My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0038.001 2006-2008
ClerkCouncil
>
Council Records
>
Communications
>
2006-2008
>
COM 0038.001 2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2008 12:52:47 PM
Creation date
5/8/2008 5:20:53 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2006-2008
Communication
0038
Point
001
Author
Bruce McClure, Public Works Director
Communications - Referred To
FC
Comments
Presented: FC - 1/18/07
Document Relationships
AGE FC 01/18/2007 2006-2008
(Related)
Path:
\Council Records\Agendas\2006-2008\Finance Committee (FC)
BIL 012 Draft 01 2006-2008
(Related)
Path:
\Council Records\Bills\2006-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . ,,T, <br /> J <br /> Hawaii County Council Committee on Finance, 3rd Session <br /> Bill 12 -Dept. of Public Works Report, 1/18/07 Page 1 of 2 <br /> A FLOOD BASIN FOR THE MOHOULI HOUSING PROJECT <br /> Bruce McClure P.E. Director, Public Works <br /> ¦ Background <br /> - The County received permission in the 1970's to route and pond water, <br /> temporarily, on certain parcels until Kukuau Street was realigned. <br /> - The County abandoned the Kukuau Street project with associated drainage <br /> improvements in the late 1980's without knowledge of the planned drainage <br /> improvements. <br /> - The planning to resolve these drainage concerns began in 2003. <br /> - The parcels in question don't have a drainage easement covering the flow <br /> and ponding of water. <br /> ¦ County Position: <br /> - The parcel owners should be compensated for their loss. <br /> - It's cheaper to buy the parcels rather than build the originally proposed <br /> drainage system. <br /> ¦ Why are we asking for these funds? <br /> - To provide property owner's fair compensation for the use of their property <br /> as a flood basin for the Mohouli Housing Project. <br /> ¦ Plan of Action (See attached map.) <br /> - Acquire fee title to TMK 3rd Div.: 2-4-025: 050, 052 & 093. <br /> - Acquire drainage easements from TMK 3rd Div.: 2-4-025: 48, 80 & 59. <br /> - Provide drainage capacity improvements on TMK 3rd Div.: 2-4-025: 050, <br /> 052 & 093 to eliminate need to acquire TMK 3rd Div.: 2-4-025: 049 & 053 <br /> - Today's construction estimate is $3,230,000 for a drainage system, detailed <br /> in the 1973 original construction plans. <br /> Comm. No. 3$' f <br /> Ref. To: ~tuswt~d <br /> Rif, Uate j,^"1 18 Rf17 _ <br /> C\DOCUMB-IVYANAG-1\LOCALS-I\Temp\Pin Com l-18-07 Mohouli Housing PmjecLdoc <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.