Laserfiche WebLink
Communication 1004 <br /> Bi11321 <br /> Page 4 of 5 <br /> commitment is to the affordable housing market and that it is in fact their intent to build and finish this <br /> project. <br /> Council member Safarik inquired how many units would be affordable and Mr. Leukeneker stated that <br /> they have been residential builders their entire corporate life and build mid-range homes on Maui. He <br /> stated they completed a 92 home subdivision of which 52% were affordable as well as a 117-unit condo <br /> project (Kahana Ridge) in which 100% was affordable or between $300,000 - $400,000. Mc Leuteneker <br /> stated the range for this project would be based on construction cost etc. but using Maui standards, <br /> affordable would be in the low $200,000. <br /> Director Yuen noted the area has already been approved for development and therefore not required to be <br /> included within the CDP process as the CDP would consider this a preliminary growth area. With regard <br /> to the lack of two entrances to the project azea, Mr. Yuen stated there was no way to remedy the situation. <br /> Mr. Yuen said it was not feasible to have another exit on Hualalai Road since that would require building <br /> a bridge over a flood channel and crossing over four (4) other parcels in order to connect to an existing <br /> roadway. Mr. Yuen noted this project is a classic urban fill that will ultimately reduce transportation <br /> needs by providing residential units closer to employment. <br /> Committee Chair Pilago expressed the need for the council to affect concurrency and noted that obtaining <br /> the necessary infrastructure is difficult if extensions aze being sold and results in deals and speculation <br /> that utilize rezoning extensions as a commodity. Mr. Yuen stated that in this case, impacts will not exist <br /> if applicant doesn't build, however, imposing time conditions is an important "check" since there is no <br /> great method to differentiate between applicants who really intend to build a project and applicants just <br /> seeking rezone and later sell it to another developer. <br /> Council Member Arakaki stated that since applicant purchased the property knowing the extension would <br /> expire, he felt confident that the applicant would follow through and develop the property because of the <br /> risk involved. Mr. Arakaki also noted that if Hualalai Road is in need of widening, one method to achieve <br /> the improvements would be through a CIP that included a provision or condition that subsequent <br /> developers be required to contribute their share. Mr. Yuen stated the only way to require developers to <br /> repay these kinds of costs would be through an improvement district. Mr. Arakaki suggested that Ms. <br /> Isbell make a CIP request for improvement of Hualalai Road. <br /> Committee Vice Chair Hoffmann stated that the Level of Service (LOS) of Hualalai Road does impact <br /> upon the CDP process and therefore the CDP steering committee should consider this regardless of <br /> whether it's an approved zoning or not. Mr. Hoffmann stated he understood Mc Yuen's "infill" position, <br /> however, this area has no school and the CDP has to consider this impact also. <br /> <br /> Your Committee on Planning concurs with the Planning Commission and the Planning Director's <br /> favorable consideration of the request to amend Change of Zone Ordinance No. 95-118. <br /> PC Report No. 109 <br /> <br />