My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0087.003 1996-1998
ClerkCouncil
>
Council Records
>
Communications
>
1996-1998
>
COM 0087.003 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2008 4:11:14 PM
Creation date
5/10/2008 8:00:33 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
1996-1998
Communication
0087
Point
003
Author
Dominic Yagong, Councilmember Chair, Public Works and Parks Committee
Communications - Referred To
PWPC
Comments
Presented: PWPC - 2/6/97
Communications - File Code
FND
Document Relationships
COM 0087.002 1996-1998
(Related)
Path:
\Council Records\Communications\1996-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 1 ~ <br /> Environmental Protection Agency-Grant Agreement <br /> PART IIIB - SPECIAL CONDITIONS <br /> 1. This grant offer is subject to withdrawal unless <br /> contracts for project construction are awarded within <br /> 90 days from the date of acceptance of this grant <br /> offer. <br /> 2. The grantee shall negotiate all engineering consulting <br /> subagreements so that the provisions contained therein <br /> are in conformance with the requirements set forth in <br /> 40 CFR Part 35, published in the Federal Register, <br /> September 27, 1978 and submit them to EPA within 90 <br /> days of the effective date of this Grant. No payments <br /> for the affected engineering work shall be made to the <br /> Grantee under this grant until EPA has approved all <br /> subagreements. <br /> 3. The Grantee shall submit the user charge system or ad- <br /> valorem tax rates and the industrial cost recovery <br /> system rates, incorporated :in a proposed municipal <br /> ordinance or other appropriate legislative enactment, <br /> to the EPA for approval, and thereafter, provide for <br /> its enactment before the treatment works constructed <br /> with the grant is placed into operation. <br /> 4. The grantee agrees to make payment to its contractor <br /> promptly after receipt of Federal sums due under this <br /> grant and to retain only such amounts as may be <br /> justified by specific circumstances and provisions of <br /> this grant or the construction contract. <br /> Retained amounts shall be limited, except where greater <br /> retention is necessary under specific circumstances <br /> specifically provided for in the construction contract, <br /> to the following schedule: <br /> (a) retention of up to 10% of payments claimed <br /> until construction,i_s 50% complete; <br /> (b) after construction is 50% complete, reduction <br /> of the total retainage to 5% of payments <br /> claimed, provided that the contractor is <br /> making satisfactory progress and there i.s no <br /> specific cause for greater withholding; <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.