Laserfiche WebLink
Summary of Findings and Recommendations <br /> Although a slow down in growth has occurred, the study provides for continued increase in the <br /> number of residential customer units for sewer service. This report uses a conservative, yet realistic, <br /> approach to recognize the slower economy and help assure that adequate revenues will be generated. <br /> If more growth occurs than projected, higher revenues will result. If a more optimistic estimate were <br /> used but growth did not materialize, revenue shortfalls would be the result. <br /> The increase in customers resulting from general system growth is projected to add approximately <br /> 60 customers a year during the 1995 to 2000 fiscal year period. The projected residential growth rate <br /> vazies depending on the customer category. Below are the annual percentage growth rates used for the <br /> various customers: <br /> Annual <br /> Customer Cateeorv Growth Rate <br /> Residential 2.0 percent <br /> Other/Commercial 2.0 percent <br /> Hotels/Motels/Resorts 0.0 percent <br /> Private Septage Haulers 0.0 percent <br /> In addition to general system growth, three proposed capital improvement projects will add <br /> approximately 380 new customers to the system by extending sewers into currently unsewered areas. <br /> With all customer categories included, the total number of projected accounts ranges from 3,074 in 1995 <br /> to 3,786 by the year 2000. <br /> The County's projected Capital Improvement Program (CIP) for 1996 through 2000 totals <br /> $44,353,200. The projects include improvements at the five sewerage system service areas of <br /> Hanapepe-Eleele, Wailua-Kapaa, Waimea, Lihue, and Poipu-Koloa. Projects currently under <br /> construction are not included in the plan since they are already funded. <br /> Projects identified in the Hanapepe-Eleele service azea total $5,951,900 and include the Eleele <br /> collector sewer rehabilitation and construction of Hanapepe collector sewers. Approximately 120 new <br /> users will be connected. <br /> Wailua-Kapaa improvement projects total $12,802,700 and include the construction of the Kapaa <br /> town collector sewers. Approximately 180 new users will be connected in the Kapaa area. <br /> Projects budgeted for Waimea total $15,755,500 and include the STP expansion and rehabilitation <br /> of the Waimea collector sewer. <br /> The improvements in the Lihue service area total $7,804,300 and include rehabilitation of the <br /> Lihue collector sewer and the construction of the Kupolo collector sewer. The Kupolo collector sewer <br /> will add approximately 80 new users to the system. <br /> Site acquisition for a treatment plant and pump station and sewerage system design are among <br /> [he projects planned in the Poipu-Koloa service area. Projects total $2,038,800. <br /> Proposed additional financing for the capital improvement projects includes revenues from sewer <br /> <br /> assessment fees totaling $2,204,000 for the study period. The revenues are based on a phased-in <br /> <br /> approach to achieve the full level of the assessment fee by the year 2000 and includes the new users <br /> 4 <br /> <br />