Laserfiche WebLink
(d) ITIA~1Traffic Impact Analysis Report Required. <br /> (1) A traffic impact analysis report (TIARI, prepared or updated within ltivebve] six <br /> <br /> months [eft before the submission of the application, shall be included with the application for <br /> <br /> anv change of zone that can eenerate 1981 50 or more peak hour tripsl. <br /> <br /> hy~s!~l. The determination of peak hour trips shall be based on the Institute of <br /> <br /> Transportation Engineers, "Tri~Generation Handbook", or anv other nationally reco ng_ ized <br /> source. When the number of trigs depends upon the exact future uses of the site, and those are <br /> <br /> unknown at the time of rezonine (for example, the types of commercial uses), the determination <br /> shall be based upon a ty~cal mix of uses found in that zoning~e in the community. The <br /> TIAR shall be certified as havin¢ been conducted in accordance with best practices by a <br /> professional engineer licensed in the State of Hawai i. <br /> (2) The TIAR shall assess impacts to 1^"''"" transportation <br /> facilities in the immediate vicinity and general area of the protect, and to the 1^°^°~ <br /> "°«a°l transportation facilities serving the project area. <br /> The TIAR shall include proiections for future growth in traffic, for a minimum of <br /> five, ten, and twenty years, and shall include other approved or proposed development finl <br /> that is expected to impact the proiect area, with reasonable assumptions about the build-out of <br /> such development. <br /> /4~ fT« 1:,.....F«°,...:..:«.. R„~ TT A D ° ~ A,° ...,1 t..°FF... 1°.,el ,,.fi°.:.,1 .,t,A <br /> L«>_° „ ,..,.°t,i° i,...°i °F..,.....:^° >,°..,.a °.~.,......,.a,.>_i° .....a:°..,1The TIAR shall <br /> present an assessment of the impacts of the proiect on LOS and an evaluation of alternative <br /> plans for miti¢atin¢ those impacts. The evaluation shall include bud¢etarv cost estimates <br /> for the capital and operatin¢ costs of promisins alternative plans. <br /> (e) Mitigation Required. <br /> (1) If the LOS for any ~ 1 transportation facility in the lstt~yl <br /> proiect area is (I) currently worse than the acceptable level of service, or (2) projected to <br /> become worse than the acceptable level of service during the five veaz period of the TIAR, any <br /> rezoning of the property, if approved, shall contain conditions that require mitigation of adverse <br /> traffic effects before occupancy of the project is permitted, or that occupancy be delayed until the <br /> level of service has reached the acceptable Level and is no ton er projected to be worse than the <br /> acceptable level. <br /> (2) Where the LOS deficiency is due to roadway or intersection deficiencies in the <br /> immediate vicinity of the proiect, the conditions of zoning shall require local mitigation. Where <br /> the deficiency is LOS list due to insufficient capacity in the ~^°a°7 <br /> transportation facilities serving the proiect area, the conditions of zoning shall require <br /> ~regienall area miti atg ion• <br /> 3 <br /> <br />