My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0999.001 2004-2006
ClerkCouncil
>
Council Records
>
Communications
>
2004-2006
>
COM 0999.001 2004-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2008 11:16:41 PM
Creation date
5/9/2008 12:05:19 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2004-2006
Communication
0999
Point
001
Author
Bob Hunter
Communications - Referred To
PC
Comments
Presented: PC - 8/21/06
Document Relationships
AGE PC 08/21/2006 2004-2006
(Related)
Path:
\Council Records\Agendas\2004-2006\Planning Committee (PC)
BIL 318 Draft 01 2004-2006
(Related)
Path:
\Council Records\Bills\2004-2006
BIL 319 Draft 01 2004-2006
(Related)
Path:
\Council Records\Bills\2004-2006
COM 0999.000 2004-2006
(Related)
Path:
\Council Records\Communications\2004-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> county. Nor do they require that developers correct existing infrastructure deficiencies. <br /> <br /> All they do is to increase the likelihood that an acceptable level of service will be <br /> maintained in two of the county's critical infrastructure systems as we grow. The <br /> conceptual framework is to control coneurrency at the time of subdivision (and condo <br /> <br /> regime creation) but to get a commitment to do so at the (assumed earlier) time of zone <br /> change, too. Only water (in existing service areas) and transportation facilities are <br /> <br /> addressed, to keep it simple, but effective. <br /> <br /> <br /> The ordinances require that the cumulative impact of development (the proposed <br /> subdivision plus then-existing, approved subdivisions) be addressed. In essence, <br /> adequate infrastructure capacity has to be either in existence at the time of subdivision or <br /> <br /> a funded capital improvements program has to be in place to provide the capacity within <br /> a reasonable time (six years is proposed, but the term could be shorter or longer). If a <br /> <br /> developer wants to find some or all of the required facilities, he could sign a bonded <br /> agreement to do so. Or he could convince the county council to commitment to the <br /> needed facilities in the Six Year Capital Improvements Program (CIP), for example, by <br /> <br /> committing a portion of reasonably expected impact fee collections, reasonably expected <br /> general obligation bond proceeds, reasonably expected income generated by a tax <br /> <br /> increment district and/or reasonably expected Federal highway funding, to a specific road <br /> project. <br /> <br /> <br /> This converts the County Six Year CIP from its current status as an unconstrained "wish <br /> list" document to a "commitment to fund priority projects" document. An infrastructure <br /> <br /> capacity accounting system would be maintained by the county (not the developers) to <br /> account for commitments to supply transportation system capacity to particular new <br /> developments in a similar way that the department of water supply currently successfully <br /> <br /> accounts for commitments to supply water. The developers would pay for the traffic <br /> studies needed to document how much transportation system capacity would be needed, <br /> <br /> as they do now in the locale of the project. The county would still decide what <br /> improvements would need to be added to the system and when. <br /> <br /> <br /> <br /> <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.