Laserfiche WebLink
<br /> <br /> <br /> <br /> DGI INTERNATIONAL, INC. <br /> <br /> <br /> Highlights of the Floating Resource Recovery System (FRRP) <br /> <br /> 1. The System uses one of the most widely installed technology in over 352 plants worldwide <br /> including Europe, United States and Japan, where 50°/B of the plants are located under a license <br /> agreement with Hitachi. Meeting the environmental standards of the European Union, United <br /> States and Japan. <br /> <br /> 2. Under the leadership of Litton Ship Systems, together with Kvaerner Masa Marine of <br /> Vancouver, British Columbia, Canada and VonRoll Inova of Zurich, Switzerland, the FRRPs <br /> were designed as a state-of-the-art waste to energy plants for a 40+ years of reliable, efficient, <br /> and environmentally sound operation. The plants will be built to the latest safety requirements <br /> including the hull, which will be of steel and will have a double bottom. These plants will be <br /> able to withstand major hurricane forces. <br /> <br /> 3. Ingalls Shipbuilding, VonRoll Inova and Foster Wheeler among others are available to provide <br /> up to full life cycle maintenance of the FRRP or support the designed maintenance company. <br /> The plants will be built to the standards of American Bureau of Shipbuilding (ABS), the hull <br /> and related primary systems will be classed in accordance with the 1991 ABS Steel Barge <br /> Rules. <br /> 4. These plants are designed to operate at over 1100° C, allowing for the safe processing of tires <br /> and medical waste in addition to the regular municipal and industrial waste. <br /> <br /> 5. Each plant will be capable of processing 960 tons of waste per day (seven days per week), <br /> produce 25 Megawatts of electricity for We and about 1 million gallons of potable water per <br /> day. <br /> <br /> <br /> 6. The Plants will be located on suitable ports where access roads are available and the <br /> interference with local neighborhoods will me minimized, the plants dimensions are: Length <br /> 134.0 in., Breadth 46.8 in., Depth 10.8 m, Draft (full load) 4.2 in. <br /> <br /> Municipal Solid Waste Incineration Plant Bergen, Norway <br /> <br /> <br /> r 1i <br /> <br /> F- <br /> { <br /> <br /> <br /> <br /> <br /> <br /> <br /> I irvee lAeoaebp Arne a Hem Feeav 15 Yetlc RaclOeela 22 Fniaebn AlerWmN1B <br /> 2 µyaW gfpre ft 9 Ydnma Oren 16 GuWw Wach 2 Ptak( <br /> 3 OvplteeA 6arie Ab palrWlAOn 18 MM SLTItIba 24 4 AKi ..Wrrloine gy 9yO® fan 10 Rh~ 4 Dane Opvabr FWpa 11 11 Aual A..Nh by 9nnma 18 9wn~bgie heat 6chanBer 25 Ash Malam <br /> 5 FeaC tletmv 12 tYel Hemirer% Beier 19 Ba911mM 26 Finwgwlr.Y Waffie Tinh <br /> 18 W'~ Aye Beaar tAUm 2 Flaucve Oran Pon a A a tASmrYig Hmtiea <br /> ~nwy Air Fen M FmAraler ianWOeeratm 21 1 Silencer 28 DrmL ' IIW?20111N A <br />