My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0689.004 1996-1998
ClerkCouncil
>
Council Records
>
Communications
>
1996-1998
>
COM 0689.004 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2008 2:14:42 AM
Creation date
5/10/2008 8:02:39 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
1996-1998
Communication
0689
Point
004
Author
Harry Funamura, Wastewater Mangement Chief, County of Kauai
Communications - Referred To
COUNCIL
Comments
Presented: Council - 2/4/98
Communications - File Code
HCC/SEW
Document Relationships
AGE COUNCIL 02/04/1998 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Council
COM 0689.000 1996-1998
(Related)
Path:
\Council Records\Communications\1996-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sewer Utility Capital Fund <br /> Fund Structure <br /> To facilitate sewer utility financial analysis two funds have been established. The first is a <br /> Capital Fund, used to finance the construction of utility capital improvements. The second is an <br /> Operating Fund. The Operating Fund is used to meet annual obligations of the utility including annual <br /> capita( costs such as debt service. The purpose of the two Funds is to clearly show capital monies (such <br /> as SRF loans, bond proceeds, etc.) are used solely for the planning, design and construction of facilities, <br /> not annual operations. Similarly, through the Operating Fund it can be shown that annual revenues are <br /> sufficient to meet annual operation, maintenance and replacement costs. <br /> To provide for the continuing capital needs of the County, adequate financing sources must be <br /> available to the utility. A proposed plan for financing the CIP shown in Table 3 is summarized in this <br /> section and shown in Table 4. Additional detail, showing the proposed funding source for each project, <br /> is shown in Table 5. <br /> Source of Funds <br /> Obligations of the sewer utility Capital Fund can be met from a combination of available funds <br /> on hand, transfers from the Operating Fund, sewer assessment fees, proposed bonds and loans, <br /> anticipated grant funds/contributions, and interest income. <br /> Funds on Hand <br /> The Eleele expansion constructed in fiscal year 1994 was funded from revenues remaining from <br /> the 1992 G.O. Bond issue. The Lihue expansion was funded with a State Revolving Loan. Funds for <br /> both these projects were assumed to be spent during fiscal years 1994 and 1995, leaving a zero <br /> beginning balance for fiscal yeaz 1996. <br /> Transfer from the Operating Fund <br /> No transfers are planned to occur from the Operating Fund based on this study. The Capital <br /> Fund is solely supported from capital related revenue sources. If the Operating Fund had excess <br /> revenues, they could be made available to finance capital improvements. There are no excess operating <br /> funds projected during the study period. <br /> Sewer Assessment Fees <br /> Revenues generated from the proposed new County-wide sewer assessment fees (discussed in <br /> more detail later) for wastewater treatment capacity are shown in this revenue category. These revenues <br /> are available to fund the capital projects listed in [he capital improvement program. Our analyses <br /> indicates that a charge of $3,900 for a new single family dwelling could be supported and we have <br /> <br /> assumed aphased-in approach to reach the full charge by fiscal year 2000. (discussed in more detail <br /> later). Non-residential new connections would pay proportionally greater amounts. We estimate annual <br /> <br /> revenues based on the phased-in amount and 60 new connections per year. Revenues generated from <br /> <br /> new customers resulting from the sewer extension projects in the CIP are included for a total of <br /> <br /> $2,204,000 during the shady period. <br /> 12 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.