Laserfiche WebLink
Capital Improvement Program <br /> Existing Facilities <br /> The County provides wastewater treatment facilities, pumping stations, and laterals [o serve <br /> wastewater customers. A total of four wastewater treatment plants currently provide service for the <br /> County. The following list summarizes the facilities, their locations and existing plant capacities. <br /> Wastewater Treatment Plant Existing WWTP Design <br /> Facility Capacity (MGD) <br /> Eleele WWTP 0.4 <br /> Lihue WWTP I.5 <br /> Waimea WWTP 0.3 <br /> Wailua WWTP I.5 <br /> Proposed Facilities <br /> Table 3 presents the proposed capital improvement program (CIP) for the sewer utility for fiscal <br /> yeaz 1996 through fiscal year 2000. The program identifies approximately $44 million of improvements <br /> not including the expansions currently under construction at the Eleele and Lihue wastewater treatment <br /> plants. All costs include inflation allowances estimated at four percent (4%) per year. <br /> We have grouped the improvement projects into the five sewerage system service areas of <br /> Hanapepe-Eleele, Wailua-Kapaa, Waimea, Lihue, and Poipu-Koloa. Following is a brief description <br /> of the improvements for each area with the corresponding project costs for the study perjod. <br /> Hanaoeoe-Eleele Seweraee Svstem -The improvements in this area include rehabilitation of the <br /> existing collector sewer lines within the older sections of Hanapepe and Eleele, and construction of the <br /> Hanapepe Heights and Hanapepe Town collector sewers to provide service to those areas not presently <br /> served. Approximately 120 new users will be connected. The projects total $5,951,900. <br /> Wailua-Kaoaa Seweraee Svstem -The improvements in this area include the construction of the <br /> Kapaa town collector sewers, effluent disposal improvements, and a new wastewater facilities plan <br /> update for Wailua-Kapaa. Approximately 180 new users will be connected in the Kapaa area. The <br /> projects total $12,802,700. <br /> Waimea Seweraee Svstem -The improvements in this area include the STP expansion plans and <br /> construction, effluent disposal project, sludge holding tank, and the rehabilitation of the Waimea <br /> collector sewer. The timing of the STP expansion, currently planned for 1998, is dependent upon <br /> development. The projects total $15,755,500. <br /> Lihue Seweraee Svstem -The improvements in this area include an effluent disposal facilities <br /> plan, construction for the Lihue Industrial Parks, rehabilitation of the Lihue collector sewer, and <br /> construction of the Kupolo collector sewer. Approximately 80 new users will be connected to the <br /> system. The projects total $7,804,300. <br /> Poipu-Koloa Seweraee Svstem -The improvements in this area include STP and SPS site <br /> <br /> acquisition, Poipu-Koloa sewerage system design, and facility planning. The projects total $2,038,800. <br /> 10 <br /> <br />