Laserfiche WebLink
TABLE 5 <br /> PROPOSED SOURCE OF PROJECT FUNDING <br /> Year/ Revenue G.O. SRF <br /> Description of Project Bonds Bonds Loan <br /> 1996 <br /> Eleele Collector Sewer Rehab 0 1,081,600 0 <br /> Kapaa Town Collector Sewer Plans 0 273,400 270,400 <br /> Waimea STP Expansion Plans 0 378,550 378,550 <br /> Waimea Effluent Disposal (Construction.) 0 1,081,600 0 <br /> Lihue Facilities Plans -Effluent Disposal 0 540,800 0 <br /> Lihue Industrial Parks, Unit 1 0 757,100 0 <br /> Poipu-Koloa STP & SPS Site Acquisition 0 649,000 0 <br /> Poipu-Koloa PH 1 Design 0 757,100 0 <br /> Subtotal 1996 0 5,516,150 648,550 <br /> 1997 <br /> Wailua-Kapaa Effluent Disposal 0 562,450 562,450 <br /> Waimea Headworks 0 393,700 393,700 <br /> Waimea Collector Sewer Rehabilitation 0 2,249,700 0 <br /> Lihue Effluent Disposal 0 899,900 899,900 <br /> Subtotal 1997 0 4,105,750 1,856,050 <br /> 1998 <br /> Hanapepe Collector Sewer (Construction) 0 2,339,700 0 <br /> Kapaa Town Collector Sewers (Construction) 0 2,632,175 7,896,525 <br /> Waimea STP Expansion (Construction) 0 2,719,925 8,159,775 <br /> Kupolo Collector Sewer (Plans) 0 331,000 0 <br /> Subtotal 1998 0 8,042,800 16,056,300 <br /> 1999 <br /> Wailua-Kapaa Facilities Plan 0 608,300 0 <br /> <br /> Kupolo Collector Sewer (Construction) 0 1,825,000 0 <br /> Subtota11999 0 2,433,300 0 <br /> <br /> 2000 <br /> <br /> Hanapepe Town Collector Sewer (Construction) 2,530,600 0 0 <br /> <br /> Lihue Collector Sewer Rehab 2,530,600 0 0 <br /> <br /> Poipu-Koloa Facilities Planning 632,700 0 0 <br /> Subtota12000 5,693,900 0 0 <br /> 14 <br /> <br />