Laserfiche WebLink
<br /> <br /> <br /> March 24, 2008 <br /> Page 3 <br /> <br /> measures applicable to Haleki`i Street shall be in <br /> accordance with appropriate engineering standards, <br /> <br /> specifications and recommendations, as follows: <br /> <br /> [a:] in [install] Install three (3) speed humps above <br /> Mamao Street and three (3) speed humps below <br /> Muli Street; <br /> <br /> [l}] (2) [eonstruet] Construct raised or textured <br /> intersections with traffic circle at the Mamao <br /> Street/Haleki`i Street intersection and at the Muli <br /> Street/Haleki`i Street intersections; <br /> <br /> [e:] (3) [install] Install 3-dimensional speed humps on <br /> Haleki`i Street between Mamao Street and Muli <br /> Street; <br /> <br /> [d:] [install] Install speed limit Smart Signs in <br /> commercial and residential sections of Haleki`i <br /> Street; <br /> <br /> [e:] (5) [install] Install pedestrian signal and mid-block <br /> crosswalk above Mamao Street near Third Circuit <br /> Court building; <br /> <br /> 6) [instal I Install pedestrian signal and mid-block <br /> crosswalk on Haleki`i Street near Muli Street and <br /> the Clarence Lum Won Park; <br /> [g.] Ej [roughen] Roughen the asphalt on Manawa Street, <br /> Haleki`i Street, and Nape Street; <br /> <br /> [h:] M [lengthen] Lengthen right and left turn Storage <br /> Lanes at the Haleki`i Street and Mamalahoa <br /> Highway signalized intersection; <br /> <br /> (9) [restrietI Restrict vehicles with three or more tons <br /> gross vehicle weight in residential sections of <br /> Haleki`i Street, Nape Street, and Manawa Street; <br /> and <br /> <br /> [j.] (10)[adfust] Adjust signal timing and upgrade system <br /> at Haleki`i Street - [Mamalahoa] Milmalahoa <br /> Highway intersection[; <br />