My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0766.022 2004-2006
ClerkCouncil
>
Council Records
>
Communications
>
2004-2006
>
COM 0766.022 2004-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2008 8:41:11 AM
Creation date
5/9/2008 12:08:29 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2004-2006
Communication
0766
Point
022
Author
Richard A. Wheelock, SCD Kona 108 LLC
Communications - Referred To
COUNCIL
Comments
Council: Close file - 11/15/06 Council: Postponed - 10/31/06
Document Relationships
AGE COUNCIL 10/31/2006 2004-2006
(Related)
Path:
\Council Records\Agendas\2004-2006\Council
AGE COUNCIL 11/15/2006 2004-2006
(Related)
Path:
\Council Records\Agendas\2004-2006\Council
BIL 251 Draft 02 2004-2006
(Related)
Path:
\Council Records\Bills\2004-2006
COM 0766.000 2004-2006
(Related)
Path:
\Council Records\Communications\2004-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> 7) Dan Olsen concerned that KCE is not coffee estates, can't be afforded by farmers, <br /> coffee can not be grown at this low elevation, and two homes will be built on each <br /> lot. KCE is in the State LUC "Urban" designated area and is designed primarily <br /> for the local white collar workers who will grow coffee on their primary residence <br /> lots, not for farmers looking to make a living farming. Coffee does grow on this <br /> land now. The requested zoning RA-la only allows one home per lot, not two. <br /> 8) Curtis Tyler notes that the property is in the State LUC designated "Urban" zone, <br /> and that this project does not come close to offering what Palamanui offers. KCE <br /> is in the "Urban" zone, subject to the numerous conditions of the LUC D&O that <br /> were required to obtain the Urban designation. The Palamanui project is over six <br /> w. times the size of KCE, is in an outlying area without much of the infrastructure <br /> existing at KCE, and is agreeing to provide numerous benefits as conditions of its <br /> D&O with the State LUC, which KCE did years ago. The situations are not <br /> v. comparable. <br /> 9) Curtis Tyler feels there is no north-south connector road nor concurrency of <br /> w infrastructure. He feels that this project should not be allowed to go forward until <br /> there are co-operative agreements for infrastructure. KCE is planning to provide <br /> segments of two north-south connector roads within their project. KCE has <br /> " already or will be contributing to the Malulani Drive signal; extension and <br /> dedication to the County of Malulani Drive plus the two north-south connector <br /> roads; water and sewer facilities that will be given to the County; expansion of <br /> the HELCO system; and upgrading of the existing Malulani Gardens water <br /> system. In addition, the existing Henry Street and Malulani Drive roads were both <br /> built with this project in mind as part of the roadway and infrastructure system. <br /> Queen Kaahumanu Highway is being widened below KCE. Infrastructure in this <br /> area has been and continues to be upgraded and installed as the central urban <br /> area is built. This project has been assessed for a lot of infrastructure through the <br /> State LUCprocess and the County COZprocess, and these agreements' <br /> conditions are co-operative agreements in effect. <br /> <br /> y. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> d. <br /> <br /> <br /> <br /> <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.