequate facility. Improve operating efficiency. Existing structure was demolished due to a deteriorated roof structure that was ed b hi h winds. CT ON OPERATIONAL BUDGET: XPENDITURE (X $1000): Prior Funding IhIS Request FY07-08 FY08-09 FY09-10 FY10-11 FY 11-12 Tocnmplenna TOTAL: Planning and Acquisition Design/Survey 30.000 $30.000 Construction 551.108 $551.208 urchase ofE uipment epair & Maintenance IN, TOTAL: 581.208 $581.208 0 & M COSTS (x $1000): FUND SOURCE (x $1000): Cly G.O. Bond/Other Cry Special Revenue (e.g., fuel tax) 581.208 $581.108 State Revolving Fund Bate CIP Federal Private TOTdl-7F581.2081 1 1 $581.208 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT c:z,.,.t ve... 2906 .,, 007 DEPARTMENT. PUBLIC WORKS -V TRAFFIC DIVISIONS DATE: April 6, 2006 ROJECTIPROGRAMNAME: STREET LIGHT INSTALLATION LOCATION (attach map). ISLAND WIDE TMK. various COUNCIL DISTRICT: All Council Districts AMOUNT REQUESTED: $500,000 ROJECDPROGRAM DESCRIPTION: Installation of Street Lights R OJECTIPR 0 GRAM JUSTIFICATION: Public Health and Safety: The installation of street lights to improve vehicular and pedestrian safety at night. MPACT ON OPERATIONAL BUDGET. The funds for these Street Light installation requests covers all costs except for on-going energy charges. ENDITURE (X $1000): rbr Funding Js Request FY07-08 FY08-09 FY09-10 FY10-11 FYII-12 Ta completion TOTAL: Tannin and Acquisition esign/Survey Construction 375 375 375 375 375 375 375 $2,625 Purchase of MA TERIALS 125 125 125 125 125 125 125 $875 Repair & Maintenance TOTAL: $500 $500 $500 $500 $500 $500 $500 $3,500 O & M COSTS (x $1000): FUND SOURCE (x $7000): 500 500 500 500 500 500 500 $3,500 Cty G. 0. Bond/Other Cty Special Revenue (e.g., fuel tax) State Revolving Fund State CIP Federal rtvate TOTAL: $500 $500 $500 $500 $500 $500 $500 $3,500 County of Hawaii PROJECT DATA/FINANCIAL IMPACT STATEMENT DEPARTMENT. Department of Public Works -^Building Division DATE: March 24, 2006 ROJECTIPROGRAMNAME. Improvements to West Hawaii County Baseyard OCA TION (attach map): TMK 8-1-016:038 COUNCIZDISTRICT. 8 AMOUNT REQUESTED: $980,000 ROJECT/PROGRAM DESCRIPTION: Demolish existing structures on site and replace with new 2 -story office building with auto repair and carpentry maintenance shop on the ground floor and offices on the second floor.(prior appropriation 5196.06 was not funded ROJECTIPR OGRAM JUSTIFICATION: Existing Structure is termite eaten, and the space for each function is inadequate. Automotive would like to expand their staff to take care of the increase in automotive re air work load. Ca entry Maintenance has in the 2ast requested mores ace with their increase in work load. IMPACT ON OPERATIONAL BUDGET: EXPENDITURE(X$1000): for Funding �s Request FY07-08 FY 08-09 FY09-10 FY10-11 FY 11-12 To compleim TOTAL: Planning and Acquisition esi n/Survey Construction 980 $980 Purchase of Equipment epair & Maintenance TOTAL: $980 $980 O & M COSTS (x $1000): 980 $980 FUND SOURCE (x $1000): Cty G.O. Bond/Other Cty Special Revenue (e.g., fuel tax) State Revolving Fund C1P retate deral rivate TOTAL: $980 $980 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT., PUBLIC WORKS - TRAFFIC DIVISIONS DATE: April 6, 2006 ROJECT/PROGRAMNAME: SIGNALSNEWAND UPGRADES LOCATION (attach map): ISLAND WIDE TMK: various COUNCIL DISTRICT. All Council Districts AMOUNT REQUESTED: $500,000 ROJECTIPROGRAM DESCRIPTION: Upgrading existing signals with hard and soft connections involving fiber optics, DSL, TV cameras and wireless equipment. Installation of new signals when warranted and approved by Traffic ROJECTIPROGRAM JUSTIFICATION: Inadequate Facility, Public Health and Safety: Communication with existing signals in the field and the main office terminal is vital for increasing response time for monitoring, adjusting, checking and obtainging volume counts. MPACT ON OPERATIONAL BUDGET: Equipment will increase efficient and response time. XPENDITURE(X$1000): Prior Funding 11 