Laserfiche WebLink
<br /> November 6, 2007 <br /> Page 9 <br /> IHF)P~t€Tff~€HftY q 4 sal. 11 ..a ,.s <br /> f~nR - 4 .1 ' .1 4 4 .....1 <br /> 1. 11 1. 1 1 1. ...1.,......:1.,..1 41.., <br /> Bsrr ~ ait 1. Il 4 ..1.. 4.... :..1 {7.....1 I..........1 <br /> ZHBeS V flf?ft-~~ TI.• ..1. ~^i <br /> ss,...4 r,r.._„1, zl ~nnc.I <br /> ~ Elevation and Floodproofing. <br /> [(-I-j] ~ Within Zones AE and AH: <br /> ~ For residential new construction, <br /> improvements to repetitive loss structures, and <br /> substantial improvements[e], [The] the lowest <br /> floor shall be elevated to [er aloe] the base <br /> flood elevationplus a freeboard of at least one <br /> foot. <br /> ii For nonresidential new construction, <br /> improvements to repetitive loss structures and <br /> substantial improvements[:], the lowest floor <br /> shall be elevated or floodproofed to the base <br /> flood elevation plus fal the required <br /> freeboard f 1. If the lowest <br /> floor is below the base flood elevation, then <br /> the structure together with attendant utility and <br /> sanitary facilities shall be designed, [and] <br /> constructed, and certified by a [~iseresed] <br /> professional civil engineer or architect <br /> licensed in the State of Hawaii, such that: <br /> as The structure is watertight below <br /> the base flood elevation plus the <br /> required freeboard. <br /> [(-iii] ~ The walls are substantially <br /> impermeable to the passage of <br /> water. <br /> [(-iii-}] cc The structural components are <br /> capable of resisting hydrostatic and <br /> hydrodynamic loads and the effects <br /> of buoyancy. <br /> [fGj] iii Within Zone AH, new construction, <br /> improvements to repetitive loss structures, and <br /> substantial improvement shall be required to <br /> provide adequate drainage paths around <br /> <br />