My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0574.005 1996-1998
ClerkCouncil
>
Council Records
>
Communications
>
1996-1998
>
COM 0574.005 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 10:34:32 AM
Creation date
5/10/2008 7:59:45 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
1996-1998
Communication
0574
Point
005
Author
Edward K. Harada, M&E Pacific, Inc.
Communications - Referred To
COUNCIL
Comments
Presented: Council - 2/4/98
Communications - File Code
ZNG/KN
Document Relationships
AGE COUNCIL 02/04/1998 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Council
BIL 166 Draft 03 1996-1998
(Related)
Path:
\Council Records\Bills\1996-1998
COM 0574.000 1996-1998
(Related)
Path:
\Council Records\Communications\1996-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on the expected delay. The results range from level of service A (best with average <br /> delays less than five seconds) to F (worst with average delays longer than 45 <br /> seconds). Traffic improvements should be considered for level of service F conditions. <br /> The results of the intersection analysis only include the "with project" scenario, <br /> since the intersection would not exist without the project: <br /> Hour of Dav <br /> Traffic movement 9:00 to 10:00 a.m. 11:00 a.m. to 12 noon <br /> Outbound from Access Road B C <br /> Left turn from Palani Road A A <br /> The level of service for traffic exiting the site would be at level of service B in the <br /> <br /> first hour before church services begin and level of service C in the second when <br /> services are ended. The level of service is lower in the second hour due to the higher <br /> volume of traffic leaving the site as well as the higher volume of traffic on Palani Road. <br /> <br /> The left turn movement from Palani Road into the project access road is forecast to be <br /> at level of service A in both hours, indicating average delays less than five (5) seconds. <br /> The above results indicate that the proposed intersection would not present a traffic <br /> problem. <br /> The methodology for calculating levels of service of a two lane rural highway <br /> considers design speed, lane widths, shoulder clearance width, amount of "no passing" <br /> zones, vehicle flow composition, directional split of traffic flow, and terrain as factors. <br /> Level of service A conditions imply average speeds of 58 mph, while levels of service E <br /> and F imply average speeds less than 45 mph. Traffic improvements should be <br /> considered for level of service E or F conditions. <br /> io. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.