This Fy Request FY07-08 FY 08-09 FY09-10 FY10-11 FYII-12 To completion TOTAL: Planning and Acquisition esign/Survey F250 Construction 250 250 250 250 250 250 $1,750 urchase ofE ui ment 50 250 250 250 250 250 250 $1,750 Repair & Maintenance TOTAL: $500 $500 $500 $500 $500 $500 $500 $3,500 O & M COSTS (x $7000): FUND SOURCE (x $1000): 500 500 500 500 500 500 500 $3,500 Cry G.O. Bond/Other Cly Special Revenue (e.g., fuel tax) Slate Revolving Fund State CIP ederal rivate TOTAL: $500 1 $500 1 $500 $500 $500 $500 1500 $3,500 County of Hawaii PROJECT DATAIFINANCIAL IMPACT STATEMENT Plcral Yrnr 2006 1. 2007 DEPARTMENT. Public Works DATE: April 12, 2006 ROJECTIPROGRAMNAME: Kupulau Road Extension Planning LOCATION (attach map): Hilo TMR: 2-4-03:12 & 26 COUNCIL DISTRICT.- 2 AMOUNTREQUESTED: $300,000 ROJECTIPROGRAM DESCRIPTION: 300 Extend Kupulau Road, approximately 4,000 feet, to intersect with Puainako Street Extension. Construction ROJECTIPROGRAM JUSTIFICATION: 3,000 $3,000 Public Safety: Alleviate traffic congestion during rush hour, especially at Kawailani and Komohana Street Intersection. Provide upper Waiakea Uka residents with direct access to Hilo Town and vice versa. epair & Maintenance MPACT ON OPERATIONAL BUDGET: Normal road maintenance operational program expenses. TOTAL: $300 EXPENDITURE (X $1000): nor u Funding Request FY 07-08 FY 08-09 FY 09-10 FY 10-11 FY 11-12 To compteaoa TOTAL: Planning and Acquisition eai r✓Survey 300 $300 Construction 3,000 $3,000 Purchase of Equipment epair & Maintenance TOTAL: $300 $3,000 $3,300 flnnnl. •. , •111R ...x _.a<..... :.3 :.. ,_ f,.x . x., s .:. +. `" ,20:x„; a tr••aI CYy C.O. Bend/Other Cry S ecial Revenue (e.., fuel tax) State Revolving Fund ate CIP 300 3,000 $3,300 Federal Private TOTAL: $300 $3,000 $3,300 County of Hawaii PROJECT DATAImANCLa IMPACT STATEMENT Fiscal Year 2006 to 2007 DEPARTMENT. Public Works DATE: April 12, 2006 R OJECTIPROGRAM NAME: Kapiolani Street Extension /anning LOCATION (attach map): Hilo TMH: 2-4-001:Por 024; 24-056:017 & Por 014 COUNCIL DISTRICT: 2 AMOUNT REQUESTED: $900,000 ROJECTIPROGRAM DESCRIPTION: esign/Survey Extension of Kaptolani Street from Mohouli Street to Lanikaula Street. (Approximately 2,200 feet of roadway, including a concrete bridge at Waiakea Stream) ROJECT/PROGRAM JUSTIFICATION: "mase of Equipment Public Safety: Kapiolani Street Extension will enhance traffic circulation between the University of Hawaii at Hilo and downtown Hilo. MPACT ONOPERATIONAL BUDGET. epair & Maintenance ormal road maintenance operational expenses. ENDITURE (X $1000): rmr Funding This Request FY 07-08 FY 08-09 FY 09-10 FY l0 -ll FY 11-12 To completion TOTAL: /anning and Acquisition esign/Survey 900 $900 Construction 6,100 $6,100 "mase of Equipment epair & Maintenance TOTAL: $900 $6,100 $7,000 O & M COSTS (x $1000): UND SOURCE (x $]000): Cty G.O. Bond/Other Cty Special Revenue (e.g., fuel tax) tate Revolving Fund tate CIP 1 900 1 6,100 $7,000 ederal rivate TOTAL: $900 $6,100 $7,000 OFFICE OF THE COUNTY CLERK County of Hawaii Hilo, Hawaii Introduced By: Virginia Isbell Date Introduced: May 17, 2006 First Reading: May 17, 2006 Published: May 30, 2006 REMARKS: Second Reading: June 5, 2006 To Mayor: June 7, 2006 Returned: June 16, 2006 Effective: July 1, 2006 Published: June 23, 2006 REMARKS: (Draft 3) (tl�1n ,11;N I A Ptn a r ROLL CALL'VftL A'A4 . NOES- ?1BS EX Arakaki Higa X Hoffmann X Holschuh X Ikeda X Isbell X Jacobson X Pilago X Safarik X 8 0 1 0 (Draft 4) ROLL CALL VOTE AYES NOES ABS EX Arakaki X Higa X Hoffmann X Holschuh X Ikeda X Isbell X Jacobson X Pilago X Safarik X 9 0 0 0 I DO HEREBY CERTIFY that the foregoing BILL was adopted by the County Council published as indicated above. y P APPROVED AS TO //� F D LEGALITY: COUNCIL CHAIRMAN CO NftAm UNTYCORPORATION COUNSEL COUNTY OF HAWAII ^— J13JY 9 2W COUNTY CLERK Approv Disapproved this 16 day 00�� 'j 20 0(- CO �F HAWAI I Bill No.: 236 (Draft 4) Reference: C-718.9 /FC -288 Ord No.: 06 Bo