Laserfiche WebLink
F. Accesses to and any improvements (rncludmg roadway, util>hes and/or mtersectton <br /> improvements) within Kuakini Highway and the future alignment of Kahului to <br /> Keauhou Pazkway, including the provision of adequate sight distances, shall meet <br /> with the approval of the Department of Public Works prior to the issuance of a <br /> Certificate of Occupancy. All sight distances shall meet the current guidelines of A <br /> Policy on Geometric Design of Highways and Streets (AASHTO). All approaches <br /> maybe subject to access management movement restrictions as required by the <br /> Department of Public Works. No vehicular security gate shall be installed within <br /> sixty (60) feet of any approach to Kuakini Highway or the future Kahului to <br /> Keauhou Parkway right-of--way. A vehicular turnaround shall be provided within the <br /> project property on the ingress side of any such gate. <br /> G. The proposed alignment and right-of--way for Kahului to Keauhou Pazkway, <br /> including the intersection with Kuakini Highway and Kuakini Highway <br /> Improvements Phase Il, as determined by the Department of Public Works, shall be <br /> reserved by subdivision of the proposed right-of--way to create a sepazate lot for <br /> future roadway improvements prior to the issuance of any certificate of occupancy <br /> and conveyed to the County upon request, at no cost to the County. <br /> H. If the project is built before the portion of the Kahului to Keauhou Parkway is built <br /> through the property, access shall consist of (1) a main project entrance located in the <br /> right-of--way of the future Parkway, with an intersection on Kuakini Highway, and <br /> (2) at Kuakini Highway north of the Waiaha Drainageway. For the main project <br /> entrance, the applicant shall provide full intersection improvements at Kuakini <br /> Highway consisting of, but not limited to, pavement widening, a dedicated left turn <br /> storage lane, drainage improvements, and any relocation of utilities meeting with the <br /> approval of the Department of Public Works, and shall dedicate the necessary right- <br /> of-way to the County for its Kuakini Highway widening project at no cost to the <br /> County, prior to the issuance of a certificate of occupancy for any residential <br /> structures. Improvements may be constructed in phases as the project is built out, <br /> with the approval of the Department of Public Works. The driveway from the <br /> intersection with Kuakini Highway to the main project entrance shall be constructed <br /> meeting with the approval of the Department of Public Works and shall, to the extent <br /> that it can be done without greatly increasing the cost to the applicant beyond the <br /> access needs of their project, be built so that it can be converted to be used as a <br /> portion of the Parkway when the Parkway is built. Upon construction of the <br /> Parkway, the applicant, its successors, and assigns, shall be responsible for the cost <br /> of constructing a replacement access from the project to the Pazkway, at a location <br /> meeting with the approval of the Department of Public Works. The applicant shall <br /> have the right to require the Deparment of Public Works to finalize the access point <br /> prior to the issuance of plan approval for the project. The necessary intersection <br /> improvements shall be determined by the Department of Public Works and shall be <br /> limited to right-in, right-out only, unless otherwise determined by the Department of <br /> Public Works. The Department of Public Works may approve a secondary access to <br /> the Parkway as long as it is limited to a right-in only. Access (2) on Kuakini <br /> Highway shall be limited to right-out movements only. <br /> -2- <br /> <br /> 4621-7489-2800.1 <br /> 5/1/06 <br /> <br />