My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0759.011 1996-1998
ClerkCouncil
>
Council Records
>
Communications
>
1996-1998
>
COM 0759.011 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2008 9:16:45 AM
Creation date
5/10/2008 8:05:08 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
1996-1998
Communication
0759
Point
011
Author
Submitted by Benjamin A. Kudo, Dwyer Imanaka Schraff Kudo Meyer & Fujimoto
Communications - Referred To
COUNCIL
Comments
Presented: Council - 4/1/98
Communications - File Code
HCC/DEV
Document Relationships
AGE COUNCIL 04/01/1998 1996-1998
(Related)
Path:
\Council Records\Agendas\1996-1998\Council
COM 0759.000 1996-1998
(Related)
Path:
\Council Records\Communications\1996-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> C. Prior to occupancy of any dwelling unit within the Property or prior to the issuance <br /> of an occupancy permit for the lodge, whichever occurs first, OCEANSIDE shall: <br /> <br /> (1) Complete construction of the roadway section from Keauhou to the makai <br /> extension of Haleki'i Street; and <br /> <br /> (2) Install a barricade or breakaway gate meeting with the requirements of the <br /> COUNTY Department of Public Works if, before the completion and opening of the entire Bypass Highway, <br /> a portion of said bypass is completed and opened, and said portion provides a connection to Haleki'i Street; <br /> <br /> d. In any event from the time construction commences, the entire Bypass Highway <br /> shall be completed within five (5) years provided that those certain circumstances as articulated in Paragraph <br /> <br /> (39) do not exist. <br /> 14. DEDICATION OF BYPASS HIGHWAY. The Bypass Highway shall be dedicated to the <br /> COUNTY in phases, if any, upon completion and the COUNTY shall accept said dedication within sixty (60) <br /> <br /> calendar days; provided that the Bypass Highway, as constructed, complies with plans and specifications for <br /> said highway as approved by the County. Following dedication of the Bypass Highway to the COUNTY, <br /> <br /> the COUNTY shall assume all responsibility and costs for operation, maintenance, repair or reconstruction <br /> of the Bypass Highway. <br /> <br /> 15. REIMBURSEMENT OF CONSTRUCTION COSTS FOR THE BYPASS HIGHWAY. <br /> a. Responsibility of Developer. OCEANSIDE shall be responsible for all costs <br /> associated with the design, land acquisition, construction of the Bypass Highway, including, without <br /> <br /> limitation, the costs associated with obtaining any necessary Approvals associated with the same ("Total <br /> Cost"); provided that, nothing herein shall be construed as preventing OCEANSIDE from seeking <br /> <br /> reimbursement for such costs and the total amount of reimbursement received by OCEANSIDE shall not <br /> exceed the difference between the Total Cost of the Bypass Highway and the "Project Impact Cost", as <br /> described in further detail in Paragraph (15.a.1). <br /> <br /> (1) Based on a development constituting seven hundred thirty (730) lots and <br /> eighty (80) lodge units ("Project Unit Count"), the Project constitutes approximately thirty-eight (38) percent <br /> <br /> of the total capacity of the Bypass Highway based upon a Level of Service "D" ("Project Impact"). Should <br /> OCEANSIDE develop less or more than the Project Unit Count, then the percentage of traffic attributable <br /> to the Project shall be adjusted accordingly. The Total Cost of the Bypass Highway multiplied by the Project <br /> <br /> Impact shall determine the Project Impact Cost. For example, if the Total Cost of the Bypass Highway is <br /> $1.0 million and the Project Impact is thirty-eight (38%) percent, the Project Impact Cost is $380,000.00. <br /> <br /> In such a case, OCEANSIDE shall then be eligible to receive no more than $620,000 of reimbursement ($1.0 <br /> million minus $380,000). <br /> <br /> <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.