Laserfiche WebLink
on the expected delay. The results range from level of service A (best with average <br /> delays less than five seconds) to F (worst with average delays longer than 45 <br /> seconds). Traffic improvements should be considered for level of service F conditions. <br /> The results of the intersection analysis only include the "with project" scenario, <br /> since the intersection would not exist without the project: <br /> Hour of Dav <br /> Traffic movement 9:00 to 10:00 a.m. 11:00 a.m. to 12 noon <br /> Outbound from Access Road B C <br /> Left turn from Palani Road A A <br /> The level of service for traffic exiting the site would be at level of service B in the <br /> <br /> first hour before church services begin and level of service C in the second when <br /> services are ended. The level of service is lower in the second hour due to the higher <br /> volume of traffic leaving the site as well as the higher volume of traffic on Palani Road. <br /> <br /> The left turn movement from Palani Road into the project access road is forecast to be <br /> at level of service A in both hours, indicating average delays less than five (5) seconds. <br /> The above results indicate that the proposed intersection would not present a traffic <br /> problem. <br /> The methodology for calculating levels of service of a two lane rural highway <br /> considers design speed, lane widths, shoulder clearance width, amount of "no passing" <br /> zones, vehicle flow composition, directional split of traffic flow, and terrain as factors. <br /> Level of service A conditions imply average speeds of 58 mph, while levels of service E <br /> and F imply average speeds less than 45 mph. Traffic improvements should be <br /> considered for level of service E or F conditions. <br /> io. <br /> <br />