Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> APPENDICES <br /> <br /> 1. Governmental Approvals <br /> 2. Performance Guarantees [To be Developed and Finalized Based on Final <br /> Technical Proposals] <br /> <br /> 3. Technical Specifications <br /> <br /> 4. Construction Requirements <br /> 5. Design/ Build Quality Management Plan [To be Developed and Finalized Based <br /> on Final Technical Proposals] <br /> <br /> 6. Pre-Acceptance Testing Requirements and Acceptance Test Procedures and <br /> Standards <br /> 7. Design/Build Work Review Procedures and Submittals <br /> <br /> 8. Facility Operation, Maintenance, Repair and Replacement (Operation and <br /> Maintenance Plan) <br /> [To be Developed and Finalized Based on Final Technical Proposals] <br /> <br /> 9. Project Schedules <br /> 10. Milestone Payment and Construction Progress <br /> [To be Developed and Finalized Based on Final Proposals] <br /> <br /> 11. Maximum Electricity Utilization Guarantee (from Price Proposal Form 18) <br /> [To be Developed and Finalized Based on Final Technical Proposals] <br /> 12. Construction Period and Operation Period Price Escalation Indices <br /> <br /> 13. Staffing Plan and Subcontractors [To be Developed and Finalized Based on <br /> Final Business Proposals] <br /> <br /> 14. Required Insurance <br /> 15. Prevailing Wages <br /> <br /> 16. Asset Evaluation Protocol <br /> <br /> 17. Exit Test Procedures and Standards <br /> 18. Description of Site <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> (Xiii) <br /> 487571.8 028493 AGMT <br />